Loading...
07-685-036ROOF TRUSS OR ROOF JOIST SEE PLAN TRUSS ANCHOR STRAP lei USP MODEL HLPTA75 WITH 20 -10d NAILS AND 2 -10d AT SEAT PLATE 'ONCRETE BEAM 5EE PLAN 8" CMU WALL WHEN APPICABLE TYPE 1 ROOF TRUSS ANCHORAGE 4X 1 /4" PLATE 4 4X1/4" 10" PLATE . 2x1 CHC /'3/161/ Q 3x3x 1/4" * WITH EXTENDED LEG CONC. w —`__ BEAM 5/8" X 6' HILT] KWIK BOLT II SECTION OF ELEVATION OF GIRDER TRUSS GIRDER TRUSS ANCHOR STRAP ANCHOR STRAP GIRDER ANCHOR TYPE 1 4x4x 1/4" x 10" 2 — 3/4" THRU TRIM BOT. CHORD TO MATCH ADJACENT TRUSS GEOMETRY x 6" A. B. ANGLE GIRDER ANCHOR TYPE 2 ROOF JOIST 2x12 0 16" 5/8" PLYWOOD NAILED JOIST WITH 10d NAILS 0 6" O.C. JOIST ANCHOR STRAP I USP MODEL HLPTA75 WITH AT PLATE TYPE 2 ROOF TRUSS ANCHORAGE TYPICAL CONNECTIONS: ROOF SHEATHING TO JOIST PROVIDE ANEL E AT S" P 4' x 8' CDX PLYWO D , SHEATHING MIN, 19%32' THICT\j MAX. SPAN 24 VA, wi�MMXVNI WOOD FASCIA SEE ARCH'L. W/ 2 -16d NAILS 0 EACH TRUSS 1/16" SPACE AT PANEL ENDS rli'1.j;1. PLYWOOD NAILING PLAN PREFABRICATED WOOD TRUSSES 24 ON CENTER SEE ROOF PLAN ON BRACING SEE DETAIL 10d NAILS AT 6 "o.c. AT PANEL EDGE AND INTERMEDIATE SUPPORT 4 "o.c. 0 GABLE ENDS FIRST 48" BACK 5/8" PLYWOOD NOTE: FABRICATOR OF ROOF TRUSSES SHALL BE RESPONSIBLE FOR INSURING THAT THE TRUSS LAYOUT IS IN ACCORDANCE WITH THE ROOF GEOMETRY SET BY ARCHITECT SEE ARCH'L. FOR ALL ROOF GEOMETRY TRUSS MFR. SHALL SUBMIT FINAL TRUSS LAYOUT PLAN TO ENGINEER PRIOR TO FABRICATION OF TRUSSES. IF REQUIRED ENGINEER WILL SUBMIT REVISED FRAMING BASED ON TRUSS LAYOUT SET BY TRUSS MFR. 3 -2x8 NEW 5/8" PLYWOOD WITH 8d NAILS 0 6" O.C. TYP. 6" WEDGE NAILED TO TRUSS W/ (2) 8D TOE NAILS OR BEVEL CUT BOTTOM CHORD OF FILLER TRUSSES. - FILLER TRUSSES 0 24" O.C. BY TRUSS MANUFACTURER 2x4 CONTINUOUS BRACE AT B BOTTOM CHORD LAP 2' MIN. CONNECT TO TRUSS WITH 2— 16d NAILS 19' -11" Ru =0.3 K TYPE 1 VALLEY JACKS CONNECT TO TRUSS WITH USP LFTA6 WITH 4 — 10d NAILS PER MEMBER RB1 it I I I! !I EXISTING I R 1 IL _ ! I R'I -- i ROOF TRUSS I I I1 1 I Ru -1.0 K I CONNECTION: NEW VALLEY JACKS TO TYPE 1 { - -- - I! — - --- -I- ! EXISTING ROOF TRUSS SYSTEM Ii II 11 II i....t....... m........... .....l.i ........ .. ............................... ...........1 I I.....I.... i l 03 f! I I af J 1 NEW 2x12 JIST a 16" O.C. oo (! UNDER 5/8" PLYWOOD -- _ -_ - -- x1l --- __ - - -_. r-_ t.... III! I!................... .......... { .................. ..... .........fit ....................... 11 1...I- ....... �: II II II Q N' n� l R u =o. Ru =0.6 K I I ........ .............. ...............I 1............ ............ I ...... ........ . ° . I I LOAD BEARING ..1....1....... TYPE 2 R B 1 TYPE 2 I I If I I I...I .......... ........ .................J.t........... / .._WOOD ....WALL ........ ! . t. -.... NOTE TOP ELEVATION OF EXISTING SHEATHING ........... ........................ ............................... . .................. � ��� � =�, _ - -- - - - - -- - SHALL MATCH TOP ELEVATION OF NEW SHEATHING \S15 II !1 !I II !! II I I r r . ............................... �......... FIELD COORDINATE TOP ELEVATION OF NEW —1 1 I BEAM AS REQUIRED TO DEVELOPE A FLUSH I I J1 �� J......� TSB- 0x4x( /2'� �R�It��..�lt�...t� .,�.-u- SHEATHING CONNECTION I.. .1 ............................. ....................................... ............................... I.. I,.................. ................................. .... . ... ..... ..... ... . ..... ......,.� 2x4 X 8' TOP CHORD HORIZONTAL BRACE LAP 2' NAIL TO TRUSS CHORD WITH 2— 10d NAILS 45° ROOF TRUSS f.................. r..)..................... ....... .............)..A ................ . r.9 .... I 2x4 DIAGONAL BRACES 2x4 CONT. BOT CHORD WITH 2— 16d NAILS HORIZONTAL BRACE LAP AT HORIZONTAL BRACE 2' NAIL TO TRUSS CHORD WITH 2— 16 NAILS CEILING HIGH HATS DIAGONAL BRACING ALONG BUILDING DEPTH NOTES: 1. SPACE DIAGONAL BRACING AT MAX. 20' O.C. ALONG DEPTH OF BUILDING 2. SEE PLAN FOR BRACE LOCATION X 2x4 AT 24" O.C. ROOF FRAMING PLAN SCALE 3/16 99 = 1 ' -0" 2 #5X6' ADD 'L CORNER BARS 4 # 3 STIRRUPS 0 12 O.C. BALANCE # 3 A 48' O.C. (U.O.N.) 1 WALL TIE BEAM SEE PLAN CORNER REINFORCING Ru -1.0 K TYPE 1 O is ADDITIONAL 4— 2x4 x 8' BOTJ CHORD BRACES 2 PLY GIRDER DESIGN GIRDER WITH A HORIZONTAL LOAD OF 4.0 IK FROM SHEATHING R2 BEAM- GIRDER TRUSS REACTIONS REMOVE EXIST. ROOF IN AREA ENCLOSED BY REMOVED WALLS AND REPLACE WITH NEW ROOF CONCRETE BEAM SCHEDULE MARK SIZE ELEV. REINFORCING STIRRUPS _ B" X H "' BOT TOP RB 1 8 X 12 i 8' -4" 2# 5 2# 5 # 3 0 48 RB2 8 X 12 8' -4" 2# 6 2# 5 # 3 0 4 ............... ................ ....... .................. .................. ... . ................... ............................... RB3 8X 12 8' -4" 2#5 2#5 #3048 NOTES: 1. FIELD VERIFY BEAM DEPTH WITH DOOR do WINDOW GEOMETRY 2. VERIFY ALL ELEVATIONS WITH ARCHITECTURAL DRAWINGS 3. TOP OF EXISTING BEAM = 8' -4" FIELD VERIFY MARK GRAVITY WIND LOAD UPLIFT _R1 ..................... 2.4 K 2.0 K R2 4 .0 K HORIZONTAL FROM SHEATHING CONNECTION DEVICE TYPE 1 TYPE 2 BUILDING ROOF WIND PRESSURES ASCE7 -02 146 mph. EXPOSURE "C" CATEGORY 2 Kd= 1 IMPORTANCE FACTOR 1 NET ZONE. 3 PRESSURE! UPLIFT _�- ZONE 1 45 PSF 38 PSF .. ................................................................. ............................... ZONE 2 64 PSF 57 PSF ROOF D.L. 25 psf LL 30 psf COMBINED ENGINEERING SCIENCES CARLOS ENSENAT, PE 32566 CERTIFICATE OF AUTHORIZATION No, 9108 1214 SW 12 CT. MIAMI, FL. 33135 ( 305 ) 856 -6345 L?`' 4rw o U J` • i J O LL_ U.-_ z Q Q O N l0 Q 0 i--- W 'n W C, W W Lr-) Q z 0 CIZI 5HEET 54 z 0 CIZI 5HEET 54