Loading...
Res. No. 203-00-11096RESOLUTION NO.203-00-11096 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF SOUTH MIAMI,FLORIDA,RELATING TO CONTRACTS,CONCERNING STREET IMPROVEMENTS, AUTHORIZING THE CITY MANAGER TO ENTER INTO A CONTRACT WITH MIRI CONSTRUCTION CORPORATION TO CONSTRUCT THE TWIN LAKE DRIVE PROJECT IMPROVEMENTS ATACOST NOT TO EXCEED $150,000.00, AND CHARGING THE DISBURSEMENT TO "ESCROW PW FINANCIAL ASSISTANCE GRANT,ACCOUNT NO.111-0000 115-3030. WHEREAS,adesignhasbeenpreparedtoaddressdrainage,environmental,and landscaping improvements fortheTwinLakeDrivearea,and; WHEREAS,Miri Construction Corporationhasbeenawardedacompetitivebidcontract withtheCity of CoralGablesforstreetconstruction(ResolutionNo.29621),andhasperformed satisfactorily fortheCity of South Miamithispreviousfiscalyear. NOW,THEREFORE,BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF SOUTH MIAMI,FLORIDA: Section 1.TheCityManageris hereby authorized toenterintoacontractwith Miri ConstructionCorporationbaseduponthe aforementioned City of CoralGablescontract. Section2.The contract withMiriConstruction Corporation isnottoexceed $150,000.00 fortheTwin Lake DriveProject. Section 3.Thisresolutionshallbecomeeffectiveimmediatelyafteradoption. PASSED AND ADOPTED this3rdday of October 2000. ATTEST: 6^jJMU j»2u_ CITY CLERK READ AND APPROVED AS TO FORM: CITY ATTORNEY ' APPROVED: 'tiw MAYOR COMMISSION VOTE:5-0 Mayor Robaina:Yea Vice Mayor FEliu:Yea Commissioner Bethel:Yea Commissioner Russell:Yea Commissioner Wiscombe:Yea CITY OF SOUTH MIAMI INTER-OFFICE MEMORANDUM TO:Mayorand Commission DATE:October 3,2000 FROM:Charles D.Scurr SUBJECT:Agenda Item # City Manager ^f)A Commission Meeting October 3,2000J> AUTHORIZATION OF THE CITY MANAGER TO ENTER INTO A CONTRACT WITH MIRI CONSTRUCTION INC.TO CONSTRUCT THE TWIN LAKE DRIVE PROJECT AT A COST NOT TO EXCEED $150,000.00. REQUEST TheattachedresolutionseeksapprovaltoallowtheCityManagertoenterintoacontractwith Miri Construction,Inc.toconstructthe"TwinLakeDriveProject"drainage improvements,a projectfundedthroughaState of Floridadrainage appropriation. BACKGROUND The "Twin Lake Drive Project"(located on SW 64th Avenue and SW 64th Place,from SW 58th Terrace to SW 65th Avenue -see attached location map)is the most ambitious civil works projecttobe initiated bytheCityindecades. Intotal,thislatestdrainageinitiativewillimproveapproximately lA mile of roadway,installing newdrainageinlets,constructingdrainageswales,andplantingstreettrees.Moreover,this proactiveprojectwillachieveenvironmentalobjectivesneverbeforeattemptedintheCity— drainageoutfalls(pipesdischargingtocanals)willbe"retrofitted"withpollutioncontrol safeguards. DRAINAGE &ENVIRONMENTAL GOALS TheexistingdrainagesystemsinandaroundTwinLakeDriveconsist of inletsandunderground pipingthatdischargesdirectlytothe nearby canal.However,norainwaterstorage,retention, treatment,orfiltrationisprovided(suchasystemcouldnotbeapprovedtodayundercurrent regulations).Thisexistingsystemalsofailsto address the stormwater drainageneedsalongthis residential street,resultingin numerous complaints about flooded garagesandlong standing waterinthe rights-of-way after storms.Itisforthisreason Twin Lake Drive was selected forthe drainage improvements. /continued ... Mayor and City Commission Twin Lake Drive Project October 3,2000 Page2 of3 Beside flood mitigation,this project also addresses environmental preservation goals.The EPA (through the Clean Water Act and the National Pollutant Discharge Elimination System)has charged the City with the responsibility to proactively protect surface water quality in our canals. As identified in our reports tothe EPA,the biggest culprit for water pollution is "direct discharge"drainagesystemssuchastheoneatTwinLakeDrive.Thereasonisthatrainwater can contain residual automotive fluids,lawn fertilizers,and pesticides;these harmful chemicals are washed bythe rainwater into the canal through such "direct discharge"drains.Worse still, these canals,in turn,discharge the industrial pollutants into the environmentally sensitive BiscayneBay. Our recent experience with manatees visiting our canals highlights the need to protect water quality,andthe proposed Twin Lake Drive project will do exactly that through underground retention weirs,oil/water separators,sedimentation chambers,andwater exfiltration systems designed to filter and treat the stormwater runoff.It should alsobe noted that thisshallbe accomplishedwithoutcompromisingfloodingconcerns.Theweirswillallowexcesswaterto spill overintothe canal (thereby preventing the system from backing-up intothe streets),but only after the water has been treated and filtered. LANDSCAPING Aswithanycivilworksprojectofthistype,most of the improvements willneverbeseenbythe residents sincethe culverts,weirs,sedimentation vaults,etc.,arealllocatedbelow ground. However,because thismulti-facetedprojectisalsomeanttoaddress aesthetics,thesurface featureswillalsobeimprovedthroughfullroadwaypaving,grassswalereconstruction,andthe addition of street trees. Aunifiedlandscapingthemewhichemphasizesnativewetlandspecieshasbeenapprovedbythe ERPB forthisproject.Wetlandspecieswereselectedtotakeadvantage of thesite-specific hydrology(thewatertableisonlyfivefeetbelowthestreetsurface).Aone-pageschematic sketch ofthe landscaping planis attached for reference (detailed 24"x36"civilplansare availableuponrequest).Insummary,theplancallsfor: Pond Cypress (forthecenter ofCircularDriveways) Paradise Tree (Street Canopy Tree) Dahoon Holly (tobeplantedin male/female pairsinsideyards) Sweetbay Magnolia (AccentTree) Red Bay (A ccentTree) Myrisne (Underneath Powerlines) Marlberry (Underneath Powerlines) Wax Myrtle (Underneath Powerlines) /continued... Mayor and City Commission Twin Lake Drive Project October 3,2000 Page3 of3 Street trees are an infrastructure asset benefiting an entire community,and over fifty (50)street trees are tobe planted for this project,making a dramatic improvement to the appearance of this neighborhood,andourCity. ANALYSIS Miri Construction Corporation has provided street construction services for the City of Coral Gables for the last five years,and currently has a one-year contract (with 2 one-year renewal options)with Coral Gables for street construction.The City of Coral Gables has renewed their contract withMiri Construction forFY 2000/2001,andthe purchase orderforthisworkisdueto be issued on 10/2.A copy of that documentation will be available during the commission meeting. You should note that Miri Construction performed the "Lake Taco Bell"drainage improvements (SW 78th Street &SW 63rd Avenue)as well as the "Lake Winn Dixie"improvements (SW 74th Street and 59th Avenue)for the City.Miri Construction completed these difficult and innovative projects ina timely fashion,and with the highest quality of workmanship. Itis proposed to designate Miri Construction asthe contractor forthis project based upon their unitprice contract withtheCity of CoralGables.Theamount of the contract wouldbe $150,000.00,which represents thebasebidof $116,085.07 plusa 15%allowance for landscaping costs(notincludedinthebid,contractorstillawaitingacostquotefromsub contractors)anda 15%prudent contingency. RECOMMENDATION Thisinnovativeprojectwillbebeneficialtoboththeresidentsandthe environment,andfurther demonstrate totheEPAtheCity's commitment towaterquality protection goals.The project willalsobe immensely popularonce completed,duetothe drainage and landscaping improvements.Approval of thisexpenditureisthereforerecommended. The total expenditure would not exceed $150,000.00,and the disbursement would come from "Escrow PWFinancial Assistance Grant",account number 111-0000-219-1810.This project is under the FDEP State Appropriation Grant;this account willbe reimbursed by FDEP after the project invoices are submitted. Attachments FROM:MIRI CONSTRUCTION FPX NO.3052332013 Sep.13 2000 01:42PM P2 Miri Construction,Inc Engineering Contractors September 13,2000 Mr.David Ooodin City of South Miami 4795 SW 75 Avenue South Miami,Florida 33155 RE:Twin Lakes Drive &SW 64 Place Drainage Improvements 7340S.W.121 St. Miami,Fia.33156 Tel.:233-S266 Dear Mr.Gondii); Our price for material,liter and equips for the taw involved to the project of refeiTCnce is as follows: Item # (1) (2) (3) (4) (5) (6) (7) (8) (H) Street resurfacing -1"Type S-'l Asphalt driveway modifications Concrete driveway modifications Gravel driveway modifications Swale construction Sod restoration Catchbasins ~Typo "P" Inverted baffles 15"HDP£ Exfiltrationtrench-15 a depth Core-drillexistingmanholes All quantities are estimated. Cordially, MIRI CONSTRUCTION,INC. >uarez Vice Presideut 4,924s.y.X 1.90 = 12,103 s.f.X2.00 = 612 s.f.X8.00- 693 s.f-X1.00 = 2,730 !-f.X8.00- 21,843 s.f.X0.29 = 8ea.X 1200.00 *-• 2ea.X 500.00- 630 Lf.X 20.00 =» 432 l.f.X 55.00 - 6ea.X 300.00 =. 9,355.60 24,206.00 4,896.00 693.00 21,840.00 6,334.47 9.600.00 1,000.00 12,600.00 23,760.00 _.jLmoo_ $116,085.07 SEP-22-2000 11:19 CITY OF SOUTH MIAMI B2CD P.01 City of South Miami 6130 Sunset Drive,South Miami,Florida 33143 663-6300 September 21,2000 City of SouthMiami Public Works Department 4795 SW 75 Avenue Miami,FL Dear Applicant: Thisletteristoconfirmfortherecordthattherequestforapprovalof: INSTALLATION OF TWIN LAKE DRIVE PROJECT [EB-OO-048'J TwinLakeDrivevicinity,betweenSW58Terrace&SW65Avenue South Miami,FL was presented to the Environmental Review and Preservation Board (ERPB)atits meetingonTuesday,September 19,2000,andwas: Approved*as presented. Sincerely, David Struder Zoning Technician Planning &Zoning Department prescribed therefore.Appeals may be taken bj the applicant,interested citizens,or the city administration [per Section 2Q-6.2 (A)ofCity'sLandDevelopmentCode] If you have any questions concerning this matter,please contact the Planning and Zoning Department between the hoursof8:00 a.m.and5:00p.m.,Monday through Friday,at 305.663.6326 or6347. "Cityof Pleasant Living" TOTAL P.01 TwinLakeDriveProjectArea Page2of2 CityofSouthMiamiPublicWorksDepartment Twin Lake Drive Project Area i i Q Paradise Tree g Cyrpess o Dahoon -Sweetbay X Pop Ash •0-Red Bay -fr Myrsine 0 Marlberry $•Wax Myrtle