Loading...
05-548-007Z N 0 �I vi m 0 REFRIGERANT LINES: 3/8" SUCTION LINE 1/4' LIQUID LINE (N) A/C COMPRESSOR #2 TO A/C COMPRESSOR MITSUBISHI -MODEL #MUH09TW REFER TO MANUFACTURERS REQUIREMENTS FOR INSTALLATION. (SEE MECHANICAL SHEET M -0 FOR A/C INFORMATION). 3/4' CONDENSATE LINE TO EXTERIOR go N-- CONNECT NEW A/C DUCT TO EXISTING UNIT FOYER PATIO (SCREENED) V_ ------------ r I D.W. I I KITCHEN I Iu I I 0 I l I � I REF. WH II I II it I II II II II II lox II I I I II II II II II II it II I II II II II II II II II II II II II II II II II II II II II II II II II II II II II II II POttCH II II II II II it II II II II II II II II II II II it II II II II II II II _ Ii 11 _ II II _ II II _ II — FT-- TI-- IT -7I IT — TI-- IT-- T1 L1 LJ LJ LJ LJ L1 LJ LJ L1 LJ (N) AHU #2 MITSUBISHI DUCTLESS MINI -SPLIT SYSTEM INDOOR UNIT: MODEL #MSH09TW 10.0 SEER WITH REMOTE CONTROL. (WALL- MOUNTED PER MANUFACTURER SPECIFICATIONS) 0 FLOO'F-1 vc =v -o• Ll AIR CONDITIONING UNIT SCHEDULE DESIGN MkWACTURER MITSUBISHI ELECTRIC SERVICE AVAILABLE 115,1,60 SEER 10 AIR HANDLING UNIT UNIT DESIGNATION AC *2 AREA SERVED NEW AREA UNIT WEIGHT M) 20 UNIT LOCATION WALL TOTAL AIR CFM 300 OUTSIDE AIR. CFM 60 EXTERNAL STATIC PRESSURE 0.4 FAN MOTOR R.P. 037 FLA TOTAL COOLING CAPACITY (BTUI-0 8800 ENTERING AIR TEMP. (DB/WB F) 80/67 FILTER WASHABLE DIMENSIONS/INCHES W/D/H TIM 33.5/7.5/11 MANUFACTURER'S MODEL NUMBER MSH09TW CONDENSING UNIT UNIT DESIGNATION AC a2 UNIT LOCATION ON CONC. PAD UNIT WEIGHT US) 82 COMPRESSOR TOTAL AMPS 12 COND. FAN TOTAL AMPS 0.6 DIMENSIONS /INCHES W/DAI TIM 31/10.25/21.25 REFRIGERANT LINES (SUCTION & LIQUID) 1/4' & 3/8' MANUFACTURER'S MODEL NUMBER a MUH09TW 1IF BEFORE COMMENCING ANY WORK. CONTRACTOR SHALL VERIFY WITH MANUFACTURER THE REFRIGERANT LINE SIZES AND FOLLOW THEIR RECOMMENDATION FOR SIZES OVER 40 LINEAR FEET OF RUN 0 0 H PI AIR CONDITIONING SPECIFICATIONS 6. PACKAGED SPLIT A.C. UNIT A. CONTRACTOR SHALL FURNISH AND INSTALL AIR HANDLING AND AIR - COOLED CONDENSING UNITS AS SHOWN AND 1. (ENTERAL LISTED IN SPECIFICATIONS AND PLANS. UNIT SHALL BE INSTALLED IN STRICT ACCORDANCE WITH MANUFACTURER'S A. ALL WORK TO BE DONE IN ACCORDANCE WITH NFPA 9D-A; ASHRAE GUIDE AND SMACNA DUCT CONSTRUCTION RECOMMENDATIONS. STANDARDS AS WELL AS WITH ALL STATE AND LOCAL CODES HAVING JURISDICTION. B. UNIT SHALL BE MANUFACTURED BY MITSUBISHI. ALTERNATES WILL BE ACCEPTED FOR UNITS OF OTHER MANUFACTURERS, CONTRACTOR SHALL VERIFY ALL SPACE CONDITIONS AT JOB SITE PRIOR TO SUBMITTING BID PROPOSAL. BUT, DEVIATIONS FROM THESE SPECIFICATIONS MUST BE CLEARLY OUTLINED IF SUCH ALTERNATE IS SUBMITTED. 2. WORKMANSHIP IT IS CONTRACTOR'S RESPONSABILITY TO INSURE ALTERNATE EQUIPMENT WILL FIT THE AVAILABLE SPACE INCLUDING A. ALL WORK SHALL BE PERFORMED BY A LICENCED AIR CONDITIONING CONTRACTOR. WORK SHALL BE DONE IN A ACCESS REQUIREMENTS SPECIFIED. HE SHALL ALSO BE RESPONSABLE FOR FURNISHING AND COORDINATING REVISED FIRST -CLASS MANNER. FULLY OPERATIVE. AND TO THE ACCEPTANCE OF THE ARCHITECT/BNGIR4M. CONTRACTOR AUXILIARY EQUIPMENT (SUCH AS CONTROL, STARTERS, ETC.) THAT ARE REQUIRED DUE TO THE ALTERNATE EQUIPMENT. SHALL PROVIDE FOR ALL NECESSARY LABOR AND MATERIAL REQUIRED FOR COMPLETION OF THE WORK INCLUDING C. PROVIDE FLOAT SWITCH DEVICE TO CONTROL OVERFLOW BY AUTOMATICALLY SHUTTING DOWN THE A/C UNIT. BUT NOT LIMITED TO CONNECTIONS TO RELATED WORK SUCH AS CONNECTION TO EXISTING SYSTEM, EXCAVATIONS D. MANUFACTURER: MITSUBISHI. AND BACKFILLING. 7. REFRIGERANT LINES 3. PERMITS AND INSURANCE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL INSURANCE, PERMITS. FEE, TAXES, INSPECTIONS, TEST, FINES AND A. REFRIGERANT PIPING SHALL BE SEAMLESS COPPER TUBING WITH 3/4' ARMAFLEX SUCTION LINE INSULATION. OTHER ITEMS AS REQUIRED FOR THE INSTALLATION OF COMPLETE AIR CONDITIONING SYSTEM AS OUTLINED HBIEIN B BEFORE COM ENCING ANY WORK CONTRACTOR SHALL VERIFY WITH MANUFACTURER THE REFRIGERANT LINE SIZES AND SHOWN ON PLANS. PROVIDE ALL REQUIRED INSURANCE FOR PROTECTION AGAINT PUBLIC LIABILITY AND AND FOLLOW THEIR RECOMMENDATION FOR SIZES OVER 50 LINEAR FEET OF RUN. PROPERTY DAMAGE FOR THE DURATION OF THE WORK. 8. CONDENSATE DRAIN LINE 4 DUCTWORK A. CONDENSATE DRAIN PIPING SHALL BE PVC SCHEDULE 40 ASTM D -2665. PROVIDE 3/4' ARMAFLE)( INSULATION A. FIBERGLASS DUCTWORK: DUCTWORK SHALL BE CONSTRUCTED OF 1-1/2' THICK FIBROUS GLASS DUCT BOARD S-6), TO ALL CONDENSATE DRAIN PIPING. TYPE 800. STAPLE AND TAPE ALL SEAMS AND JOINTS. FABRICATION AND INSTALLATION OF DUCT AND FITTINGS SHALL 9. CONTROLS BE DONE IN ACCORDANCE WITH THE LATEST EDITION OF THE SMACNA FIBROUS GLASS DUCT CONSTRUCTION STANDARD. A. PROVIDE A REMOTE CONTROLLER. B. ALL EXHAUST AND OUTSIDE AIR DUCTWORK SHALL BE CONSTRUCTED OF GALVANIZED STEEL (26GA) IN ACCORDANCE WITH SMACNA 'LOW PRESSURE DUCT CONSTRUCTION STANDARDS' LATEST EDITION. 10 TEST AND BALANCE C. DUCTWORK SIZES SHOWN ARE INSIDE DIMENSIONS A. THE ENTIRE HVAC SYSTEM SHALL BE TESTED, ADJUSTED AND BALANCED TO DELIVER THE AIR QUANTITIES SHOWN D. PROVIDE BALANCING DAMPERS AT EACH BRANCH TAKE-OFF FROM MAIN DUCTS AND OTHER LOCATIONS AS REQUIRED ON DRAWINGS. TO PROPERLY BALANCE THE SYSTEM. 11. GUARANTEE 5. NOT USED A. ALL MATERIALS. EQUIPMENT AND WORKMANSHIP SHALL BE GUARANTEED FOR A PERIOD OF ONE YEAR FROM THE DATE OF ACCEPTANCE OF THIS PROJECT AND ADDITIONAL FIVE -YEAR PERIOD FOR THE COMPRESSOR. B. ALL WORK FOUND TO BE DEFECTIVE SHALL BE REPAIRED OR REPLACED BY THE CONTRACTOR WITHOUT ANY CHARGE TO THE OWNER. FILUMEEE!'DINCG`� FLO'0`m`!�' 'F—LA—\\xN, va• =t -o• • 1 :i i COMM NO: 05 -008 DATE: FEB. 16, 2005 DRAWN BY: CADD REVISIONS: a a0 -6 U7 T � a 4 an a: = O V„ MID zo R, V W 0 O 2 a: W a O O Q 11 z I ' 4 • LL :cc � � s ;-.19 w F- � t- o k rrnn 1 COMM NO: 05 -008 DATE: FEB. 16, 2005 DRAWN BY: CADD REVISIONS: a a0 -6 U7 T � a 4 an a: = O V„ MID zo R, V W 0 O 2 a: W a O O Q 11 z I ' 4 • LL :cc � � s ;-.19 w F- � t- o k rrnn