Loading...
Res. No. 152-01-11300RESOLUTION NO.152-01-11300 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF SOUTH MIAMI,FLORIDA,AUTHORIZING THE CITY MANAGER TO EXECUTE A PROFESSIONAL SERVICE WORK ORDER WITH CORZO CASTELLA CARBALLO THOMPSON SALMAN,PA.FOR PROFESSIONAL ENGINEERING SERVICESFOR ENGINEERING ROUTESURVEY,GEOTECHNICAL,DESIGN& PERMITTING,BID PHASE AND BID PHASE FOR THE WATER MAIN EXTENSION PHASE IB,INAN AMOUNT NOT TO EXCEED EIGHTY-ONE THOUSAND SEVEN HUNDRED DOLLARS,($81,700.00)TO BE CHARGED TO ACCOUNT NO.001-0000-132-2055;PROVIDING FOR AN EFFECTIVE DATE. WHEREAS,theCityCommission of theCityofSouthMiami,Florida,wishestocontinuethe portabledrinkingwatermainextensionand fire flowprotectionproject;and WHEREAS,theCityCommissionoftheCity of SouthMiami,Florida,wishestousethe professionalservices of CorzoCastellaCarballoThompsonSalman,P.A.,toprovideroutesurvey, geotechnicalservices,design&permittingandbidphaseservicesfor Water MainExtension-Phase IB; and WHEREAS,thestreetswithinthe boundaries ofPhase 1A are defined as;SW 75th Terrace from SW 65th Court toSW 67th Avenue,SW 77th Terrace from SW 66th Avenue toSW 67th Avenue,SW 78th Terrace from Manor Lane toSW 67th Avenue,SW 65th Court from SW 74th TerracetoSW 75th Terrace, SW 68th Court from SW 72nd Street toSW 75th Street;and WHEREAS,the Water MainExtension-Phase IB isfunded through the 2001 State Legislative appropriation funds. NOW,THEREFORE,BEITDULYRESOLVEDBYTHECITY COMMISSION OFTHECITYOF SOUTH MIAMI,FLORIDA,that: Section1:TheCityManagerisauthorizedtoenterintoacontractualagreement witii CorzoCastella CarballoThompsonSalman,P.A.forthe professional servicesinconnectionwithroutesurvey, geotechnical services,design &permitting andbidphasefortheWaterMain Extension -Phase IB project,inanamountnottoexceed $81,700.00. Section 2:Thattheattached proposal,Professional Service WorkOrder,bemadeapartofthe resolution. Section 3:The total amount $81,700 willbe drawn fromthe account number 001-0000-132-2055. Section4:This resolutionshalltakeeffectimmediatelyupon approval. PASSED AND ADOPTED this 16th day of October ATTEST^ READ AND APPROVED AS TO FORM: fJL/(s>.(cxufviA^- CITY ATTORNEY MAYOR COMMISSION VOTE: Mayor Robaina: Vice Mayor Feliu: Commissioner Russell: Commissioner Bethel: Commissioner Wiscombe: _,2001. 4-0 Yea Yea out of rooir Yea Yea CITY OF SOUTH MIAMI INTER-OFFICE MEMORANDUM To:Mayor and City Commission Date:October 9,2001 Agenda Item #<Q Comm Mtg.10-16-01 Re:Authorization to execute Professional Service Work Order for Water Main Extension -Phase IB From:Charles D.Scurr City Manager REQUEST: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF SOUTH MIAMI,FLORIDA,AUTHORIZING THE CITY MANAGER TO EXECUTE A PROFESSIONAL SERVICE WORK ORDER WITH CORZO CASTELLA CARBALLO THOMPSON SALMAN,P.A.FOR PROFESSIONAL ENGINEERING SERVICES FOR ENGINEERINGROUTESURVEY,GEOTECHNICAL,DESIGN&PERMITTING,BID PHASEANDBID PHASE FORTHE WATER MAIN EXTENSION PHASE IB,INAN AMOUNTNOTTOEXCEEDEIGHTY-ONETHOUSANDSEVENHUNDREDDOLLARS, ($81,700.00)TOBE CHARGED TO ACCOUNT NO.001-0000-132-2055. BACKGROUND: Thisprojectwillfulfillthe City's intenttoprovideportabledrinkingwaterandfireprotectionto the residents inthearea specified.The boundaries of Phase 1A are defined as;SW 75th Terrace from SW 65th Court to SW 67th Avenue,SW 77th Terrace from SW 66th Avenue to SW 67th Avenue,SW 78th Terrace from Manor Lane to SW 67th Avenue,SW 65th Court from SW 74th Terrace to SW 75th Terrace,SW 68th Court from SW 72nd Street to SW 75th Street.The residents withintheseareascurrentlyusewellwaterasdrinkingwater.Firehydrantsarenotavailablefor fire protection.Thisprojectwill provide the much-needed drinking waterand fire protection along each street.Thisprojectwillbe funded fromthe 2001 State Legislative Appropriations. CorzoCastellaCarballoThompson Salman,P.A.isoneoftheCity'sapproved Professional General Engineering Consultants. RECOMMENDATION: Itis recommended thattheCity Commission approve the funding fortheworktobe performed. Page2 of 2 Agenda Item... Oct.8,01 ATTACHMENTS: a Proposed Resolution a Professional Engineering Services WorkOrder •Map of the proposed Phase IB area a Estimated Material Quantities Engineers Architects Planners E30005022 AAC002U2 PROFESSIONAL SERVICES WORK ORDER Date: To: Attention: Project Name: July 13,2001 City of South Miami Engineering &Construction Department 6130 Sunset Drive South Miami.FL 33143 W.AjibolaBalogun,Director Water Main Extension -Phase IB C3TS File 1929-00 Funding Source:FDEP Water Advisor}Panel Description of Project: This project consists of improvements to the Water Distribution System for areas of the City of South Miami that presently are lacking adequate water service and fire protection.A contractor selected under the City's competitive bidding process will install the water mains for the City of South Miami.After completion,the system will be conveyed to the Mir.nrJ-Dade Watcrt.,^S?-.vei Department (WASD).Operation and Maintenance of the extended Water Distribution System will be by WASD. Phase IB of this project consist of the installation of approximately 3,390 lineal feet (0.6 mile)of eight inch (8?*)diameter,ductile iron water mains and new service lines from the water main to the existing meters.Also,this project will install fire hydrants to provide fire protection as required to meet Miami-Dade County standards.The estimated cost of the project is approximately $400,000 to be funded in part by State appropriations (Year 2001 FDEP Water Advisory Panel recommendation). The following street segments are included in Phase 2of the Project: 1. 2. j. 4. 5. 6. SW 75l'Terrace,from SW 65th Court to SW67th Avenue (630 LF) SW If Terrace,from SW 66th to SW 67th Avenue (340 LF) SW 78th Terrace,from Manor Lane to SW 67th Avenue (800 LF) SW 79th Street,from Manor Lane to SW 67th Avenue (440 LF) SW 65th Court,from SW 74th Terrace to SW 75th Terrace (260 LF) SW 68r Court,from SW 72nd Avenue to SW 75th Street (920 LF) This Work Order provides for the required professional services during the Design, Permitting and Bid Phase of the project,including Route Surveying,Geotechnical Services,providing a Design Report,preparation of Construction Documents and Specifications (Project Manual),and provides for limited assistance during the Bid Phase leading to the recommendation of the award of contract to the successful Bidder. as outlined intheScopeof Services. 901 PoncedeLeon Blvd..Suite 900Cora!Gables,Florida 33134 Web Site:www.c3ts.com 305.445.2900 1.800.448.0227 Facsimile 305.445.3366 Eaual OoDctuniiy Employsf Professional Services Work Order July 13,2001 Page 2 Scope of Services and Schedule of Fees: 1.0 ENGINEERING ROUTE SURVEY: 1.01 Location Survey /Onsite data collection 1.02 Topographical Survey (Cross Section at50feetinterval maximum) 1.03 Establishhorizontalandverticalcontrol(BenchMarks) 1.04 Coordination of Survey Work Thefeefor Engineering RouteSurveyPhase of theprojectwillbe a Lump Sum amount of Thirteen Thousand Three Hundred Dollars ($13,000.00). 2.0 GEOTECHNICAL SERVICES: 2.01 Perform requiredAuger Boring toadepthof10feetminimum(8 locations) 2.02 On-site utilities location and coordination 2.03 Coordination of Geotechnical Work ThefeeforGeotechnicalServicePhase of theprojectwillbea Lump Sum amount of One Thousand Five Hundred Dollars (SI ,500.00). j.O DESIGN AND PERMITTING PHASE: 3.01Attend "kick-off meetingandcoordinatewithCity of SouthMiami, Engineering&Construction Department. 3.02 Perform andsubmita distribution systemstudyanddesign (Limited to projectarea),includingengineeringcalculations. 3.03PreparedesignplansfortheWaterDistributionSystemtoinclude roadway resurfacing. 3.04ProvidetechnicalcriteriaandassisttheCity of SouthMiamiwiththe preparation of applications toobtainpermitsfrom applicable regulatory agencieswithjurisdictionovertheproject. 3.05 Provide updatedEngineer's Opinion ofProbableTotalProjectCost. 3.06 Prepare Construction Contract Agreement &Design Specification Document (Project Manual). 3.07 Furnish 95%complete plans and Project Manual,present and review the projectwiththeCity's Engineering &ConstructionDirector. 3.08 Furnish 12 copies of final plans and Project Manual tothe Engineering & Construction Department. The fee forthe Design and Permitting Phase ofthe project will bea Lump Sum amount of Sixty Three Thousand Two Hundred Dollars (§63,200.00).This amount includes normal reimbursable expenses suchas printing and furnishing twelve (12)copies of theProject Manual. \\C3TS1\Enviromental\1929_South MiamiNWater Main Expansion-Phase 1\WO Phase 1B Revised.doc Professional Services Work Order July 13,2001 Page 3 4.0 BID PHASE: 4.01 Provide bid advertisement documents,respond to bidders'questions and attend pre-bid conference. 4.02 Prepare addenda to Bid Documents,if required by the Engineer to clarify the requirements of theBid Documents. 4.03 Tabulate and evaluate bids received,check references of the responsible lowestbidderandmakerecommendationforaward. The fee for the Bid Phase of the project will be a LumpSumamountof Four Thousand Dollars ($4,000.00)." The maximum fee authorized for all of the services listed by this Work Order is Eighty One Thousand Seven Hundred Dollars ($81,700.00),including Value Added Services and normal reimbursable expenses.Permit fees arenot included. If acceptable to you,we will accept a signed copy of this Work Order as your written authorization to proceed with this assignment.Thank you for the opportunity to be of service totheCity of SouthMiami. Sincerely, Corzo iJaatelh.Carballo Thompson Salman,P.A. Jorge E.Corzo,P.E. President CITY OF SOUTH MIAMI Approved by: Signature rjate Title \\C3TS1\Enviromental\1929_South MiamiWVater Main Expansion-Phase 1\WO Phase 1B Revised.doc Qtyof South Miami WATER MAIN EXTENSION -PHASE I MASTER PLAN p>ra cs ra .*• City of South Miami -WATER MAIN EXTFNRinM phasf IR ESTIMATED MA ERIALS QUANTI Y Streets H K Sub-Total: 5%margin of err Grand Total: Legend: H Length 830 250 600 650 400 2,730 137 2,867 No.of homes to service 15 34 8"GV Fire Hydrants SW 78 Terrace between SW 65 Place and SW 67 Avenue SW 75 Terrace between SW 65 Court and SW 67 Avenue [SW 65 Court between SW 74 Terrace and SW 75 Terrace SW 68 Court between SW 72 Street and SW 75 street K SW 79 Street between SW 66 Avenue and SW 67 Avenue