05-437-003TIE SURVEYOR'S TAPE
AT MIDPOINT OF
FABRIC STRAP (TYR)
PLACE TOP OF ROOTBALL _
MINIMUM I" ABOVE FIN. GRADE
REMOVE BURLAP
FROM TOP OF-
ROOT BALL
TIE FRONDS SECURELY AROWD
LEADER UTH BINDERS TWIG.
FS10VE UPON PLANT-
INSTALLATION ACCEPTANCE
BY LANDSCAPE ARCHITECT.
WRAP S NAIL FABRIC
STRAP TO (3) 36" LOA&,
2 "X 4" P.T. STAKE FIRMLY
DRIVEN 3" BELOW GRADE
PLANTING DOME - SLOPE
TO DRAM AWAY FROM
ROOT BALL
TREE INSTALLATION
PLANT LOCATIONS
TRIANGULAR
VARIES BY
REFER TO PL
TYPICAL PLANTING PATTERN
REMOVE BURLAP
FROM TOP
OF ROOT BALL
VIII
SIDEWALK MR
EDGE
APPLICABLE)
` � 3WOW aeT1O
Q8 3 LAYERS OP VJP LAP
8ECM! SAM* UT14
3/4" 67El4 "V6
TOE NAIL TO CAVE!!
a8 �
Z" x 4" f LEAST14
A6 NEGE86ARY
PLAN VIEW MBTALLATIM BATTEN DETAIL
24 "5( 2 "X 4" BATTENS UTH
AL BANDING AS SHOWN,
SEE PLAN DETAIL
2'X 4" P.T. BRACES PLACED
ROWD TRUNK AT 120 DEG. PHS1,4
INTERVALS (TYP) GRADE
CREATE 4" HKN WATER SAUCER
\V-002- %-3' DIRK AROWD PLANT PIT L.6►
PLANT PIT
2X SIZE OF
ROOT BALL
PALM INSTALLATION
GRADE
3611 1 IM, 211X 411
-P.T. STALE DRIVEL,
3" BELOW GRADE ITYPJ
PLANTING DOME - SLOPE TO
DRAM AWAY FROM ROOT BALL
PLANT SPACING VARIES
TH PLANT SPECIES, REFER
IR3" TO PLANT LIST FOR SPACING.
7P. rte" MULCH TYP.
EXCAVATE AND BACKKFILL W/PREPARED
PI -ANTMG SOIL, SEE PLANTING
SOIL SPECS M GENERAL LANDSCAPE
NOTES THIS SHEET
GROUNDCOVER INSTALLATION
14
PLANT PIT
2X WIDTH
OF ROOT BALL
SHRUB INSTALLATION
ST. AUGUSTNE
'SEVILLE' SOD
SIDEWAIX U ERE
EXISTING
SOD INSTALLATION
PLANT MATERIAL. SHAD. NOT BE
PRUNED PRIOR TO INSTAU.ATIONt
AFTER PLANTS HAVE BEEN
INSTALLED, EACH PLANT SHALL
BE PINNED FOR WFORMITY
REMOVE BURLAP FROM
TOP OR ROOT BALL
MIN. 3' DEEP LAYER OF
MULCH To COVER ENTIRE
PLANT BED. WET DOWN
TO STABILIZE - DO NOT
MULCH TO TRWK
PREPARED PLANTING
SOIL, AS DESCRIBED
IN LANDSCAPE NOTES,
COMPACTED FULLY
PLANTING DOME
SLOPE TO DRAIN
AWAY FROM ROOT BALL
BLS WITH
7ED TOPSOIL
CAVATE AND BACKFILL
PREPARED PLANTING SOIL
SCARIFY EXISTING SUBGRADE
TO FACILITATE POROSITY
GENERAL LANDSCAPE NOTES
U ALL PLANT MATERIAL SHALL BE FLORIDA M OR BETTER AS DEFINED IN THE
GRADES AND STANDARDS FOR NURSERY PLANTS, PART I and II BY THE STATE OF
FLORIDA, DEPARTMENT OF AGRICULTURE.
2) ALL LANDSCAPE MATERIAL 4 INSTALLATION SHALL MEET ALL APPLICABLE LOCAL
AND C LINTY ZONING CRITERIA AND / OR ORDINANCES.
3) IT IS THE CONTRACTOR'S RESPONSIBILITY TO LOCATE 4 FLAG ANY EXISTING
UNDERCxROUND UTILITIES and /or EASEMENTS PRIOR TO THE INSTALLATION OF PLANT
MATERIAL.
4) ALL TREES, SHRUBS AND GROUNDCOVERS SHALL RECEIVE A 3" DEPTH OF
SHREDDED MULCH.
5J THERE SHALL BE A 12' WIDE STRIP OF MULCH (3' DEPTH) BETWEEN SOD AND
SHRUBS /GROUNDCOVERS.
6J LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR THEIR OWN QUANTITY TAKE OFF. IN
CASE OF DISCREPANCIES, PLAN SHALL TAKE PRECEDENCE OVER PLANT LIST.
V SOLID SOD SHALL BE STENOTAPHRIJM SECUNDATUM 'SEVILLE', SOD QUANTITIES
GIVEN ARE APPROXIMATE. CONTRACTOR IS RESPONSIBLE TO REPLACE ANY
EXISTING SOD DAMAGED DURING CONSTRUCTION.
8J ALL NEW PLANT MATERIAL SHALL HAVE AN ESTABLISHMENT PERIOD OF OW) DAYS
AFTER CONDITIONAL ACCEPTANCE BY LOCAL OR COUNTY INSPECTOR/OFFICAL.
DURING THE ESTA13LISHMENT PERIOD AND UNTIL THE FINAL ACCEPTANCE, THE
CONTRACTOR WILL BE RESPONSIBLE FOR THE FOLLOWING ITEMS: WATERING,
RE- SETTING OF PLANTS, REPLACEMENT OF SICK OR DEAD PLANTS, AND ALL OTHER
CARE REQUIRED FOR PROPER GROWTH. ANY PLANT MATERIAL NOT IN A HEALTHY
GROWING CONDITION WILL BE REPLACED BY THE CONTRACTOR, AT NO ADDITIONAL
COST TO OWNER.
W ALL SYNTHETIC BURLAP, SYNTHETIC STRING OR CORDS, OR WIRE BASKETS SHALL
BE REMOVED BEFORE TREES ARE PLANTED. ALL SYNTHETIC TAPE SHALL BE
REMOVED FROM TRUNKS, BRANCHES, ETC, BEFORE INSPECTION. THE TOP 1/3 OF ANY
BURLAP SHALL BE REMOVED, OR TUCKED INTO THE PLANTING PIT BEFORE THE TREES
ARE BACK FILLED.
10) ALL STAKING SHALL BE REMOVED NO LATER THAN TWELVE MONTHS AFTER
PLANTING, REBAR STAKING SHALL NOT BE USED.
11) CONTRACTOR TO ADD TERRASORB, OR APPROVED EQUAL, TO ALL PLANTING PITS
ACCORDING TO MANUFACTURER'S RECOMMENDED QUANTIY AND SPECIFICATIONS THE
CONTRACTOR SHALL BE RESPONSIBLE FOR APPROPRIATE TAKEOFF QUANITITIES FOR
THIS MATERIAL.
12) CONTRACTOR SHALL FERTILIZE ALL TREES, PALMS AND SHRUBS UPON
INSTALLATION WITH LESCO 8 -10 -10 OR EQUAL, ACCORDING TO MANUFACTURER'S
RECOMMENDED RATE.
13) PLANTING SOIL SHALL BE A MIX OF 80% FRESHWATER SAND AND 2M6 INLAND
GLADES MUCK THOROUGHLY MIXED ON SITE WITH A COMMERCIAL BLENDER OR
EQUAL.
14J CONTRACTOR IS RESPONSIBLE TO INSPECT THE PROJECT SITE AND EVALUATE ANY
TREE REMOVALS PRIOR TO BIDDING IF APPLICABLE.
15J SYMBOLS REPRESENT PLANTS AT MATURE STAGE, NEVER AT TIME OF
INSTALLATION.
10 AN UNDERGROUND AUTOMATIC IRRIGATION SYSTEM SHALL BE PROVIDED FOR ALL
LANDSCAPE AREAS. THIS DESIGN SHALL SUPPLY 10090 COVERAGE.
n
�y
o
Sib
a` .
Ire
h
5 -TURNS BROW BURLAP
FABRIC TIE STRAPS,
ON TR kk
LOOP 41040T
NAIL AS REQ'D. DO
ABOVE LOWEST LIMB.
NOT PU1NCrdRE-
_3" MIN. OF SPECIFIED MULCH, KEEP
TRW "ILS
6" CFF TRW BASE.
N
Q
CREATE 4" 141W WATER
3" MIN. OF
— SAUCER 3' DIAM. AROIND
SPECIFIED MULCH
PLANT PIT
TIE SURVEYORS TAPE
INISH GRADE AT MIDPOINT OF BRACE (TYP)
NAIL BRACES TO
00
2 "X 4" STAKES —\
WRAP S NAIL FABRIC
STRAP TO (3) 36" LOA&,
2 "X 4" P.T. STAKE FIRMLY
DRIVEN 3" BELOW GRADE
PLANTING DOME - SLOPE
TO DRAM AWAY FROM
ROOT BALL
TREE INSTALLATION
PLANT LOCATIONS
TRIANGULAR
VARIES BY
REFER TO PL
TYPICAL PLANTING PATTERN
REMOVE BURLAP
FROM TOP
OF ROOT BALL
VIII
SIDEWALK MR
EDGE
APPLICABLE)
` � 3WOW aeT1O
Q8 3 LAYERS OP VJP LAP
8ECM! SAM* UT14
3/4" 67El4 "V6
TOE NAIL TO CAVE!!
a8 �
Z" x 4" f LEAST14
A6 NEGE86ARY
PLAN VIEW MBTALLATIM BATTEN DETAIL
24 "5( 2 "X 4" BATTENS UTH
AL BANDING AS SHOWN,
SEE PLAN DETAIL
2'X 4" P.T. BRACES PLACED
ROWD TRUNK AT 120 DEG. PHS1,4
INTERVALS (TYP) GRADE
CREATE 4" HKN WATER SAUCER
\V-002- %-3' DIRK AROWD PLANT PIT L.6►
PLANT PIT
2X SIZE OF
ROOT BALL
PALM INSTALLATION
GRADE
3611 1 IM, 211X 411
-P.T. STALE DRIVEL,
3" BELOW GRADE ITYPJ
PLANTING DOME - SLOPE TO
DRAM AWAY FROM ROOT BALL
PLANT SPACING VARIES
TH PLANT SPECIES, REFER
IR3" TO PLANT LIST FOR SPACING.
7P. rte" MULCH TYP.
EXCAVATE AND BACKKFILL W/PREPARED
PI -ANTMG SOIL, SEE PLANTING
SOIL SPECS M GENERAL LANDSCAPE
NOTES THIS SHEET
GROUNDCOVER INSTALLATION
14
PLANT PIT
2X WIDTH
OF ROOT BALL
SHRUB INSTALLATION
ST. AUGUSTNE
'SEVILLE' SOD
SIDEWAIX U ERE
EXISTING
SOD INSTALLATION
PLANT MATERIAL. SHAD. NOT BE
PRUNED PRIOR TO INSTAU.ATIONt
AFTER PLANTS HAVE BEEN
INSTALLED, EACH PLANT SHALL
BE PINNED FOR WFORMITY
REMOVE BURLAP FROM
TOP OR ROOT BALL
MIN. 3' DEEP LAYER OF
MULCH To COVER ENTIRE
PLANT BED. WET DOWN
TO STABILIZE - DO NOT
MULCH TO TRWK
PREPARED PLANTING
SOIL, AS DESCRIBED
IN LANDSCAPE NOTES,
COMPACTED FULLY
PLANTING DOME
SLOPE TO DRAIN
AWAY FROM ROOT BALL
BLS WITH
7ED TOPSOIL
CAVATE AND BACKFILL
PREPARED PLANTING SOIL
SCARIFY EXISTING SUBGRADE
TO FACILITATE POROSITY
GENERAL LANDSCAPE NOTES
U ALL PLANT MATERIAL SHALL BE FLORIDA M OR BETTER AS DEFINED IN THE
GRADES AND STANDARDS FOR NURSERY PLANTS, PART I and II BY THE STATE OF
FLORIDA, DEPARTMENT OF AGRICULTURE.
2) ALL LANDSCAPE MATERIAL 4 INSTALLATION SHALL MEET ALL APPLICABLE LOCAL
AND C LINTY ZONING CRITERIA AND / OR ORDINANCES.
3) IT IS THE CONTRACTOR'S RESPONSIBILITY TO LOCATE 4 FLAG ANY EXISTING
UNDERCxROUND UTILITIES and /or EASEMENTS PRIOR TO THE INSTALLATION OF PLANT
MATERIAL.
4) ALL TREES, SHRUBS AND GROUNDCOVERS SHALL RECEIVE A 3" DEPTH OF
SHREDDED MULCH.
5J THERE SHALL BE A 12' WIDE STRIP OF MULCH (3' DEPTH) BETWEEN SOD AND
SHRUBS /GROUNDCOVERS.
6J LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR THEIR OWN QUANTITY TAKE OFF. IN
CASE OF DISCREPANCIES, PLAN SHALL TAKE PRECEDENCE OVER PLANT LIST.
V SOLID SOD SHALL BE STENOTAPHRIJM SECUNDATUM 'SEVILLE', SOD QUANTITIES
GIVEN ARE APPROXIMATE. CONTRACTOR IS RESPONSIBLE TO REPLACE ANY
EXISTING SOD DAMAGED DURING CONSTRUCTION.
8J ALL NEW PLANT MATERIAL SHALL HAVE AN ESTABLISHMENT PERIOD OF OW) DAYS
AFTER CONDITIONAL ACCEPTANCE BY LOCAL OR COUNTY INSPECTOR/OFFICAL.
DURING THE ESTA13LISHMENT PERIOD AND UNTIL THE FINAL ACCEPTANCE, THE
CONTRACTOR WILL BE RESPONSIBLE FOR THE FOLLOWING ITEMS: WATERING,
RE- SETTING OF PLANTS, REPLACEMENT OF SICK OR DEAD PLANTS, AND ALL OTHER
CARE REQUIRED FOR PROPER GROWTH. ANY PLANT MATERIAL NOT IN A HEALTHY
GROWING CONDITION WILL BE REPLACED BY THE CONTRACTOR, AT NO ADDITIONAL
COST TO OWNER.
W ALL SYNTHETIC BURLAP, SYNTHETIC STRING OR CORDS, OR WIRE BASKETS SHALL
BE REMOVED BEFORE TREES ARE PLANTED. ALL SYNTHETIC TAPE SHALL BE
REMOVED FROM TRUNKS, BRANCHES, ETC, BEFORE INSPECTION. THE TOP 1/3 OF ANY
BURLAP SHALL BE REMOVED, OR TUCKED INTO THE PLANTING PIT BEFORE THE TREES
ARE BACK FILLED.
10) ALL STAKING SHALL BE REMOVED NO LATER THAN TWELVE MONTHS AFTER
PLANTING, REBAR STAKING SHALL NOT BE USED.
11) CONTRACTOR TO ADD TERRASORB, OR APPROVED EQUAL, TO ALL PLANTING PITS
ACCORDING TO MANUFACTURER'S RECOMMENDED QUANTIY AND SPECIFICATIONS THE
CONTRACTOR SHALL BE RESPONSIBLE FOR APPROPRIATE TAKEOFF QUANITITIES FOR
THIS MATERIAL.
12) CONTRACTOR SHALL FERTILIZE ALL TREES, PALMS AND SHRUBS UPON
INSTALLATION WITH LESCO 8 -10 -10 OR EQUAL, ACCORDING TO MANUFACTURER'S
RECOMMENDED RATE.
13) PLANTING SOIL SHALL BE A MIX OF 80% FRESHWATER SAND AND 2M6 INLAND
GLADES MUCK THOROUGHLY MIXED ON SITE WITH A COMMERCIAL BLENDER OR
EQUAL.
14J CONTRACTOR IS RESPONSIBLE TO INSPECT THE PROJECT SITE AND EVALUATE ANY
TREE REMOVALS PRIOR TO BIDDING IF APPLICABLE.
15J SYMBOLS REPRESENT PLANTS AT MATURE STAGE, NEVER AT TIME OF
INSTALLATION.
10 AN UNDERGROUND AUTOMATIC IRRIGATION SYSTEM SHALL BE PROVIDED FOR ALL
LANDSCAPE AREAS. THIS DESIGN SHALL SUPPLY 10090 COVERAGE.
n
�y
o
Sib
a` .
Ire
h
O
ce
rx
CO
cqco
M I
M N
to
N
Q
u
0 n
U
(�
00
o�
LLJ
W
L-LL-
W
W d
C\2
cn
M
I
g
O
M
o
a
1
w
z��wz
co
o
N
(�
N �
v
N
oE-1w
F-
N
ic
3L0
0
Zv
°pz Ci
Q
d- o
0
0
Q
O
ce
rx
U
(�
00
A
LLJ
W
W d
C\2
cn
0
I
O
M
a
z��wz
co
o
(�
rn
x
0
oE-1w
aLO
C/2
DRANK
EXR.
CHECKED
EJLC.
DATE
FEB. 23, 2005
SCALE
SHOWN
JOB No.
04 -37
SHEET
A -2