Loading...
05-437-003TIE SURVEYOR'S TAPE AT MIDPOINT OF FABRIC STRAP (TYR) PLACE TOP OF ROOTBALL _ MINIMUM I" ABOVE FIN. GRADE REMOVE BURLAP FROM TOP OF- ROOT BALL TIE FRONDS SECURELY AROWD LEADER UTH BINDERS TWIG. FS10VE UPON PLANT- INSTALLATION ACCEPTANCE BY LANDSCAPE ARCHITECT. WRAP S NAIL FABRIC STRAP TO (3) 36" LOA&, 2 "X 4" P.T. STAKE FIRMLY DRIVEN 3" BELOW GRADE PLANTING DOME - SLOPE TO DRAM AWAY FROM ROOT BALL TREE INSTALLATION PLANT LOCATIONS TRIANGULAR VARIES BY REFER TO PL TYPICAL PLANTING PATTERN REMOVE BURLAP FROM TOP OF ROOT BALL VIII SIDEWALK MR EDGE APPLICABLE) ` � 3WOW aeT1O Q8 3 LAYERS OP VJP LAP 8ECM! SAM* UT14 3/4" 67El4 "V6 TOE NAIL TO CAVE!! a8 � Z" x 4" f LEAST14 A6 NEGE86ARY PLAN VIEW MBTALLATIM BATTEN DETAIL 24 "5( 2 "X 4" BATTENS UTH AL BANDING AS SHOWN, SEE PLAN DETAIL 2'X 4" P.T. BRACES PLACED ROWD TRUNK AT 120 DEG. PHS1,4 INTERVALS (TYP) GRADE CREATE 4" HKN WATER SAUCER \V-002- %-3' DIRK AROWD PLANT PIT L.6► PLANT PIT 2X SIZE OF ROOT BALL PALM INSTALLATION GRADE 3611 1 IM, 211X 411 -P.T. STALE DRIVEL, 3" BELOW GRADE ITYPJ PLANTING DOME - SLOPE TO DRAM AWAY FROM ROOT BALL PLANT SPACING VARIES TH PLANT SPECIES, REFER IR3" TO PLANT LIST FOR SPACING. 7P. rte" MULCH TYP. EXCAVATE AND BACKKFILL W/PREPARED PI -ANTMG SOIL, SEE PLANTING SOIL SPECS M GENERAL LANDSCAPE NOTES THIS SHEET GROUNDCOVER INSTALLATION 14 PLANT PIT 2X WIDTH OF ROOT BALL SHRUB INSTALLATION ST. AUGUSTNE 'SEVILLE' SOD SIDEWAIX U ERE EXISTING SOD INSTALLATION PLANT MATERIAL. SHAD. NOT BE PRUNED PRIOR TO INSTAU.ATIONt AFTER PLANTS HAVE BEEN INSTALLED, EACH PLANT SHALL BE PINNED FOR WFORMITY REMOVE BURLAP FROM TOP OR ROOT BALL MIN. 3' DEEP LAYER OF MULCH To COVER ENTIRE PLANT BED. WET DOWN TO STABILIZE - DO NOT MULCH TO TRWK PREPARED PLANTING SOIL, AS DESCRIBED IN LANDSCAPE NOTES, COMPACTED FULLY PLANTING DOME SLOPE TO DRAIN AWAY FROM ROOT BALL BLS WITH 7ED TOPSOIL CAVATE AND BACKFILL PREPARED PLANTING SOIL SCARIFY EXISTING SUBGRADE TO FACILITATE POROSITY GENERAL LANDSCAPE NOTES U ALL PLANT MATERIAL SHALL BE FLORIDA M OR BETTER AS DEFINED IN THE GRADES AND STANDARDS FOR NURSERY PLANTS, PART I and II BY THE STATE OF FLORIDA, DEPARTMENT OF AGRICULTURE. 2) ALL LANDSCAPE MATERIAL 4 INSTALLATION SHALL MEET ALL APPLICABLE LOCAL AND C LINTY ZONING CRITERIA AND / OR ORDINANCES. 3) IT IS THE CONTRACTOR'S RESPONSIBILITY TO LOCATE 4 FLAG ANY EXISTING UNDERCxROUND UTILITIES and /or EASEMENTS PRIOR TO THE INSTALLATION OF PLANT MATERIAL. 4) ALL TREES, SHRUBS AND GROUNDCOVERS SHALL RECEIVE A 3" DEPTH OF SHREDDED MULCH. 5J THERE SHALL BE A 12' WIDE STRIP OF MULCH (3' DEPTH) BETWEEN SOD AND SHRUBS /GROUNDCOVERS. 6J LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR THEIR OWN QUANTITY TAKE OFF. IN CASE OF DISCREPANCIES, PLAN SHALL TAKE PRECEDENCE OVER PLANT LIST. V SOLID SOD SHALL BE STENOTAPHRIJM SECUNDATUM 'SEVILLE', SOD QUANTITIES GIVEN ARE APPROXIMATE. CONTRACTOR IS RESPONSIBLE TO REPLACE ANY EXISTING SOD DAMAGED DURING CONSTRUCTION. 8J ALL NEW PLANT MATERIAL SHALL HAVE AN ESTABLISHMENT PERIOD OF OW) DAYS AFTER CONDITIONAL ACCEPTANCE BY LOCAL OR COUNTY INSPECTOR/OFFICAL. DURING THE ESTA13LISHMENT PERIOD AND UNTIL THE FINAL ACCEPTANCE, THE CONTRACTOR WILL BE RESPONSIBLE FOR THE FOLLOWING ITEMS: WATERING, RE- SETTING OF PLANTS, REPLACEMENT OF SICK OR DEAD PLANTS, AND ALL OTHER CARE REQUIRED FOR PROPER GROWTH. ANY PLANT MATERIAL NOT IN A HEALTHY GROWING CONDITION WILL BE REPLACED BY THE CONTRACTOR, AT NO ADDITIONAL COST TO OWNER. W ALL SYNTHETIC BURLAP, SYNTHETIC STRING OR CORDS, OR WIRE BASKETS SHALL BE REMOVED BEFORE TREES ARE PLANTED. ALL SYNTHETIC TAPE SHALL BE REMOVED FROM TRUNKS, BRANCHES, ETC, BEFORE INSPECTION. THE TOP 1/3 OF ANY BURLAP SHALL BE REMOVED, OR TUCKED INTO THE PLANTING PIT BEFORE THE TREES ARE BACK FILLED. 10) ALL STAKING SHALL BE REMOVED NO LATER THAN TWELVE MONTHS AFTER PLANTING, REBAR STAKING SHALL NOT BE USED. 11) CONTRACTOR TO ADD TERRASORB, OR APPROVED EQUAL, TO ALL PLANTING PITS ACCORDING TO MANUFACTURER'S RECOMMENDED QUANTIY AND SPECIFICATIONS THE CONTRACTOR SHALL BE RESPONSIBLE FOR APPROPRIATE TAKEOFF QUANITITIES FOR THIS MATERIAL. 12) CONTRACTOR SHALL FERTILIZE ALL TREES, PALMS AND SHRUBS UPON INSTALLATION WITH LESCO 8 -10 -10 OR EQUAL, ACCORDING TO MANUFACTURER'S RECOMMENDED RATE. 13) PLANTING SOIL SHALL BE A MIX OF 80% FRESHWATER SAND AND 2M6 INLAND GLADES MUCK THOROUGHLY MIXED ON SITE WITH A COMMERCIAL BLENDER OR EQUAL. 14J CONTRACTOR IS RESPONSIBLE TO INSPECT THE PROJECT SITE AND EVALUATE ANY TREE REMOVALS PRIOR TO BIDDING IF APPLICABLE. 15J SYMBOLS REPRESENT PLANTS AT MATURE STAGE, NEVER AT TIME OF INSTALLATION. 10 AN UNDERGROUND AUTOMATIC IRRIGATION SYSTEM SHALL BE PROVIDED FOR ALL LANDSCAPE AREAS. THIS DESIGN SHALL SUPPLY 10090 COVERAGE. n �y o Sib a` . Ire h 5 -TURNS BROW BURLAP FABRIC TIE STRAPS, ON TR kk LOOP 41040T NAIL AS REQ'D. DO ABOVE LOWEST LIMB. NOT PU1NCrdRE- _3" MIN. OF SPECIFIED MULCH, KEEP TRW "ILS 6" CFF TRW BASE. N Q CREATE 4" 141W WATER 3" MIN. OF — SAUCER 3' DIAM. AROIND SPECIFIED MULCH PLANT PIT TIE SURVEYORS TAPE INISH GRADE AT MIDPOINT OF BRACE (TYP) NAIL BRACES TO 00 2 "X 4" STAKES —\ WRAP S NAIL FABRIC STRAP TO (3) 36" LOA&, 2 "X 4" P.T. STAKE FIRMLY DRIVEN 3" BELOW GRADE PLANTING DOME - SLOPE TO DRAM AWAY FROM ROOT BALL TREE INSTALLATION PLANT LOCATIONS TRIANGULAR VARIES BY REFER TO PL TYPICAL PLANTING PATTERN REMOVE BURLAP FROM TOP OF ROOT BALL VIII SIDEWALK MR EDGE APPLICABLE) ` � 3WOW aeT1O Q8 3 LAYERS OP VJP LAP 8ECM! SAM* UT14 3/4" 67El4 "V6 TOE NAIL TO CAVE!! a8 � Z" x 4" f LEAST14 A6 NEGE86ARY PLAN VIEW MBTALLATIM BATTEN DETAIL 24 "5( 2 "X 4" BATTENS UTH AL BANDING AS SHOWN, SEE PLAN DETAIL 2'X 4" P.T. BRACES PLACED ROWD TRUNK AT 120 DEG. PHS1,4 INTERVALS (TYP) GRADE CREATE 4" HKN WATER SAUCER \V-002- %-3' DIRK AROWD PLANT PIT L.6► PLANT PIT 2X SIZE OF ROOT BALL PALM INSTALLATION GRADE 3611 1 IM, 211X 411 -P.T. STALE DRIVEL, 3" BELOW GRADE ITYPJ PLANTING DOME - SLOPE TO DRAM AWAY FROM ROOT BALL PLANT SPACING VARIES TH PLANT SPECIES, REFER IR3" TO PLANT LIST FOR SPACING. 7P. rte" MULCH TYP. EXCAVATE AND BACKKFILL W/PREPARED PI -ANTMG SOIL, SEE PLANTING SOIL SPECS M GENERAL LANDSCAPE NOTES THIS SHEET GROUNDCOVER INSTALLATION 14 PLANT PIT 2X WIDTH OF ROOT BALL SHRUB INSTALLATION ST. AUGUSTNE 'SEVILLE' SOD SIDEWAIX U ERE EXISTING SOD INSTALLATION PLANT MATERIAL. SHAD. NOT BE PRUNED PRIOR TO INSTAU.ATIONt AFTER PLANTS HAVE BEEN INSTALLED, EACH PLANT SHALL BE PINNED FOR WFORMITY REMOVE BURLAP FROM TOP OR ROOT BALL MIN. 3' DEEP LAYER OF MULCH To COVER ENTIRE PLANT BED. WET DOWN TO STABILIZE - DO NOT MULCH TO TRWK PREPARED PLANTING SOIL, AS DESCRIBED IN LANDSCAPE NOTES, COMPACTED FULLY PLANTING DOME SLOPE TO DRAIN AWAY FROM ROOT BALL BLS WITH 7ED TOPSOIL CAVATE AND BACKFILL PREPARED PLANTING SOIL SCARIFY EXISTING SUBGRADE TO FACILITATE POROSITY GENERAL LANDSCAPE NOTES U ALL PLANT MATERIAL SHALL BE FLORIDA M OR BETTER AS DEFINED IN THE GRADES AND STANDARDS FOR NURSERY PLANTS, PART I and II BY THE STATE OF FLORIDA, DEPARTMENT OF AGRICULTURE. 2) ALL LANDSCAPE MATERIAL 4 INSTALLATION SHALL MEET ALL APPLICABLE LOCAL AND C LINTY ZONING CRITERIA AND / OR ORDINANCES. 3) IT IS THE CONTRACTOR'S RESPONSIBILITY TO LOCATE 4 FLAG ANY EXISTING UNDERCxROUND UTILITIES and /or EASEMENTS PRIOR TO THE INSTALLATION OF PLANT MATERIAL. 4) ALL TREES, SHRUBS AND GROUNDCOVERS SHALL RECEIVE A 3" DEPTH OF SHREDDED MULCH. 5J THERE SHALL BE A 12' WIDE STRIP OF MULCH (3' DEPTH) BETWEEN SOD AND SHRUBS /GROUNDCOVERS. 6J LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR THEIR OWN QUANTITY TAKE OFF. IN CASE OF DISCREPANCIES, PLAN SHALL TAKE PRECEDENCE OVER PLANT LIST. V SOLID SOD SHALL BE STENOTAPHRIJM SECUNDATUM 'SEVILLE', SOD QUANTITIES GIVEN ARE APPROXIMATE. CONTRACTOR IS RESPONSIBLE TO REPLACE ANY EXISTING SOD DAMAGED DURING CONSTRUCTION. 8J ALL NEW PLANT MATERIAL SHALL HAVE AN ESTABLISHMENT PERIOD OF OW) DAYS AFTER CONDITIONAL ACCEPTANCE BY LOCAL OR COUNTY INSPECTOR/OFFICAL. DURING THE ESTA13LISHMENT PERIOD AND UNTIL THE FINAL ACCEPTANCE, THE CONTRACTOR WILL BE RESPONSIBLE FOR THE FOLLOWING ITEMS: WATERING, RE- SETTING OF PLANTS, REPLACEMENT OF SICK OR DEAD PLANTS, AND ALL OTHER CARE REQUIRED FOR PROPER GROWTH. ANY PLANT MATERIAL NOT IN A HEALTHY GROWING CONDITION WILL BE REPLACED BY THE CONTRACTOR, AT NO ADDITIONAL COST TO OWNER. W ALL SYNTHETIC BURLAP, SYNTHETIC STRING OR CORDS, OR WIRE BASKETS SHALL BE REMOVED BEFORE TREES ARE PLANTED. ALL SYNTHETIC TAPE SHALL BE REMOVED FROM TRUNKS, BRANCHES, ETC, BEFORE INSPECTION. THE TOP 1/3 OF ANY BURLAP SHALL BE REMOVED, OR TUCKED INTO THE PLANTING PIT BEFORE THE TREES ARE BACK FILLED. 10) ALL STAKING SHALL BE REMOVED NO LATER THAN TWELVE MONTHS AFTER PLANTING, REBAR STAKING SHALL NOT BE USED. 11) CONTRACTOR TO ADD TERRASORB, OR APPROVED EQUAL, TO ALL PLANTING PITS ACCORDING TO MANUFACTURER'S RECOMMENDED QUANTIY AND SPECIFICATIONS THE CONTRACTOR SHALL BE RESPONSIBLE FOR APPROPRIATE TAKEOFF QUANITITIES FOR THIS MATERIAL. 12) CONTRACTOR SHALL FERTILIZE ALL TREES, PALMS AND SHRUBS UPON INSTALLATION WITH LESCO 8 -10 -10 OR EQUAL, ACCORDING TO MANUFACTURER'S RECOMMENDED RATE. 13) PLANTING SOIL SHALL BE A MIX OF 80% FRESHWATER SAND AND 2M6 INLAND GLADES MUCK THOROUGHLY MIXED ON SITE WITH A COMMERCIAL BLENDER OR EQUAL. 14J CONTRACTOR IS RESPONSIBLE TO INSPECT THE PROJECT SITE AND EVALUATE ANY TREE REMOVALS PRIOR TO BIDDING IF APPLICABLE. 15J SYMBOLS REPRESENT PLANTS AT MATURE STAGE, NEVER AT TIME OF INSTALLATION. 10 AN UNDERGROUND AUTOMATIC IRRIGATION SYSTEM SHALL BE PROVIDED FOR ALL LANDSCAPE AREAS. THIS DESIGN SHALL SUPPLY 10090 COVERAGE. n �y o Sib a` . Ire h O ce rx CO cqco M I M N to N Q u 0 n U (� 00 o� LLJ W L-LL- W W d C\2 cn M I g O M o a 1 w z��wz co o N (� N � v N oE-1w F- N ic 3L0 0 Zv °pz Ci Q d- o 0 0 Q O ce rx U (� 00 A LLJ W W d C\2 cn 0 I O M a z��wz co o (� rn x 0 oE-1w aLO C/2 DRANK EXR. CHECKED EJLC. DATE FEB. 23, 2005 SCALE SHOWN JOB No. 04 -37 SHEET A -2 2 OF 11 SHEETS