1969-644ORDINANCE NO. 12 -69 -644
BE IT ORDAINED BY THE MAYOR AND CITY 'COUNCIL OF THE
CITY OF SOUTH MIAMI, FLORIDA:
Section `1. That subsections (A), (B), (C) andr(D) of
Section 7 -3, Chapter 7 of the Code of Ordinances, City of South
Miami, Florida, be a.nd -the same hereby are amended and a new
subsection (E) is hereby added, all to read as "follows, to -wit:
(Schedule attached)
Section 2. That all ordinances or parts of ordinances in
conflict herewith be and the same hereby are repealed insofar as
they are in conflict.
Section 3. It is the intent that this ordinance be
permanent in nature and shall be included in the Code of Ordinances
of the City of South Miami, Florida, and the sections hereof may be
renumbered for such purpose.
Section 4. That any person, pers'ons, firm, partnership
or corporation violating any of the provisions of this ordinance
shall, upon conviction, be punished by a fine not to exceed $500.00,
or by imprisonment not to exceed six months, or by both such fine and
imprisonment in the discretion of the Municipal Judge. Each 'day
that a violation is permitted to exist shall constitute a. separate
offense.
PASSED and ADOPTED this 20 day of May 1969.
Attest:
ay r_
y Clerk .
Ci
�.
BUILDING PERNSIT FEES
ORDINANCE NO. 12 -69 -644
(A) BUILDING PERMITS FEES
(Fees listed here do not include plumlirg, electrical
or mechanical installations)
(1) NEW BUILDING AND /OR ADDITIONS:
For each 100 E:q. ft. or fractional part
of floor area . . . . . . . . . . . . . . . . $
2.25
Minimum fee . . . . . . . . . . . . . . . . .
15.00
Except that for builddings for storage and
industrial uses of the'Group E and F do -.:
cupancies as defined in the South Florida
Building Code, the fee shall be':
For each 100's'q. ft., or fractional
part of floor area up to 20,000 sq. ft.
2.25
For each additional 100 sq. ft. or
fractional part of floor`Area thereafter.
1.00
Minimum fee . . . . . . . . . . . . . . . .
10.00
Except'that for greenhouses and buildings
for agricultural uses (nonresidential)
when `located on the premises so used, screen
enclosures and trailer additions:
For each 100 sq. ft. or fractional
,.ter,. Of floor area . . . . . . . . . . . . .
1.00
Minimum 'fee . . . . . . . . . . . . . . . . .
5.00
(2) NEW CONSTRUCTION OT ~HER TITAN AS SPECIFIED HEREIN:
(WA TER "TOWERS, PYLONS, BULK STORAGE -TANK FOUN-
DATIONS, SEA WALLS, BULKHEADS, UNUSUAL LIMITED -
USE BUILDINGS, FREE - STANDING RIGID CANOPIES,
MARQUEES AND SIMILAR CONSTRUCTION)
For each $1,000 of estimated cost or
fractional part. . . .
. . , •
2.25
Minimum fee . . ,
. . . .
10.00
1;,
-2-
is 1
r;
(Except for each service station under-
ground-storage tank and each approved
fall6bt shelter which conforms to the
specifications - established by--the Civil
Defense and mobilization agency and the
South Florida Building Code) . . . . . . . . .
5.00
Minimum fee . . . (Storage Tank only).
10.00
(3)
A "ERATIONS--Xie REPAIRS TO zWqlLlbfNGS AND
OTHER STRUCI'URES:
Up to $10000-6f estimated cost or
fractional part . . . . . . . . . . . . . .
5.00
For each additional $1,000 of estimated
cost"or fractional part. . . . . . . . . .
2.50
(4)
IN-S.'T"ATUATIOU OF EXTERIOR OPERABLE WINDOWS 'AND`
EXTERIOR SLIDING "Mjds§1Yd618 IN NEW bUILDINtg-
OR ADDITIONS -ERt EXCEEDING W61 ST6k'Ei"S' IN HEIGHT
AND THE INSTALLATION,' ALTERATION AND 911�KW'&F
SUCH WINb6WS ARD"b6&8 IN EXISTING BUILDINGS
OF ANY HEIGHT, AS FOLLOWS:
New ifi'stal!Atipn or replacement for each
window or door unit up to the first
100 units* . . . . . . . . . . . . . . .
.50
For each additional unit . . . . . . . ..
.25
Minimum fee . . . . . . . . . . . . . . .
2.00
*Unit is the openingi``bbtweeh
structural columns
(5)
IN§Wk 'ZF'C`bRTAiN WALLS, INCLUDING
WINDOW AND DOORS THEREIN AND THE ALTERATION,
REPAIR OR REPLACEMENT OF STORE' FRONTS AND
SIMILAR FIXED GLASS
For each additional 100 sq. ft. or
fractional part thereof . . . . . . . . .
1.00
i
For each addition-al lbb sq. ft. or
fractional part thereof . . . . . . . . .
.50
Minimum fee . . . . . . . . . . . . . . .
2.00
(6)
MOVING BUILDINGS OR OTHER STRUCTURES:
Per Building or Structure . .. . . . . . .
25.00
For each 100 sq. ft. or fractional part
1.00
thereof - (does not include Cost of new
foundation or repairs to building or
structure
-2-
is 1
(7)
CONCRETE SLABS: (OTHER THAN PAVING)
(Where separate installation not covered
by prior permit) _
For first 1,000 sq. ft. or fractional
part thereof . . . . . . . . ... . .:
$ 5.00
r-. each additional 1,000 sq. ft. or
fractional part of area . . . . . . . . .
2.00
(8)
PAVING:
(On other than public right -of -way and
excluding paving in connection with "single
famly`and duplex 'use)
For first 1,000 sq. ft. or fractional
part of area . . . . . . . . . . . . . .
5.00
For each additional 1,000 sq. ft. or
fractional part of area . . . . . . . . .
1.00
(9)
ROOFING: (Including reroofing)
For first 2,000 sq. ft. or fractional
part of area . . . . . . . . . . . . .
5.00
For each additional 1,000 sq. ft. or
additional part'of area . . . . . . . .
2.00
(10)
FENCES AND /OR WALLS:
For each 100 lineal feet or fractional
part . . . . . . . . . . . . . . . . .
3.00
(11)
AWNINGS AND CANOPIES:
First $1,000 of estimated cost . . . . .
5.00
For each additional $1,000 or fractional
part thereof . . . . . . . . . . . . . .
2.00
(12)
SWIMMING POOLS:
For the first 20,000 gallon capacity or
fractional part . . . . . . . . . . . . .
20.00
For each additional 1,000 gallon capacity
or fractional part . . . . . . . . . . . .
1.00
(13)
TEMPORARY PLATFORMS AND TEMPORARY' BLEACHERS
TO BE USED FOR PUBLIC ASSEMBLY:
For each 100 sq. ft. or fractional part
of platform area . . . . . . . . . . . . .
2.25
For 100 lineal feet or fractional part of
seats---;,. . . . . . . . . . .
1.25
-3-
}
■
Mr
(14 )
DEMOLITION OF BUII,DINGS :
For the first 1,500 sq. ft. or fractional
part of floor area •. .. .......... .... -. . -. $
500
For each additional 1,000 sq. ft. or
fractional part of floor area . . . . . .
2.00
(15)
DEMOLITI61i] -OF SIGNS, FENCES AND 16R`WALLS
AND STPUC:URnb OTIIER THAN ABOVE:
For each $LOO or fractional part of
esti=mated cost up to $1,060 . . . . . . .
1.25
For each Additional $1,000`or fractional
part of estimated cost . . . . . . . . . .
2.25
(16)
DOUBLE FEES:
When work for which a permit is required is
commenced prior to the obtaining of a permit,
the fees, as specified herein, may doubled,
but in no event shall such doubled 'fee be less
than ten dollars ($10:00)`: The payment " "of
such double fee shall not relieve any person,
firin'or cor oration from full- corny
p y plying with
all of the regiirements of all appl`i.cable 'reg-
ulitions and codes, nor shall it `relieve them
from being subject to any of "the "penalties
therein. The double fee requirement shall be
appkicable'`to all divisions of the Building
Department.
(17)
REINSPECTION FEES:
When extra inspection trips "are necessary due
to (1) wrong address being given on call for
inspection (2) prior rejection of work due to
faulty construction (3) work not be'irig'ready
for inspection at time specified`(4) failure
to call for final or other inspections (S)
reci red corrections not being'made'or completed
at time specified, a fee of 'five dollars ($5.00)
for each reinspection may be charged.
The payment of reinspection fees may be required
before any further permits will be issued to
the person or firm owing same, and further in-
spections may be refused until payment of re-
inspection 'fees have been made.
Reins p ect ion of existing., buildings-by 1Cl`1 divisions
to determine compliance with the South Florida
Building Code, but not annual inspections as re-
quired by 305.1(d) . . . . . . . . . . •
$5.00
-4-
-5-
4
(B) PLUMBING
PE' IT FF.F.S:
(1)
ROUGHI G`4N OR P .
- LUGGED -OUTLETS Ff1R:
g - --T -_.
- ---- -- .-.
BATH TUBS CLOSETS, DOCT7RS, DENTISTS
AND IiOSPITAL' STERILIZEERS, hJTOCi,A,.T� ,
AUTOPSY TABLES F+tM OTHER FIXTURES, AP-
PURTENANCES'dA -OTHER APPLIANCES 'HAVING
WATEA-SUPPLY OR WASTE OIiTLET, OR`BO H
DRINKING FOUNTAINS; FIX TLRES'DISCHARGING
INTO TRApS OR SAFE WAS TE PIPES, FLOOR
DRAINS, LAUNDRY TUBS, LAVATORIES, 'SAFE
WASTE PIPES-, SHOWERS, SINKS, SLOP SINKS,
URINALS:
For first roughing -in or plugged outlet. . . $
1.25
For each additional outlet . . . . . . . . .
1.25
Fixtures set on new roughing- in' 'or plugged
outlets or replaced on old roughing=in:
First fixture . . . . . . . . . . . . . .
1.25
Each additional fixture . . . . . . .
1.25
(2)
SEPTIC TANKS, SETTLIgNG TANKS, GAS AND" OIL
INTERCEPTORS, GREASE TRAPS AND�"SOAKAGE PITS:
(Including drai'ritile for same)
1,200 gallon capacity" or less . . . . • •
4.00
Over 1,200'gal'lon capacity . . . . ...
5.00
Draintile relay . . . . .
4.00
Tank Abandonment (where being abandoned).
4.00
(3)
SEWER:
Each building storm sewer and each building
sewer where connection is made to a sepfc
tank, to a collector line or to an exist "ir►g
sewer or to a city sewer o-- soakage `pit or
to a buildin g drain outside a build;7,^
3.00
SEWER CAPPING
. . . . . . . . . . . . . . .
5 .00
(4)
WATER DRAINAGE:
RAIN WATER ROOF INLET:
First inlet . . . . . . . . . . . . . .
2.00
Each additional inlet . . . . . . . . .
1.00
AREA, YARD, SIDEWALK OR RAINWATER` DRAIN
FOR WHICH NO OTHER FEE IS PROVIDED:
First surface inlet . . . . . . . . , . . .
2.00
Each additional inlet . . . . . . . . . . .
1.00
Each soakage pit . . . . . . . . . . . . .
5.00
-5-
(5)
CONDENSATE DRAIN:
Per outlet . . ... . . . . . . . . . . . . $
1.00
Except single not 'rtianifolded A/C outlet,
not exceeding 5 HP. . . . . . . . . . .
No Charge
(6)
WATER PIPING:
Water service connection to a municipal
or private water supply system (for first
meter on each lot) . . . . . . . . . . . .
3 .-00
Each additional meter on same lot
2.00
Water connection to 'or 6 t "lets forap -
pliance or installat 6ns`°rot covered by
fixtures or other permit . . . . . . . . . .
2.00
Irrigation system and" " under ground
sp'r`inkler system, etc. . . . . . . . . . .
5.00
Fire sprinkler system connection to
city water . . . . . . . . . . . . . . . .
5.00
Fire control system, including standpipe,
siamese connections, and pumps:
Each standpipe . . . . . . . . . . . . .
3:00
Each Bose rack . . . . . . . . . . . . .
1.00
Standby for emergency potable water supply
outlet . . . . . . . . . . . . . . . . . . .
5.00
Solar waterheater installations or repairs.
5 .00
Solar waterheater booster connection . . . .
2.00
Swimming °-pool piping `installations, not
including wells . . . . . . . . . . . . . .
5.00
Swimming pool piping replacement or repair
work (each )ob). Fee only for jobs, costing
more than "$25.00 (material and labor)
unless hydraulics of piping system on
lesser job affected. . . . . . . . . . .
4.00
Repairs to water piping . . . . . . . . .
4.00 i -'`,
Fee only for jobs costing more than $25.00
(material and labor)
!7)
WELLS:
All wells . . . . . . . . . . . . . . . . .
5.00
(8)
MINIMUM PLUMBING PERMIT FEE . . . , . . , , ,
4.00
Except waterheater replacement and water
connection from well to water service . . .
2 .00
-6-
L
Nl'-T-'RAT, GAS & LIOITEFIED PFTR I MEOW
For the first outlet (includes cylinders
and regulators) . . . . . . . . . . . .
2.00
For each additional outlet . . . . . .
1.25
For the first iioplllance (does not include
warm air - heating units) (See Fee Section D
(2) for heating) . . . . . . . . . . . .
1.25
For each additional appliance or replacement
1.25
For f irst meter . . . . . . . . . . . . . . .
2.00
For each additional meter . . . . . . . . . .
1.25
For change from master-to an individual meter
2.00
For m& , Jor repairs to gas pipe i pe whdire' no 'fixit1fre
or appliance installation is involved
2.00
-Underg'robhd L.P. Gas tanks . . . . . . . .
5.00
Change of coM an y - (no additional a ppli-
ances or outlets) . . . . . . . . . . . . .
2.00
(10)
ER TREATMENT PLANTS, PUMPING STATION,
SEWAGE TkE_A_T''MEN1T'P_'LANT AND L-4-FT STATIONS:`
Water 'treatment plant ('Interior plant
piping) . . . . . . . . . . . . . . .
10.00
Sewage treatment plant (Interior plant
piping) . . . . . . . . . . . . . . . . . .
10.00
Lift station (Interior station piping) . . .
5.00
(11)
WATER AND (on private property
and other than public utility easements)
Minimum fee per job . . . . . . . . . . . .
4.00
(12)
SiPOkM P&D" SANITARY UTILITY AND /OR
COLLECTOR- " LIN'E'S=: (On private property
other than public utility easements)
MINIMUM fee per job . . . . . . . . . . .
4.00
(13)
(a) TEMPORARY TOILETS - WATER BORNE
For each installation . . . . . . . . .
4.00
(b) CHEMICAL TOILETS
For each installation . . . . . . . . . .
4.00
(14)
MISCELLANEOUS:
Siphon breakers on old installations,
required wh6n: repair of unapproved water
closet is made, each . . . . . . . . . . .
2.25
-7-
(15)
D6MI.F. FEES:
Same as Section 7 -3 (A)(16)
(16)
REINSPECTION FEES:
Same as Section 7 -3 (A) (17)
(C) ELECTRICAL PERMIT FEES:
(1)
ROUGH WIRING'OLITLETS ;' (Light, receptacle,
switch; sign and also telephone and other
low voltage outlets)
1 through "`10 outlets . . . . . . . . .
$ 2,25
For each additional outlet . . . . . .
.25
(2)
SERVICES: (The fo1 °lowing fees shall be
charged'for each service and for each
sub`feed in new installati6ns 'only. No
charge will be made for subfeeds in
existing installations)
Temporary for construction .. . . . . .
3.00
100 ampere and° 'under. - . .
2.5U
Over 100 ampere to 200 ampere . . . . . .
3.50
Over 200 ampere'to 400 ampere . . . . .
4.50
Over 400�6mpere to 60�0'ampere . . . . .
5.50
Over 66, ampere `to 800` ampe °re . . . . .
6.50
For each additional 100 ampere (over 800
ampere) . . . . . . . . . .
1.00
Service repair and /or meter change . . .
3'00
(3)
SWITCHBOARDS: (By amperes, same as "SERVICES"
shown in Item C -2 above)
(4)
EQUIPMENT OUTLETS OR+PERMANEN'P CONNECTIONS:
Range o . . . . . . . . . . . . . . . . .
1.75
Range top . . . . . . . . . . . . . . .
1.75
Oven . . . . . . . . . . . . . . . .
1.75
Waterheater . . . . . . . . . . . . . . .
1.75
Spac6heater . . . . . . . . . . . . . .
1.25
Washilhg Machine . . . . . . . . . . . . .
1.25
Dryer . . . . •
1.25
Fan (with fractional HP motor). . . . . .
1.25
Garbage Disposal . . . . . . . . . . . . .
1.25
Dishwasher . . . . . . . . . . . . . . . .
1.25
Deep freezer . . . . . . . . . . . . . .
1.25
Refrigerator . . . . . . . . . . . . . .
1.25
Air conditioners, window and through
wall units . . . . . . . . . . . . .
1.25
(Motors)
Each up to 1 IiP
1.25
Each over 1 HP thr6u4h -3 HP
2,25
Each over 3 HP through' 5 HP
3.50
Each over 5 IIP through 8 hp
4.50
Each over 8 HP through 10 `HP
5.50
Each over 10 HP through 25 HP
9.00
Each over 25 HP through 100 HP
11.00
Each over 100 HP
17.00
.p-
`'
(Air conditioners - electrical work
except wall and window units - per ton
$1.00
(5)
MACHINE OUTLETS OR PERMANENT CONNECTIONS:
X -ray - Portable (D&ntist . . . . . .
1.25
X -ray - Stationary- (Doctor . . . .
5.50
Diathermy . . . . . . . . . . . . . .
1.25
(6)
GENERATORS `AND "TRANSFORMEKS, COMMERCIAL
HEATING EQUIPMENT AND STRIP HEATERS;
Each up to 5 KVA or Kw . . . . .
2.25
Each Ygener'ator or tkdh4former `over
5 KVA or KW through 10 KVA or KFT
4.50
Each generator or "transformer over
10 KVA or KW `through 15 KVA 'or KW.
6.75
Each 'generator`or transformer over
15KVA or KW through 20 "KVA'or KW . . .
9.00
- Each generator or transformer over
20 KVA 'or KW 'through `25 KVA 'or KW. . .
11._00
Each generator or transformer over
25 KVA or KW or over . . .
17.00
Generators and transformers, where
located "on the "same floor, 'fee for
largest, plus $1-0010_r each additional
(7)
WELDING MACfIINE OUTLETS:
Up to 25 amperes . . . . . . .
2.25
Over 25 amperes to 50 amperes . . . .
3.50
Over 50 amperes, $3.50 plus . . . . .
1.25
for each additional 50 amperes or
fractional part thereof.
(8)
SPECIAL PURPOSE OUTLETS: (Commercial)
Popcorn, doughnut, drink machines
coin music machines, toaster's,
coffee 'urn, deep`fryer, telephone
booths, refrigerator, display
cases, etc each. . . . . . . . . . .
1.25
Painting - bake ovens, each . . . . . .
5.50
(9)
SIGNS:
F'ir'st l00 bulbs . . . . . . . . . . .
5.00
Each additional 100 bulbs or fraction
thereof . . . . . . . . . . . . .
1.00
Transformers (Neon) for first . . . . .
2.00
Each additional transformer . . . . . .
1.50
Flasher i . . . . . . . . . . . . . . .
1.50
Time clock . . . . . . . . . . . . . . .
1.50
Sign repairs, connection and reconnection
1.50
-9-
a
•
(10)
FIXTURES:
Lights I through 10 sockets
1.25
I through 10 fluorescent tubes
1.25
Each additional . . . . . . . . . . . .
.10
(11)
COMBINATION:
Light fiXtures and outlets up through
10 - one inspection . . . . . . . . . .
2.00-
(12)
STREAMERS OR FESTOON tfG_'H'_T_S:
First 10 lights or less . . . . . . . .
Each Additional 10 or less . . . . .
.15
(13)
PLUGMOLD:
First 25 feet . . . . . . . . . . . . .
1.25
Each 5 feet thdreaft&r . . . . . . . . .
.25
(14)
ttkpomky w0ftK ON ctRcUSES, CARNIVALS, ETC.
"k- - t
E q U J 1 p�me n' ground, each . . . . . . . .
1.00
Service as per Itdmd(i)
Outlets as per Items 6(1) and (13)
Minimum 'fee . . . . . . . . . . . . . . 25.00
(15)
MINIMS - A
UM" PERMIT INCLUB� REPAIR -WORK
NOT ftSEWfflg'RE CLASSIFIED. . . . . . . . . .
3.00
(16)
FIRE DETECTION SYSTEM:
Installation, Cd"
ntral System . . . . . .
3.00
Head or target area, with prote'ctu
or wire of similar character
EACH. . . . ... . . . . . . . . . . . .
.25
Bell alarm station, each. . . . . . . .
.25
Reiiispection fee, semiannually. . . . .
4.50
(11)
MASTER TELEVISION AND RADIO RECEIVING ANTENNAE:
3. 00
TV and radio aht&n_na,devices, wall outlets,
suppressors, splitters, lightning arrestors,
receivers, input deVices, audio amplifiers,
ground connections, etc.
I through 5 devices . . . . . . . . . .
3.00
Each additional device. . . . . . . . .
.25
(18)
DOUBLE FEES:
Same as Section 7-3 (A)(16)
(19)
REINSPECT-LON FEES:
Same as Section 7-3 (A)(17)
-10-
•
r
.Y
(D) MECHANICAL PERMIT FEES:
(1) AIR CONDITIONING AND REFRIGERATION:
(Includes all component parts of the
system except that water, electric
and gas lines and connections are feed
separately)
(Where BUT rating—is not known, substitute
one`h°orsepower for one ton or 12,000 BUT's
'for one ton)
For each ton capacity or fractional
part thereof . . . . . . . . . . . . . .
2.00
Minimum Fee . . . . . . . . . . . . . . . .
3.00
(2) FURNACES AND HEATINWIQUIPMENT,
INCLUDING'COMMERCIAL DRIERS, OVENS
AND OTHER FIRED'd CTS NOT ELSEWHERE
CLASSIFIED '(Includes all component
parts of the system except fuel and
electrical lines)
For the first 200,00'0 "BTU per
hour or fractional "part. . . . . . . . .
5.`00
For each addit�id al 100,00 BTU per
hour or fractional "part . . . . . . . . .
2.00
Except for unvent'ed spaceheaters and
vented wall heaters (no'duct work)
First such unit . . . . . . . . . . . . .
3.00
For each additional such unit . . . . . .
1.00
(E) ELEVATORS', ESCALATORS AND
OTHER LIFTING APPARATUS:
Fee for rR &t for original instt.
al -
lation or major revamping' "( iclude's
initial inspection and certificate)
Passenger and freight elevators. . . . . .
10.00
Each-landing other than first floor. . .
2.00
Escalator, manlifts, dumbwaiters, hand
M:red freight elevators and all other
ing and transporting apparatus (ex-
cept as herein otherwise provided)
10.00
Material hoists for construction. . . . .
No fee
sets
14)
AMII.":SWNT RIDES AND DEVICES: 4
For each portable or temporary unit. . .
11.00
For each pd'kmanent unit installed
or altered . . . . . . . . . . . . . .
55:00
Semiannual inspection (permanent
installation only)
For each ride or device at
any one location. . . . . . . . . . . .
5.00
(5)
BOILERS AND PRESSURE VESSELS:
Installation permit fees (including
initial inspections and certificate)
(Does not include . installation
or connection of fuel and water
lines:
"
�ined in the ASME
Steam boilers (as def
Boiler and Pressure Vessel Code)
Each . . . . . . . . . . . . . . . . . . .
10.00
Hot water boilers "(as defined in the
ASME Boiler and Pressure Vessel Code)
Each . . . . . . . . . . . . . . . . . .
. 10.00
Minature boilers (as defined in the
ASME Boiler and °P'res'sure Vessel Code)
Each. . . . . . . . . . . . . . . . . .
. 5.00
Steam driven prime movers
Each . . . . . . . . . . . . . . . . . .
. 10.00
Steam actuated machiners
Each . . . . . . . . . . . . . . . . . .
. 2.00
Unfired Pressure Vessels (gpera`tirig
at pressures 'in ' excess of 40 psi and
having a volume of more than 5 cu.ft.).
. 5.00
(6)
FIRE SPRINKLER SYSTEM
Per sprinkler head . . . . . . . . . . .
. .10
Miniiium permit fee . . . . . . . . . . .
. 5.00
CO2 and Dry Powder Systems for
estimated cost up to $1,000 . . . . . .
. . 5.00
For each additional `$1,000
or fractional part thereof . . . . . . .
. 2.00
(7)
STORAGE TANKS FOR FLAMMABLE LIQUIDS . . . . . . .
. 5.00
-12-
1
}
INTERNAI, COMBUSTION ENGFINES:
f-
Stationary . . . . . . . . . .
$ 5.00
(9)
OTHER FEES:
Pressure and process 'piping, sheet
metal and duct work and other
mechanical lines
For estimated cost's up to $1;000.
5.00
For 'each additional $1;000 or
fractional part . . . . . . . . . .
2.00
(10)
DOUBLE FEES:
Same as Section 7 -3 (A)'(16)
(11)
REINSPECTION FEES:
E
Same as Section 7 -3 (A)(17)
I
(E) SIGN
'PERMIT FEES
i
(1)
(TEMPORARY SIGNS)
(a) Sub`divis'ion signs larger than six
III
(6) square feet . . . . . . . .
5.00
(b) Construction on the premises
(present or proposed) Real Estate
"For Sale" or "For Rent" signs
larger than six (6) square feet.
3.00
(2)
POINT`'OF SALE SIGNS
(OCCUPANT USE, PRODUCTS SOLD)
�rA
(8)
INTERNAI, COMBUSTION ENGFINES:
Stationary . . . . . . . . . .
$ 5.00
(9)
OTHER FEES:
Pressure and process 'piping, sheet
metal and duct work and other
mechanical lines
For estimated cost's up to $1;000.
5.00
For 'each additional $1;000 or
fractional part . . . . . . . . . .
2.00
(10)
DOUBLE FEES:
Same as Section 7 -3 (A)'(16)
(11)
REINSPECTION FEES:
Same as Section 7 -3 (A)(17)
(E) SIGN
'PERMIT FEES
(1)
(TEMPORARY SIGNS)
(a) Sub`divis'ion signs larger than six
(6) square feet . . . . . . . .
5.00
(b) Construction on the premises
(present or proposed) Real Estate
"For Sale" or "For Rent" signs
larger than six (6) square feet.
3.00
(2)
POINT`'OF SALE SIGNS
(OCCUPANT USE, PRODUCTS SOLD)
(a) Cantilever sign . . . . . . .
'
500
(b) Flat sign . . .
5.00
(c) Marquee sign. . . . . . . . . . .
5.00
(d) Py" 16h sign . . . . . .
5.00
(e) Detached sign . . . . . . . ...
10.00
f Project sign . . . .
5.00
(g) of sign . . . . . . . . . . . .
10-00
(h) Combination vertical - projecting -
roof sign . . . . .
15.00
U) Painted signs on walls of building
7.50
-13-