Loading...
6TilE CITY OF PLEASANT LlVINC To: FROM: DATE: CITY OF SOUTH MIAMI OFFICE OF THE CITY MANAGER INTER-OFFICE MEMORANDUM The Honorable Mayor & Members of the City Commission Steven Alexander, City Manager Agenda Item NO.:~ September 2, 2014 SUBJECT: A resolution authorizing the City Manager to negotiate and enter into a contract with the Corradino Group for a total expenditure not to exceed $26,609.48 for Twin Lakes Traffic Calming Design. BACKGROUND: A traffic study was performed to assess the magnitude of cut-through traffic in the neighborhood depicted as Twin Lakes, bounded by SW 62 nd Avenue and SW 67th Avenue between SW 48 th Street and SW 64th Street, and also the neighborhood depicted as Bird Estates, between SW 61 st Avenue and 64th Avenue and between SW 40 th Street and SW 44th Street. For location of neighborhoods see Exhibit 1 "South Miami Traffic Calming Neighborhood" map. Based on the results of the study, traffic calming measures such as speed tables and a traffic circle are recommended. In accordance with pursuant to Florida Statute 287.055 for CCNA, The Corradino Group was one of the firms selected to provide professional engineering services. The City negotiated hourly rates with the firm and entered into a professional service agreement with The Corradino Group to perform engineering services for the City. Below is a table demonstrating the Traffic & Transportation Firms under the CCNA. Firm Project Status Ty Lin International Mango/ Manor Lane Traffic Calming Design in process The Corradino Bird Estate & Twin Lakes Traffic Design proposal Group Calming submitted Marlin Engineering Pinecrest/ Snapper Creek Traffic Pending design Calming proposal C H Perez Cocoplum Traffic Calming Consulting Study phase URS Crosswalk Pending TilE CITY OF PLEASANT LIVING AMOUNT: ACCOUNT: CITY OF SOUTH MIAMI OFFICE OF THE CITY MANAGER INTER-OFFICE MEMORANDUM The Corradino Group submitted a proposal in the amount $26,609.48 to perform the Twin Lakes Traffic Design. Amount not to exceed $26,609.48 The expenditure shall be charged to the People's Transportation Plan account number 124-1730-541-6490 which has a balance of $712,942.09, before this request was made. ATTACHMENTS: Resolution Proposal Exhibit 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 RESOLUTION NO.: _____ _ A Resolution authorizing the City Manager to negotiate and enter into a contract with the Corradino Group for a total expenditure not to exceed $26,609.48 for Twin Lakes Traffic Calming Design WHEREAS, pursuant to Florida Statute 287.055 for CCNA, The Corradino Group was one of the firms selected to provide professional engineering services; and WHEREAS, the City negotiated hourly rates with the firm and entered into a professional service agreement with The Corradino Group to perform engineering services for the City; and WHEREAS, the Mayor and City Commission wish to provide traffic calming to the area known as Twin Lakes, bounded by , and WHEREAS, the total expenditure is not to exceed $26,609.48; and WHEREAS, the Mayor and City Commission desire to authorize the City Manager to negotiate and enter into a contract with The Corradino Group for the Twin Lakes Traffic Calming Design for a total amount not to exceed $26,609.48 NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF SOUTH MIAMI, FLORIDA THAT: Section 1: The City Manager is authorized to negotiate the terms and conditions and to execute a contract with The Corradino Group for the Twin Lakes Traffic Calming Design for an amount not to exceed $26,609.48. A copy of the proposal is attached. Section 2: The expenditure shall be charged to the People's Transportation Plan account number 124-1730-541- 6490 which has a balance of$712,942.09, before this request was made. Section 3: If any section clause, sentence, or phrase of this resolution is for any reason held invalid or unconstitutional by a court of competent jurisdiction, the holding shall not affect the validity of the remaining portions of this resolution. Section 4. This resolution shall take effect immediately upon adoption. PASSED AND ADOPTED this ___ day of ______ " 2014. ATTEST: CITY CLERK READ AND APPROVED AS TO FORM LANGUAGE, LEGALITY AND EXECUTION THEREOF CITY ATTORNEY APPROVED: MAYOR COMMISSION VOTE: Mayor Stoddard Vice Mayor Harris Commissioner Welsh Commissioner Liebman Commissioner Edmond THE CORRADINO GROUP Date: August 24, 2014 Dear Mr. Ayala: CONSULTANT WORK ORDER PROPOSAL Twin Lakes Neighborhood Traffic Calming The Corradino Group, Inc. proposes to provide the services identified below for the project entitled "Twin Lakes Neighborhood Traffic Calming", pursuant to its Professional Service Agreement with the City of South Miami for Civil Engineering services for Roadway Projects, dated June 28, 2013 . I. GENERAL The general objective for the Consultant is to provide all project management and professional engineering services required for the design and preparation of a complete set of construction contract plans for a traffic calming devices (Roundabout and Speed Tables), at the following locations: • S.W. 63 rd Avenue and S.W. 42 nd Terrace -Roundabout • S.W. 44th Street from S.W. 64th Avenue to S.W. 62 nd Avenue -1 Speed Hump • S.W. 63rd Court from S.W. 58th Street to S.W. 62 nd Terrace -2 Speed Humps • S.W. 65th Avenue from S.W. 64th Street to S.W. 61 st Terrace -1 Speed Humps Elements of work shall include roadway analysis, topographic survey, signing and pavement markings, and drainage and geotechnical activities as required. All existing features, i.e. sidewalks, driveways, etc., requiring repair or replacement, shall also be addressed accordingly. All plans and design documents are to be prepared with Standard English values in accordance with all applicable engineering manuals and guidelines. II. SCOPE OF WORK Project Activity 4: Roadway Analysis Task No. 4.4 HorizontalNertical Master Design Files Includes all efforts required for establishing the master design files for the horizontal and vertical geometry, existing drainage features, utilities (including conflict location identification and adjustment), etc. Also includes all work to create elements showing the alignment for the horizontal geometry in the plan sheets and all efforts required to place labels and required information in the master design file. In addition, through the use of AUTOTURN, the vehicle path for all roundabouts will be included as requested, to ensure maneuverability. Task No. 4.11 Cost Estimate Includes all work required to prepare a construction cost estimate for each submittal. Task No. 4.14 Field Reviews Includes travel time for field visits in order to obtain the necessary data for design. 4055 NW 97th A VENUE • MIAMI, FL 33178 TEL 305.594.0735 • 800.887.5551 FAX 305.594.0755 VlVv'WCORRADINO.COM August 24, 2014 Page 2 WORK ORDER PROPOSAL Task No. 4.16 Quality Assurance/Quality Control Includes implementation of QAlQC plan. Also includes internal peer review and/or constructability reviews, responses to comments and any resolution meetings if required, and assembly of plans for submittals for reviews. Task No. 4.18 Supervision Includes all effort required to supervise all technical design analysis and plans production. Task No. 4.19 Coordination Includes all efforts to coordinate with all disciplines of the project team, including sub-consultants, to produce a final set of construction documents. Project Activity 5: Roadway Plans Task No. 5.1 Key Sheet Includes efforts for producing the Key Sheet. Task No. 5.5 Typical Section Sheets Includes all efforts for development and production of the Typical Section Sheets. Task No. 5.6 General Notes / Pay Item Notes Includes all efforts for development and production of the general notes and pay item notes as required. Task No.5. 7 Summary of Quantities CADD production work necessary to complete sheets, does not include the effort required to perform quantity take offs. Task No. 5.15 Plan Sheet Includes production work necessary to develop sheets and all required labeling not included in the Master Design file. Task No. 5.21 Miscellaneous Detail Sheet Includes efforts for developing miscellaneous roadway construction details as required. Task No. 5.31 Traffic Control Detail Sheets Includes efforts for developing Traffic Control Detours Sheets Task No. 5.41 Quality Assurance/Quality Control Includes implementation of QAlQC plan. Also includes internal peer review and/or constructability reviews, responses to comments and any resolution meetings if required, and assembly of plans for submittals for reviews. Task No. 5.42 Supervision Includes all efforts required to supervise and coordinate plans production and sUb-consultant coordination. Project Activity 6: Drainage Task No. 6.0 Drainage Analysis/Design Includes all work required for the design of an isolated storm drain system composed of inlets and/or manholes with a closed French drain system. Analysis will be based on a 5-year return period using the rational method and a minimum time of concentration of 10 minutes. CIPForm116 Revised 7/30/10 August 24,2014 Page 3 WORK ORDER PROPOSAL Project Activity 7: Utilities Task No. 7.2 Identify Existing UAOs Includes identification of all utilities at each intersection by reviewing existing plans, checking with Sunshine State One Call, City of Miami, and any potential existing SUE reports. Task No. 7.3 Make Utility Contacts Includes sending letters and plans to each utility company for coordination. Task No. 7.10 Review Utility Markups, Work Schedules, Provide Relocation Documents Includes review of utility marked up plans and work schedules as they are received. Task No. 7.11 Utility Coordination / Follow-up Includes coordination and follow-up to ensure the resolution of all known utility conflicts and/or attainment of utility clearance or "No conflict" letters from each utility company. If there is a conflict that it can't be resolved, a UWS shall be prepared, coordinated and obtained by the EOR with the corresponding utility agency. Project Activity 8: Permitting Task No. 8.5 Complete and Submit all Required Permit Applications Includes the following permits and approvals: Miami-Dade County Public Works Traffic Division approval DERM/DRER Project Activity 19: Signing & Pavement Marking Analysis Task No. 19.3 Reference and Master Design File Includes all efforts required for establishing the signing and marking master design file to include reference files of topo, r/w, roadway, etc. Also includes design and layout of signs, lane lines, gores, pavement markings, rpm's, and all efforts required for drafting. Task No. 19.7 Quantities Includes all work required to determine the quantities for each plan sheet. Task No. 19.9 Cost Estimate Includes all work required to prepare a construction cost estimate for each submittal. Task No. 19.14 Quality Assurance/Quality Control Includes implementation of QAlQC plan. Also includes internal peer review and/or constructability reviews, verify comments are addressed, assembly of plans for submittals, etc. Task No. 19.16 Supervision Includes effort to supervise all technical design analysis. Project Activity 20: Signing & Pavement Marking Plans Task No. 20.3 Tabulation of Quantities Includes time to place pay item numbers, descriptions, quantities and totals on tabulation sheet(s). Task No. 20.6 Plan Sheet Includes all efforts required to create the signing and pavement marking sheets. CIP Form 116 Revised 7/30/10 August 24, 2014 Page 4 WORK ORDER PROPOSAL Task No. 20.14 Quality Assurance/Quality Control Includes QC review, verify comments are addressed, resolution meetings and documentation, assembly of plans for phase submittals, etc. Task No. 20.15 Supervision Includes all efforts required to supervise and coordinate plans production and sub-consultant coordination. Additional Services Task No. 3.7 Post Design (Hourly rate as required) Includes shop drawing reviews, responding to RFI's, plan revisions (not involving errors or omissions), and limited construction assistance. Reimbursable Expenses Project Activity 27: Survey See attached Scope Project Activity 30: Geotechnical See attached Scope III. SUB-CONSULTANTS The below listed SUb-Consultants will assist in the performance of the Work. Sub-Consultant Name Specialty or Expertise PSI, Inc. Geotechnical Exploration Longitude Surveyors, LLC Surveying IV. SCHEDULE OF WORK -TIME OF PERFORMANCE Consultant shall submit the Deliverables and perform the Work as depicted in the tables below (Additional pages may be added as needed) I SCHEDULE OF DELIVERABLES Task, Sub-task, Duration (specify Delivery Date* or Activity ID # Major Task, Sub-Task, Activity, or Deliverable weeks or calendar (cumulative weeks, or days) calendar days) 1 Phase I Submittal -60% Plans 8 weeks ** NTP+ 8 weeks 2 Phase 2 Submittal -90% Plans 4 weeks *** NTP+12weeks 3 Final Submittal -100% Contract Plans 4 weeks *** NTP+16weeks RE1 Topographic Survey 2 weeks NTP+2 weeks RE2 Geotechnical Report 2 weeks NTP+2 weeks * An updated schedule, mdlcatmg actual delivery dates, based on the above duratIOns, Will be proVided to the City upon receipt of the NTP and will be submitted in Microsoft Project Schedule software. **Includes time for coordination with Miami-Dade County Public Works Department for concept approval. ***Includes time for review by the City as well as review by the Miami-Dade County Public Works Department. Also includes time for obtaining all necessary permits. CIP Form 116 Revised 7/30/10 August 24,2014 Page 5 WORK ORDER PROPOSAL V. COMPENSATION Consultant shall perform the Work detailed in this Proposal for a Total fee of twenty-six housand-six hundred and nine dollars and fouty-eight cents ($26,609.48). The City shall not be liable for any fee, cost, expense or reimbursable expense or other compensation beyond this amount. Said fee includes an allowance for Reimbursable Expenses required in connection with the Work, which shall not exceed $4,955.00. Said Reimbursable Expenses shall be used in accordance with the Agreement Provisions and shall conform to the limitations of Florida Statutes § 112.061. SUMMARY OF COMPENSA TlON* Task, Sub- task, or Activity 10 # Major Task Name and/or Activity Description Fee Amount Fee Basis 1 Phase I Submittal (60% Plans) $9,127.06 Lump Sum 2 Phase II Submittal (90% Plans) $4,563.53 Lump Sum 3 Final Submittal (100% Plans) $1,521.18 Lump Sum AS1 Allowance for Drainage Design (As needed) $2,336.88 Lump sum AS2 Allowance for Post Design $2,105.84 Lump sum, Subtotal -Professional Fees $19,654.48 Lump Sum RE1 Topographic Survey $2,800.00 Lump Sum RE2 Geotech n ical $2,155.00 Lump Sum AS3 Allowance for Additional Services $2,000.00 Limiting Amount, not to (Upon City's PM approval) exceed TOTAL $26,609.48 . .. .. *Note: Compensation should match the Task, ActIvItIes, and/or Deliverables IdentIfIed . VI. ADDITIONAL SERVICES The City may establish an allowance for additional services requested by the City and for unforeseen circumstances, which shall be utilized at the sole discretion of the City. VII. DATA PROVIDED BY CITY The following information or documents are to be provided by the City, if available: • Right-of-Way Maps • As-built Information VIII. PROJECT MANAGER CONSULTANT'S Project Manager for this Work Order assignment will be Carlos Alcantara, P.E. Submitted by: Carlos Alcantara, P.E. The Corradino Group, Inc. Reviewed and approval in concept Recommended by: Ricardo Ayala, P.E. City of South Miami Capital Improvements Project Manager CIPForm116 Revised 7/30/10 Name of Project County: FPN: FAP N "" nU .. 3. Project General Tasks 4. Roadway Analysis 5, Roadway Plans 6. Drainage Analysis 7. Utilities 8. Environmental Permits Staff Classification 9. Structures -Misc. Tasks, Dwgs, Non-Tech. 10. Structures -BDR 11. Structures -Temporary Bridge 12. Structures -Short Span Concrete 13. Structures -Medium Span Concrete 14. Structures -Structural Steel 15. Structures -Segmental Concrete 16. Structures -Movable Span 17. Structures -Retaining Walls 18. Structures -Miscellaneous 19. Signing & Marking Analysis 20. Signing & Marking Plans 21. Signalization Analysis 22. Signalization Plans 23. Lighting Analysis 24. Lighting Plans 25. Landscape Architecture Analysis 26. Landscape Architecture Plans 27. Survey (Field & Office Support) 28. Photogrammetry 29. Mapping 30. Geotechnical 31. Architecture Development 32. Noise Wall Analvsis Total Staff Hours Total Staff Cost Form Re'IIlSCdJI2BfOS StaffHourEstimate Fee Sheet -Prime ESTIMATE OF WORK EFFORT AND COST -PRIME CONSULTANT T",n Lake Neighborhood Traffic Calming Project MiamiMDade Total Staff Project Sr. Project Project Hours From Manager Engineer Engineer "SH Summarv-$150.00 $162.05 $115.51 28 4 7 8 24 4 6 7 18 2 5 5 14 1 3 3 8 2 0 4 21 2 5 6 22 2 6 7 135 17 32 40 52,550.00 $5,185.60 $4,620.40 Notes: Engineering Intern $108.18 8 9 6 7 3 7 8 48 $5,192.64 1. This sheet to be used by Prime Consultant to calculate the Grand Total fee. $0.00 Survey Field Days by Subconsultant 4 -Person Crew: 2. Manually enter fee from each subconsultanl. Unused subconsultant rows may be hidden. Page 12 of 1 SALARY RELATED COSTS: SUBTOTAL ESTIMATED FEE: REIMBURSABLE EXPENSES Subconsultant: Longitude Subconsultant PSI, Inc. SUBTOTAL ESTIMATED FEE: ADDITIONAL SERVICES Drainage (Limiting Amount, Not to Exceed) Aditional Services Consultant Name: The Corradino Group, Inc. Consultant No.: Date: 8/19/2014 Estimator: Carlos E. V, -_ .. ,.o>v,. SH Salary By Cost By Activity Activitv 27 $3,524 26 $3,354 18 $2,337 14 $1,740 9 $1,087 20 $2,561 23 $2,946 137 $17,548.64 Check = $17,548.64 Post Design Services (12% of DeSign Fee) (Hourly Rate, Not to Exceed) GRAND TOTAL ESTIMATED FEE: Average Rate Per Task $130.51 $129.02 $129.83 $124.28 $120.73 $128.03 $128.10 $128.09 $17,548.64 $17,548.64 52,800.00 $2,155.00 $22,503.64 $2,000.00 $2,105.84 $26,609.48 8/1912014 1:11 PM Project Activity 4: Roadway Analysis Estimator: CEV Twin Lake Neighborhood Traffic Calming Project Task Task Units No of Hours / Total Comments I No. Units Unit Hours i 4.1 Typical Section Package LS 1 0 0 4.2 Pavement Design Package LS 1 0 0 • 4.3 Access Management LS 1 0 0 4.4 Horizontal Nertical Master Design Files LS 1 15 15 15 hours per Roundabout 4.5 Cross Section Design Files LS 1 0 0 4.6 Traffic Control Analysis LS 1 0 0 4.7 Master TCP Design Files LS 1 0 0 4.8 Design Variations and Exceptions LS 1 0 0 4.9 Design Report LS 1 0 0 4.10 Computation Book & Quantities LS 1 0 0 4.11 Cost Estimate LS 3 2 6 3 hours per each submittal x 2 submittals 4.12 Technical Special Provisions LS 1 0 0 4.13 Other Roadway Analysis LS 1 0 0 Roadway Analysis Technical Subtotal 21 4.14 Field Reviews LS 1 4 4 2 people x 2 hours x 1 review per Roundabout 4.15 Technical Meetings LS 0 0 4.16 Quality Assurance/Quality Control LS % 5% 1 4.17 Independent Peer Review LS % 0% 0 4.18 Supervision LS % 3% 1 Roadway Analysis Nontechnical Subtotal 6 StaffHourEstimate 4. Roadway Analysis Page 2 of 12 8/19/2014 Project Activity 4: Roadway Analysis Task Task Units No of Hours I Total Comments No. Units Unit Hours 4.19 Coordination LS % 2% 1 4. Roadway Analysis Total 28 StaffHourEstimate 4. Roadway Analysis Page 3 of 12 8/19/2014 Estimator: CEV Task Task No. 5.1 Key Sheet 5.2 Summary of Pay Items-including Quantity Input 5.3 Drainage Map 5.4 Interchange Drainage Map 5.5 Typical Section Sheets 5.6 General Notes/Pay Item notes 5.7 Summary of Quantities 5.8 Box Culvert Data Sheet 5.9 Bridge Hydraulics Recommendation Sheets 5.10 Summary of Drainage Structures 5.11 Optional Pipe/ Culvert Material 5.12 Project Layout 5.13 Plan/Profile Sheet 5.14 Profile Sheet 5.15 Plan Sheet 5.16 Special Profile 5.17 Back of Sidewalk Profile Sheet 5.18 Interchange Layout Sheet 5.19 Ramp Terminal Details (Plan View) 5.20 Intersection Layout Details 5.21 Miscellaneous Detail Sheets 5.22 Drainage Structure Sheet (per Structure) StaffHourEstimate 5. Roadway Plans Scale Project Activity 5: Roadway Plans Twin Lake Neighborhood Traffic Calming Project Units No. of Hours I No. of Total Comments Units Unit Sheets Hours Sheet 1 3 1 3 Sheet 0 0 0 0 Sheet 0 0 0 0 Sheet 0 0 0 0 Sheet 1 2 1 2 Sheet 1 2 1 2 Sheet 1 2 1 2 Sheet 0 0 0 0 Sheet 0 0 0 0 Sheet 0 0 0 0 Sheet 0 0 0 0 Sheet 0 0 0 0 Sheet 0 0 0 0 Sheet 0 0 0 0 Sheet 5 1.4 5 7 3 hours per Roundabout + 1 hour per speed hump Sheet 0 0 0 0 Sheet 0 0 0 0 Sheet 0 0 0 0 Sheet 0 0 0 0 Sheet 0 0 0 0 Sheet 1 2 1 2 EA 0 0 0 0 Page 4 of 12 8/19/2014 Project Activity 5: Roadway Plans Task Task Scale Units No. of Hours I No. of Total No. Units Unit Sheets Hours 5.23 Miscellaneous Drainage Detail Sheets Sheet 0 0 0 0 5.24 Lateral Ditch Plan/Profile Sheet 0 0 0 0 5.25 Lateral Ditch Cross Sections EA 0 0 0 0 5.26 RetentionlDetention Ponds Detail Sheet Sheet 0 0 0 0 5.27 Retention Pond Cross Sections EA 0 0 0 0 5.28 Cross-section Pattern Sheet Sheet 0 0 0 0 5.29 Roadway Soil Survey Sheet Sheet 0 0 0 0 5.30 Cross Sections EA 0 0 0 0 5.31 Traffic Control Plan Sheets Sheet 0 0 0 0 5.32 Traffic Control Cross Section Sheets EA 0 0 0 0 5.33 Traffic Control Detail Sheets Sheet 2 2 2 2 5.34 Utility Adjustment Sheets Sheet 0 0 0 0 5.35 Selective Clearing and Grubbing Sheet 0 0 0 0 5.36 Erosion Control Plan Sheet 0 0 0 0 5.37 SWPPP Sheet 2 1 2 2 5.38 Project Control Network Sheet Sheet 0 0 0 0 5.39 Interim Standards LS 0 0 0 0 5.40 Utility Verification Sheet (SUE Data) Sheet 0 0 0 0 Roadway Plans Technical Subtotal 14 22 5.41 Quality Assurance/Quality Control 5.42 Supervision StaffHourEstimate 5. Roadway Plans LS LS % 5% 1 % 3% 1 5. Roadway Plans Total 14 24 Page 5 of 12 Comments 8/19/2014 Project Activity 6: Drainage Analysis Estimator: FAL B-30628, Bird Avenue Road Improvements Task Task Units No of Hours! Total Comments No. Units Unit Hours 6.1 Determine Base Clearance Water Elevation Per Location 0 0 0 6.2 Pond Siting Analysis and Report Per Basin 0 0 0 6.3 Design of Cross Drains EA 0 0 0 6.4 Design of Roadway Ditches Per Ditch Mile 0 0 0 6.5 Design of Outfalls EA 0 0 0 6.6 Design of Stormwater Management Facility EA 0 0 0 : (Offsite Pond) Design of Stormwater Management Facility 6.7 (Roadside Ditch as Linear Pond or Infield Per System 0 0 0 Pond) 6.8 Design of Flood Plain Compensation Area Per Encroachment 0 0 0 6.9 Design of Storm Drains EA 0 0 0 6.10 Optional Culvert Material LS 0 0 0 6.11 French Drain Systems Per 1000 Feet of 1 8 8 French Drain 6.12 Drainage Wells EA 0 0 0 6.13 Drainage Design Documentation Report LS 1 8 8 6.14 Bridge Hydraulic Report EA 0 0 0 6.15 Temporary Drainage Analysis LS 1 0 0 6.16 Cost Estimate LS 1 0 0 6.17 Technical Special Provisions LS 1 0 0 I StaffHourEstimate 6. Drainage Analysis-1 6 of 12 8/19/2014 Project Activity 6: Drainage Analysis Task Task Units No of Hoursl Total Comments No. Units Unit Hours 6.18 Other Drainage Analysis LS 1 0 0 Drainage Analysis Technical Subtotal 16 6.19 Field Reviews LS 1 0 0 6.20 Technical Meetings LS 1 2 2 1 people x 2 hours per meeting 6.21 Quality Assurance/Quality Control LS % 0% 0 6.22 Independent Peer Review LS % 0% 0 6.23 Supervision LS % 0% 0 Drainage Analysis Nontechnical Subtotal 2 6.24 Coordination LS % 0% 0 6. Drainage Analysis Total 18 1 StaffH 0 urEsti mate 6. Drainage Analysis-1 7 of 12 8/19/2014 Estimator: CEV Task TASK No. 7.1 Kickoff Meeting 7.2 Identify Existing UAOs 7.3 Make Utility Contacts 7.4 Exception Coordination 7.5 Preliminary Utility Meeting 7.6 Individual/Field Meetings 7.7 Collect and Review Plans and Data from UAO(s) 7.8 Subordination of Easements Coordination 7.9 Utility Design Meeting 7.10 Review Utility Markups, Work Schedules, Processing of Schedules and Agreements 7.11 Utility Coordination / Followup 7.12 Utility Constructability Review 7.13 Additional Utility Services 7.14 Processing Utility Work by Highway Contractor (UWHC) 7.15 Contract Plans to UAO(s) 7.16 Certification/Close-out 7.17 Other Utilities StaffHourEstimate 7. Utilities Project Activity 7: Utilities Twin Lake Neighborhood Traffic Calming Project Units No of Hours I Total Hours Comments Units Unit LS 1 0 0 LS 1 1 1 LS 1 1 1 LS 1 0 0 LS 1 0 0 LS 1 0 0 LS 1 0 0 LS 1 0 0 LS 1 0 0 LS 1 6 6 1 hour x 6 Utilities LS 1 6 6 6 Utilities x 1 hour per Utility LS 1 0 0 LS 1 0 0 LS 1 0 0 LS 1 0 0 LS 1 0 0 LS 1 0 0 7. Utilities Total 14 Page 8 of 12 8/19/2014 Staffi-lourEstimate 8. Environmental Permits Estimator: CEV Form Revised SIStOS Task Task No. 8.1 Preliminary Project Research 8.2 Complete Permit Involvement Form 8.3 Establish Wetland Jurisdictional Lines 8.4 Agency Verification of Wetland Data Project Activity 8: Environmental Permits Units No. of Hours/ Total Units Units Hours LS 1 Q 0 LS 1 l) 0 LS 1 0 0 LS 1 0 0 Tvvin Lake Neighborhood Traffic Calming Project o Comments 8.5 Complete And Submit All Required Permit LS 1 8 8 DERM I DRER (4hr) and Miami-Dade Traffic Division Approval Applications (2hr x 2 submittal) 8.6 Prepare Dredge and Fill Sketches LS 1 0 0 8.7 Prepare USCG Permit Sketches LS 1 0 0 8.8 Prepare Easement Sketches LS 1 0 0 8.9 Prepare RIW Occupancy Sketches LS 1 0 0 8.10 Prepare Coastal Construction Control Line (CCCL) LS 1 0 0 Permit Sketches 8.11 Prepare Tree Permit Information LS 1 0 0 8.12 Mitigation Coordination and Meetings LS 1 0 0 8.13 Mitigation Design LS 1 G 0 8.14 Environmental Clearances LS 1 0 0 8.15 Other Environmental LS 1 Q 0 Environmental Permits Technical Subtotal 8 8.16 Technical Meetings LS 1 0 0 8.17 Quality Assurance/Quality Control LS % O;J,~; 0 8.18 Supervision LS % 0% 0 Environmental Permits Nontechnical SubTotal 0 8.19 Coordination LS % (n~ 0 8. Environmental Permits Total 8 Technical Meetings WMO EA ACOE EA USCG EA 0 USFWS EA 0 FFWCC EA 0 0 FOOT EA (} () Other meetings EA 0 0 Subtotal technical meetings Progress Meetings EA Phase Review Meetings EA ITotal Meetings Carries to 8.16 Projectma Note: Project Manager attendance at progress, phase and field review meetings are manually entered on General Task 3 Page 9 of 12 8/19/2014 Project Activity 19: Signing and Pavement Marking Analysis Estimator: CEV Form Revised 6/6/05 Task Task No. 19.1 Traffic Data Analysis 19.2 No Passing Zone Study 19.3 Reference and Master Design File 19.4 Multi Post Sign Support Calculations 19.5 Sign Panel Design Analysis 19.6 Sign Lighting/Electrical Calculations 19.7 Quantities 19.8 Computation Book 19.9 Cost Estimate 19.10 Technical Special Provisions 19.11 Other Signing and Pavement Marking Units No. of Hoursl Units Units LS 1 0 LS 1 0 LS 1 7 EA 0 0 EA 0 0 EA 0 0 LS 3 2 LS 1 0 LS 3 2 LS 1 0 LS 1 0 Signing & Pavement Marking Analysis Technical Subtotal 19.12 Field Reviews LS 1 0 19.13 Technical Meetings LS 1 0 19.14 Quality Assurance/Quality Control LS % 5% 19.15 Independent Peer Review LS % 0% 19.16 Supervision LS % 3% Signing & Pavement Marking Analysis Nontechnical Subtotal 19.17 I Coordination LS % 2% StaffHourEstimate Total Hours 0 0 7 0 0 0 6 0 6 0 0 19 0 0 1 0 1 2 0 19. Signing & Marking Analysis Page 10 of 12 Twin Lake Neighborhood Traffic Calming Project Comments 3 hours per Roundabout + 1 hours per speed hump 2 hour x 3 submittals 2 hour x 3 submittals ... 8/19/2014 Project Activity 19: Signing and Pavement Marking Analysis Task Task Units No. of Hoursl Total Comments • No. Units Units Hours • 19. Signing & Pavement Marking Analysis Total 21 StaffHourEstimate 19. Signing & Marking Analysis Page 11 of 12 8/19/2014 Project Activity 20: Signing and Pavement Marking Plans Estimator: CEV Twin Lake Neighborhood Traffic Calming Project Task Task Scale Units No of Hours! No. of Total Comments No. Units Unit Sheets Hours 20.1 Key Sheet Sheet 1 0 0 20.2 Summary of Pay Items-including CES Input LS 1 0 0 20.3 Tabulation of Quantities Sheet 5 1 5 1 hour per sheet 20.4 General Notes 1 Pay Item Notes Sheet 0 0 0 20.5 Project Layout Sheet 0 0 0 20.6 Plan Sheet Sheet 5 3 15 3 hours per sheet 20.7 Typical Details EA 0 0 0 20.8 Guide Sign Work Sheet (s) EA 0 0 0 20.9 Traffic Monitoring Site EA 0 0 0 20.10 Cross Sections EA 0 0 0 20.11 Special Service Point Detail EA 0 0 0 20.12 Special Details LS 1 0 0 20.13 Interim Standards LS 1 0 0 Signing & Pavement Marking Plans Technical Subtotal 0 20 20.14 Quality Assurance/Quality Control LS % 5% 1 20.15 Supervision LS % 3% 1 20. Signing & Pavement Marking Plans Total 0 22 -------- StaffHourEstimate 20. Signing & Marking Plans Page 12 of 12 8/19/2014 ITEM # 1 2 3 4 5 1 2 3 4 COST BREAKDOWN S.W. 63RD AVENUE AND S.W. 42ND TERRACE CITY OF SOUTH MIAMI, FLORIDA PSI PROPOSAL NO. 0397-131532 18-Aug-14 DESCRIPTION UNIT I. Field Exploration Mobilization of Truck-Mounted Drill Rig Per Job Percolation Tests Per Test Open Hole Method (Min. 6" Dia.) Asphalt Cores Each Closing Holes with Grout/Approved Method(s) to Safeproof Per Site. [Safeproof to be Accomplished Before Laboratory Lineal Leaves the Site(s).] Foot II. Geotechnical Engineering Services Senior Engineer Per Hour Project Engineer Per Hour Senior Engineering Technician Per Hour CADD/Computer Technician Per Hour TOTAL PROJECT FEE PER CIRCLE #OF UNITS 1.0 1.0 2.0 15.0 1.0 6.0 5.0 2.0 UNIT TOTAL RATE $ 350.00 $ 350.00 $450.00 $ 450.00 $100.00 $ 200.00 $ 10.00 $ 150.00 $120.00 $ 120.00 $ 90.00 $ 540.00 $ 45.00 $ 225.00 $ 60.00 $ 120.00 $2,155.00 LONGITUDE SURVEYORS, LLC Monday, August 18, 2014 Carlos E. Verson, P.E. Project Manager THE CORRADINO GROUP 4055 NW 9ih Avenue, 2nd floor Miami, FL 33178 VIA EMAIL: cverson@corradino.com TWIN LAKES.DOCX In reference to: Surveying services for the intersection of SW 42 Terrace and SW 63 Avenue South Miami, FL Dear Mr. Verson, In response to your request regarding a fee estimate for surveying and mapping services for the above referenced project. LONGITUDE SURVEYORS, LLC (LS) is pleased to submit the following proposal for your consideration. A. Scope of Services: LONGITUDE will perform a full Topographic Survey including the following information; • A Digital Terrain Model (DTM) will be prepared. • Right-of-Way and property lines for the project area and adjacent properties will be shown graphically. • A graphical baseline will be created and included. • Location of all overhead utilities, sidewalks, curb and gutters, paved roads, fences, signs, manholes, catch basins, valves/valve boxes and any other aboveground improvements within the project area, with elevations. • Invert and grate elevations for all project area storm and sanitary manholes and catch basins. • Elevations will be taken at edge of pavement, center of pavement, right-of-way limits and approximately 5 feet beyond wherever possible. In addition, cross section elevations will be taken at 25-foot intervals. • LS will collect shots to delineate the driveways beyond the right-of-way whenever possible. • All elevations will be referenced to the National Geodetic Vertical Datum of 1929 (NGVD29). • Control points will be set outside the project limits, in locations where they can be used by the contractor during construction. • All control points will have Northing and Easting coordinates referenced to the Florida State Plane Coordinate System, based on the North American Datum of 1983/90 and elevations referenced to the National Geodetic Vertical Datum of 1929 (NGVD29). B. Survey Limits: City of South Miami intersection of SW 63 Avenue and SW 42 Terrace approximately 250 feet in each direction of the intersection. C. Deliverables: LS will deliver signed and sealed originals of the resulting Map of Survey and an electronic copy of the resulting cad file. D. Schedule: LS have estimated eight business days to complete this task. ~ Fee: The total professional fee to complete this task shall be a lump sum of $2,800.00 I understand and agree by signing below "I APPROVE AND ACCEPT" this proposal as a legal binding contract. By: Date: (Authorized Signature) Title: (Typed or printed name) I thank you for the opportunity to submit this proposal. We look forward to utilizing our best professional efforts on your behalf on this very important project. \/ Eduardo M. Suarez, PSM/PreSidentJ LONGITUDE SURVEYORS 8290 NW 64th Street· Miami, FL 33166· ph: 305.463.0912· fax: 305.513.5680 ·www.longitudesurveyors.com· LB7335 South Miami Traffic Calming Neighborhoods Prepared January 2013 Twin Lakes Study: RFP Cocoplum Construction: Complete Mango Terrace Study: Complete Design: RFP Manof.lane . Study: Complete Design: RFP Pinecrest Villas Construction: Complete Study: RFP CRA City Road County Road III III III State Road Exhibit 1