Loading...
Res. No. 053-01-11201RESOLUTION No.:53-01-11201 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF SOUTH MIAMI,FLORIDA,AUTHORIZING AND DIRECTING THE CITY MANAGER TO ENTER INTO A CONTRACTUAL AGREEMENT WITH CORZO CASTELLA CARBALLO THOMPSON SALMAN,P.A.FOR PROFESSIONAL ENGINEERING SERVICES FOR ENGINEERING ROUTE SURVEY,GEOTECHNICAL,DESIGN &PERMITTING,BID PHASE AND NECESSARY VALUE ADDED SERVICES FOR THE WATER MAIN EXTENSION PHASE 1A,IN AN AMOUNT NOT TO EXCEED ONE HUNDRED TEN THOUSAND DOLLARS,($110,000.00)TO BE CHARGED TO ACCOUNT NO.001-0000-132-2055. WHEREAS,the City Commission of theCity of South Miami,Florida,wishes to begin the portable drinking water main extension andfire flow protection project;and WHEREAS,the City Commission of theCity of South Miami,Florida,wishes tousethe professional services of Corzo Castella Carballo Thompson Salman,P.A.,to provide route survey,geotechmcal services,design &permitting,bid phase and necessary value added services for Water Main Extension -Phase 1A;and WHEREAS,the streets within the boundaries of Phase 1A are defined as;SW 74th Street between SW 67th Avenue and SW 68th Avenue,SW 77th Terrace between SW 67th Avenue &SW 69th Avenue,SW 78th Terrace between SW 68th Avenue &SW 69th Avenue,SW 68th Avenue between SW 78th Terrace &SW 80th Street,SW 69th Avenue between SW 76th Terrace &SW 80th Street,SW 67th Court from Cul-de-sac to SW 80th Street;and WHEREAS,theWaterMainExtension-Phase 1A isfundedthroughtheState Legislative appropriation funds. NOW,THEREFORE,BE IT DULY RESOLVED BY THE CITY COMMISSION OF THE CITY OF SOUTH MIAMI,FLORIDA,that: Section1:TheCityManageris authorized toenterintoa contractual agreement with CorzoCastellaCarballoThompsonSalman,P.A.fortheprofessionalservicesin Page 2 of Resolution No.53-01-11201 connection with route survey,geotechnical services,design &permitting,bid phase and necessary value added engineering forthe Water Main Extension -Phase 1A project,in an amount not to exceed $110,000.00. Section 2:That the attached proposal,Professional Service Work Order,be made a part of the resolution. Section 3:The total amount $110,000 will be drawn from the account number 001-0000- 132-2055. PASSED AND ADOPTED this 17th ATTEST: <u£D*^>A ^L CITY CLERK READ AND APPROVED AS TO FORM: day of April ,2001. APPROVED: 4/H+s MAYOR Commission Vote:5-0 Mayor Robaina:Yea ViceMayor Feliu:Yea Commissioner Russell:Yea Commissioner Bethel:Yea Commissioner Wiscombe:Yea CITY OF SOUTH MIAMI INTER-OFFICE MEMORANDUM To:Mayor and City Commission Date:April 12,2001 1 I ^Agenda Item #&From:Charles D.Scurr />fl II ai//^Coram Mtg.04-17-01 City Manager /1/j/^p vj ^Re:Authorization to execute Professional /Jur^Service Work OrderforWater Main Extension -Phase 1A REQUEST: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF SOUTH MIAMI,FLORIDA,AUTHORIZING AND DIRECTING THE CITY MANAGER TO ENTER INTO A CONTRACTUAL AGREEMENT WITH CORZO CASTELLA CARBALLO THOMPSON SALMAN,P.A.FOR PROFESSIONAL ENGINEERING SERVICES FOR ENGINEERING ROUTE SURVEY,GEOTECHNICAL,DESIGN &PERMITTING,BID PHASE AND NECESSARY VALUE ADDED SERVICES FOR THE WATER MAIN EXTENSION PHASE 1A,IN AN AMOUNT NOT TO EXCEED ONE HUNDRED TEN THOUSAND DOLLARS,($110,000.00)TOBECHARGEDTO ACCOUNT NO.001-0000- 132-2055. BACKGROUND: Thisprojectwill fulfill theCity'sintentto provide portable drinking waterandfire protection to the residents inthearea specified.Currently,the residents intheareausewellwateras drinking waterandtheydonothavefirehydrantforfireprotection.Theboundaries of Phase 1A are defined as;SW 74th Street between SW 67th Avenue and SW 68th Avenue,SW 77th Terrace between SW 67th Avenue &SW 69th Avenue,SW 78th Terrace between SW 68th Avenue &SW 69th Avenue,SW 68th Avenue between SW 78th Terrace &SW 80th Street,SW 69th Avenue between SW 76th Terrace &SW 80th Street,SW 67th Court from Cul-de-sac to SW 80th Street. The City,withState's approval is converting the $1.1 million Wastewater grantto portable water. An advanced funds account forwatermain extension asbeen established forthis project.It must be noted thatthe reimbursement from the state isnot guaranteed until the legislators have completed action. RECOMMENDATION: Itis recommended that the City Commission approve the funding for the work to be performed. Page2 of2 Agenda Item... Apr.12,01 ATTACHMENTS: a Proposed Resolution a Professional Engineering Services Work Order a Map of the proposed Phase 1A area a EstimatedMaterial Quantities Engineers Architects Planners EB0005022 AAC002142 Date: To: PROFESSIONAL SERVICES WORK ORDER April 12,2001 City of South Miami Engineering &Construction Department 6130 Sunset Drive South Miami,FL 33143 Attention: Project Name: W.Ajibola Balogun,Director Water Main Extension -Phase I C3TS File 1929-00 Funding Source:FDEP Water Advisory Panel Description of Project: Thisprojectconsists of improvementstotheWaterDistributionSystemforareas of the City of SouthMiamithatpresentlyarelackingadequatewaterserviceand fire protection.A contractor selectedunderthe City's competitivebiddingprocesswill installthewatermainsfortheCity of SouthMiami.After completion,thesystemwill beconveyedtotheMiami-DadeWaterandSewerDepartment(WASD).Operationand Maintenance of the extended Water Distribution System willbeby WASD. Phase 1 of this project consist of the installation of approximately 4,695linealfeet(0.9 mile)of eight inch(8")diameter,ductile ironwatermainsandnew service linesfrom the water maintothe existing meters.Also,this project willinstall fire hydrants to provide fire protection as required to meet Miami-Dade County standards.The estimated totalcost of theprojectis approximately $500,000 tobefundedinpartby State appropriations (Year 2001 FDEP Water Advisory Panel recommendation). The following street segments are included inPhase1 of theProject: 1. 2. 3. 4. 5. 6. SW 74th Street,from SW 67th Avenue to SW 68th Avenue (600 LF) rth ,thSW77mTerrace,fromSW 67U1 AvenuetoSW 69m Avenue(1,200LF) rtll tilSW67mCourt,fromCul-de-sactoSW 80l"Street(300LF) SW 78th Terrace,from SW 68th Avenue to SW 69th Avenue (600 LF) SW 68th Avenue,from SW 78th Terrace to SW 80th Avenue (500 LF) >tii thSW69mAvenue,fromSW76TerracetoSW 80m Avenue (1070 LF) ThisWorkOrderprovidesfortherequiredprofessionalservicesduringtheDesign, PermittingandBidPhase of theproject,includingRouteSurveying,Geotechnical Services,providing aDesignReport,preparation of Construction Documentsand Specifications(ProjectManual),andprovidesforlimitedassistanceduringtheBid 901 Ponce de Leon Blvd.,Suite 900 Coral Gables.Florida 33134 Web Site:www.c3ts.com 305.445.2900 1.800.448.0227 Facsimile 305.445.3366 Eaual Opportunity Employer Professional Services Work Order April 12,2001 Page 2 Phase leading tothe recommendation of theaward of contract tothe successful Bidder, as outlined inthe Scope of Services. Scope of Services and Schedule of Fees: 1.0 ENGINEERING ROUTE SURVEY: 1.01 Location Survey /Onsitedata collection 1.02 TopographicalSurvey(CrossSectionat50feetintervalmaximum) 1.03 Establish horizontal and vertical control (Bench Marks) 1.04 Coordination of Survey Work ThefeeforEngineeringRouteSurveyPhase of theprojectwillbe a Lump Sum amount of Fifteen Thousand Dollars ($15,000.00). 2.0 GEOTECHNICAL SERVICES: 2.01PerformrequiredAugerBoringtoadepth of 10feetminimum(8 locations) 2.02 On-site utilities location and coordination 2.03 Coordination of Geotechnical Work Thefeefor Geotechnical Service Phase of the project willbea Lump Sum amount of Four Thousand Dollars ($4,000.00). 3.0 DESIGN AND PERMITTING PHASE: 3.01 Attend "kick-off meeting and coordinate with City of South Miami, Engineering &Construction Department. 3.02 Perform and submit a distribution system study and design (Limited to project area),including engineering calculations. 3.03 Prepare design plans forthe Water Distribution System toinclude roadway resurfacing. 3.04 Provide technical criteria and assist theCity of South Miami withthe preparation of applications toobtainpermitsfromapplicableregulatory agencies with jurisdiction over the project. 3.05Provideupdated Engineer's Opinion of ProbableTotalProjectCost. 3.06PrepareConstructionContractAgreement&Design Specification Document (Project Manual). 3.07Furnish95%completeplansandProjectManual,presentandreviewthe project withthe City's Engineering &Construction Director. 3.08Furnish12copies of finalplansandProjectManualtothe Engineering & Construction Department. Wc3ts1\Enviromental\1929_South MiamiWVater MainExpansion-Phase 1\WO Phase 1 Revised.doc Professional Services Work Order April 12,2001 Page 3 Thefeeforthe Design and Permitting Phase of the project willbea Lump Sum amount of Seventy One Thousand Dollars ($71,000.00).This amount includes customarynormalexpensessuchasprintingandfurnishingtwelve (12)copies of the Project Manual. 4.0 BID PHASE: 4.01 Provide bid advertisementdocuments,respond to bidders'questions and attend pre-bid conference. 4.02PrepareaddendatoBidDocuments,if requiredbytheEngineertoclarify the requirements of theBid Documents. 4.03 Tabulate and evaluate bids received,check references of the responsible lowest bidder and make recommendation for award. ThefeefortheBidPhase of the project willbea Lump Sum amount of Six Thousand Dollars ($6,000.00). 5.0 VALUE ADDED SERVICES The following services are optional but recommended bythe Engineer tobe included inthe budget for the project These services willbe performed ONLY UPON RECEIVING WRITTEN AUTHORIZATION IN ADVANCE bythe City ofSouth Miami: 5.01 Contingency Reserve allowance for changes intheScope of Services that mayberequiredbytheCity of South Miami,such aschangesdueto unforeseen conditions,availability of additional funding,attendance to Public Hearings,orforany other authorized additional services ($10,000.00 Budget). 5.02WASDConveyance.Allowanceforservicesthatmayberequiredin connection withthe conveyance of the system for ownership bythe Miami-Dade WaterandSewer Department (WASD)($4,000.00Budget) Thefee allowance foroptionalValue Added Services is Fourteen Thousand Dollars ($14,000.00). The maximum fee authorized forall of the services listed by this Work Order is One Hundred Ten Thousand Dollars($110,000.00),including Value Added Services and normal reimbursable expenses.Permit feesare not included. If acceptabletoyou,wewillacceptasignedcopy of thisWorkOrderasyourwritten authorizationtoproceedwiththis assignment.Thankyoufortheopportunitytobe of servicetotheCity of South Miami. Wc3ts1\Enviromental\1929_South MiamiWVater Main Expansion-Phase 1\WO Phase 1 Revised.doc C Professional Services Work Order - April 12,2001 Page 4 Sincerely, Corzo Castella Carballo Thompson Salman,P.A. Jorge E.Corzo,P.E.j&lJlX- President CITY OF SOUTH MIAMI Approved by: Signature Title Date \\c3ts1\EnviromentaI\1929_South MiamiWVater Main Expansion-Phase 1\WO Phase 1 Revised.doc City of South Miami -WATER MAIN EXTENSION,PHASE IA ESTIMATED MATERIALS QUANTHrv Streets Length Est.No.of homes to service 8"GV Fire Hydrants A 1,020 14 2 3 B1 1,200 31 3 4 C 500 17 3 2 D 550 9 2 2 E 400 8 2 1 J 550 9 2 2 Sub-Total:4,220 88 14 14 5%margin oferr 211 Grand Total:4,431 Legend: A SW 69 Avenue between SW 76 Terrace and SW 80 Street B1 SW 77 Terrace between SW 67 Avenue and SW 69 Avenue C SW 78 Terrace between SW 68 Avenue and SW 69 Avenue D SW 68 Avenue between SW 78 Terrace and SW 80 Street E SW 67 Court between SW 80 Street and end of cul-de-sac J SW 74 Street between SW 67 Avenue and SW 68 Avenue