10TIlE CITY OF PLEASANT LIVING To: FROM: DATE: CITY OF SOUTH MIAMI OFFICE OF THE CITY MANAGER INTER-OFFICE MEMORANDUM The Honorable Mayor & Members of the City Commission Steven Alexander, City Manager Agenda Item No.: / July 15, 2014 SUBJECT: A resolution authorizing the City Manager to negotiate and enter into a contract with Maggolc, Inc. for a total expenditure not to exceed $15,582.50 for Citywide Sidewalk Repair BACKGROUND: In an effort to address public safety concerns, it is the City's intent to perform sidewalk repairs in various locations in an effort to eliminate tripping hazards. An extensive inspection of sidewalks was conducted to identify cracks or broken sidewalks. These repairs require the replacement of sidewalk flags to correct the broken or missing sections. The City received four (4) quotes in response to a solicitation, shown below. Pursuant to review, it was determined that Maggolc, Inc. is the lowest, responsive and responsible bidder for this project. AMOUNT: ACCOUNT: Four (4) quotes received: Maggolc, Inc.: Pioneer Construction Management Services Sanchez Arango: B Square Construction Management Group, LLC $13,550.00 $14,277.50 $21,937.00 $28,496.69 A 15% contingency of $2,032.50 will be included over the proposal amount to address for unknown factors that may arise during the work. The total amount of the contract, including the contingency, will be $15,582.50. Amount not to exceed $15,582.50 The expenditure shall be charged to the Engineering & Construction account number 001-1790-519-3450, which has a balance of $55,730.00, before this request was made. ATTACHMENTS: Resolution Quotes 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 RESOLUTION NO.: _____ _ A Resolution authorizing the City Manager to negotiate and enter into a contract with Maggolc, Inc. for a total expenditure not to exceed $15,582.50 for Citywide Sidewalk Repair WHEREAS, the Mayor and City Commission wish to provide sidewalk repair to several locations within the City, and WHEREAS, pursuant to a competitive selection process in accordance with the City Charter, it was determined that Maggolc, Inc submitted a proposal in the amount of $13,550.00 that was the most comprehensive and cost effective in its construction approach; and WHEREAS, the City desires to provide a 15% contingency of $2,032.50 over the proposal amount for unknown factors that may arise during the work; and WHEREAS, the total expenditure, including the contingency amount, is not to exceed $15,582.50; and WHEREAS, the Mayor and City Commission desire to authorize the City Manager to negotiate and enter into a contract with Maggolc Inc for citywide sidewalk repairs for a total amount not to exceed $15,582.50. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF SOUTH MIAMI, FLORIDA THAT: Section 1: The City Manager is authorized to negotiate the terms and conditions and to execute a contract with Maggolc, Inc for the citywide sidewalk repairs for an amount not to exceed $13,550.00 and he is authorized to expend up to $2,032.50 for unforeseen conditions. A copy of the proposal is attached. Section 2: The expenditure shall be charged to the Engineering & Construction account number 001-1790-519-3450 which has a balance of $55,730.00, before this request was made. Section 3: If any section clause, sentence, or phrase of this resolution is for any reason held invalid or unconstitutional by a court of competent jurisdiction, the holding shall not affect the validity of the remaining portions of this resolution. Section 4. This resolution shall take effect immediately upon adoption. PASSED AND ADOPTED this ___ day of ______ , 2014. ATTEST: CITY CLERK READ AND APPROVED AS TO FORM LANGUAGE, LEGALITY AND EXECUTION THEREOF CITY ATTORNEY APPROVED: MAYOR COMMISSION VOTE: Mayor Stoddard Vice Mayor Harris Commissioner Welsh Commissioner Liebman Commissioner Edmond ENGINEERING CONTRACTOR -LlC: E-251302 and CUC-1224888 11020 SW 55 ST., MIAMI, FL 33165 Miami, June10, 2014 To: Ricardo A. Ayala, PE · City of South Miami PHONE: 786·291·2949 FAX: 786-472·8831 maggolc@yahoo.com PROPOSAL • Capital Improvement Project Manager Public Works and Enginering Deapartment The Maggolc Inc. Proposal for Sidewalk Repair (263 SY) and Curb Type D (40 LF) as quantities provides in: North End and Downtown Area is: $ 13,550.00 · The price Include: -Maintenance of Traffic. · -Mobilization. -Concrete Remove and Disposal -New concrete sidewalk -Restoration. Thank You for the opportunity, E:J.!QNEEJ~ PROPOSAL ITEMS liTEM DESCRIPTION Qty Units Unit Price Amount 1 Mobilibation LS 1 $ 200.00 $ 200.00 2 Maintenance of Traffic (pedestri LS 1 $ 200.00 $ 200.00 3 Root Pruning (as needed) SF 500 $ 0.10 $ 50.00 4 Concrete Removal (as needed) SY 279 $ 9.50 $ 2,650.50 5 4 11 Concrete Sidewalk SY 182 $ 33.00 $ 6,006.00 6 6 11 Concrete Sidewalk LF 97 $ 43.00 $ 4,171.00 7 D-Curb 40 $ 25;00 $ 1,000.00 Bid Total $ 14/277.50 Martinez. Grizel From: Sent: To: Subject: Good Morning, ROUGET SANCHEZ [ROUGET@sanchezarango.com] Friday, June 13, 2014 11 :07 AM Martinez, Grizel; Ricardo Ayala RE: Concrete Sidewalk Repair Our price for the sidewalk repair project is twenty one thousand nine hundred thirty seven dollars ($21,937.00). Thank you for allowing us to submit a price for this project. Should you need a formal written proposal [lease do not hesitate to let me know. Regards, Rouget From: Martinez, Grizel [mailto:GMartinez@southmiamifl.gov] Sent: Thursday, June 05, 20149:23 AM To: Ricardo Ayala Subject: FW: Concrete Sidewalk Repair Good Morning, Attached is a revised scope for the sidewalk repair project. There is one line item that was missing information, now it is included. Please provide a quote by next week. Thank you, Grizel Martinez, E.I. GMartinez@SouthMiamiFL.gov Engineering & Construction Division City of South Miami 4795 SW 75 Avenue Miami, FI33155 305-403-2063 From: Ricardo Ayala Sent: Wednesday, May 28, 2014 8:07 PM To: Martinez, Grizel Cc: Kelly Barket Subject: Concrete Sidewalk Repair Attached please find a summary for the locations and quantities for concrete sidewalk repair at various locations citywide. We need a fee proposal for the repair of the concrete sidewalks. The quantities reflect the repair of several 6 inch flags that are included in the overall SY quantity. Please visit the sites and get familiar with the locations and the amount of root pruning that could be required for the repair. Please include in the fee proposal the concrete removal, a lump sum for root pruning if required, and the new concrete sidewalk per the provided quantities. Please keep in mind that a Curb type D is also included within the scope. Please let us know if you have any questions or comments. Thanks, Ricardo A. Ayala, P.E. (;() N S')'II (J (;')'1 () N MANAGEMENT GROUP Item 5221 SML Exclusion Conditions Description Sidewalk 4" Various Location, Include Demo and Short Loads I. Any Work not SpecifY in the Scope of Work 2. Handling and/or Removal of Contaminate Material if any 3. Maintenance of Traffic 4. Excavation, Backfill, Compaction and Harmonization 5. Utility Relocation, Location and Protection 6. Sidewalk Base and Curb Pad 7. Survey Layout 8. Material Testing and Sampling 9. Concrete Color 10. Night Work 1. The contractor agrees to complete all of the above-mentioned work within the time spccified, weather permitting. 2. The contractor will not be held responsible for loss of time due to weather conditions or any other reasons beyond the contractor's control. 3. The contractor will perform the job as per city, state and governmental regulations. 4. Any repairs to damages caused by other contractors will be done at a rate of $35 per hour per worker. 5. If the owner is dissatisfied with any of the completed work he/she shaH inform the contractor in writing within 48hrs. 6. Contractor will submit a statement of insurance coverage and will remain in effect for duration of 30 All materials and workmanship will be as per specification. Prime contractor shall allow adequate time for all work scheduled by the prime contractor to be completed by B Square construction Management Group, LLC if there is a set time that B Square Construction Management Group, LLC must cease all work per FDOT/COUNTY/CITY/MUNICIPALITY requirements. Five business days' notice is required for scheduling of work. This quote shall be part of the subcontract. NO bond is included in quote. Respectfully submitted B Square Construction Management Group, LLC. Gabriel Martinez .. Note: This proposal may be withdrawn by us ifnot accepted within 30 days. Estimate does not include any provision to contract. Estimate Date Estimate # 61712014 110 Name I Address CITY OF SOUTH MIAMI Project I Contract Number Sidewalk Various Locations Qty U/M Price Each Total 1 LS 28,496.69 28,496.69 0.00 0.00 ACCEPTANCE OF PROPOSAL -The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorizes to do the work as specified. Payment will be made as outlined. Date of Acceptance: _____________ _ Print Name: _______________ _ Tittle: ________________ _ Signature: Will be a pleasure to work with you and keep an exceHent business relation Total Page 1 Item Description days. 7. Any changes from the original estimate may be subject to additional fees, if necessary. 8. Ifproject is completed prior to previously specified date, the remaining balance shall be paid at that time. 9. Final release oflien will be provided upon full payment. 10. Customer/Contractor agrees to pay all costs and expenses incurred collecting any amounts due under this agreement, including reasonable attorney's fees and all incurred costs and associated expenses. II. A charge of$25.00 will be added to all checks returned for insufficient funds. 12. Any balance due under this agreement and/or invoice will incur interest at the rate of 1.5% per month. 13. Please include the invoice numbcr on your check 14. Please make check payable to B SQUARE CONSTRUCTION MANAGEMENT GROUP THIS IS ONLY AN APPROXIMATION, FINAL MEASUREMENTS AND COUNTS TO BE DETERMINED ON FIELD UPON COMPLETION OF JOB. NO QUANTITIES CAN BE REDUCING FROM THE ESTIMATE. All materials and workmanship will be as per specification. Prime contractor shall allow adequate time for all work scheduled by the prime contractor to be completed by B Square construction Management Group, LLC if there is a set time that B Square Construction Management Group, LLC must cease all work per FDOT/COUNTY/CITY/MUNICIPALITY requirements. Five business days' notice is required for scheduling of work. This quote shall be part ofthe subcontract. NO bond is included in quote. Respectfully submitted B Square Construction Management Group, LLC. Gabriel Martinez .. Note: This proposal may be withdrawn by us ifnot accepted within 30 days. Estimate does not include any provision to contract. Estimate Date Estimate # 61712014 110 Name / Address CITY OF SOUTH MIAMI Project / Contract Number Sidewalk Various Locations Qty U/M Price Each Total ACCEPTANCE OF PROPOSAL -The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorizes to do the work as specified. Payment will be made as outlined. Date of Acceptance: ____________ _ Print Name: _______________ _ Tittle: ________________ _ Signature: Will be a pleasure to work with you and keep an excellent business relation Total $28,496.69 Page 2