04-1538-018-
WA W.M W.M
❑ l�
AREA 1
EXIST.
OFFICE 4
EXIST.
OFFICE 5
NEW BATHROOM
NEW BATHROOM
EXIST.
CONFERENCE ROOM
EXIST.
OFFICE 3
EXIST.
OFFICE 2
EF- D(IST.
EXIST.
�n BATHROOM
EXIST.
EATING AREA
2 0 —
2 "0
2 "0 CW
3 "0 DRAIN
3/4 "0 CW
z
3 "0 DRAIN
F.0 =4 EXIST.
3 "0 DRAIN
1. COLD WATER /
IS TAKEN FROM
EXIST. BATHROOM
EXIST. 4 "0 SEWER LINE
NEW PLUMBING (AREA 2) SC 3/16" =1'
� o
I
6 ^� 36" / cl)
VTORY
M M 4 "
4"
t
w w
OVER ALL HATER PIPE
18" IF HOT WATER IS PROVIDED
HANDI AAPPE
WATER CLOSET
UATHROOM ..FVATION4
RIM
EXIST. 3/4 "0
COLD WATER
TURN HEAD PIPE DOWN INTO STACK
LEAD COVER
CEMENT TILE (REFER TO TYP. WALL
SECTION)
SOLDERED LAP SEAM
MEMBER FLA5HIN6
a
LEAD BASE I n 1 n c-
14/32- PLYWOOD SHEATHING,
BEER TO TYP. WALL SECTION
FOR METHOD OF ATTACHMENT
NOTE:
ANY FIRE VENT WITHIN 10'-0" OF
ANY DOOR WINDOW OR EXHAUST
OPN65. SHALL EXTEND NOT LESS
THAN 3' -0" ABOVE SUCH
NOTE:
ALL UNDER GROUND 2" PIPES RUN @ 1/411/ FT. SLOPE
ALL UNDER GROUND 3" 4 4" PIPE5 RUN e 1 /0"/ FT. SLOPE
plumbing noes:
1.0 GENERAL
1.1 PROVIDE ( FURNISH AND INSTALL ) ALL NECESSARY
MATERIALS AND LABOR FOR A COMPLETELY OPERATIONAL
PLUMBING SYSTEM AS SHOWN ON THE DRAWINGS AND
HEREIN SPECIFIED. INSTALL IN ACCORDANCE WITH THE
FLORIDA BUILDING CODE 2001 EDITION.
1.2 SCOPE OF WORK :
PROVIDE THE FOLLOWING COMPLETE SYSTEMS
A. SANITARY COLLECTION.
B. DOMESTIC HOT AND COLD WATER.
C. AIR CONDITIONING CONDENSATE.
1.3 PAY FOR ALL FEES, INSPECTIONS AND CONNECTION
CHARGES REQUIRED.
1.4 VERIFY AT JOB SITE ALL SPACE CONDITIONS, DIMENSIONS
WITH PIPE, FIXTURES, AND EQUIPMENT SIZES PRIOR TO
FABRICATION OR INSTALLATION. COORDINATE REQUIREMENTS
TO AVOID INTERFERENCE WITH OTHER TRADES.
1.5 SUBMIT SHOP DRAWINGS FOR ARCHITECT / ENGINEER
APPROVAL BEFORE PROCEEDING WITH THE PURCHASE OR
INSTALLATION OF EQUIPMENT AND MATERIALS.
1.6 GUARANTEE ALL WORK FREE OF DEFECTS IN MATERIALS
AND WORKMANSHIP FOR A PERIOD OF ONE YEAR FROM
DATE OF ACCEPTANCE.
2.0 MATERIALS
2.1 PROVIDE SHUT -OFF VALVES FOR EACH FIXTURE AND AIR
CHAMBERS WHERE SHOWN AND WHERE REQUIRED FOR
PROPER PERFORMANCE OF THE SYSTEM.
2.2 PROVIDE DIELECTRIC FITTINGS TO CONNECT PIPING TO
EQUIPMENT OF DISSIMILAR METALS. USE CLAMPS AND
FASTENERS OF SIMILAR METALS OR ISOLATE THEM FROM
PIPING AND SLABS TO PREVENT CORROSION.
2.3 PIPING
2.3.1 DOMESTIC HOT AND COLD WATER: COPPER TUBING TYPE
"K" OR "L" WITH SOLDER JOINTS. WOG BRONZE VALVES
125 P.S.I. MIN. PROVIDE PRE - MOLDED FIBERGLASS
INSULATION FOR HOT WATER LINES.
2.3.2 SANITARY WASTE AND VENT: CAST IRON PIPING UNDER
SLABS, CAST IRON NO -HUB OR COPPER D.W.V. ABOVE
P.V.C. DRAIN PIPE AND FITTINGS MAY BE USED WHEN
ALLOWED BY THE LOCAL JURISDICTION.
2.3.3 A/C CONDENSATE: PVC SCEDULE 40 PIPE AND FITTINGS.
18'MIN
GOING TO THE TOP
16'
O
o \ II 1 O
GOING TO THE TOP
16'
NEW 3/4 "0
COLD WATER
NEW PLUMBING (AREA 3) SC 3/16 " =1'
M
M
CQ
1FLI
W.c
t
2"0 2"0
VENT
M
O
NEW
BATHROOM
1/2"0 COLD WATER
0
EXIST.
3 "0 DRAINAGE
EXIST. 4 "0 SEWER LINE " • ._ _
PLUMBING FIXTURE SCHEDULE
QTY.
SYMBOL
FIXTURE TYPE
TRA
SIZE
C W
H W
IX UNIT
VALUE
TOTAL
NIT
DESCRIPTION
3
l
WATER CL05ET
3" 3
24"
-
llluq
3
TANK TYPE
EF- D(IST.
EXIST.
�n BATHROOM
EXIST.
EATING AREA
2 0 —
2 "0
2 "0 CW
3 "0 DRAIN
3/4 "0 CW
z
3 "0 DRAIN
F.0 =4 EXIST.
3 "0 DRAIN
1. COLD WATER /
IS TAKEN FROM
EXIST. BATHROOM
EXIST. 4 "0 SEWER LINE
NEW PLUMBING (AREA 2) SC 3/16" =1'
� o
I
6 ^� 36" / cl)
VTORY
M M 4 "
4"
t
w w
OVER ALL HATER PIPE
18" IF HOT WATER IS PROVIDED
HANDI AAPPE
WATER CLOSET
UATHROOM ..FVATION4
RIM
EXIST. 3/4 "0
COLD WATER
TURN HEAD PIPE DOWN INTO STACK
LEAD COVER
CEMENT TILE (REFER TO TYP. WALL
SECTION)
SOLDERED LAP SEAM
MEMBER FLA5HIN6
a
LEAD BASE I n 1 n c-
14/32- PLYWOOD SHEATHING,
BEER TO TYP. WALL SECTION
FOR METHOD OF ATTACHMENT
NOTE:
ANY FIRE VENT WITHIN 10'-0" OF
ANY DOOR WINDOW OR EXHAUST
OPN65. SHALL EXTEND NOT LESS
THAN 3' -0" ABOVE SUCH
NOTE:
ALL UNDER GROUND 2" PIPES RUN @ 1/411/ FT. SLOPE
ALL UNDER GROUND 3" 4 4" PIPE5 RUN e 1 /0"/ FT. SLOPE
plumbing noes:
1.0 GENERAL
1.1 PROVIDE ( FURNISH AND INSTALL ) ALL NECESSARY
MATERIALS AND LABOR FOR A COMPLETELY OPERATIONAL
PLUMBING SYSTEM AS SHOWN ON THE DRAWINGS AND
HEREIN SPECIFIED. INSTALL IN ACCORDANCE WITH THE
FLORIDA BUILDING CODE 2001 EDITION.
1.2 SCOPE OF WORK :
PROVIDE THE FOLLOWING COMPLETE SYSTEMS
A. SANITARY COLLECTION.
B. DOMESTIC HOT AND COLD WATER.
C. AIR CONDITIONING CONDENSATE.
1.3 PAY FOR ALL FEES, INSPECTIONS AND CONNECTION
CHARGES REQUIRED.
1.4 VERIFY AT JOB SITE ALL SPACE CONDITIONS, DIMENSIONS
WITH PIPE, FIXTURES, AND EQUIPMENT SIZES PRIOR TO
FABRICATION OR INSTALLATION. COORDINATE REQUIREMENTS
TO AVOID INTERFERENCE WITH OTHER TRADES.
1.5 SUBMIT SHOP DRAWINGS FOR ARCHITECT / ENGINEER
APPROVAL BEFORE PROCEEDING WITH THE PURCHASE OR
INSTALLATION OF EQUIPMENT AND MATERIALS.
1.6 GUARANTEE ALL WORK FREE OF DEFECTS IN MATERIALS
AND WORKMANSHIP FOR A PERIOD OF ONE YEAR FROM
DATE OF ACCEPTANCE.
2.0 MATERIALS
2.1 PROVIDE SHUT -OFF VALVES FOR EACH FIXTURE AND AIR
CHAMBERS WHERE SHOWN AND WHERE REQUIRED FOR
PROPER PERFORMANCE OF THE SYSTEM.
2.2 PROVIDE DIELECTRIC FITTINGS TO CONNECT PIPING TO
EQUIPMENT OF DISSIMILAR METALS. USE CLAMPS AND
FASTENERS OF SIMILAR METALS OR ISOLATE THEM FROM
PIPING AND SLABS TO PREVENT CORROSION.
2.3 PIPING
2.3.1 DOMESTIC HOT AND COLD WATER: COPPER TUBING TYPE
"K" OR "L" WITH SOLDER JOINTS. WOG BRONZE VALVES
125 P.S.I. MIN. PROVIDE PRE - MOLDED FIBERGLASS
INSULATION FOR HOT WATER LINES.
2.3.2 SANITARY WASTE AND VENT: CAST IRON PIPING UNDER
SLABS, CAST IRON NO -HUB OR COPPER D.W.V. ABOVE
P.V.C. DRAIN PIPE AND FITTINGS MAY BE USED WHEN
ALLOWED BY THE LOCAL JURISDICTION.
2.3.3 A/C CONDENSATE: PVC SCEDULE 40 PIPE AND FITTINGS.
18'MIN
GOING TO THE TOP
16'
O
o \ II 1 O
GOING TO THE TOP
16'
NEW 3/4 "0
COLD WATER
NEW PLUMBING (AREA 3) SC 3/16 " =1'
M
M
CQ
1FLI
W.c
t
2"0 2"0
VENT
M
O
NEW
BATHROOM
1/2"0 COLD WATER
0
EXIST.
3 "0 DRAINAGE
EXIST. 4 "0 SEWER LINE " • ._ _
PLUMBING FIXTURE SCHEDULE
QTY.
SYMBOL
FIXTURE TYPE
TRA
SIZE
C W
H W
IX UNIT
VALUE
TOTAL
NIT
DESCRIPTION
3
WC
WATER CL05ET
3" 3
24"
-
.'00
3
TANK TYPE
3
LAV
LAVATORY
- 11/22" 3
24"
1/24"
3
W1 ANTI -SCALD VALVE
O
O
_1
I
FD
I FLOOR DRAIN
-3
112"
-
a
Q
O
O
00
Q
TOTAL FIXTURE UNIT VALUE - 6
1- 6" PIPE TO BAR FROM WALK IN
3- 3" PIPES FROM "SODA GUN" TO BAR STATION
54'MIN
TOILLET
'MIN 36' MIN CAPER
II IN 33-36
17 -19
SIDE WALL
7/ -2N
15»
5' -2.5' T
)of
I _ GL- -E -AR 4_5'
12A' 42" =
t
v
i
a e
y
y
R � •
�s
r
A
'Y
•
f
a•
REVISIONS:
r.
t
Y. Rte
V
0
fib � ..T' • •� ,
Q ..
Q
. r•
w
N
1
' n
L J
a
.'00
W
..(_0
O
O
O
_1
W
00
L
a
Q
O
O
00
Q
LO
U
W
O
L
0
N
-j
, a�
O
>
�
I
0
U)
z
O
Q ..
Q
. r•
w
O
.'00
W
..(_0
_1
W
00
Q
Ln
O
00
LO
W
0
, a�
Z.
o
z
W
0�
J
V)
a-
LL
O
I
C)
—
O
ry
Q
DRAWN
E a..
,G
SCALE
al
AS
SHOWN
DATE
'•
10 -04