REFRIGERANT LINES:
3/8" SUCTION LINE
1/4' LIQUID LINE
(N) A/C COMPRESSOR #2 TO A/C COMPRESSOR
MITSUBISHI -MODEL #MUH09TW
REFER TO MANUFACTURERS
REQUIREMENTS FOR INSTALLATION.
(SEE MECHANICAL SHEET M -0
FOR A/C INFORMATION).
3/4' CONDENSATE
LINE TO EXTERIOR
go N-- CONNECT NEW
A/C DUCT TO
EXISTING UNIT FOYER
PATIO
(SCREENED)
V_ ------------
r
I D.W. I
I KITCHEN I
Iu I
I 0 I
l I
� I
REF.
WH II I II it I II II II II II
lox II I I I II II II II II
II it II I II II II II II
II II II II II II II II II II
II II II II II II II II II II
II II II II II POttCH II II II II
II it II II II II II II II II
II II II it II II II II II II
II _ Ii 11 _ II II _ II II _ II
— FT-- TI-- IT -7I IT — TI-- IT-- T1
L1 LJ LJ LJ LJ L1 LJ LJ L1 LJ
(N) AHU #2
MITSUBISHI DUCTLESS
MINI -SPLIT SYSTEM
INDOOR UNIT:
MODEL #MSH09TW
10.0 SEER WITH REMOTE
CONTROL. (WALL- MOUNTED
PER MANUFACTURER
SPECIFICATIONS)
0
FLOO'F-1
vc =v -o•
Ll
AIR CONDITIONING UNIT SCHEDULE
DESIGN MkWACTURER
MITSUBISHI
ELECTRIC SERVICE AVAILABLE
115,1,60
SEER
10
AIR HANDLING UNIT
UNIT DESIGNATION
AC *2
AREA SERVED
NEW AREA
UNIT WEIGHT M)
20
UNIT LOCATION
WALL
TOTAL AIR CFM
300
OUTSIDE AIR. CFM
60
EXTERNAL STATIC PRESSURE
0.4
FAN MOTOR R.P.
037 FLA
TOTAL COOLING CAPACITY (BTUI-0
8800
ENTERING AIR TEMP. (DB/WB F)
80/67
FILTER
WASHABLE
DIMENSIONS/INCHES W/D/H TIM
33.5/7.5/11
MANUFACTURER'S MODEL NUMBER
MSH09TW
CONDENSING UNIT
UNIT DESIGNATION
AC a2
UNIT LOCATION
ON CONC. PAD
UNIT WEIGHT US)
82
COMPRESSOR TOTAL AMPS
12
COND. FAN TOTAL AMPS
0.6
DIMENSIONS /INCHES W/DAI TIM
31/10.25/21.25
REFRIGERANT LINES (SUCTION & LIQUID)
1/4' & 3/8'
MANUFACTURER'S MODEL NUMBER a
MUH09TW
1IF BEFORE COMMENCING ANY WORK. CONTRACTOR SHALL VERIFY WITH
MANUFACTURER THE REFRIGERANT LINE SIZES AND FOLLOW THEIR
RECOMMENDATION FOR SIZES OVER 40 LINEAR FEET OF RUN
0
0
H PI
AIR CONDITIONING SPECIFICATIONS
6. PACKAGED SPLIT A.C. UNIT
A. CONTRACTOR SHALL FURNISH AND INSTALL AIR HANDLING AND AIR - COOLED CONDENSING UNITS AS SHOWN AND
1. (ENTERAL
LISTED IN SPECIFICATIONS AND PLANS. UNIT SHALL BE INSTALLED IN STRICT ACCORDANCE WITH MANUFACTURER'S
A. ALL WORK TO BE DONE IN ACCORDANCE WITH NFPA 9D-A; ASHRAE GUIDE AND SMACNA DUCT CONSTRUCTION
RECOMMENDATIONS.
STANDARDS AS WELL AS WITH ALL STATE AND LOCAL CODES HAVING JURISDICTION.
B. UNIT SHALL BE MANUFACTURED BY MITSUBISHI. ALTERNATES WILL BE ACCEPTED FOR UNITS OF OTHER MANUFACTURERS,
CONTRACTOR SHALL VERIFY ALL SPACE CONDITIONS AT JOB SITE PRIOR TO SUBMITTING BID PROPOSAL.
BUT, DEVIATIONS FROM THESE SPECIFICATIONS MUST BE CLEARLY OUTLINED IF SUCH ALTERNATE IS SUBMITTED.
2. WORKMANSHIP
IT IS CONTRACTOR'S RESPONSABILITY TO INSURE ALTERNATE EQUIPMENT WILL FIT THE AVAILABLE SPACE INCLUDING
A. ALL WORK SHALL BE PERFORMED BY A LICENCED AIR CONDITIONING CONTRACTOR. WORK SHALL BE DONE IN A
ACCESS REQUIREMENTS SPECIFIED. HE SHALL ALSO BE RESPONSABLE FOR FURNISHING AND COORDINATING REVISED
FIRST -CLASS MANNER. FULLY OPERATIVE. AND TO THE ACCEPTANCE OF THE ARCHITECT/BNGIR4M. CONTRACTOR
AUXILIARY EQUIPMENT (SUCH AS CONTROL, STARTERS, ETC.) THAT ARE REQUIRED DUE TO THE ALTERNATE EQUIPMENT.
SHALL PROVIDE FOR ALL NECESSARY LABOR AND MATERIAL REQUIRED FOR COMPLETION OF THE WORK INCLUDING
C. PROVIDE FLOAT SWITCH DEVICE TO CONTROL OVERFLOW BY AUTOMATICALLY SHUTTING DOWN THE A/C UNIT.
BUT NOT LIMITED TO CONNECTIONS TO RELATED WORK SUCH AS CONNECTION TO EXISTING SYSTEM, EXCAVATIONS
D. MANUFACTURER: MITSUBISHI.
AND BACKFILLING.
7. REFRIGERANT LINES
3. PERMITS AND INSURANCE
CONTRACTOR SHALL OBTAIN AND PAY FOR ALL INSURANCE, PERMITS. FEE, TAXES, INSPECTIONS, TEST, FINES AND
A. REFRIGERANT PIPING SHALL BE SEAMLESS COPPER TUBING WITH 3/4' ARMAFLEX SUCTION LINE INSULATION.
OTHER ITEMS AS REQUIRED FOR THE INSTALLATION OF COMPLETE AIR CONDITIONING SYSTEM AS OUTLINED HBIEIN
B BEFORE COM ENCING ANY WORK CONTRACTOR SHALL VERIFY WITH MANUFACTURER THE REFRIGERANT LINE SIZES
AND SHOWN ON PLANS. PROVIDE ALL REQUIRED INSURANCE FOR PROTECTION AGAINT PUBLIC LIABILITY AND
AND FOLLOW THEIR RECOMMENDATION FOR SIZES OVER 50 LINEAR FEET OF RUN.
PROPERTY DAMAGE FOR THE DURATION OF THE WORK.
8. CONDENSATE DRAIN LINE
4 DUCTWORK
A. CONDENSATE DRAIN PIPING SHALL BE PVC SCHEDULE 40 ASTM D -2665. PROVIDE 3/4' ARMAFLE)( INSULATION
A. FIBERGLASS DUCTWORK: DUCTWORK SHALL BE CONSTRUCTED OF 1-1/2' THICK FIBROUS GLASS DUCT BOARD S-6),
TO ALL CONDENSATE DRAIN PIPING.
TYPE 800. STAPLE AND TAPE ALL SEAMS AND JOINTS. FABRICATION AND INSTALLATION OF DUCT AND FITTINGS SHALL
9. CONTROLS
BE DONE IN ACCORDANCE WITH THE LATEST EDITION OF THE SMACNA FIBROUS GLASS DUCT CONSTRUCTION STANDARD.
A. PROVIDE A REMOTE CONTROLLER.
B. ALL EXHAUST AND OUTSIDE AIR DUCTWORK SHALL BE CONSTRUCTED OF GALVANIZED STEEL (26GA) IN ACCORDANCE
WITH SMACNA 'LOW PRESSURE DUCT CONSTRUCTION STANDARDS' LATEST EDITION.
10 TEST AND BALANCE
C. DUCTWORK SIZES SHOWN ARE INSIDE DIMENSIONS
A. THE ENTIRE HVAC SYSTEM SHALL BE TESTED, ADJUSTED AND BALANCED TO DELIVER THE AIR QUANTITIES SHOWN
D. PROVIDE BALANCING DAMPERS AT EACH BRANCH TAKE-OFF FROM MAIN DUCTS AND OTHER LOCATIONS AS REQUIRED
ON DRAWINGS.
TO PROPERLY BALANCE THE SYSTEM.
11. GUARANTEE
5. NOT USED
A. ALL MATERIALS. EQUIPMENT AND WORKMANSHIP SHALL BE GUARANTEED FOR A PERIOD OF ONE YEAR FROM THE
DATE OF ACCEPTANCE OF THIS PROJECT AND ADDITIONAL FIVE -YEAR PERIOD FOR THE COMPRESSOR.
B. ALL WORK FOUND TO BE DEFECTIVE SHALL BE REPAIRED OR REPLACED BY THE CONTRACTOR WITHOUT ANY
CHARGE TO THE OWNER.
FILUMEEE!'DINCG`� FLO'0`m`!�' 'F—LA—\\xN,
va• =t -o•
•
1
:i
i
COMM NO:
05 -008
DATE:
FEB. 16, 2005
DRAWN BY:
CADD
REVISIONS:
a a0 -6
U7
T
� a
4
an
a: =
O V„ MID
zo
R, V
W
0
O
2
a: W a
O
O Q 11
z I '
4 • LL
:cc � � s ;-.19
w F-
�
t- o k
rrnn
1
COMM NO:
05 -008
DATE:
FEB. 16, 2005
DRAWN BY:
CADD
REVISIONS:
a a0 -6
U7
T
� a
4
an
a: =
O V„ MID
zo
R, V
W
0
O
2
a: W a
O
O Q 11
z I '
4 • LL
:cc � � s ;-.19
w F-
�
t- o k
rrnn