Loading...
06-847-016Plumbing Notes 1. ALL PLUMBING WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE LATEST EDITION OF THE "FLORIDA BUILDING CODE ", CHAPTER 29, LOCAL ORDINANCE AND IN COMPLIANCE WITH "FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION. 2. CONTRACTOR TO VERIFY AT SITE LOCATION THE ELEVATION AND SIZE OF EXISTING WATER AND SEWER MAINS FOR CONNECTION OF NEW SERVICES BEFORE INSTALLATION OF ANY PIPING. 3. UNDERGROUND METAL PIPING SHALL BE PROTECTED WITH COAT OF BITUMINOUS COMPOUND ( "BITUSMATIC" OR EQUAL) BEFORE COVERING. 4. PROVIDE SHUT -OFF AND VACUUM BREAKER TO ALL HOSE BIBBS AND FAUCETS WITH HOSE -END CONNECTION. 5. PLUMBING FIXTURES SHALL BE SUPPLIED BY OWNER AND INSTALLED BY CONTRACTOR 6. SLOPE OF HORIZONTAL DRAINAGE PIPE: SIZE (INCHES) MIN. SLOPE (INCH PER FOOT) 2 1/2 OR LESS 1/4 3 TO 6 1/8 8 OR LARGER 1/16 7. PROVIDE FULLY ACCESSIBLE CLEANOUTS ON SANITARY AND ANY WASTE PIPING AT EVERY CHANGE OF DIRECTION AND AT BOTTOM OF STACKS CLEAN OUT LOCATION AND SIZES ON HORIZONTAL LINES SHALL BE ACCORDING TO CODE. 8. VENT LINES SHALL EXTEND 6" MIN. ABOVE ROOF AND FLASHED WITH LEAD OR CONNECTED TO EXISTING VENT LINES. 9. ALL FLOOR DRAINS SHALL HAVE TRAP PRIMERS TO PROTECT THE SEAL OF THE TRAP. 10. PROVIDE CONTROL VALVES TO ALL MAINS ENTERING THE BUILDING, RISERS, BRANCHES, GROUPS OF FIXTURES, AND TO EACH PIECE OF EQUIPMENT. 11. THE MAXIMUM WATER CONSUMPTION FLOW RATES AND QUANTITIES FOR ALL PLUMBING FIXTURES FITTINGS SHALL BE IN ACCORDANCE WITH TABLE 604.4 F.B.C. 3/411. GOLD WATE1;P,--, SUPPLY GATE VA ELECTRIC WATEIR I- 4EATER WITI -4 5- "/'EAR WARRANTY, GLA55 LINED TAN<, DOUG ELEMENT NON- CONCURREI ENERGY EFFICIENT INSULA MEETING ASHRAE 90A -19� MINIMUM i INSULATION R -fro 4" DEEP DRAIN PAN (WHEN INSTALLED ABOVE 1st FLR.i DRAIN V WATER HAMMER: A WATER- HAMMER ARRESTOS SHALL BE INSTALLED WHERE QUICK- CLOSING VALVES ARE UTILIZED, UNLESS OTHERWISE APPROVED. WATER- HAMMER ARRESTORS SHALL CONFORM TO ASSE 1010. ACCESS SHALL BE PROVIEDED TO WATER- HAMMER ARRESTORS. NOTE: ALL STORM DRAINAGE RUN OFF FROM ROOF AND TERRACES SHALL TERMINATE AT GRASSY AREA, AND SHALL BE RETAINED WITHIN THE PROPERTY. SEE ARCHITECTURE PLAN. NOTE: ALL INDERECT WASTE TO FLOOR DRAINS SHALL BE 2 "MINIMUM WHEN INSTALLED BELOW GRADE. ALL INDIRECT WASTE PIPING THAT EXCEEDS 2FT IN LENGTH SHALL BE TRAPPED UNLESS A TRAP IS PROVIDED INTERNALLY AS PART OF THE APPLIANCE IS IN USE. IF SUCH APPLIANCE IS IN USE, PROVIDE SPEC SHEET W /INTERNAL TRAP SHOWN /INTERNAL TRAP SHOWN NOTED FOR FIELD INSPECTOR'S REVIEW, DURING CONSTRACTION. ALL FIXTURE DRAINS FROM VENTED LINES SHALL BE PER FBC 906.1, MAX. OF 10FT. FROM A VENTED 3 "LINE AND MAXIMUM OF 6FT. FROM A VENTED 2 "LINE. Piping Materials 1. SANITARY WASTE, VENT AND STORM DRAIN: POLYVINYL CHLORIDE (PVC) PIPE AND FITTINGS (SCHEDULE 40). MATERIAL SHALL COMPLY WITH D -1784, TYPE 1, GRADE 1 COMPOUND. PIPE SHALL COMPLY WITH ASTM D -1785. FITTIINGS SHALL COMPLY WITH ASTM D -2467 SOCKET TYPE. SOLVENT CEMENT SHALL COMPLY WITH D -2564. 2. CONDENSATE DRAINS FROM AIR CONDITIONING UNITS: "PVC" SCHEDULE 40 PIPE & FITTINGS. SHEET LEAD FLASHING MOP. II\ WITH ROOFING MATERIAL. 3. DOMESTIC WATER ABOVE GROUND: TYPE L COPPER PIPE WITH WROUGHT COPPER SOLDERED JOINT FITTINGS. TYPE K COPPER BELOW GROUND PIPE ACCORDING TO ASTM B -42. TUBE ACCORDING TO ASTM B -88. ALTERNATE FOR UNDERGROUND PIPE: CAST IRON WATER PIPE ACCORDING TO ANSI A 21.6. STEEL PIPE (SCHEDULE 40, GALVANIZED) ACCORDING TO ASTM A120 -68. 4. ALL CONTROL VALVES FOR DOMESTIC WATER SHALL BE CAST BRASS OR B -88 BRONZE GATE VALVES. 5. PROVIDE DIELECTRIC FITTINGS FOR JOINING DISSIMILAR METALS. HOT UJATER SUPPLY �-- 3/4" RELIEF LINE OUTSIDE OF E3UILDING SPILL 0I' AE30VE FINISHED GROUND a5ME PRESSURE 4 TEMPERATURE RELIEF VALVE ELIEF PIPE TO HAVE AN OPEI �) DRAIN OUTSIDE OF BLDG. � ELECT�RIC WATER HEATER [DETAL NTS.= l NOTE: ANY VENT PIPE WITHIN 10' -0" OF ANY DOOR, WINDOW,OR EXHAUST OPENING SHALL EXTEND DOT LESS THAN 3' -0" ABOVE SUCH. TURN HEAD PIPE DOWN INTO STACK. :ING. CONSTRUCTION. JLC C VG ROOF CONSTRUCTION AS REQUIRED. VENT THRU ROOF DETAIL N.T.S. Domestic Water Piping 1. PIPE HANGERS AND SUPPORTS: PROVIDE ADJUSTABLE HANGERS, INSERTS BRACKETS, ROLLS, CLAMPS AND SUPPLEMENTARY STEEL AS REQUIRED FOR PROPER SUPPORT OF PIPE LINES. HANGERS SHALL ALLOW FOR EXPANSION AND CONTRACTION OF PIPE LINES AND COVERING TO RUN CONTINUOUSLY THROUGH HANGERS. 2. SPACING AND SIZES A. HORIZONTAL CARBON STEEL PIPE PIPE SIZE ROD DIAMETER UP TO 1-1/4" 3/8" 1 -1/2" & 2" 3/8" B. HORIZONTAL COPPER PIPING PIPE SIZE ROD DIAMETER UP TO 1" 3/8" 1 -1/4" & 1 -1/2" 3/8" 2" 3/8" NOTE: ALL WASTE PIPING SLIP JOINTS SHALL BE SOLDERED, OR SOLVENT CEMENTED SO AS TO FORM A SOLID CONNECTION PER FBC 405.8 CRITERIA, IF NO ACCESS IS PROVIDED FOR SUCH PIPE CONNECTIONS. MAXIMUM SPACING 8' 10' MAXIMUM SPACING 6' 6' 8' PLUMBING SYMBOLS -*� Hot + cold water + Cold water + Filtered cold water SS Steam supply Q BLDG DEPT COMMENTS Steam return + Gas " Waste / indirect waste C° Floor drain / funnel floor drain WFloor sink (n General Notes & Details Plan n.t.S. ARCHITECTURE PLANNING INTERIORS 3Y` ::...... H E R S H VITA L N C ORAZZI NI Luigi Vitalini AR -13513 Pablo Corazzini AR -91716 U Florida Project No. I~ Distribution Date PERMIT SET 04 -17 -06 Q BLDG DEPT COMMENTS 06/08/06 cfl co C° c� O . s� rl CO o 0 z co o � o co Sushi Maki 5812 S.W. 72nd St. South Miami Florida Project No. 04033 Distribution Date PERMIT SET 04 -17 -06 Q BLDG DEPT COMMENTS 06/08/06 Sheet ESI ENERGY SCIENCES INC CONSULTING ENGINEERS ESBER ANDIROGLV, P.E. MECH./ELEC. - 142454 2821 DOUGLAS ROAD MIAMI. FL 33193 TEL 305- 448 -8828 FAX 305- 448 -7375 e -mail enerWObellsouth.net P•204 H:�Proj a1 Drawicgs�D4033 Sushi h 00 x 24.00 inches)