Loading...
3City of South Miami PUBLIC WORKS & ENGINEERING DEPARTMENT 4795 SW 75 th Avenue Miami, FL 33155 Tel. (305) 663-6350 Fax (305) 668-7208 South Miami ~;d)d iijjP 2001 TO: Steven Alexander, City Manager FROM: Kelly Barket, Jr., Chief Superintendent of Public Works DATE: February 18, 2014 Resolution: A Resolution authorizing the City Manager to enter into a contract with SRS Engineering, Inc. for a contract price not to exceed $32,630 for civil engineering services for the Police Fueling Station Improvements Background: In accordance with Florida Statute 287.055 "Consultants Competitive Negotiation Act ("CCNA"), firms were selected and approved (Resolution 151-13-13969) to provide professional engineering services to the City. City staff negotiated hourly billing rates with the selected firms and entered into individual Professional Service Agreements ('PSA'). Expense: Account: The scope of work includes, engineering design and preparation of final design plans and construction phase services for improvements to the existing Police Fueling Station located within the City Hall Complex at 6130 Sunset Drive. SRS Engineering, Inc. was one of the City Commission approved firms to perform civil engineering services for the City on future projects. This is the third project under the civil engineering category. Civil Engineering Firms EAC Consulting Civil Works, Inc., SRS Engineering, Inc" R.J. Behar and Company, Inc Millian Swain & Associates Dorn Avenue Drainage Design Pending Police Fueling Station Improvements Marshall Williamson Ph.1 Environ. Site Assessment Pending City staff negotiated with SRS Engineering, Inc. the scope of work, cost and number of hours to perform engineering services for the Police Fueling Station Improvements. After reaching a consensus, SRS Engineering, Inc. submitted the attached proposal to the City for Commission approval in an amount not to exceed $32,630. Contract amount not to exceed $32,630. The expenditure shall be charged to the Federal Forfeiture Public Safety Infrastructure Fund 615-1910-521-6440, which has a balance of $450,000. Attachments: Proposal Approved Resolution 151-13-13969 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 RESOLUTION NO.: _____ _ A Resolution authorizing the City Manager to enter into a contract with SRS Engineering, Inc. for a contract price not to exceed $32,630 for civil engineering services for the Police Fueling Station Improvements. WHEREAS, pursuant to Florida Statute 287.055 "Consultants Competitive Negotiation Act" ('CCNA'), SRS Engineering, Inc. was one of the firms selected and ranked to provide professional engineering services; and WHEREAS, the City negotiated hourly rates with the firm and entered into a professional service agreement with SRS Engineering, Inc. to perform engineering services for the City; and WHEREAS, the Mayor and City Commission wishes to provide improvements to the Police fueling station; and WHEREAS, After negotiating with SRS Engineering, Inc. on a cost to perform the design services, they submitted a proposal to perform the Police Fueling Station Improvements; and WHEREAS, the total expenditure to perform the design services for an amount not to exceed $32,630; and WHEREAS, the Mayor and City Commission desire to authorize the City Manager to enter into a contract with SRS Engineering, Inc. for the design of the Police Fueling Station Improvements for an amount not to exceed $32,630. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF SOUTH MIAMI, FLORIDA THAT: Section 1: The City Manager is authorized to enter into a contract with SRS Engineering, Inc. for the Police Fueling Station Improvements for an amount not to exceed $32,630 and in accordance with the terms of the professional service agreement previously approved by the City Commission. Section 2: The expenditure shall be charged to the Federal Forfeiture Public Safety Infrastructure Fund 615-1910-521-6440, which has a balance of $450,000. Section 3: If any section clause, sentence, or phrase of this resolution is for any reason held invalid or unconstitutional by a court of competent jurisdiction, the holding shall not affect the validity of the remaining portions of this resolution. Section 4. This resolution shall take effect immediately upon adoption. PASSED AND ADOPTED this ___ day of ______ , 2014. ATTEST: CITY CLERK READ AND APPROVED AS TO FORM LANGUAGE, LEGALITY AND EXECUTION THEREOF CITY ATIORNEY APPROVED: MAYOR COMMISSION VOTE: Mayor Stoddard Vice Mayor Harris Commissioner Welsh Commissioner Liebman Commissioner Edmond January 31,2014 (Revised) City of South Miami 6130 Sunset Drive South Miami, FL 33143-5093 Attn: Ms. Shari Kamali Assistant City Manager Re: City of South Miami Police Fueling Station Improvements Dear Ms. Kamali, We appreciate this opportunity to prepare this Proposal for Professional Services for the referenced project. In accordance with our Agreement for General Engineering Services, we are submitting our understanding of the Scope of Work and Fee Proposal to provide Professional Consulting Engineering Services in connection with the referenced project. The Scope of Work as we understand it at the present time will consist of the site investigations, site layout and engineering design for future iinprovements to the existing Police Fueling Station located within the City Hall Complex at 6130 Sunset D~ive. This work shall include contracting and coordinating all work with specialty firms including -MEP Engineers, Surveyors, Geotechnical, and Structural Engineers. Renovations shall include new prefab metal canopy, lighting and camera on canopy, new hose bib, electrical outlet connection, vacuum system, air compressor, and storage cabinet at Service Island, and additional electrical outlet connector in island next to parking space. This work will include the following: • Meeting with City of South Miami staff to establish design guidelines and permit requirements. • After the initial meeting with City staff and regulatory agencies, the first step will be to gather all available data concerning the project site and associated design requirements. This task includes conducting a site visits and reviewing existing available site records to identify existing utilities and conditions. • Contract and coordinate with the Surveyor to obtain survey information required for design. The survey will obtain all topography information within the limits of our project. • Contract and coordinate with a geotechnical test lab to prepare geotechnical report with recommendations for design and to conduct soil borings, as required for structural design. • Once the survey, geotechnical and utilities information is gathered, the design base maps (existing conditions) are prepared. The base maps will include all topographical information, existing site elevations, fueling island, topographical features, and marked utilities and underground lines, etc. The base map shall be prepared in AutoCAD format at a scale of 1 inch = 20 feet or as needed. • Preparation of civil engineering design plans and specifications for the construction of the selected altemative from the Conceptual Report. All work shall be in accordance with the accepted practices and design standards of City of South Miami, Miami-Dade County, and local regulatory agencies. January 31,2014 Page 2 • Provide Project Administration services, to include attending local meetings with City and regulatory agencies, and coordination with design team consultants. • Conduct site visits to observe existing site conditions and verify survey and utility information. • Prepare construction drawings consisting of the following: • Title Sheet. • • • • • • • • • • • General Notes and Location Map. Demolition Plan. Site Geometry Plan. Paving, Grading and Drainage Plan Site Paving Details Sheet Canopy Details Sheet Canopy Structural Sheet Electrical Site Plan Electrical Detail Sheets Plumbing and Mechanical Plan Plumbing and Mechanical Details Sheets • Prepare engineer's estimate of probable construction cost. • Submit 50% and 90% complete design documents to City Public Works and Police Staff for their review and comments. Task may also include meetings with the various Departments. • Finalize drawings based on comments and prepare and process permits application and documentation for approval by regulatory agencies (Building Department, RER, and Fire). • Submit 100% complete construction documents including construction drawings, technical specifications, final construction cost estimate, and copies of approved permitted construction drawings. 10 full size sets of drawings shall be provided to the City. • Attend pre-bid Meeting. • Provide supplemental information and/or clarification of construction documents to prospective bidders during the bid solicitation process. • Review bid submittals and attend bid-opening meeting. Construction Phase Services SRS shall provide construction services including responding to contractor's request for information (RFI), reviewing shop drawings, review request for changed work, attending meetings or conducting site construction observations (limited to 5 site visits). The City will provide SRS with the following: • The City provide all available information about the existing fueling station including, but limited to, construction drawings, as-built drawings, system's information, etc. • The City shall contract and coordinate the removal of the existing Sea Grape Tree. January 31,2014 Page 3 • The City shall pay all applicable permit and plan review fees required by regulatory agencies. • Landscaping design services are included as part of this proposal. Compensation Our Engineering Fees for the above described Basic Services will be a lump sum amount shown below. This fee proposal includes the cost of mechanical and electrical engineering, structural engineering, geotechnical and topographical survey. It does not include plan review or permitting fees. Payment will be based on monthly invoicing as a percentage of completion of worle Our Engineering Fees are as follows: Topographical Survey ............................................................................................ $1,280.00 Geotechnical ............................................................................................................... $ 850.00 Completion of 50% Design Plans ...................................................................... $ 11,200.00 Completion of 90% Design Plans ........................................................................ $ 8,960.00 Completion of 100% Design Plans ...................................................................... $ 2,240.00 Plans Processing and Permitting Approval. ...................................................... $ 3,300.00 Construction Phase Services ............................................................................... $ 4,800.00 Total ........................................................................................................................ $ 32,630.00 We would expect to commence our services promptly after receipt of your acceptance of this proposal and approval of the purchase order. This Proposal and our Standard Agreement with the City represents the entire understanding between the City of South Miami and SRS Engineering, Inc. in respect to the Project and may only be modified in writing when signed by both of us. If the foregoing is agreeable to you, please execute the original of this Agreement where indicated below and return to our office. Very truly yours, =Z.~J~ 1~,fuciO Serralta, P.E. President I have read the foregoing Letter of Agreement and agree to all terms and conditions stated therein. Accepted this ___ day of ______ , 2014 City of South Miami By: ____________ __ Title: ____________ __ RESOLUTION NO.: 151-13-13969 A Resolution authorizing the City Manager to execute a Professional Service Agreement provided under Florida Statute 287.055 Consultant's Competitive Negotiation Act "CCNA", with EAC Consulting, Inc, Marlin Engineering, Inc., The Corradino Group, Inc., SRS Engineering, Inc" R.J. Behar and Company, Inc, T.Y.Lin International, Stanley Consultants, Inc., Sol-Arch, Inc., Civil Works, Inc., C.H. Perez & Associates Consulting Engineers, Inc., for the following professional services: Architecture, Civil/Environmental Engineering, Structural, and Traffic & Transportation Engineering. WHEREAS, the Mayor and City Commission desire to enter into service agreements for professional services for the following categories: Architecture, Landscape Architecture, Civil/Environmental Engineering, Structural, Traffic and Transportation Engineering; and WHEREAS, pursuant to Florida Statute 287.055 for CCNA, the City solicited qualification from interested firms and the City's review committee conducted a thorough review of the qualifications of the firms that responded to the solicitation, and upon evaluation the firms were ranked; and WHEREAS, the City met with the firms and reviewed the proposed hourly billing rates and the following firms have agreed upon the hourly billing rates disclosed in the Professional Service Agreement request for qualifications; EAC Consulting, Inc, Marlin Engineering, Inc., The Corradino Group, Inc., SRS Engineering, Inc" R.J. Behar and Company, Inc, T.Y.Lin International, Stanley Consultants, Inc., Sol-Arch, Inc., Civil Works, Inc., C.H. Perez & Associates Consulting Engineers, Inc.; and WHEREAS, the Mayor and City Commission desires to authorize the City Manager to execute the professional service agreements. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF SOUTH MIAMI, FLORIDA THAT: Section 1: The City Manager is hereby authorized to execute the form of the professional service agreement that is attached, for the negotiated hourly rates in accordance with the procedure set forth in Florida Statute 287.055 (Consultant's Competitive Negotiation Act) with EAC Consulting, Inc, Marlin Engineering, Inc., The Corradino Group, Inc., SRS Engineering, Inc" R.J. Behar and Company, Inc, T.Y.Lin International, Stanley Consultants, Inc., Sol-Arch, Inc., Civil Works, Inc., C.H. Perez & Associates Consulting Engineers, Inc Section 2: If any section clause, sentence, or phrase of this resolution is for any reason held invalid or unconstitutional by a court of competent jurisdiction, the holding shall not affect the validity of the remaining portions of this resolution. Section 3. This resolution shall take effect immediately upon adoption. PASSED AND ADOPTED this 6 th day of __ A_u_g",-u_s_t __ , 2013. ATTEST: CITY CLERK COMMISSION VOTE: 5 -0 Mayor Stoddard: Yea Vice Mayor Liebman Yea Commissioner Newman: Yea Commissioner Harris: Yea Commissioner Welsh: Yea