06-847-018CONDENSING UNIT
UNIT N❑,
FLAT STRAPS
SECURE TO FRAMEWORK
TO
SENSIBLE
WITHSTAND 150 MPH
WINDS
2 -16 GA, X 1 1/2' FLAT
IN FITTING IN ACCORD TO
HEAT
STRAPS DRAWN TIGHT,
IS❑M ❑DE PADS UNDER
USE SEALER AND
WELDED TO C SECTIONS.
4 CORNERS OF UNIT
FLEXIBLE DUCT
AIR FLOW
DUCT CONNECTION
DETAILS
COIL
KW
V.
WELD. TYP. EACH SIDE,
3'X 3'X1/4' SQ,
co
FLA
2" X 4" - ALUMINIUM
ALUMINIUM PLATE
Ph
MOUNTING)
'C' CHANNEL
WELD TO PIPE
'C'
CFM
&P. IN
1 1/2" X 1 1/2"
POST &
CHANNEL,
A
O
ALUMINIUM ANGLE BR.
3" DIA. ALUMINIUM
5,8
i,
208/230
CARRIER W /R -22 REF,
• �--�
3 1/2' X 3 1/2' X 1/4'
POST
`x
(Cj
U
ALUMINIUM PLATE
PITCH POCKET
48HJE009 -5
101,200
68,900
WELDED TO PIPE POST, &
FILL W /PITCH
(2)15.0
CO
1/4
NONE
BOLTED W/3/8' 0 BOLT TO
ROOF
1st Ciro 7 -14 I,b -oz,
880 Lbs
4' X 4' PLATE
CONCRETE SLAB
2nd Circl 8 -5 lb -oz,
NOTE: PROVIDE 2' -0" MIN. CLEARENCE
AROUND 3 SIDES OF UNIT.
ALL ROOFTOP MOUNTED EQUIPMENT
EER -13,00
SUPPORTS SHALL COMPLY WITH
FBC,
MECH, 301,13, 304.8 AND 305,5,
C.U. I" IOUNTINGs DETAIL
NTS
PLASTIC OR METAL
BUSHINGS
CLINCH EDGES
1/4 "0 GALV. BAR—
TO BRANCH DUCT `
GALV. STEEL RODS
[a
TRUNK DUCT
18 GAGE GALV_ SHEET
FSTEEL DAMPER BLADE:
FULL HEIGHT OF
MAIN DUCT. DOUBLE
BEND LEADING EDGE
POSSIBLE OF DAMPER BLADE
AIR FLOW
SET SCREW
SPACER REQ'D.
ON INSULATED
DUCTS
TYP. DETAIL OF 90' DUCT TAP WITH
DAMPER BLADE
ELBOW
TURNING VANES W /SIN.
SCREW FA8TERNER6 IN
DUCTS 8" O.C.
OR LARGER
FLEXMASTER SPIN -IN
DAMPER AND
EXTRACTOR SCOOP
FITTING MODEL NO. DBDE
FOR FI15EROU5 GLASS
DUCT BOARD.
H V A,C, NUTES
1, ALL WORK SHALL BE AS PER S,F,B,C, AND NFPA
2, ALL AIR CONDITIONING DUCT WORK SHALL BE FIBERGLASS,
AS MANUFACTURED BY OWENS- CORNING,
TYPE 800 (15' THICK), R =6,
3. DUCT WORK SHALL BE FABRICATED AND INSTALLED IN ACCORDANCE
WITH MANUFACTURER'S SPECIFICATIONS & ACCORDING TO ASHRAE &
SMACNA STANDARDS AND IN COMPLIANCE WITH UL 181.
4. DUCT DIMENSIONS ARE IN INCHES AND CORRESPOND TO INSIDE
DIMENSIONS WIDTH x HEIGHT. DUCT SYSTEM SHALL COMPLY WITH
NFPA STD, NO, 90A AND /OR 90B, DUCTWORK AND MATERIALS SHALL
BE CLASS 1 MATERIALS IN ACCORDANCE WITH U,L, 181 TESTS,
5, COORDINATE LOCATIONS, SIZES & OPENINGS W /OTHER TRADES
ON THE JOB. A/C CONTRACTOR SHALL PROVIDE THE COMPLETE DUCT
SYSTEM W /TURNING VANES AT ALL ELBOWS. SPILITTERS AND DAMPERS
AS REQUIRED, A/C CONTRACTOR SHALL USE THE BEST PRACTICES OF
THE TRADE IN THE FABRICATION AND INSTALLATION OF THE SYSTEM.
6. ALL SUPPLY AIR AND RETURN AIR GRILLES /DIFFUSERS SHALL BE NEW,
AND SHALL BE LOCATED AND BALANCED IN ORDER THAT THEY DELIVER
THE REQUIRED CFM TO THE ENTIRE ROOM EVENLY & DRAFT FREE TO
MAINTAIN THE FOLL ❑WING DESIGN CONDITIONS,
INSIDE OUTSIDE RELATIVE HUMIDITY
COOLING - 76 DB 90 DB - 79 WB 50Z TO 60X
7. ALL TEMPERATURE CONTROLS SHALL BE VIA A CENTRAL PROGRAMMABLE
THERMOSTAT. MOUNT ALL T'STATS AT 48'A,F,F,
8. ALL NEW GRILLES AND DIFFISURES TO BE ALUMINUM
CONSTRUCTION. DIFFUSERS SHALL HAVE HIDDEN OPPOSED BLADE
DAMPERS, PROVIDE GASKETS ON ALL GRILLES & DIFFUSERS,
9. PROJECT ARCH, SHALL REVIEW AND APPROVE ALL DIFFUSER TYPES &
FINISHES PRIOR TO PURCHASE AND INSTALLATION,
10. ALL CONDITIONS AND SYSTEMS NOTED AS EXISTING SHALL BE FIELD
VERIFIED. ALL NECESSARY SERVICE & REPAIRS SHALL BE PROVIDED TO
THE EXISTING SYSTEM IN ORDER TO ENSURE PROPER OPERATION,
11. CONTRACTOR SHALL FIELD VERIFY /COORDINATE ALL CONDITIONS AND
PARAMETERS W /OTHER TRADES INVOLEVED W /THE PROJECT,
LOW VELOCITY 5UPPLY
AIR DUCT ISEE PLAN VI
METAL ROUND FITTING
QUADRANT OPERTOR
TO BE OUTSIDE INSULATION.
PROVIDE INSULATION
GUARD WHERE NECESSARY
PROVIDE P FI5ERGLA55
INSULATION SEALED TO NECK
t PERIMETER OF DIFFUSER—
D IFFU8ER
SHEET LEAD FLASHING MOP IN
WITH ROOFING MATERIAL
AIR FLOW
INSULATED FLEX. DUCT
(S' -O" MAXIMUM)
THERMOFIN OR EQUAL
ONLY IN A NONE
SPRINKLERED BLDG.
SEAL JOINT WITH DUCT
a= AI Y=tD A TA==
FLEX. DUCT / D II=I =U5Efi`R CONN. DETAIL
Outside Air Intake Calculations per ASHRAE
NEW SPACES
OCCUPANCY OF SPACE SERVED BY RTU #11 40 PEOPLE
15 CFM / PERSON OF ❑/A INTAKE REQUIRED
15 CFM / PERSON X 40 PEOPLE = 600 CFM
SET BUILTIN VOLUME DAMPER IN RTU #1 AT 600 CFM,
4'0 DRYER EXH, UP
18 GAGE GALV, METAL ROOF CONSTRUCTI ❑N
SLEEVE ROOF C❑NSTRUCTI ❑N
BACKDRAFT DAMPER - -m AS REQUIRED
DRYER �c EXH. DUCT THRU ROOF DETAIL.
N.T.S.
NOTE+
1. ALL DRYER & BATH ROOM EXH, DUCTS SHALL BE
24 GA. GALV, METAL, EQUIPPED WITH
BACKDRAFT DAMPER AND WIRE MESH SCREEN,
SEE FLOOR PLANS AND ROOF PLAN FOR ALL
TERMINATION POINTS.
2, KITCHEN HOOD EXH. DUCT SHALL BE 18 GA.
GALV, METAL, EQUIPPED WITH BACKDRAFT
DAMPER AND WIRE MESH SCREEN, SEE
FLOOR PLAN FOR TERMINATION POINT.
3. ALL DUCT REINFORCEMENTS SHALL BE PER
SMACNA REQUIREMENTS, SEE DUCT HANGER
DETAIL ON THIS SHEET.
Roof Top Package System Air Conditioning Unit Schedule
UNIT N❑,
MANUF, MOD,
UNIT N❑,
-
SENSIBLE
JOIN FLEX DUCT TO SPIN -
COM.
OUT
IN FITTING IN ACCORD TO
HEAT
MFGR. INSTALL. INSTRUCT.
EER
USE SEALER AND
WT. (LB).
BANDING DEVICE.
FLEXIBLE DUCT
AIR FLOW
DUCT CONNECTION
DETAILS
H V A,C, NUTES
1, ALL WORK SHALL BE AS PER S,F,B,C, AND NFPA
2, ALL AIR CONDITIONING DUCT WORK SHALL BE FIBERGLASS,
AS MANUFACTURED BY OWENS- CORNING,
TYPE 800 (15' THICK), R =6,
3. DUCT WORK SHALL BE FABRICATED AND INSTALLED IN ACCORDANCE
WITH MANUFACTURER'S SPECIFICATIONS & ACCORDING TO ASHRAE &
SMACNA STANDARDS AND IN COMPLIANCE WITH UL 181.
4. DUCT DIMENSIONS ARE IN INCHES AND CORRESPOND TO INSIDE
DIMENSIONS WIDTH x HEIGHT. DUCT SYSTEM SHALL COMPLY WITH
NFPA STD, NO, 90A AND /OR 90B, DUCTWORK AND MATERIALS SHALL
BE CLASS 1 MATERIALS IN ACCORDANCE WITH U,L, 181 TESTS,
5, COORDINATE LOCATIONS, SIZES & OPENINGS W /OTHER TRADES
ON THE JOB. A/C CONTRACTOR SHALL PROVIDE THE COMPLETE DUCT
SYSTEM W /TURNING VANES AT ALL ELBOWS. SPILITTERS AND DAMPERS
AS REQUIRED, A/C CONTRACTOR SHALL USE THE BEST PRACTICES OF
THE TRADE IN THE FABRICATION AND INSTALLATION OF THE SYSTEM.
6. ALL SUPPLY AIR AND RETURN AIR GRILLES /DIFFUSERS SHALL BE NEW,
AND SHALL BE LOCATED AND BALANCED IN ORDER THAT THEY DELIVER
THE REQUIRED CFM TO THE ENTIRE ROOM EVENLY & DRAFT FREE TO
MAINTAIN THE FOLL ❑WING DESIGN CONDITIONS,
INSIDE OUTSIDE RELATIVE HUMIDITY
COOLING - 76 DB 90 DB - 79 WB 50Z TO 60X
7. ALL TEMPERATURE CONTROLS SHALL BE VIA A CENTRAL PROGRAMMABLE
THERMOSTAT. MOUNT ALL T'STATS AT 48'A,F,F,
8. ALL NEW GRILLES AND DIFFISURES TO BE ALUMINUM
CONSTRUCTION. DIFFUSERS SHALL HAVE HIDDEN OPPOSED BLADE
DAMPERS, PROVIDE GASKETS ON ALL GRILLES & DIFFUSERS,
9. PROJECT ARCH, SHALL REVIEW AND APPROVE ALL DIFFUSER TYPES &
FINISHES PRIOR TO PURCHASE AND INSTALLATION,
10. ALL CONDITIONS AND SYSTEMS NOTED AS EXISTING SHALL BE FIELD
VERIFIED. ALL NECESSARY SERVICE & REPAIRS SHALL BE PROVIDED TO
THE EXISTING SYSTEM IN ORDER TO ENSURE PROPER OPERATION,
11. CONTRACTOR SHALL FIELD VERIFY /COORDINATE ALL CONDITIONS AND
PARAMETERS W /OTHER TRADES INVOLEVED W /THE PROJECT,
LOW VELOCITY 5UPPLY
AIR DUCT ISEE PLAN VI
METAL ROUND FITTING
QUADRANT OPERTOR
TO BE OUTSIDE INSULATION.
PROVIDE INSULATION
GUARD WHERE NECESSARY
PROVIDE P FI5ERGLA55
INSULATION SEALED TO NECK
t PERIMETER OF DIFFUSER—
D IFFU8ER
SHEET LEAD FLASHING MOP IN
WITH ROOFING MATERIAL
AIR FLOW
INSULATED FLEX. DUCT
(S' -O" MAXIMUM)
THERMOFIN OR EQUAL
ONLY IN A NONE
SPRINKLERED BLDG.
SEAL JOINT WITH DUCT
a= AI Y=tD A TA==
FLEX. DUCT / D II=I =U5Efi`R CONN. DETAIL
Outside Air Intake Calculations per ASHRAE
NEW SPACES
OCCUPANCY OF SPACE SERVED BY RTU #11 40 PEOPLE
15 CFM / PERSON OF ❑/A INTAKE REQUIRED
15 CFM / PERSON X 40 PEOPLE = 600 CFM
SET BUILTIN VOLUME DAMPER IN RTU #1 AT 600 CFM,
4'0 DRYER EXH, UP
18 GAGE GALV, METAL ROOF CONSTRUCTI ❑N
SLEEVE ROOF C❑NSTRUCTI ❑N
BACKDRAFT DAMPER - -m AS REQUIRED
DRYER �c EXH. DUCT THRU ROOF DETAIL.
N.T.S.
NOTE+
1. ALL DRYER & BATH ROOM EXH, DUCTS SHALL BE
24 GA. GALV, METAL, EQUIPPED WITH
BACKDRAFT DAMPER AND WIRE MESH SCREEN,
SEE FLOOR PLANS AND ROOF PLAN FOR ALL
TERMINATION POINTS.
2, KITCHEN HOOD EXH. DUCT SHALL BE 18 GA.
GALV, METAL, EQUIPPED WITH BACKDRAFT
DAMPER AND WIRE MESH SCREEN, SEE
FLOOR PLAN FOR TERMINATION POINT.
3. ALL DUCT REINFORCEMENTS SHALL BE PER
SMACNA REQUIREMENTS, SEE DUCT HANGER
DETAIL ON THIS SHEET.
Roof Top Package System Air Conditioning Unit Schedule
UNIT N❑,
MANUF, MOD,
UNIT N❑,
TOTAL CAP,
SENSIBLE
EVAPORATOR
COM.
OUT
BLOW
HEAT
HVAC UNIT
EER
CHARGE
WT. (LB).
BTU /HR
CAP
BTU /HR
AIR FLOW
RLA
DOOR
FAN
COIL
KW
V.
(POSITI ❑N OF
CURB (LB),
co
FLA
FLA
HP
V -Ph
A
Ph
MOUNTING)
CFM
&P. IN
A
O
5,8
i,
208/230
CARRIER W /R -22 REF,
• �--�
En
`x
(Cj
4
3
3
RTU# 1
48HJE009 -5
101,200
68,900
31000
0.6
(2)15.0
1,4
1/4
NONE
NEW ZONE
1st Ciro 7 -14 I,b -oz,
880 Lbs
2nd Circl 8 -5 lb -oz,
EER -13,00
143 Lbs
ROOFTOP, DOWN FLOW,
OUTDOOR C ❑NDITIONSi 91'F DB, 79'FWB V - VOLTS
INDOOR CONDITIONSi 74'F DB, RELATIVE HUMIDITY = 50X ph - NUMBER OF PHASES
x WITH BUILT -IN OUTSIDE AIR INTAKE DAMPER a - FUSE AMPS
ROOF TOP UNIT
24x24 SUPPLY GRILLE SECURE TO FRAMEWORK TO
WITHSTAND 150 MPH WINDS
2 -16 GA. X 1 1/2' FLAT -
STRAPS DRAWN TIGHT,
BOLTED TO ROOF STRUCT,
ROOF CURB (DADI
COUNTY PRODUCT
APROVAL),
ROOF
STRUCTURE
TERMINATE EXH. DUCT W /RAIN CAP
PROVIDE WIRE MESH SCREEN IN DUCT, BOLTED W/3/8' 4 BOLT
T 4' X 4' PLATE
TE
n r— ROOFING
7,.,,0 /A
ROOF TOP AC UNIT <100% ❑ /A) FOR
COMM ❑MN AREAS
2 HR FIRE RATE
DUCT CHASE,
22 GAGE,
GALVANIZED
METAL S/A DUCT,
DUCT SMOKE DETECTOR
IN SUPPLY AIR DUCT
J
CL
0-
D
0
ANGLE SUPPORT
ROOFTOP AC UNIT TIE DOWN
& DUCTS DETAIL
AIR CONDITIONING
HOUSING ---
CANT, STRI 0
2 #3 CONT d;
CANT. STRIP
BUILT UP R❑❑FI
ROOF INS —. a
N T,S,
PROVIDE 1/2' THRU BOLTS (AT
8 LOCATIONS MIN) THRU BOTTOM
OF UNIT HOUSING INTO TOP
OF CURB
BOLT TOP OF CURB TO AIR
CONDITIONING HOUSING TO
WITHSTAND HURRICANE WINDS
AS PER LOCAL CODE
CURB GASKET
TAIL CURB SUPPORT
CONCRETE ROOF.
#3@ 12' O,C.
W /STD HOOK,
N❑TESI
1. CURBS SHALL BE FACTORY FABRICATED WITH INSULATION,
2. INSTALL ELECTRICAL CONDUIT SIMILAR TO CONDENSATE DRAIN.
3. ROOF EQUIPMENT CURBS MUST BE PROVIDED WITH PROPERLY DESIGNED
FABRICATED LEVELING DEVICES, S❑ THE EQUIPMENT IS LEVEL AND CURB
INSTALLATION MATCHES THE ROOF SLOPE,
4. CURB SHALL NOT REST ON ROOF INSULATI ❑N,
5. RESLOPE ROOFING TO PROVIDE ADEQUATE DRAINAGE,
ROOFTOP UNIT CURB MOUNTING DETAIL
FOR CONCRETE ROOF (TYP) nts
ARCHITECTURE PLANNING INTERIORS
s 5
s ;{
:v
H E R S H
VITA LI N
CORAZZINI
Luigi Vitalini
AR -13513
Pablo Corazzini
AR -91716
Sushi Maki
5812 S.W. 72nd St.
South Miami
U
Project No.
04033
Distribution
Date
PERMIT SET
0 BLDG DEPT COMMENTS
04-17 -06
06/08106
H
• 1- I
co
ca
O
i,
• �--�
En
`x
(Cj
4
o
�
z
ILI
o
Cf)
00
Sushi Maki
5812 S.W. 72nd St.
South Miami
Florida
Project No.
04033
Distribution
Date
PERMIT SET
0 BLDG DEPT COMMENTS
04-17 -06
06/08106
ESI
ENERGY SCIENCES IN�-
CONSULTING ENGINEER$
ESHER ANDIROGLUl :0' 'Y •
MECH /ELEC. - #.4?245 s'
2821 DOVGLA3r�
MIAMI, FL 331
TEL 306- 448 -8 it
FAX 305 -448 -7 e —mail energys0bella i.A
Sheet
Mo 202
tit
R t iq
C) .
U
I •�
A Y;
R\P, 1cd Dr inp104033 - Sushi Maki -South Miami \MEP,04033- M- 201.dw&, 6; 82006 6:18:45 PM, ARCH upend D (24.00 x 3fi OO indms)