Loading...
07-685-035ROOF TRUSS OR ROOF SEE I USS ANCHOR STRAP P MODEL HLPTA75 WITH -10d NAILS D 2 -10d AT SEAT PLATE CONCRETE BEAM SEE PLAN 8" CMU WALL WHEN APPICABLE TYPE 1 ROOF TRUSS ANCHORAGE 4X1 4" PLA E 4X1/4" 10" PLATE 3/16" I I Q 3x3x 1/4" �E WITH EXTENDED LEG _ CONC. io iD BEAM Q 3x3x 1/4"---"' WITH EXTENDED LEG 2x1 CHC GIRDER I I TRUSS _ 5/8" X 6" HILTI KWIK BOLT II �( FIELD DETERMINE LENGTH BASED ON TRUSS GEOMETRY 5/8" X 6" HILTI KWIK BOLT II SECTION OF ELEVATION OF GIRDER TRUSS GIRDER TRUSS ANCHOR STRAP ANCHOR STRAP GIRDER ANCHOR TYPE 1 4x4x 1/4" x 10" 2 — 3/4" THRU TRIM BOT. CHORD TO MATCH ADJACENT TRUSS GEOMETRY x 6" A. B. ANGLE GIRDER ANCHOR TYPE 2 ROOF JOIST 2x12 @ 15" 5/8" PLYWOOD NAILED JOIST WITH 10d NAILS @ 6" O.C. JOIST ANCHOR STRAP (� USP MODEL HLPTA75 WITH AT PLATE TYPE 2 ROOF TRUSS ANCHORAGE TYPICAL CONNECTIONS: ROOF SHEATHING TO JOIST PROVIDE 1 8' SPACING A PANEL EDGES 4' x 8' CDX PLYWO SHEATHING MII�, 19% D 32" THICK MAX. SPAN 24 WOOD FASCIA SEE ARCH'L. —� W/ 2 -16d NAILS ® EACH TRUSS 1/16" SPACE AT PANEL ENDS PLYWOOD NAILING PLAN PREFABRICATED WOOD TRUSSES 24 ON CENTER SEE ROOF PLAN NOTE: FABRICATOR OF ROOF TRUSSES SHALL BE RESPONSIBLE FOR INSURING THAT THE TRUSS LAYOUT IS IN ACCORDANCE WITH THE ROOF GEOMETRY SET BY ARCHITECT SEE ARCH'L. FOR ALL ROOF GEOMETRY TRUSS MFR. SHALL SUBMIT FINAL TRUSS LAYOUT PLAN TO ENGINEER PRIOR TO FABRICATION OF TRUSSES. IF REQUIRED ENGINEER WILL SUBMIT REVISED FRAMING BASED ON TRUSS LAYOUT SET BY TRUSS MFR. 3 -2x8 Ru =0.9 K TYPE 2 NOTE TOP ELEVATION OF EXISTING SHEATHING SHALL MATCH TOP ELEVATION OF NEW SHEATHING FIELD COORDINATE TOP ELEVATION OF NEW NEW 5/8" PLYWOOD WITH 8d NAILS ® 6" O.C. TYP. 6" WEDGE NAILED TO TRUSS W/ (2) 8D TOE NAILS OR BEVEL CUT BOTTOM CHORD OF FILLER TRUSSES. - FILLER TRUSSES ® 24" O.C. BY TRUSS MANUFACTURER EXISTING ROOF JOIST CONNECTION: NEW VALLEY JACKS TO EXISTING ROOF TRUSS SYSTEM J 1 NEW 2x12 JIST a 16" O.C. UNDER 5/8" PLYWOOD Q Ru =0.9 K TYPE 2 B2x4 CONTINUOUS BRACE AT BOTTOM CHORD LAP 2' MIN. CONNECT TO TRUSS WITH 2— 16d NAILS IKU =U.3 K TYPE 1 19' -11" VALLEY JACKS CONNECT TO TRUSS WITH USP LFTA6 WITH 4 - 10d NAILS 1 -- - -- -- - -- -- - -- I PER MEMBER I I I I w 11 -0i z \ ELEV. X X STIRRUPS R2 I II II II -- L►�_ __LIqr BOT TOP 4 .0 K HORIZONTAL FROM SHEATHING F_ -- II N ----------------- - - - - -- -- I- r,---- - - - - - - - -� - -- - - � - - -- -� I I 8 U-) ------- - - --� - - J1 I —1 I 5 I I 3@ II I I 11 1 I I I RB2 J1 I 1 U N m N 11 II B1 II II II 0 I I I I I LO II II -- l I I R1 I II R1 I I NI RuI I I /N�11/ I I =1.o K I I I I I TYPE 1 I I I I I I I I II II I T I I LU mll I I I I II II � I I I I II m II I I I I II II I I I I II V I I I I II I I I I II II I I I I II II I I I I II II I I Ru =0.6 K fill LOAD BEARING RB4 WOOD WALL __ —_ — _J1 II II II II I I J 1 I II II II II I I II II II II II m I II II II I II 11 J1 I I II �i II II II II I I II II II II 11 II I I I 1 II II I BEAM AS REQUIRED TO DEVELOPE A FLUSH SHEATHING CONNECTION I I w 11 -0i z J1 ELEV. X X STIRRUPS R2 I II II II -- L►�_ __LIqr BOT TOP 4 .0 K HORIZONTAL FROM SHEATHING TYPE 2 Top N ----------------- - - - - -- -- I- r,---- - - - - - - - -� - -- - - � - - -- -� I a N 8 IF--------- I-- T---------- ------- - - --� - - - - -- —1 I 5 I I 3@ II I I 11 1 I I I RB2 8 I 1 U N m N II R =0.7 K I I 6 I I I I I I EXISTING CONC. 3@ F-j 6 EXISTING I I 8 I I Q I I < I I BEAM 2# 5 H 5 I I 3@ I I Li I I Li I I RB4 8 X 12 8' -0" 2# 5 I I m I I m I I # 3® I I 1 1 48 I I I I 8 I I I I I I U I I C) I I 2# 5 I I 5 I I 3@ I I I I Z Z I I I I I I I I I I II II U Ig I I I I U �I I I I II I I I I I I I I F- I I II I N EXISTING FLAT I I I I I I I I I I I I I I I I X I I I I x ROOF TO REMAIN EXISTING BEAM I I I I I I I I Ld I I Lv I I I I I I I I I I I I I EXISTING CONVENTIONAL I I I I I I I I I ROOF TO REMAIIN 2x8 TOP CHORD I I I I I I I I EXISTING FLAT I I WALLS BEING U) "`i11 I AND 2x6 BOT. CHORD AT 12" O.C. I I I I I I I I ROOF TO REMAIN I I REMOVED m I I SEE SEET A4 FOR AS BUILT FRAMING PLAN I I I I I I i- 7- - - - - -- - - - -- - - - - -- � I F I I — J - - - - -- -- T -- l - -- S--------------------------------- - - - - -- 1 1 I I I I I I I I J1 I I 1­7 ------------------------------------ MI I I D J1 11 I I I L--------- 1-- L---- 5---- L- 1 - - - - -- - - - -1 L--------------------------- - - - - -- -- -- — — I -1—y , -- — --� SEE S5 FOR ROOF WIND ZONE MAP 2x4 X 8' TOP CHORD 5/8" PLYWOOD HORIZONTAL BRACE LAP 2' NAIL TO TRUSS CHORD WITH 2- 10d NAILS 45° ROOF TRUSS 2x4 DIAGONAL BRACES 2x4 CONT. BOT CHORD WITH 2- 16d NAILS HORIZONTAL BRACE LAP AT HORIZONTAL BRACE 2' NAIL TO TRUSS CHORD LATERAL BRACING SEE DETAIL WITH 2- 16 NAILS ON THIS SHEET. CEILING HIGH HATS 10d NAILS AT 6 "o.c. AT PANEL EDGE DIAGONAL BRACING ALONG BUILDING DEPTH AND INTERMEDIATE SUPPORT FIRST ®GABLE ENDS 1. NOPACE DIAGONAL BRACING AT MAX. 20 O.C. FIRST 48" BACK ALONG DEPTH OF BUILDING 2. SEE PLAN FOR BRACE LOCATION X 2x4 AT 24" O.C. ROOF FRAMING PLAN SCALE 3/16 99 2 #5X6' ADD'L. CORNER BARS 4 # 3 STIRRUPS 0 12' O.C. BALANCE # 3 0 48° O.C. (U.O.N.) WALL TIE BEAM SEE PLAN CORNER REINFORCING EXIST. B EAM REMOVE EXIST. ROOF IN AREA ENCLOSED BY REMOVED WALLS AND REPLACE WITH NEW ROOF CONCRETE BEAM SCHEDULE MARK GRAVITY LOAD SIZE ELEV. REINFORCING STIRRUPS B" X H" BOT TOP 4 .0 K HORIZONTAL FROM SHEATHING TYPE 2 Top y (� N Q RB1 8 X 12 8' -4" 2# 5 2# 5 # 3@ 0 48 RB2 8 X 16 9' -4" 2# 6 2# 5 # 3@ TYPE 1 6 RB3 8 X 12 8' -4" 2# 5 2# 5 # 3@ Lr) 48 RB4 8 X 12 8' -0" 2# 5 2# 5 # 3® 48 RB5 8 X 12 NOTE 4 2# 5 2# 5 # 3@ 48 NOTES: 1. FIELD VERIFY BEAM DEPTH WITH DOOR do WINDOW GEOMETRY 2. VERIFY ALL ELEVATIONS WITH ARCHITECTURAL DRAWINGS 3. TOP OF EXISTING BEAM = 8' -4" FIELD VERIFY 4. TOP ELEVATION OF RB4 SLOPES TO ACCOMODATE ROOF SLOPE ( + 8' -4" H..P TO 8' -0" L.P. ) 0 I ADD I IONAL 4— 2x4 x 8' BOT CHORD BRACES 2 P Y GIRDER DESI N GIRDER WITH A HOR ZONTAL LOAD OF 4.0 K FROM SHEATHING PRO IC 2x10 BOTTOM CHORD i� GIRDER TRUSS REACTIONS MARK GRAVITY LOAD WIND UPLIFT sy R1 2.4 K 1 2.0 K TYPE 1 R2 4 .0 K HORIZONTAL FROM SHEATHING TYPE 2 Top y (� N Q c. L% lA .� *' ►: fm y Q n NO 0 L�T:mot z Q W J '40, �r Ru =1.0 K .. W TYPE 1 vie LJ .. ° y wo Vd i � �� � L T: Lr) II .7. 0 I ADD I IONAL 4— 2x4 x 8' BOT CHORD BRACES 2 P Y GIRDER DESI N GIRDER WITH A HOR ZONTAL LOAD OF 4.0 K FROM SHEATHING PRO IC 2x10 BOTTOM CHORD i� GIRDER TRUSS REACTIONS MARK GRAVITY LOAD WIND UPLIFT CONNECTION DEVICE R1 2.4 K 1 2.0 K TYPE 1 R2 4 .0 K HORIZONTAL FROM SHEATHING TYPE 2 BUILDING ROOF WIND PRESSURES ASCE7 -02 146 mph. EXPOSURE "C" CATEGORY 2 l 1 IMPORTANCE FACTOR 1 ZONE. PRESSURE NET UPLIFT ZONE 1 45 PSF 38 PSF ZONE 2 64 PSF 57 PSF ROOF D.L. 25 psf LL 30 psf COMBINED .ENQ"I -E G SCIENCES CARL08- ENSE�N(�1�� �Er,�2566 CERTIFIC�TL OF. •��}��1�l�S J�A,T�ON No, 9108 1214 SW 12. CSJT.:: '" ��` • 1 -t J LLJ 0 ,mI 7 a SHEET 54 O N Q Q Q 0 -I z Q W C W W ry W Lr) J LLJ 0 ,mI 7 a SHEET 54