Loading...
5TilE CITY or PLEASANT LIVING TO: FROM: DATE: SUBJECT: CITY OF SOUTH MIAMI OFFICE OF THE CITY MANAGER INTER-OFFICE MEMORANDUM The Honorable Mayor & Members of the City Commission Steven Alexander, City Manager Agenda Item NO.:S-September 2,2014 A resolution authorizing the City Manager to negotiate and enter into a contract with EMK General Service, Corp. for a total expenditure not to exceed $8,912.50 for the installation of concrete poles for a Wi-Fi System. BACKGROUND: In an effort to provide Wi-Fi service in the Downtown area, it is the City's intent to install two concrete poles to accommodate electrical service and antennas for a Wi-Fi system. AMOUNT: ACCOUNT: The City received three (3) quotes in response to a solicitation, shown below. Pursuant to review, it was determined that Trident Telecom, Inc. submitted a proposal that was the most comprehensive and cost effective in its construction approach. A resolution was presented to the commission on to award Trident Telecom, Inc. and was approved on July 15, 2014. The contractor formally withdrew from the project on August 27,2014. EMK General Service, Corp., being the next lowest and responsive bidder, was contacted. Due to the concrete pole cost increase, their current bid price is increased to $7,750, form $6,750. This is still the next lowest bid. The three (3) quotes received: Trident Telecom, Inc. EMK General Service, Corp. JN Electrical Contractors, LLC. $5,900 (7-15-14), Withdrawn $6,750 (7-15-14), Now $7,750 (8-27-14) $12,876 (7-15-14) A 15% contingency of $1,162.50 will be included over the proposal amount from EMK General Service, Corp. to address for unknown factors that may arise during the work. The total amount of the contract, including the contingency, will be $8,912.50. Amount not to exceed $8,912.50 The expenditure shall be charged to the City's Parking account number 001- 1410-513-3459, which has a balance of $101,540.22, before this request was made. ATTACHMENTS: Resolution Quotes Withdrawal notice from Trident Telecom, Inc. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 RESOLUTION NO.: _____ _ A Resolution authorizing the City Manager to negotiate and enter into a contract with EMK General Service, Corp. for a total expenditure not to exceed $8,912.50 for installation of Wi-Fi antennas WHEREAS, the Mayor and City Commission wish to provide Wi-Fi service in the Downtown area, and require the installation of two antennas to do so; and WHEREAS, pursuant to a competitive selection process in accordance with the City Charter, it was determined that Trident Telecom, Inc. submitted a proposal in the amount of $5,900 that was the most comprehensive and cost effective in its construction approach; and WHEREAS, Trident Telecom, Inc. made a mistake in preparing its proposed price and has requested the City's Consent to withdraw its proposal; and WHEREAS, pursuant to the competitive selection process, it was determined that EMK General Service, Corp. submitted a current proposal in the amount of $7,750 that was the next most comprehensive and cost effective in its construction approach; and WHEREAS, the City desires to provide a 15% contingency of $1,162.50 over the proposal amount for unknown factors that may arise during the work; and WHEREAS, the total expenditure, including the contingency amount, is not to exceed $8,912.50; and WHEREAS, the Mayor and City Commission desire to authorize the City Manager negotiate and to enter into a contract with Trident Telecom, Inc for the installation of Wi-Fi Antennas for a total amount not to exceed $8,912.50; NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF SOUTH MIAMI, FLORIDA THAT: Section I: The City Manager is authorized to negotiate the terms and conditions and execute a contract with EMK General Service, Corp for the installation of two concrete poles and an electric panel for the installation of Wi-Fi Antennas for an amount not to exceed $7,750. A copy of the proposal is attached. The manager is authorized to expend an additional amount of $1 , 162.50 over the proposal amount for unknown factors that may arise during the work. Section 2: The expenditure shall be charged to the City's Parking account number 001-1410-513-3459 which has a balance of $10 I ,540.22, before this request was made. Section 3: If any section clause, sentence, or phrase of this resolution is for any reason held invalid or unconstitutional by a court of competent jurisdiction, the holding shall not affect the validity of the remaining portions of this resolution. Section 4. This resolution shall take effect immediately upon adoption. PASSED AND ADOPTED this ___ day of _______ " 2014. ATTEST: CITY CLERK READ AND APPROVED AS TO FORM LANGUAGE, LEGALITY AND EXECUTION THEREOF CITY ATTORNEY APPROVED: MAYOR COMMISSION VOTE: Mayor Stoddard Vice Mayor Harris Commissioner Welsh Commissioner Liebman Commissioner Edmond EMK GENERAL SERVICE, CORP JOB ESTIMATE 292 nw 44 ave MIAMI FL 33126 ContVladimir j Garcia phon:(786)296-4251 emkgeneralserv@yahoo.com TO: City of South Miami ATT :Ricardo A.Ayala 6130 Sunset dr Miami fI 33143 Email:Rayala@SouthMiamiFL.gov JOB DESCRIPTION install two post for wifi network ITEMIZED ESTIMATE: TIME AND MATERIALS Job consists of providing electrical power at two post for the wifi-network.1 will supply the 120 volts with 20 and metter along with the post Labor, Material nota:jobs start date consists of post delivery, it from 3 to 4 weeks TOTAL ESTIMATED JOB COST Quotation prepared by: AC Electrical contractor inc This is a quotation on the goods named, subject to the conditions noted below: (Describe any conditions pertaining to these prices and any additional terms of the agreement. You may want to include contingencies that will affect the quotation.) To accept this quotation, sign here and return: _________________ _ DATE:8/26/2014 AMOUNT $7,750.00 $7,750.00 electrical power at two post for the wifi·network.1 will supply the 120 volts with 20 amp breaker Wlihth~post "Ihiifaiiotis slartdl!fe consists of post delivery,it from 3 to 4 weeks TOTAL ESTIMATED JOB COST these prices and any additional terms of the agreement. affect the quotation.) To: Ricardo A. Ayala. City of South Miami. IN Electrical Contractors, LLC. 2811 NW 103 Street. Miami FL 33147. Cell:786-693-3392,fax:305-694-9284 Email:jsalgueiros@yahoo.es Capital Improvement Project Manager. 4795 SW 75 Ave. Miami, FL 33155. Date: 06/15/14. This is the estimate of the work and materials needed to install the two poles, with all the below specifications as you send us: • A meter can and an electric panel in each pole. • A 120V system. • The city is using a hot, neutral and ground. The ground will be connected to the grounding rod that needs to be installed for the system. • FPL is coming with a duplex #6. • Certain construction work in the sidewalk with the electric box necessary. We are estimating using a concrete pole of 20', whose price is valid 30 days and their delivery is within 6-7 weeks. For all this work IN Electrical Contractors, LLC. is estimating $12876.00, that according the above will change depending the pole prices but around the above estimation, or if there are changes in the job specifications. We are going to need a payment of half of the monies at the beginning and the other one at the final inspection. In the prices, we are including the City permits, the materials, and the above services of our company. If some other job has to be done, or if the inspector asks for some other job to be done, these jobs are not included in this estimate. Jorge E. Salgueiros IN Electrical Contractors, LLC. 13832 SW 142nd Avenue, Miami, FL 33186 DATE: 6/9/2014 JOB NAME: City of South Miami New Concrete Poles CUSTOMER PO: CUSTOMER: Grizel Martinez QUOTE NO.: S6-9-14 -------PREPARED BY: Bob Price PHONE NO.: E-MAIL: bprice@tridenttel.com FAX NO.: E-MAIL: Martinez, Grizel <GMartinez@southmiamifl,gov> Install (2) new 25' concrete poles and electrical hardware per $ $ $ customer provided scope and specifically drawing (file name $ $ $ "droppedimage Rev3 21 14"). $ $ $ This quote includes labor & material cost for the following: $ $ $ (2) 25' concrete poles $ $ $ (2) 60 amp e1ctrical panels $ $ $ (2) meter cans $ $ $ (2) handholes $ $ $ Misc. hardware & conduits $ $ $ permits (City of South Miami only) $ $ $ sidewalk restoration $ $ $ Underground Locates $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ SCOPE: NOTES: Quote does not provide for any fees required by FPL or others. Quote Does not include any sealed structural drawings if required. Traffic control will consist ofbarrades, cones, and flag persons. (No law enforcement personell have been provided for). LABOR AMOUNT: $ MATERIAL/FLAT AMOUNT.' $ ~--------LUMP SUM TOTAL: $ 5,900.00 13832 SW 142 AVE. MIAMI, FLORIDA 33186 * 305.234.0133: MIAN 305.234.0138: FAX 'If IF CITY or PU:A5N·JT UVl:--iG To: FROM: DATE: CITY OF SOUTH MIAMI OFFICE OF THE CITY MANAGER INTER-OFFICE MEMORANDUM The Honorable Mayor & Members of the City Commission Steven Alexander, City Manager Agenda Item No.: ~ July 15, 2014 SUBJECT: A resolution authorizing the City Manager to negotiate and enter into a contract with Trident Telecom, Inc. for a total expenditure not to exceed $6,785 for the installation of Wi-Fi anten nas BACKGROUND: In an effort to provide Wi-Fi service access to provide proper communication for our new parking meter improvements in the Downtown area, it is the City's intent to install two electrical poles to accommodate the antennas for service. AMOUNT: ACCOUNT: The City received three (3) quotes in response to a solicitation, shown below. Pursuant to review, it was determined that Trident Telecom, Inc. is the lowest, responsive and responsible bidder for this project. The three (3) quotes received: Trident Telecom, Inc. EMK General Service, Corp. IN Electrical Contractors, LLC. Amount not to exceed $6,785 $5,900 $6,750 $12,876 The expenditure shall be charged to the City's Parking account number 001-1410-513-3459, which has a balance of $101,540.22, before this request was made. ATTACHMENTS: Resolution Quotes 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 RESOLUTION NO.: _____ _ A Resolution authorizing the City Manager to negotiate and enter into a contract with Trident Telecom, Inc. for a total expenditure not to exceed $6,785 for installation of Wi-Fi antennas WHEREAS, the Mayor and City Commission wish to provide Wi-Fi service in the Downtown area, and require the installation of two antennas to do so; and WHEREAS, pursuant to a competitive selection process in accordance with the City Charter, it was determined that Trident Telecom, Inc. submitted a proposal in the amount of $5,900 that was the most comprehensive and cost effective in its construction approach; and WHEREAS, the City desires to provide a 15% contingency of $885 over the proposal amount for unknown factors that may arise during the work; and WHEREAS, the total expenditure, including the contingency amount, is not to exceed $6,785; and WHEREAS, the Mayor and City Commission desire to authorize the City Manager negotiate and to enter into a contract with Trident Telecom, Inc for the installation of Wi-Fi Antennas for a total amount not to exceed $6,785. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF SOUTH MIAMI, FLORIDA THAT: Section 1: The City Manager is authorized to negotiate the terms and conditions and execute a contract with Trident Telecom, Inc. for the installation of Wi-Fi Antennas for an amount not to exceed $5,900 and he is authorized to expend up to $885 for unforeseen conditions. A copy of the proposal is attached. Section 2: The expenditure shall be charged to the City's Parking account number 001-1410- 513-3459 which has a balance of $101,540.22, before this request was made. Section 3: If any section clause, sentence, or phrase of this resolution is for any reason held invalid or unconstitutional by a court of competent jurisdiction, the holding shall not affect the validity of the remaining portions of this resolution. Section 4. This resolution shall take effect immediately upon adoption. PASSED AND ADOPTED this ___ day of ______ , 2014. ATTEST: CITY CLERK READ AND APPROVED AS TO FORM LANGUAGE, LEGALITY AND EXECUTION THEREOF CITY ATTORNEY APPROVED: MAYOR COMMISSION VOTE: Mayor Stoddard Vice Mayor Harris Commissioner Welsh Commissioner Liebman Commissioner Edmond T 13832 SW 142nd Avenue, Miami, FL 33186 DATE: 6/9/2014 JOB NAME: City of South Miami New Concrete Poles CUSTOMER po: CUSTOMER: Grizel Martinez QUOTE NO.: S6-9-14 --~---PREPARED BY: Bob Price PHONE NO.: E-MAIL: bprice@tridenttel.com FAX NO.: E-MAIL: Martinez, Grizel <GMartinez@southmiamifl.gov> Il}l;:mli)jif:,!S\;';'ii'}~:"" "C" m\inir{\n'\(Nillij~j;;Fi!l\;jiW;i;H;f~jr', ~1(t91!¥?l!;! ~M~~~~~jt::::~:~c .",1~~i;~i·'I';'t! •. 'f;'itqJ2~~tHn¥;~ 1~'i:'L"."m,' r:~:!y", Install (2) new 25' concrete poles and electrical hardware per 1 $ -$ -$ customer provided scope and specifically drawing (file name $ -$ -$ " dropped image Rev321 14"). $ -$ -$ This quote includes labor & material cost for the following: $ -$ -$ (2) 25' concrete poles $ -$ -$ (2) 60 amp elctrical panels $ -$ -$ (2) meter cans $ -$ -$ (2) handholes $ -$ -$ Misc. hardware & conduits $ -$ -$ permits (City of South Miami only) $ -$ -$ sidewalk restoration $ -$ -$ ., Underground Locates $ -$ -$ $ -$ -$ $ -$ -$ ~~ .. -.. . ....... --.. -~ ... $ -$ -$ $ -$ -$ $ -$ -$ SCOPE: NOTES: Quote does not provide for any fees required by FPL or others. Quote Does not include any sealed structural drawings if required. Traffic control will consist of barrades, cones, and flag persons. (No law enforcement personell have been provided for). LABOR AMOUNT: $" MATERIAL/FLAT AMOUNT: $ LUMP SUM TOTAL: -$..,,----5---:::,9-:"00':'"". O':'""O~ 13832 SW 142 AVE. MIAMI, FLORIDA 33186 * 305.234.0133: MIAN 305.234.0138: FAX - - - - - - - - - - - - - - -~~"--.. --- - - To: Ricardo A. Ayala. City of South Miami. IN Electrical Contractors, LLC. 2811 NW 103 Street. Miami FL 33147. Cell:786-693-3392,fax:305-694-9284 Email:jsalgueiros@yahoo.es Capital Improvement Project Manager. 4795 SW 75 Ave. Miami, FL 33155. Date: 06/15/14. This is the estimate of the work and materials needed to install the two poles, with all the below specifications as you send us: • A meter can and an electric panel in each pole. • A 120V system. • The city is using a hot, neutral and ground. The ground will be connected to the grounding rod that needs to be installed for the system. • FPL is coming with a duplex #6. • Certain construction work in the sidewalk with the electric box necessary. We are estimating using a concrete pole of 20', whose price is valid 30 days and their delivery is within 6-7 weeks. For all this work IN Electrical Contractors, LLC. is estimating $12876.00, that according the above will change depending the pole prices but around the above estimation, or if there are changes in the job specifications. We are going to need a payment of half of the monies at the beginning and the other one at the final inspection. In the prices, we are including the City permits, the materials, and the above services of our company. If some other job has to be done, or if the inspector asks for some other job to be done, these jobs are not included in this estimate. Jorge E. Salgueiros IN Electrical Contractors, LLC.