Loading...
00-498-004CAP FOR FUTURE - CONNECTION SOLAR OR HEAT RECOVERY GATE VALVE HEAT TRAP H.W. TO FIXTURES HOT WATER, 3/4 UNION 3/4" GA� DRAIN VALVE 3" N FLUE CLASS I W/ A6A APPROVED HEAT TRAP GATE VALVE ' COLD WATER, 314 UNION i el PRESSURE & TEMF RELIEF VALVE (ASI 3/4" Cu RELIEF DI GAS LINE, TO OUTSIDE HEATER AREA, TERMINATE 75 GAL. ABOVE FIN. GRADE 96,000 BTU WATER HEATER PIPING DIAGRAM NO SCALE PLUMBING GENERAL NOTES AND SPECIFICATIONS: 1. A. SCOPE OF WORK: THE WORK SHALL INCLUDE ALL PLUMBING NECESSARY SHOWN ON THE DRAWINGS, SPECIFIED HEREIN AND /OR AS NEEDED FOR A COMPLETE SYSTEM, INCLUDING BUT NOT NECESSARILY LIMITED TO: 1. DOMESTIC COLD AND HOT WATER PIPING SYSTEMS 2. SANITARY DRAIN AND VENT SYSTEMS 3. PLUMBING FIXTURES AND TRIM 4. AIR CONDITIONING CONDENSATE DRAINS 5. PRESSURE AND TEMPERATURE RELIEF FROM WATER HEATER 6. PIPING INSULATION 7. SUPPORTS AND HANGERS B. ALL PLUMBING WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE LATEST EDITION OF THE "SOUTH FLORIDA BUILDING CODE" CH. 46 LOCAL ORDINANCES AND IN COMPLIANCE WITH THE "FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION ", AND "HRS" REGULATIONS. IN THE EVENT OF CONFLICT BETWEEN ANY CODE OR REGULATIONS, THE MORE STRINGENT REQUIREMENTS WILL GOVERN. 2. CONTRACTOR TO VERIFY AT SITE THE LOCATION, ELEVATION AND SIZE OF ALL EXISTING LINES FOR CONNECTION BEFORE INSTALLATION OF ANY PIPING. 3. ALL FIXTURES SHALL BE PROTECTED AGAINST WATER HAMMER WITH AIR CHAMBERS WATER METER & VALVE CEILING PLAN 1" SCALE: 1/4" = 1' -0" OR SHOCK ABSORBERS AS INDICATED ON PLANS. 1 4. PLUMBING FIXTURES SHALL BE CONSTRUCTED WITH THE APPROVED MATERIALS, SHALL HAVE SMOOTH IMPERVIOUS SURFACES AND SHALL BE FREE FROM DEFECTS AND CONCEALED FOULING SURFACES. ALL FIXTURE TRIM TO BE CHROME PLATED. FIXTURES SHALL BE PROVIDED WITH SUPPORTS, HANGERS, ETC. AIR CHAMBERS 5. SANITARY PIPES TO BE PVC SCH. 40. SLOPE U.G. PIPES 3" AND ABOVE 0 1 /8 " /FT. SANITARY PIPES 2" & SMALLER SLOPE AT 1 /4 " /FT. 1/2.. 3/4" 6. PROVIDE FULLY ACCESSIBLE CLEAN OUTS ON SANITARY AND ANY WASTE PIPING AT EVERY CHANGE OF DIRECTION, AND AT BOTTOM OF STACKS. CLEAN OUT LOCATIONS AND SIZES ON HORIZONTAL LINES SHALL BE ACCORDING TO CODE. 7. VENT LINES TO EXTEND 9" MIN. ABOVE ROOF AND FLASH WITH LEAD. S. WATER PIPE BELOW GROUND SHALL BE COPPER TYPE "K" ABOVE GROUND TO BE COPPER TYPE "L ". OR APPROVED CPVC NO JOINTS ALLOWED UNDER SLAD 9. PIPING A. SUPPORT ALL PIPE FROM SOUND PORTIONS OF STRUCTURE AND AT PROPER INTERVALS ACCORDING WITH CODE. B. PROVIDE SLEEVES FOR ALL PIPING PASSING THROUGH FOUNDATION SLABS OR MASONRY WALLS, CAULK OPENINGS BETWEEN PIPE AND SLEEVES. C. WHERE EXPOSED PIPES PASS THROUGH FLOORS, WALLS, OR CEILINGS, PROVIDE ESCUTCHEONS FIRMLY SECURED TO THE PIPES AND OF SUFFICIENT OUTSIDE DIAMETER TO COVER THE SLEEVED OPENINGS FOR THE PIPES. PROVIDE CHROMIUM PLATED ESCUTCHEONS IN BATHROOMS. 10. INSPECTIONS AND TESTS A. CONTRACTOR SHALL BE RESPONSIBLE TO ASK FOR INSPECTIONS, TO THE AUTHORITIES HAVING JURISDICTION, AS THE WORK PROGRESSES. ALL SYSTEMS SHALL BE TESTED BY CODE AND /OR LOCAL REGULATIONS. B. DRAINAGE PIPING: BEFORE INSTALLATION OF ANY DRAINS, THE ENDS OF SYSTEMS SHALL BE CAPPED AND ALL LINES FILLED WITH THE WATER TO THE HIGHEST POINT AND ALLOWED TO STAND UNTIL INSPECTION IS MADE BY AN OWNER REPRESENTATIVE. 11. STERILIZE ALL WATER LINES WITH A MIXTURE OF TWO (2) POUNDS OF CHLORINATED LIME TO EACH 1.000 GALLONS OF WATER (50 PPM OF AVAILABLE CHLORINE). RETAIN MIXTURE IN PIPES 24 HOURS AND FLUSH THOROUGHLY WITH POTABLE WATER BEFORE PLACING IN SERVICE. 12. COMPLETE SYSTEM, FIXTURES AND EQUIPMENT SHALL BE GIVEN AN IN- SERVICE TEST AFTER COMPLETION OF THE INSTALLATION. 3��W3/4" AIR CHAMBERS ALVES 3/4" HW 1 /2" /2.. 3/4- 1 AIR CHAMBERS 1/2" Q Q 3/4" AIR CHAMBERS CW 1/2" H W 1 /` 3 COMP SINK 3/4" 1 /2�2" CW HAND 1SINK WCN WC,.i J LAV 1/2" LAV 1 /2" 1/2' LAV1 /2" 3/4" R 31/2"P SINK WATER RISER DIAGRAM N.T.S. 60 GAL. WATER HEATER ELECTRICAL DP SINK /2 " `0_1 /2" AIR CHAMBERS 7" 2 LAV -- �WC 2" V.T.R. 2 "1 1 3 C CO 3" F. D. Jv \4 EXIST SEWER LINE EXIST GREASE TRAP K � PNL. ..� 3 -12 2" 2" V. T. R. J r 2„ I SINK I 3 COMP I SINK , ii HAND SINK SINK C 4" GR.. LINE 3 E" X I S T I � N% elDj WC FD LAV LAV V I, 3 �V.T.R. J EXIST CO* I EXIST 3» V. T. R. J I, II\�N% EW /I N% I 1 � I ( LAVI AV I WC ALL FLOOR DRAINS ",1001 SHALL BE CONNECTED TO AN AUTOMATIC PRIMER VALVE SANITARY RISER DIAGRAM N.T.S. 8' 3/4" LONGEST RUN 50 FEET 75 GAL. SHUT -OFF VALVE WATER HEATER 75,000 B.T.U. GAS DIAGRAM AIR CHAMBERS N.T.S. AUTOMATIC PRIMER VALVE WITH INTEGRAL VACUUM BREAKER OMESTIC WATER LINE IN TO SEWER LINE L , FLOOR DRAIN RESEAL u NO SCALE .s :•it: '"!a fir, �_ k _7 PROJECT No 0 o N ZN w I N W N= N FILE: solerest o' OO', J LL_ z Q I zQ Q� w> Quo W N V) ' j2�CL �:2 Ld (n -j3:�� -q- 0 0) J (n Q > O Ld tY Z CL O Q M O N O O O D! Q C z oc O n 1= I F V O C LLJ � M LL O F_ J u- u; Lr 0 r M M, W a O J LL Z Ua N W 0 Q N CV vi 0