Loading...
05-875-007OIL TOP OF TIE BEAM ELEV. +18 -T Spanish "S" tile roof on 90# hot mopped roofing roll over 30# well saturated felt tin capped to 5/8" cdx plywood w/ 8d nails @ 6$I o.c. at panel edges & intermediate supports & 10d nails ® 4" o.c. ® gable end MIN. LAP 3C DOWEL'S SPLICING LENGTH TO BE 48 DIA BAR .MIN #5 EMBEDDED MIN. 6 INTO EXIST. TB-1 0 24' O.0 IN FULLY_ GROUTED CELL FINISH RI ELEV. +10=1' — — 1 2nd FLOOR (TOP OF TIE B� ELEV. +9..6 EXIST. T.B 83(12' • o e ANCHORS ® END FO OPENING W/ (5' SPACING) \ ADD 2#5 REBAR , V EA END OF OPENING VERT. ® REMAINDER USE 1/7 DIA WEDGE ANCHOR BY SIMPS^N STRONG TIES OR EQUAL dP 24' O/C W/ 3-3/8 ' EMBEDIMENT #5 REINF BAR j'APpol N-0-100; I IN OWN, 8' CONC. BL.IC W/ 9 GA LADDER TYPE_ HORIZ. REINF EVERY OTHER COURSE 5/6 STUCC.O- MIN. LAP 3C DOWEL'S SPLICING LENGTH TO BE 48 DIA. BAR MIN. GROUND FLOOR PLAN zo ze R -19 INSULATION TYP THRU -OUT ' GYP. BOARD ON MET. HI -HATS cP 16 O.C. 18X 4! XRESTOP OYP.) 8' X 17 CONC. TIE BEAM (SEE BEAM SCHEDULE) R-42 INSULATION PT. FURRING STRIP 4P 24' O.C. 1/7 GYP. BD. PLACE DTC STRAPS $ WRAP AROUND W/ FELT PAPER (TYP) ' GYP. BOARD ON MET. HI -HATS CP 16' O.G. 1' X 4 RRESTOP (`TYP.) 8' MAX o P• a 0 a o A e A 0 d o• a• d • a CONG. FOOTING \h/F-1 (SEE FOOTING SCHEDULE FOR SIZE AND REINFORCEMENTS R -19 INSULATION TYP THRU -OUT GYP. BOARD ON MET._ HI -HATS diP 16 O.G. T X 4' FLRESTOP CT1? _ _ ..)- 8' X 17 CONG. TIE BEAM (SEE BEAM SCHEDULE)- R,4.2 PT. FURRING STRIP tIP 24 O.0 1/7 GYP. BD. PLACE DTG STRAPS ,$ WRAP AROUND W/ FELT PAPER (TYP) (2) LAYERS (5/6 $ 3/4' PLY WD SHEATHING W/ 30# FELT PAPER BETWEEN ) 16' WOOD FLOOR TRUSS V 24 O.0 (BY OTHER) EXIST. OVERT -SANG TO BE SAW GUT COVER TIP OF EXISTING WD. TRUSS THAT COME IN CONTACT W/NEW CONC. BLOCK W/ 30# ROOFING PAPER R,4.2 INSULATION: PT. FURRING STRIP 0 24' O.C. 1/7 GYP. BD. V4 EXPANSION MATERIAL_ 4' MIN. CONC SLAB W /GXG. WIA X WIA• WWM, ON VAPOR BARRIER SOIL POISON AND WELL COMP. FILL. AS PER SOILS COMP. SPECIFICATIONS. (PROVIDE TERMITE SOILS POISON) (DOUBLE MESH AT PERIMETER 30 IN.) SEE FOUNDATION PLAN ' GYP. BOARD ON MET. HI -HATS 0 16 O.G. 16 WOOD FLOOR TRUSS 0 24' O.0 (BY OTHER) GYP. BOARD ON MET. — HI-HATS 016' O.G. T X 4' FuzESTOP 8 MAX 12 PITCH 13 M111 oil VA I I� D ° • d G-MIL VAPOR ®II ®I BARRIER, b b CONC. FOOTING WF-2 (SEE FOo -nNG SCHEDULE FOR SIZE AND REINFORCEMENTS TOP OF TIE BEAM — — EL€V. +18 -1' • a- —MIN. LAP 30' DOWELS SPLJONG LENGTH TO BE 48 DIA, BAR MIN. — — FINISH FLOOR ELI 2n4 RI (TOP OF TIE BEAM) ELEV. +9-8' �J #5 REINF BAR 6 CONC. BLr, W/ 9 GA LADDER TYPE HORIZ. REINF EVERY OTHER COURSE 5/6 STUCCO MIN. LAP 30' DOWEL'S SPLICING LENGTH TO BE 48 DIA. BAR MIN. — — GROUND FLOOR PLAN ELI O'-C' GRADE W N T- 0 N-) U ri-) W Z � � Q 0 U � � IV-- ry Q O Z (n I U N — W I Q C/') c0 — C O r � � W N C G- u � ICI N 1 f �l DRAWN BY JULIO G SILVA CHECKED BY G.M JOB No. X005 °0005 lfa1�