Loading...
Res. No. 124-01-11272RESOLUTION No.:1 24-01 -11 272 ARESOLUTIONOFTHE MAYOR AND CITY COMMISSIONOFTHE CITY OFSOUTHMIAMI,FLORIDA,AUTHORIZINGTHE CITY MANAGERTO ISSUEASERVICE WORK ORDERTOCORZO CASTELLA CARBALLO THOMPSON SALMAN,P.A.(C3TS)FORPROFESSIONALENGINEERING SERVICES FOR CONSTRUCTION ENGINEERING INSPECTION PHASE SERVICES FOR THE WATER MAIN EXTENSION PHASE 1A,INAN AMOUNT NOT TO EXCEED THIRTY-THREE THOUSAND DOLLARS, ($33,000.00)TO BE CHARGED TO ACCOUNT NO.001-0000-132-2055. WHEREAS,the City Commission of the City of South Miami,Florida,wishes to begin the portable drinking water main extension and fire flow protection project;and WHEREAS,C3TS has completed the design and bid phases forthe Phase 1A and C3TS isone of ourGeneralEngineering Consultants;and WHEREAS,theCity Commission oftheCityof South Miami,Florida,wishes tousethe professional services of C3TS,to provide construction engineering inspection phase servicesforWaterMainExtension-Phase1A;and WHEREAS,the streets within the boundaries of Phase 1A are defined as;SW 74th Street between SW 67th Avenue and SW 68th Avenue,SW 77th Terrace between SW 67th Avenue &SW 69th Avenue,SW 78th Terrace between SW 68th Avenue &SW 69th Avenue,SW 68th Avenue between SW 78th Terrace &SW 80th Street,SW 69th Avenue between SW 76th Terrace &SW 80th Street,SW 67th Court from Cul-de-sac to SW 80th Street;and WHEREAS,the Water Main Extension -Phase 1A is funded through the State Legislative appropriation funds. NOW,THEREFORE,BEIT DULY RESOLVED BY THE CITY COMMISSION OF THECITYOFSOUTHMIAMI,FLORIDA,that: Section 1:The City Manager is authorized to enter into a contractual agreement with Corzo Castella Carballo Thompson Salman,P.A.for the professional services in Page 2 of Res.NO.124-01-11272 connection with construction engineering inspection phase services for the Water Main Extension -Phase 1A project,in an amount not to exceed $33,000.00. S^ction 2:That the attached proposal,Professional Service Work Order,be made a part of the resolution. Sftion 3:The total amount $33,000 will be drawn from the account number 001-0000- 132-2055. PASSED AND ADOPTED this 4th ATTEST: ALA^tZS^> CITY CLERK READ AND APPROVED ASTO FORM: ^y /^.^j/&£ CITY'Ai K ctNEY ' day of September 2m APPROVED: MAYOR Commission Vote*S-0 Mayor Robaina:Yea Vice Mayor Feliu:Yea Commissioner Russell:Yea Commissioner Bethel:Yea Commissioner Wiscombe:Yea CITY OF SOUTH MIAMI INTER-OFFICE MEMORANDUM To:MayorandCityCommission Date:August 27,2001 Agenda Item # From:Charles D.Scurr A 1 ^^?Comm Mtg.09-04-01 City Manager /)ff ff J t/n^Re.Authorization to execute Professional Service Work Order for Water Main Extension -Phase 1A REQUEST: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF SOUTH MIAMI,FLORIDA,AUTHORIZING THE CITY MANAGER TO ISSUE A SERVICE WORK ORDER TO CORZO CASTELLA CARBALLO THOMPSON SALMAN,P.A.(C3TS)FOR PROFESSIONAL ENGINEERING SERVICES FOR CONSTRUCTION ENGINEERING INSPECTION PHASE SERVICES FOR THE WATER MAIN EXTENSION PHASE 1A,IN AN AMOUNT NOTTO EXCEED THIRTY-THREE THOUSAND DOLLARS,($33,000.00) TO BE CHARGED TO ACCOUNT NO.001-0000-132-2055. BACKGROUND: This project willfulfillthe City's intenttoprovide portable drinking water andfire protection to theresidentsinthe area specified.Currently,the residents intheareausewell water as drinking water and they donothavefire hydrant for fire protection.The boundaries of Phase 1A are defined as;SW 74th Street between SW 67th Avenue and SW 68th Avenue,SW 77th Terrace between SW 67th Avenue &SW 69th Avenue,SW 78th Terrace between SW 68th Avenue &SW 69th Avenue,SW 68th Avenue between SW 78th Terrace &SW 80th Street,SW 69th Avenue between SW 76th Terrace &SW 80th Street,SW 67th Court from Cul-de-sac toSW 80th Street. C3TShas completed the design phase andbid phase for Phase 1A and C3TS is currently one of ourGeneralEngineeringConsultants.Thisprojectispart of the State's approved$1million grantfor potable drinking water project. RECOMMENDATION: Itis recommended thattheCity Commission approvethefundingforthe work tobe performed. Page2 of 2 Agenda Item... Aug.27,01 ATTACHMENTS: a Proposed Resolution a Professional Engineering ServicesWorkOrder a Map of the proposed Phase 1A area CORZO CASTELLA CARBALLO THOMPSON SALMAN Engineers Architects Planners EB0005022 AAC002142 Date: To: PROFESSIONAL SERVICES WORK ORDER August 27,2001 City of South Miami Engineering &Construction Department 6130 Sunset Drive South Miami,FL 33143 Attention: Project Name: Funding Source: Description of Project: W.Ajibola Balogun,Director Water Main Extension -Phase IA ConstructionPhaseandPostConstructionAdministrationServices C3TS File 1929-08 FDEP Water Advisory Panel This project consists of improvements to the Water Distribution System for areas of the City of South Miami that presently are lacking adequate water service and fire protection.A contractor selected under the City's competitive bidding process will install the water mains for the City of South Miami.After completion,the system will be conveyed to the Miami-Dade Water and Sewer Department (WASD).Operation and Maintenance of the extended Water Distribution System will bebyWASD. c;tr.:s J. 4. 5. 6. m >jcct consist of the installation of approximately ^,270 lineal teoTTuTh mile)of eight inc.i (8")diameter,ductile iron water mains and new service lines from the water main to the existing meters.Also,this project will install fire hydrants to provide fire protection as required to meet Miami-Dade County standards.The estimated total cost of the project is approximately $500,000 to be funded in part by State appropriations (Year 2001 FDEP Water Advisory Panel recommendation). The following street segments are included in Phase 1of the Project: 1.SW 74'"Street,from SW 67th Avenue to SW 68*Avenue (600 LF) 2.SW 77"'Terrace,from SW 67th Avenue to SW 69th Avenue (1,200 LF) SW 67'"Court,from Cul-de-sac to SW 80lh Street (300 LF) SW 78'"Terrace,from SW 68*Avenue to SW 69th Avenue (600 LF) SW 68'"Avenue,from SW 78'"Terrace to SW 80th Avenue (500 LF) SW 69,h Avenue,from SW 76 Terrace to SW 80*Avenue (1070 LF) ,r This Work Order provides for the required professional services during the Construction Phase of the Project,in connection with the.General Administration of the Construction Contract,and for Post Construction Administration Services as outlined in the Scope of Services. Scope of Services and Schedule of Fees: 1.0 CONSTRUCTION PHASE SERVICES: 1.01 Conducta pre-award meeting with Contractor. 901Ponce de Leon Blvd..Suite 900CoralGables.Florida 33134 Web Site:www.c3ts.com 305.445.2900 1.800.448.0227 Facsimile 305.445.3366 Equal Opportunity Employer Professional Services Work Order August 27,2001 Page 2 1.02 Assist in obtaining and reviewing all documents needed in executing the contract betweentheCityandthe Contractor. 1.03 Attendpre-constructionconference. 1.04 Perform Construction Engineering Inspections (minimum of twice per week,up to 16 hours per week)and submit reports. 1.05 Review and approve /disapprove all shop drawings. 1.06 Review the Contractors'Application for Payment and submit recommendation to theEngineering&ConstructionDirector. 1.07 Perform project closeout with Contractor including final inspection,punch list, final Application for Payment review,and submit Certificate of Completion. The fee for the Construction Phase of the project will be a Fixed Fee amount of Thirty Thousand Dollars ($30.000.00)based on a three (3)month uninterrupted construction schedule.Extended services during the Construction Phase of the Project will be billed at arate of $12.000.00permonth. 2.0 POST CONSTRUCTION ADMINISTRATION SERVICES: 2.01 Review "As-Built"plans furnished by the Contractor for conformance with MD- WASD Standards. 2.02 Perform inspection of Work one month prior to the one-year guaranteeAvarranty expiration date,and report any defective work for correction.Assist the City with administration of guaranteeAvarranty for correction of defective work. The fee for the I"•j>.l Construction Administration Services Phase of the project will be a FixedFee amount of Three Thousand Dollars($3,000.00). The maximum fee authorized for all of the services listed by this Work Order is Thirty Three Thousand Dollars ($33.000.00). If acceptable to you,we will accept a signed copy of this Work Order as your written authorization to proceed with this assignment.Thank you for the opportunity to be ofservice to the City of South Miami. Sincerely, Cp^ztTTastella Carballo Thompson Salman,P.A. /P.E. President CITY OF SOUTH MIAMI Approved by: Signature andTitle Date N:\1929_South MiamiWVater Main Expansion-Phase UWork Order-Construction Phase Services.doc QtyofSouth Miami WATER MAIN EXTENSION -PHASE I MASTER PLAN CO0Oft S3 TO O CT TO IBB D9 10399 -*•