Loading...
09-735-005DROPPED METAL FRA 19 WITH DROOPED CEILING AS NOTED ONLY AT HOOD AREA SEE HOOD MANUFACTURER SHOP DRAWMUS. USE SOUTHWEST PRODUCT TYPE 5GP PLENUM READY AS FOLLOWS FOR EXISTMG STEEL JOIST ASSEMBLIES + FLOOR : UL 5139 FOR FLOOR JOIST (1 HOURS MNJ t P THICK UL 8140 FOR ANY STEEL SEAMS 11 HOURS MN) :k 9/61 THICK CONTACT COMPANY CARBOLNE AT 68- 331.1804 (RANDY KELLETE) PENDANT LICaHT, TYP. MECH. DUCT. SEE MECH. SHEET& REFLECTED CEILING I. SUSPENDED CEILING 8181E CONSISTNG OF MAN TEES CONNECTED TOGETHER TO FORM A MODULAR INSTALLATION FOR ACOUSTICAL PANELS, ACOUSTICAL MATERIALS, LIGHT FIXTURES, AND AIR DIFFUSERS. SUSPENDED CEILING PANiEL8, MUST MEET THE REQUIREMENTS OF ABTM C635,C636, C423, AND E84. SUPPORTING CEILING SYSTEIMS SHALL HAVE A MAXIMUM DEFLECTION OF 11360. 2. COORDNATION WITH OTHER WORK CONTRACTOR SHALL COORDINATE WITH OTHER WORKS : SUPPORTED BY OR PENETRATING THROUGH 10EILING, INCLUDING MECHANICAL AND ELECTRICAL WORK AND PARTITION SYSTEMS, DUCTWORK ABOVE SUSPEN&ON SYSTEMS SHALL BE COMPLETE, AND PERMANENT HEATING AND COOLING SYSTEMS OPERATING, INSTALLATION OF CONDUIT ABOVE SUSPENSION SYSTEMS SHALL BE COMPLETE BEFORE INSTALLATION OF MPEN51CNN SYSTEMS. 3. PROTECTION .CONTRACTOR SHALL PROTECT COMPLETED WORK ABOVE SUSPENSION SYSTEMS FROM DAMAGE DURING THE INSTALLATION OF SUSPENSION SYSTEMS. 4. EXISTING CONDITIONS. BU'LIpING SHALL BE ENCLOSED WITH ALL WINDOWS AND EXTERIOR DOORS IN PLACE AND GLAZED, AND THE ROOF UJA'TERTIGHT BEFORE INSTALLATION OF SUSPENSION SYSTEMS. WET WORK SHALL BE IN PLACE, COMPLETED AND NOMINALLY DRY WITH HVAC SYSTEM IN CONTNUOUS OPERATION. MANTAN CLIMATE CONDITIONS TO RANGE FRORM (60'F,ll(VC) TO 85TOTC) AND RELATIVE HUMIDITY OF NOT MORE THAN 109'0 BEFORE INSTALLATION OF CEILING SYSTEMS. D. MAIN RUNNERS. MAIN RW4ERRS MUST BE 12 FEET LONG AND SPACED A MAXIMUM OF 4 FEET O.G., MAIN RUNNERS MUST BE IN61iALLED AND LEVELED TO WITHIN 1/8 INCH IN 12 FEET, WITH THE SUPPORTING WIRE TAUT. TIDE: DESIGN LOADS FOR MAN RUNNERS MUST BE LESS THAN OR EQUAL TO THE CAPACITIES SHOWN IN MANUFACTURER'S RECOMMENDATIONS. VERTICAL HANGERS, PERIMETER HANGERS, AND LATERAL -FORCE BRRAOING FOR THE MAIN RUNNERS MUST BE INSTALLED IN ACCORDANCE TO THE CODE. .,MIMI REFLECTED CEILING PLAN SCALE : 3ilt»" = V -0" 5900 SW 73 ST. NORTH NOTES 6. CROSS RUNNERS. MAIN RUNNERS OR CROSS MEMBERS THAT SUPPORT THE CROSS RUNNERS MUST BE LOCATED WITHN 1/32 INCH OF THE REQUIRED CENTER DISTANCES, AND THIS TOLERANCE SHALL BE NONACUMULATIVE BEYOND 12 FEET. INTERSECTING RUNNERS SHALL BE INSTALLED TO FORM A RIGHT ANGLE TO THE SUPPORTING MEMBERS. THE DESIGN LOADS FOR CROSS RUNNERS MUST BE LESS THAN OR EQUAL TO THE CAPACITIES SHOWN IN THE MANUFACTURER'S RECOMMENDATIONS. CROSS RUNNERS THAT SUPPORTS ANOTHER CROSS MEMBER MUST BE HAVE A MINIMUM UNIFORMLY DISTRIBUTED LOAD CAPACITY OF 12 POUNDS PER LINEAL FOOT. 1. HANGER WIRE. THE SUSPENDED CEILING 18 SUPPORTED BY NO-12 SWG IN DIAMETER GALVANIZED STEEL WIRE THAT 16 ATTACHED TO THE CONCRETE SLAB WITH HANGER CLIPS. THE HANGER CLIPS ARE MINIMUM 0045 INCH THICK, 2 INCH BY 3 -1/1 INCH LONG GALVANIZED STEEL CLIPS THAT ARE HOOKED AT ONE END, FOR ATTACHMENT OVER THE MALE LEG OF STEEL FLOOR UNITS, AND SPACED AS REQUIRED FOR HANGER WIRE ATTACHMENT. DO NOT SUPPORT WIRES FROM MECHANICAL AND /OR ELECTRICAL EQUIPMENT, PIPING, OR OTHER EQUIPMENT OCCURRING ABOVE CEILING. 8. HOLD -DOI1N CLIPS. HOLD DODUN! CLIPS MUST BE USED TO HOLD THE ACOUSTICAL PANELS IN PLACE. THE CLIPS ARE PRODUCED FROM No24 GAUGE SPRING STEEL. WHEN THE CEILING IS COMPOSED OF NOMINAL (241'4411),(241136")f 30"x3O"), LAY -IN- PANELS, ONE CLIP 18 PLACED OVER BULBS OF CROSS -TEES NEAR CROSS TEES MIDPOINTS. WHEN THE CEILING IS COMPOSED BY (20 "x60 "), (36 "x36 "),(24 "x48 19,130 "x60 "), (48 "x48 "), LAY -N- PANELS, TWO CLIPS ARE PLACED OVER BULBS OF EACH GROSS -TEE QUARTER- POINTS. ONE LEG OF EACH CLIP MUST BE CUT OFF WHEN PLACEMENT 18 OVER BULBS OF CROSS TEES ADJACENT TO THE LONG SIDE OF LIGHT FIXTURES. 9. INSTALLATION. INSTALL IN ACCORDANCE WITH ASTM C636, CISCA RECOMMENDATIONS AND LOCAL BUILDING CODES, AND MANUFACTURER'S RECOMMENDATIONS. l�lY�f Ov ;3ol'r;�i t3tJ1b.0UlSU �iECttCN (- r0 -o? SEE FINISH SCHEDULE SHEET A -3 FOR CEILING HEIGHTS. SEE SHEET A -1 FOR DROOPE CEILING ACOUSTICAL TILE DETAIL. REFLECTED CEILING LEGEND FINISH CEILING HEIGHT AS PER FINISH SCHEDULE HEIGHT 18 NOTED ABOVE FIN. CONC. SLAB 24 "x14" ACCOU8TICAL DROPPED CEILING SYSTEM ® FLUORESCENT LIGHT Ifl WALL MOUNTED LIGHT ® AG DIFFUSER GRILLE Q PENDANT LIGHT NAC RETURN GRILLE ® EXHAUST FAN Job No. 5900-09 CEILING HEIGH ABOVE FINISHED FLOOR 8' -6" 1 J 14335 SW 120 street Miami, Florida, 33186 phone # (305- 408 -4025) fax # (305- 408 -4026) email— emfengineering@bellsouth.net APPROVALS /REVISIONS NOTES: • • C) O M P6� (440) OawM W � w i� M~ o 00 V SEAL ENRIQUE L: FRNANDEZ P.E. FL. REG. # 2 218 PROJECT: QS T Ae� r r Q= - (.� UAY1 A OWNER CONTACT: OWNER TELEPHONE: TABU GROUP 305- 669 -6281 SHEET TITLE: REFLECTED CEILING PLAN Job No. 5900-09 Drawing No. Drawn By. J. B. A-4 Date. 8 -3 -09 OF Scale. AS NOTED 10