Loading...
Res. No. 035-00-10928RESOLUTION NO.35-00-10928 A RESOLUTION OF THE MAYOR AND CITY COMMISSIONOFTHECITYOFSOUTHMIAMI, FLORIDA,CONCERNING CONTRACTS,RELATING TO STORMWATER DRAINAGE,AUTHORIZING THE CITY MANAGER TO ENTER INTO A CONTRACT WITHMC HARRY &ASSOCIATES, INC.,TO PERFORM CIVIL ENGINEERING SERVICES FOR THE TWIN LAKES PROJECT (PHASE I)AT A COST NOT TO EXCEED $5,500.00, AND CHARGING THE DISBURSEMENT TO "ESCROW PUBLIC WORKS FINANCIAL ASSISTANCE GRANT"ACCOUNT NO.111-0000- 219-1810. WHEREAS,the City Commission andCity Administration have resolved to address stormwaterdrainageandstormwatertreatmentenvironmentalgoals throughout theCity,and; WHEREAS,the 6000 and 6100 block of Twin Lakes Drive isa residential area within theCitywithvery poor drainage,and; WHEREAS,M.C.Harry &Associates,Inc.is one of the three pre-selected engineering firms approved bythe City Commission to perform engineering services forthe City,per Resolution No.30-96-9783. NOW,THEREFORE,BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF SOUTH MIAMI,FLORIDA: Section1.TheCityManagerisherebyauthorizedtoenterintoacontractwithMC Harry&Associates,Inc.,atacostnotto exceed $5,500.00 forPhaseI. Section 2.This resolution shall become effective immediately after adoption. PASSED AND ADOPTED this 15th day of February 2000. CITY CLERK READ AND APPROVED AS TO FORM: CITY ATTORNEY APPROVED:^-** ?^j^,^/t£U**/ MAYOR COMMISSION VOTF: Mayor Robaina: Vice Mavor Feliu: Commissioner Wiscombe: 4-0 Yea Yea Yea Commissioner Russell: Commissioner Bethel: Out of room Yea TO: FROM: CITY OF SOUTH MIAMI INTER-OFFICE MEMORANDUM Mayor and Commission Charles D.Scurr CityManager ic*"* DATE:February 15,2000 SUBJECT:AgendaItem# Commission Meeting, February 15,2000 AUTHORIZATION OF THE CITY MANAGER TO ENTER INTO A CONTRACT WITH MC HARRY & ASSOCIATES,INC.TO PROVIDE CIVIL ENGINEERING SERVICES AT A COST NOT TO EXCEED $5,500.00. * INTRODUCTION The attached resolution seeks approval toallowtheCity Manager toenterintoa contract with MC Harry &Associates,Inc.,(MC Harry)to provide civil engineering services fora drainage project onTwin Lakes Drive.MC Harry isoneofthe three pre-approved engineering firms used bytheCityforsuch work,perResolutionNo.30-96-9783. BACKGROUND TwinLakesDrive(seeattachedlocationmap)iswithinaresidential neighborhood,andruns paralleltoaMiami-DadeCountycanal.A"positive"drainagesystemcurrentlyservesthisstreet (stormwateris conveyed bycatchbasinsintoundergroundculverts discharging intothecanal). However,thisdrainagesystemdoesnotextendtoeveryhomealongthestreet,leaving stormwatertopondinfront of severalproperties.Inaddition,because of the uneven grade of the swalesand "low"driveway approaches,stormwater will accumulate intheareas between the drains.Thenetresultisaninefficientdrainagesystem,andastreetwhichexperiences unacceptable amounts of standing waterintheroadsideswales. Moreover,froman environmental viewpoint,thecurrentdrainagesystemis undesirable sinceit provides no retention,no french drain disposal,andno pretreatment of the stormwater.Instead, itisa direct conveyance system of untreated stormwater intothe canal,aviolation of current stormwater disposal regulations. /continued... Mayor and City Commission Twin Lakes Drive Resolution February 15,2000 Page 2 of2 The Federal Clean Water Act's National Pollutant Discharge Elimination System (NPDES) requires that the City undertake proactive action toward achieving improved water quality in our canals (etc.)to the maximum extent practicable.One means to achieve this goal is by retrofitting positive drainage systems with proper retention and "pollution control"pretreatment features, which is what is being proposed for this project.Therefore,the Twin Lakes Drive project will not only address a stormwater accumulation problem ina residential area,butalso demonstrate totheEPAthe City's commitment totheCleanWaterAct. Part Iof this project involves developing design options and cost estimates based upon the site specific topography and subsurface soil conditions.The lump sum fee proposal from MC Harry forthisserviceis$5,500.00. Lastly,it should be noted thatthisisthelastofthe four drainage project covered under the $115,000.00 appropriation from the 1998 State legislature.The other three projects funded by that appropriation were the 57th Court Project,the "Lake Taco Bell"project,and the ongoing 74th Street /59th Avenue "traffic calming"project. The total expenditure would not exceed $5,500.00,and the disbursement would come from a special account set-up forthe$115,000.00 appropriation,the "Escrow PWFinancial Assistance Grant",account number 111-0000-219-1810.Deducting reimbursements already provided by the State,$53,575.25 remains fromtheoriginal appropriation. CONCLUSIONS TheTwinLakesDriveProjectshalladdresslong-standingcitizencomplaintsconcerningthe accumulation of stormwateralongtheedge of this street's pavement.And just asimportant,the TwinLakesDriveProjectrepresentsthefirsttimetheCitywillundertakea"pollutioncontrol" retrofit of apositivedrainagesystem.Inasmuch,thiswillbean important milestone inthe City's ongoing commitment toward environmental preservation. Approval of this resolution is therefore recommended. Attachments FEB.9.2800 11:50AM MC HRRRY ASSOC NO.421 P.1/1 MCHARRYASSOCIATES February 8,2000 David K.Gccdin PublicWorks Department City of South Miami 4795 SW70*Avenue South Miami,Florida 33155 Re:Twin Lakes Drive Drainage Improvements Project -Part 1 Fee Proposal Dear David: MCHarry Associates,in collaboration with our civil engineer,Klmley-Horn,ispleasedtosubmit this,lump sumproposalintheamountof$5,500foryour review andapproval.Thisproposal addresses professional services related tothe drainage system improvements referencedabove.Part1scopeof A/E services are identified below,Part2 scope ofservices,tobeauthorized separately,will include constructionplans,and DERM permitting.Please refertotheattached KHA proposalforadetailed descriptionof tasks and services. Task 1-Site Visit andProject Review $5500 The consultant will visit the sitetoreviewexistingconditions,andidentify constraints which will limit possible options for drainage Improvement and/or impact the permitting process.The A/E will conducta 'workshop'with thecitytodiscuss preliminary options which bestservethecity'sinterests.A maximum oftwooptions will bedocumentedin schematic drawingformaccompaniedwithopinionsofprobableconstruction cost The City will provide all necessary survey,utility,and geotechnical data required to property designand document theproject. Please acknowledge City review andacceptanceofthis proposal by signing oneofthetwo original copies of this document.Keep one for your files and return theotherto MCHarry and Associates. Thankyou tor the opportunity toservethe City ofSouth Miami. Sincerely, NLC.Harry &Associates,Inc.City of South Miami lomas M.Carlson,A.I.A.Charles Scurr Principal City Manager I 10-7> 10-9 ^ ) 10-24 OR.kINACE EA!EMENT 4E$ 10-25 (JOINS SECTION 13) (JOINS SECTION 7) 10-29 10-31 1 \jO-28 a a. 10-32 SW 63rd TER 1 o a A/TS Q»H tr 64M0 apotvatotr i! ST /N 646ctt- * /?.« 10-36 10-39 g3 ^ 0*«ff *MMD«* 02/03/00 THU 17:11 FAX 19547392247 KIMLEY HORN <HA Kimley-Horn and Associates,Inc. February 3,2000 Mr.Thomas Carlson,AIA Principal MC HARRY ASSOCIATES 2780 S.W.DouglasRoad Miami,Florida33133 Re:City ofSouth Miami Scope ofServicesfor Twin LakesDriveDrainageProject Dear Tom: Kimley-HoraandAssociates,Inc.is pleased tosubmitthis proposal for providing engineering services associated withmodifyinganexisting drainage system fortheabovereferencedresidential neighborhood.Theintent ofthe project istoprovidea level of stormwater treatmentforthe existing positive drainage system.Theserviceswillincludereviewingtheexistingstormwater system,preparing constructionplansfor proposed modifications,andsubmitting permit applications to DERM forreview.AsdirectedbytheCity of South Miami,theprojectdoes not requirecontractdocumentsand the City will provide the necessary survey data,utility data,andgeotechnicaldatafortheproject design. SCOPE OF SERVICES Task I-Site Visit/Proiect Review The ENGINEER will visit the projectsitetoreviewthe existing project conditions and develop preliminary projectoptions.Thesite observations are necessary to identify potentiallimitationsandconflictsforinstallation ofthe proposeddrainage modifications andotherconstraintsthatmayimpact permitting.This scopedoesnotinclude preparation of legal descriptions and sketches forobtaining utility easements within theproject area. The ENGINEER will review the survey,utility,and geotechnical data provided by the City tofurther develop thepreliminaryprojectoptions.The survey and utility data must beprovidedin AutoCAD 14formatandcontaina topographic basemap oftheproject area,complete information of theexistingutilities such asstormwater,water,andsanitarysewersystems(includingpipesizesand invert TEL 954 7392233 FAX B5*739 2247 mooi Suite157 5100NW.33rd Avenue Ft Lamfsrdala,Florida 33309 02/03/00 THU 17:11 FAX 19547392247 KIMLEY HORN 1^002 can Kimley-Horn and Associates,Inc. Mr.Thcmai Cofsoo,February 3,2000,Pope 2 elevations where applicable),and a point file with the topography symbology. The survey\utility information will be used to develop the project base maps. The geotechnical data must contain the necessary soils and percolation data requiredfor drainage calculations. Basedonreview of theabove information,theENGINEERwillmeetwiththe City to discuss up to two (2)preliminary drainage design options.The proposed improvements willbe schematic drawings,and opinions of probable construction cost will be provided for both option.Upon selection and approval of a preliminary design option bythe City,the ENGINEER will proceed with construction plan development,and attend one pre-application meeting with DERMto discuss the preliminary design.During construction plan development,any modifications tothe approved preliminary design will be considered additional services. Task II -Construction Plans The finalConstructionPlanswillbe prepared forreproductionat half sizesheets (11"x17")totake advantage oftheeaseandquality ofreproduction aswellas beingamoreconvenient format foruseinthefieldduringconstruction. The plansshallcontainthefollowinginformation: 1.A cover sheet will be prepared containingprojectidentification information,avicinitymap,index of sheets and other information asmay be appropriate. 2.Horizontal alignments andgeometricimprovementswillbe detailed onthe topographicbasemapping. 3.Plan/profilesheets will not beprovided,but verticaldata,construction notes,and construction detailsfortheproposed drainage improvements will bedetailedontheplan sheets. 4.Existing utility informationfromTaskI-Site Visit/Project Review will be detailedasneededforprojectclarification. 5.Technicalspecifications will beprovidedfor primary projectelementsthat are not addressed in the Standard FDOT technical specifications.The FDOT technical specifications will be the referencedstandardforproject construction. 02/03/00 THU 17:11 FAX 19547392247 KIMLEY HORN can Kimley-Horn and Associates,Inc. Mr.ThomasCarlson,February 3.2000,Paga 3 Total Project Plan setwould include the following: •» •KeySheet (1 sheet)-Project title,vicinitymap,Engineer of Record,and otherappropriateinformation. •Horizontal &Vertical Control Plan sheet (1 sheet)-Containing the proposed drainage improvementswithhorizontalalignmentandvertical data. •Detail Sheet (1 sheet)-Containing thenon-standarddetails. •SpecificationSheet(1sheet)-Containingthesupplementalspecifications. Task m -Permitting The drainage improvementswillrequireobtamingapermitfromDERM.Permit applications along with drainage calculations and plans willbe submitted to DERM forreview.TheENGINEER \yill attendonemeetingwithDERM to discuss the finaldesign.All permit fees will bepaiddirectly by the City of South Miami.Noomerpeimitsj^ Task IV -Additional Upon yourauthorization^we will provideanyadditionalservicesthat may be requiredbeyondthose descHbed inTaskI throughTEL;Theseservices may ,;• includebutare not limitedto such itemsas utility easement acquisition,and construction phase'.services!;.%}•%•}:M!.:l'i':£-'^&-*h!&^^BX :•['i;':••;'.'"•' ;;7...77;v^ We will provideourservicesas expeditiously aspossibleto meet the schedule developed with you forthevarious elements ofthe project.. 1^1003