Loading...
04-1660(3)-010• • r • v Y Y •••!• • Y Y • Y f Y • • • . Y • • • R Y • • Y Y R • Y • ..._ • • r Y W U • • W • • • f • • L 1f=L IFT ANCHO E��R�C�I •� D I ��d Y V *•o�0 "..1OF' 14?4W.W Y W W W • u Y f Y Y Y Y Y ! TOP OF � Y • ��7(,JBrE' OR�'tRI�LE MEMBER GIRDER " Y • CONCRETE BEAM � �-.3"X 3, X 1 411 OR 1 1 II II 11 1 � \-1,211# OR 3/4 "# WEDGE A.B. 11112 "(T`f=.) 1 ENSlO>`I CA '4CIT� OF 5%. 5 1) POLE Anet= .451 Tn2 2) 114" 4ret = .L (0.25)= .609 Tn2 3) POLE Anet= (3- 0.813X0.1875)= 410 Tn2 4) 1/4" z� Anst= 1. (0.25)= .54-1 Tnz 4LLCUU45L.E TEN51ON 57RE55= 0.45x30000= 18200 psi 1) 0.451 Tn2(I6200 x 2 ANGLES)= 1480 &* 2) O.ro09 Tn2 = 19732* 3) 0.410 Tn2 = 132,540 4) 05471 Tn2 = 11123* 4.5. C4774C,IT1" I N C0NCiE- T'='--. CAPACITY ULTIMATE WORKING OF 2 BOLTS 1/2 "0 BOLT 8818* --- 2205* 4410'" 3/4 "0 BOLT 18892* 4723* 9440* WELD CAPACITY TO BE SAME AS BASE METAL. 0.101 X 21 X 311ro = 2.18 kip /fn 5OLT 5t 4 �F, GOVERNS! TRU55 GIRDER T.C. JJ000 5E,41;;'.INCi G,4F,4CIT'T - ARE A SINGLE MEMBER= 1.5(4)T (oTn2 DOUBLE = 3(4)= 12Tn2 TRIFLE - 45(4)= 18Tn2 ASSUME SO, PINE T.G., NDS -91, Fc= 5 &5psl, GAFACITIES. SINGLE MEMBER= C(oX5Ca5X1,6)= 5424* DOUBLE = (12) 1 1 = 10848* TRIPLE = 08) = 16272* * OF MEMBERS U.L. CAPACITY BOLT SIZE ANGLE SIZE (GIRDER) (5ERV. LOAD5) 2- 1/2 "0 2�- 3 "X3 "X3 /V' 2 4410* 2- 3/4 "0 2�- 3 "X3 11X3/18" 2 944(0* SECTION SLAB REI SEE SECOND FLC REINF. PLAN (S- ±10�8' 2ND. FLR. 3 /lro" lia "� POLES FOR I &d NAILS GONG. T.E3• CP'c= 3000 i✓'s - -- r0374 " FOR 3/4114' NOTE: OTHER FACE OF TRU55 SIMILAR'. E 7 A 1 L N.T.S. SPECIAL BRACKET DETAIL SCALE: 1 " = l'—O" C 0. co TOP OF CONCRETE BEAM I I I I I I I I /4" (TYP.) I I /4" (TYP.) r� 5 . ,A 12 1 12 . 3" 34 3" 3„ 4 3" 10 3/4" 3" 3" 3 „, 44 3„ TWO PLY TRUSS THREE PLY TRUSS (MAX UPLIFT 5,8000 (MAX UPLIFT 7,4000 10 3/4” DI D2 THREE PLY TRUSS D3 �G (MAX UPLIFT 13,5000 SCHEDULE ,MARK DESCRIPTION MARK DESCRIPTION 1 ANGLE 3 "X3 "X1/4" W /EXTENDED LEG (Fy =36 KSI) SEE DWG. 5 3/4" DIAM., HILTI DWIK BOLT 11 (CARBON STEEL), 2 RE'Q 2 STEEL PLATE 9- 3/4 "X4 "X1/4" (Fy =36 KSI) 6 PREFABRICATED TWO OR THREE PLY TRUSS j STEEL PLATE 1 1- 1 /4 "X4 "X3 /8" (Fy= 36 KSI) % MIN. 5/8" EXTERIOR GRADE PLYWOOD, SEE PLAN FOR NAILING REQ'MTS 4 ONE (A), 5/8" DIAM, THRU BOLT FOR TWO PLY TRUSS 8 MIN. E "X12" CONCRETE TIE BEAM (Fc= 3,000 PSI, MINIMUM) 4- 106x1 -1/2" EACH TRUSS ONE (1), 3/4" DIAM. THRU BOLT FOR THREE PLY TRUSS 9 CONCRETE MASONRY BLOCK Tt U55 A \C-IOP 5G1-IE DULc SCALE: 3/4 " =1' --Q" S -4 SEE FOUND, PLAN FILL ' - -- 4*5 BARS CONC. TIE BEAM 1% IN BLOCK FILLED CELL 5 =1 011LF� OFD N NC:: SCALE: 3/4" = 1' -0II STANDARD HOOK 2ND. FLR. A CONCRETE BLOCK WALL TOP BARS, SEE PLAN 7" CONC. SLAB #4(�16 TEMP. r � • BOTT. BARS SEE FRAMING PLAN 4+t5 EARS CONC. 51L. 1016 I'. 1=11 1 CONC �„ C �4c�1 -8" III CONC BECTON SCALE: 3/4 " =1'-0„ S -4 TOP BARS, SEE PLAN SCALE: /411 11-�II 5.5" CONC. SLAB 3 1/2" DROP -- SLOPE �— BOTT. BARS SEE FRAMING PLAN SEE TYP. DROP OVER OPENING FOR REINF. (S -3) SECTION C TI O I V SCALE: 3/4 „ ^1' -01' S -4 CONC. BLOCK WALL 4@16 TEMP. 2ND, FLR, I CONCRETE BEAM (8-4) SEE SCHEDULE AM PA5TENER5 DATE: STRAW TYRE 5EAT PLATE STR,4F UPLIFT F'IRODUCT CONTFPOL N.O.AI. A 1 -DTG 4- 106xI -1/2" 9- 106x1 -1/2" 1410 01.0- 124,06 F3 2 -DTC 4- 106x1 -1/2" EACH TRUSS 9- 10dxl -1/2" EACH TRUSS 1410 (EACN) 01.0724.0(o C TA 16 6-106 83P 00- 0913.0 1 D USG -ro 4 - 3/4" EXPANSION BOLTS 14,400 SEE 5PECI,4L BRACKET SCALE: 3/4 " =1' --Q" S -4 SEE FOUND, PLAN FILL ' - -- 4*5 BARS CONC. TIE BEAM 1% IN BLOCK FILLED CELL 5 =1 011LF� OFD N NC:: SCALE: 3/4" = 1' -0II STANDARD HOOK 2ND. FLR. A CONCRETE BLOCK WALL TOP BARS, SEE PLAN 7" CONC. SLAB #4(�16 TEMP. r � • BOTT. BARS SEE FRAMING PLAN 4+t5 EARS CONC. 51L. 1016 I'. 1=11 1 CONC �„ C �4c�1 -8" III CONC BECTON SCALE: 3/4 " =1'-0„ S -4 TOP BARS, SEE PLAN SCALE: /411 11-�II 5.5" CONC. SLAB 3 1/2" DROP -- SLOPE �— BOTT. BARS SEE FRAMING PLAN SEE TYP. DROP OVER OPENING FOR REINF. (S -3) SECTION C TI O I V SCALE: 3/4 „ ^1' -01' S -4 CONC. BLOCK WALL 4@16 TEMP. 2ND, FLR, I CONCRETE BEAM (8-4) SEE SCHEDULE AM • y ""W ►� p D C) CU 'l E-l”( I� Q1.J 4 J. M. — X. C. DATE: 08-00 -2004 SHEET V _J. . 4-- • ' f • �� r1 J ] Ci„ • tl 4. • y ""W ►� p D C) CU 'l E-l”( I� Q1.J 4 J. M. — X. C. DATE: 08-00 -2004 SHEET V _J. . 4--