Loading...
05-875-0142 w/ 30" REFER TO TIE BEAM SCHEDULE FOR CONTINUOUS REINFORCEMENTS. 21YA n2 SOUTHERN YBJ.OWi PINE CROSS BRAC79 1"B• BERS FASTENED TO TRUSSES W/2 -16D NAIL, EACH END FL 444M AT BA CH ENO OF BLDG. ARID AT 29-a O.G. SPACING LOCATED AT RDGLINE AND AT 16-O' O.C. • INTERVAL. Q2EFER TO TRUSS+ NOTES AND WUSS LAYOUT FOR LOC.ATkXNo 21YA CONI r LATERAL WOOD BRACING NAIII.ED TO BOTTOM CHORD AT PANE. POINT OR TM M Ca ACNO AND AS REQUIRED BY 11-115 LATB?AI- BRACING SHALL W RESTA"M AT EACH END AND AT 2O-O' INTERVALS AS PER F.B.G. 2"T712 TYPICAL X- BRACING SCALE: N TS. 0124 NAILS EACH MEMBER Z CONT. LATERAL WOOD BRAGINO NAILED TO BOTTOM CHORD AT PANEL POINT OR MAXIMUM 10-0' SPACING AND AS REOURED BY TRUSS ENGINEER . CONT. 2k4 WOOD LAT BRACING (aVELAP V 5PJC E) W PLAN VIEW BRACING DRILL EPDXY (TYF EXIE TIE COL I NFIII Tn NEW CONC. COL. SEE SCHEDULE "5 DOWELS AS SHOWN. NEW GRADE BEAM P VERT. REINFORCEMENT TO BE CONTINUOUS FROM TO TIE BEAM OF UALL. BARS INTO BOND BOVE AND LION WALL BELOW 2 "5 LV uU" BL HEAD SECTD7N 2 N.T.S. Is Ru cFl L UiH C%V= cTTPJ NOTE: ALL MASONRY WALLS JAMB SECTION 3 TO BE IN PLACE BEFORE N.T.S. BEAMS AND COLUMNS ARE POURED. TYPICAL WINDOW OPENINCs DETAIL VERT. REINFORCEMENT TO BE CONTINUOUS FROM FOOTER TO TIE BEAM OF TOP OF WALL. SEE LINTEL SCHEDULE i FILL CELL WITH GROUT 1 "'1 SECTION i N.T.S. VDAT I ON L OR ICRETE k1" I PROVIDE PRECAST, (OR AT CONTRACTOR'S OPTION POURED IN PLACE), LINTELS OVER OPENINGS IN MASONRY WALLS ACCORDM TO THE SCHEDULE, SHOWN ON SHEET UNLESS OTHERWISE NOTED. !CRETE SLAB, PLAN FOR SIFORC ING 1UOUS TYPICAL tNfKENED EDGE DETAIL O CONCRETE SLAB, SEE PLAN FOR THICKNESS 1/8 " 5AW -CUT JOINT AND REINFORCING FILL WITH JOINT MATERIAL X X X X X N Zlt CONTINUOUS LATERAL BRACE O O TYPICAL DOOR OPENIHCs DETAIL CONTROL JOINT DETAIL (C.J.) O REFER TO TIE BEAM SCHEDULE FOR CONTINUOUS REINFORCEMENTS. TWO 1"5 FILLED CELLS tv TIE BEAM ELEVATION CHANGE. (TIPICAL BOTH DETAIL N.T.5 30 it oe 4 $5 CONT. COL. REINF. SEE COL. SCHEDULE 2 *5 CORNER BARS TOP 4 BOTT. BEND 30" EA. WAY TYP. ,s EA. CORNER OF BLDCx. -rig BEAM ELEVATION cHANGE DETAIL � T°P. TIE BEAM CORNER DETAIL( (1)# 5 IN 3000 PSI GROUT FILLED CELL PROVIDE CLEANOUT AT BOTTOM TO ENSURE PROPER FILL. ADD WEEP HOLES AT 1/3 AND 2/3 OF SPAN HOOK REINF. BAR 12" AT TOP AND BOTTOM 8" x 8" x 16" CONCRETE MASONRY UNITS W/ TYPE "M" MORTAR 4" CONCRETE SLAB W/ 6x6 #10 /10 WELDED WIRE MESH ON CLEAN COMPACTED ALL VAPOR BARRIER WALL FOOTING (REFER TO FOOTING SCHEDULE) 9 CsAUGE OUR-O -WALL HORIZONTAL REINFORCEMENT EVERY OTHER COURSE N.T.S. .T.S. V x 16' CONCRETE NRY UNITS all x8 "x16" MASONRY Ur PROVIDE 1/8" SPACING AT PANEL EDGES 4'x W COX PLYWOOD SHEATHING MR ?5/32" THICK MAX SPAN 24" PROVIDE 2'x4' BLOCKING 48' BACK OF GABLE END PLYWOOD SEAMS. NAIL SEAM w/ 10d NAILS A 4'o.c. EA SIDE OF SEAM (WHEN A IPLICA5LE) STUCCO FASCIA SEE TYPICAL WALL SECTION 11I6" SPACE AT PANEL ENDS PREFABRICATED WOOD TRUSSES 24' ON CENTER SEE ROOF PLAN LATERAL BRACMG SEE DETAIL 4 CN THIS 61-EET AND LOCATION ON 6-1 F6dNALS AT 6 "os AT PANEL EDGE AND INTEAIhEDIEN SUPPORT 4'oL. a GABLE ENDS FIRST 48' BACK 9 GAUGE DUR -O -WALL HORIZONTAL a>- 1 *11-n»r- CirtC *It EVERY OTHER COURSE 5/8" PLYWOOD SHEATHING - W /BdNAILS ATb "O.C. AT ALL POINTS OF SUPPORT SEE ARCH. DWG . FOR FASCIA AND SOFFIT DETAILS TB -1 ROOF TRUSS SEE PLAN CONNECTOR SEE ROOF PLAN WALL REINFORCEMENT WITH STD. HOOK AT TOP d TYP. GROUT FILLED MA50NR7 CELL DETAIL 11 TYPICAL DUR-0 .W,4ALL La-) CORNER DETAIL 1� 'TYPICAL DUR-0 WALL DETAIL W I� • o L1J Z N Q Q U CD 7-- 11� Q 0 I (n LL_ U_ LL 0 _ L.1J In Q Q — • i r f � W ■ I� I� Lm DRAWN BY JULIO G SILVA CHECKED BY I.H aa�� JOB No. 6005 °000.9 PAGES- - II�� OF�® SHEETS r ■