Loading...
08-603-035I FLUl IBINr-:� C:;ENEF:,�',4L NOTES ,4ND SFEGIFICATIONS, 1. A. SCOPE OF WORK: THE WORK SHALL INCLUDE ALL PLUMBING NECESSARY SHOWN ON THE DRAWINGS, SPECIFIED HEREIN AND /OR AS NEEDED FOR A COMPLETE SYSTEM, INCLUDING BUT NOT NECESSARILY LIMITED TO: 1. DOMESTIC COLD AND HOT WATER PIPING SYSTEMS 2. SANITARY DRAIN AND VENT SYSTEMS 3. PLUMBING FIXTURES AND TRIM 4. AIR CONDITIONING CONDENSATE DRAINS 5. PRESSURE AND TEMPERATURE RELIEF FROM WATER HEATER 6. PIPING INSULATION 1. SUPPORTS AND HANGERS B. ALL PLUMBING WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE LATEST EDITION OF THE "FLORIDA BUILDING CODE" AND LOCAL ORDINANCES AND IN COMPLIANCE WITH THE "FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION ", AND "HRS" REGULATIONS. IN THE EVENT OF CONFLICT BETWEEN ANY CODE OR REGULATIONS, THE MORE STRINGENT REQUIREMENTS WILL GOVERN. 2. CONTRACTOR TO VERIFY AT SITE THE LOCATION, ELEVATION AND SIZE OF ALL EXISTING LINES FOR CONNECTION BEFORE INSTALLATION OF ANY PIPING. 3. UNDERGROUND METAL PIPING SHALL BE PROTECTED WITH A COAT OF BITUMINOUS COMPOUND BEFORE COVERING 4. ALL FIXTURES SHALL BE PROTECTED AGAINST WATER HAMMER WITH AIR CHAMBERS OR SHOCK ABSORPERS (ARRESTORS) . WASHING MACHINE SHALL HAVE WATER HAMMER ARRESTOR FOR GOTH CW t HW. 5. ALL FLOOR DRAINS TO HAVE TRAP PRIMERS 1/2" LINE FROM THE NEAREST PLUMBING FIXTURE. (0. PLUMBING FIXTURES SHALL BE CONSTRUCTED WITH THE APPROVED MATERIALS, SHALL HAVE SMOOTH IMPERVIOUS SURFACES AND SHALL BE FREE FROM DEFECTS AND CONCEALED FOULING SURFACES. ALL FIXTURE TRIM TO BE CHROME PLATED. FIXTURES SHALL BE PROVIDED WITH SUPPORTS, HANGERS, ETC. -1. UNDERGROUND WASTE LINES 3" AND ABOVE TO BE PVC SCH. 4o ,AND SLOPE It I /8"/ FT. WASTE LINES 2" AND UNDER, AND ABOVE GROUND PIPES SLOPE 1@ 1 /4 "/FT. S. PROVIDE FULLY ACCESSIBLE CLEAN OUTS ON SANITARY AND ANY WASTE PIPING AT EVERY CHANGE OF DIRECTION, AND AT BOTTOM OF STACKS. CLEAN OUT LOCATIONS AND SIZES ON HORIZONTAL LINES SHALL BE ACCORDING TO CODE. 9. VENT LINES TO EXTEND 9" MIN. ABOVE ROOF AND FLASH WITH LEAD. 10. WATER PIPE BELOW GROUND SHALL BE COPPER TYPE "K" ABOVE GROUND TO BE COPPER TYPE "L ". OR APPROVED CPVC . NO JOINTS ALLOWED UNDERGROUND. 11. PIPING A. SUPPORT ALL PIPE FROM SOUND PORTIONS OF STRUCTURE AND AT PROPER INTERVALS ACCORDING WITH CODE. B. PROVIDE SLEEVES FOR ALL PIPING PASSING THROUGH FOUNDATION SLABS OR MASONRY WALLS, CAULK OPENINGS BETWEEN PIPE AND SLEEVES. C. WHERE EXPOSED PIPES PASS THROUGH FLOORS, WALLS, OR CEILINGS, PROVIDE ESCUTCHEONS FIRMLY SECURED TO THE PIPES AND OF SUFFICIENT OUTSIDE DIAMETER TO COVER THE SLEEVED OPENINGS FOR THE PIPES. PROVIDE CHROMIUM PLATED ESCUTCHEONS IN BATHROOMS. 12. INSPECTIONS AND TESTS A. CONTRACTOR SHALL BE RESPONSIBLE TO ASK FOR INSPECTIONS TO THE AUTHORITIES HAVING JURISDICTION, AS THE WORK PROGRESSES. ALL SYSTEMS SHALL BE TESTED BY CODE AND /OR LOCAL REGULATIONS. B. DRAINAGE PIPING: BEFORE INSTALLATION OF ANY DRAINS, THE ENDS OF SYSTEMS SHALL BE CAPPED AND ALL LINES FILLED WITH THE WATER TO THE HIGHEST POINT AND ALLOWED TO STAND UNTIL INSPECTION IS MADE BY AN OWNER REPRESENTATIVE. 13. STERILIZE ALL WATER LINES WITH A MIXTURE OF TWO (2) POUNDS OF CHLORINATED LIME TO EACH 1.000 GALLONS OF WATER (50 PPM OF AVAILABLE CHLORINE). RETAIN MIXTURE IN PIPES 24 HOURS AND FLUSH THOROUGHLY WITH POTABLE WATER BEFORE PLACING IN SERVICE. 14. COMPLETE SYSTEM, FIXTURES AND EQUIPMENT SHALL BE GIVEN AN IN- SERVICE TEST AFTER COMPLETION OF THE INSTALLATION_ FLUM5iNG FIXTURE SCHEDULE C TRAP FIXTURE uOT COLD MARK SIZE UNITS WATER WATER FWG H 4" - I" w z �.. w TANK 311 _ 1/211 WC II r— Z J v� LL C2 LAV 11/2" 1 1/2 1/211 SH 211 2 1/2 11 1/211 SK 1 �12 " 2 1/211 1/211 WM 211 2 1/211 1/211 2" III UQco LU DW INDIRECT N/A o C'4 F— LL LL. 1/2" W/VALVE < VAC. BREAKER TUB U.G. A G. 2 1,2 t% 51D 2" U.G. 11/2" A.G. 2 UR 2 " 4 1) FIXTURES TO COMPLY W/FBG 2001 Plumbing Sections �09.1,ro03.1 4 604.3 2) ANTI -SCALD VALVE: ALL SHOWERS 4 BATH /SHOWER GOMBINATIONS SHALL BE PROTECTED WITH A CONTROL VALVE OF THE PRESSURE BALANCE, THERMOSTSTIG MIXING OR GOM- 51NATION TYPE SET. HANDLE POSITION STOPS PER MANUFACTURERS INSTRUCTIONS AT TIME OF INSTALLATION TO A MAXIMUM MIXED WATER OUTLET TEMPERATURE OF 120' F. 3/4 211 311 w V V Wv U V G ♦ 7 4 N V G y y♦ • G V U V V U {1 y _ V 4•i W Fr W V V Y - — ♦ V V V � V u u W V Y y ` y V •W• Vii• 4 V • NvV A • • • W i u • • • • W• • • W c • Y V ♦ Y • V • V A • • V 12 x xI =200 GAL USE E ONE 20 200 GAL GREASE TRAP u u u V V! V W i i u • y W r G uue - Tevision V �. ., r • • V V V 4 {. 4 In cn.:+ k W LL. <C C Z IL t1, tw Z "IV CD w z �.. w wo � III O It � 1l Jj HM II r— Z J v� LL C2 = 0 = U4 M :p 00- QC6 c Nw Z J Z UJ LU Z VLL O¢� LO � III UQco LU Ln cn.:+ k W LL. <C C Z w t1, tw Z "IV w z �.. w wo � O Z� HM z r— Z J v� LL C2 = 0 = U4 M :p 00- QC6 c Nw Z J Z UJ LU Z VLL O¢� LO W UQco LU W °Ow o C'4 F— LL LL. DRAWN BY: LIDA PRIETO RUE3 I ORTEGA Checked: Date: Sca le: Shown Job No: Sheet: OF 14 To the best of my knowledge subject drawing comply with FBC. Dade County requir a Final Letter of Compliance from Architect. Any deviation of approved drawing is subject to revision by Architect /Engineer. Contractor or sub contractor shall notify Engineer prior any change to be done on approved drawings.