Loading...
04-1538-018- WA W.M W.M ❑ l� AREA 1 EXIST. OFFICE 4 EXIST. OFFICE 5 NEW BATHROOM NEW BATHROOM EXIST. CONFERENCE ROOM EXIST. OFFICE 3 EXIST. OFFICE 2 EF- D(IST. EXIST. �n BATHROOM EXIST. EATING AREA 2 0 — 2 "0 2 "0 CW 3 "0 DRAIN 3/4 "0 CW z 3 "0 DRAIN F.0 =4 EXIST. 3 "0 DRAIN 1. COLD WATER / IS TAKEN FROM EXIST. BATHROOM EXIST. 4 "0 SEWER LINE NEW PLUMBING (AREA 2) SC 3/16" =1' � o I 6 ^� 36" / cl) VTORY M M 4 " 4" t w w OVER ALL HATER PIPE 18" IF HOT WATER IS PROVIDED HANDI AAPPE WATER CLOSET UATHROOM ..FVATION4 RIM EXIST. 3/4 "0 COLD WATER TURN HEAD PIPE DOWN INTO STACK LEAD COVER CEMENT TILE (REFER TO TYP. WALL SECTION) SOLDERED LAP SEAM MEMBER FLA5HIN6 a LEAD BASE I n 1 n c- 14/32- PLYWOOD SHEATHING, BEER TO TYP. WALL SECTION FOR METHOD OF ATTACHMENT NOTE: ANY FIRE VENT WITHIN 10'-0" OF ANY DOOR WINDOW OR EXHAUST OPN65. SHALL EXTEND NOT LESS THAN 3' -0" ABOVE SUCH NOTE: ALL UNDER GROUND 2" PIPES RUN @ 1/411/ FT. SLOPE ALL UNDER GROUND 3" 4 4" PIPE5 RUN e 1 /0"/ FT. SLOPE plumbing noes: 1.0 GENERAL 1.1 PROVIDE ( FURNISH AND INSTALL ) ALL NECESSARY MATERIALS AND LABOR FOR A COMPLETELY OPERATIONAL PLUMBING SYSTEM AS SHOWN ON THE DRAWINGS AND HEREIN SPECIFIED. INSTALL IN ACCORDANCE WITH THE FLORIDA BUILDING CODE 2001 EDITION. 1.2 SCOPE OF WORK : PROVIDE THE FOLLOWING COMPLETE SYSTEMS A. SANITARY COLLECTION. B. DOMESTIC HOT AND COLD WATER. C. AIR CONDITIONING CONDENSATE. 1.3 PAY FOR ALL FEES, INSPECTIONS AND CONNECTION CHARGES REQUIRED. 1.4 VERIFY AT JOB SITE ALL SPACE CONDITIONS, DIMENSIONS WITH PIPE, FIXTURES, AND EQUIPMENT SIZES PRIOR TO FABRICATION OR INSTALLATION. COORDINATE REQUIREMENTS TO AVOID INTERFERENCE WITH OTHER TRADES. 1.5 SUBMIT SHOP DRAWINGS FOR ARCHITECT / ENGINEER APPROVAL BEFORE PROCEEDING WITH THE PURCHASE OR INSTALLATION OF EQUIPMENT AND MATERIALS. 1.6 GUARANTEE ALL WORK FREE OF DEFECTS IN MATERIALS AND WORKMANSHIP FOR A PERIOD OF ONE YEAR FROM DATE OF ACCEPTANCE. 2.0 MATERIALS 2.1 PROVIDE SHUT -OFF VALVES FOR EACH FIXTURE AND AIR CHAMBERS WHERE SHOWN AND WHERE REQUIRED FOR PROPER PERFORMANCE OF THE SYSTEM. 2.2 PROVIDE DIELECTRIC FITTINGS TO CONNECT PIPING TO EQUIPMENT OF DISSIMILAR METALS. USE CLAMPS AND FASTENERS OF SIMILAR METALS OR ISOLATE THEM FROM PIPING AND SLABS TO PREVENT CORROSION. 2.3 PIPING 2.3.1 DOMESTIC HOT AND COLD WATER: COPPER TUBING TYPE "K" OR "L" WITH SOLDER JOINTS. WOG BRONZE VALVES 125 P.S.I. MIN. PROVIDE PRE - MOLDED FIBERGLASS INSULATION FOR HOT WATER LINES. 2.3.2 SANITARY WASTE AND VENT: CAST IRON PIPING UNDER SLABS, CAST IRON NO -HUB OR COPPER D.W.V. ABOVE P.V.C. DRAIN PIPE AND FITTINGS MAY BE USED WHEN ALLOWED BY THE LOCAL JURISDICTION. 2.3.3 A/C CONDENSATE: PVC SCEDULE 40 PIPE AND FITTINGS. 18'MIN GOING TO THE TOP 16' O o \ II 1 O GOING TO THE TOP 16' NEW 3/4 "0 COLD WATER NEW PLUMBING (AREA 3) SC 3/16 " =1' M M CQ 1FLI W.c t 2"0 2"0 VENT M O NEW BATHROOM 1/2"0 COLD WATER 0 EXIST. 3 "0 DRAINAGE EXIST. 4 "0 SEWER LINE " • ._ _ PLUMBING FIXTURE SCHEDULE QTY. SYMBOL FIXTURE TYPE TRA SIZE C W H W IX UNIT VALUE TOTAL NIT DESCRIPTION 3 l WATER CL05ET 3" 3 24" - llluq 3 TANK TYPE EF- D(IST. EXIST. �n BATHROOM EXIST. EATING AREA 2 0 — 2 "0 2 "0 CW 3 "0 DRAIN 3/4 "0 CW z 3 "0 DRAIN F.0 =4 EXIST. 3 "0 DRAIN 1. COLD WATER / IS TAKEN FROM EXIST. BATHROOM EXIST. 4 "0 SEWER LINE NEW PLUMBING (AREA 2) SC 3/16" =1' � o I 6 ^� 36" / cl) VTORY M M 4 " 4" t w w OVER ALL HATER PIPE 18" IF HOT WATER IS PROVIDED HANDI AAPPE WATER CLOSET UATHROOM ..FVATION4 RIM EXIST. 3/4 "0 COLD WATER TURN HEAD PIPE DOWN INTO STACK LEAD COVER CEMENT TILE (REFER TO TYP. WALL SECTION) SOLDERED LAP SEAM MEMBER FLA5HIN6 a LEAD BASE I n 1 n c- 14/32- PLYWOOD SHEATHING, BEER TO TYP. WALL SECTION FOR METHOD OF ATTACHMENT NOTE: ANY FIRE VENT WITHIN 10'-0" OF ANY DOOR WINDOW OR EXHAUST OPN65. SHALL EXTEND NOT LESS THAN 3' -0" ABOVE SUCH NOTE: ALL UNDER GROUND 2" PIPES RUN @ 1/411/ FT. SLOPE ALL UNDER GROUND 3" 4 4" PIPE5 RUN e 1 /0"/ FT. SLOPE plumbing noes: 1.0 GENERAL 1.1 PROVIDE ( FURNISH AND INSTALL ) ALL NECESSARY MATERIALS AND LABOR FOR A COMPLETELY OPERATIONAL PLUMBING SYSTEM AS SHOWN ON THE DRAWINGS AND HEREIN SPECIFIED. INSTALL IN ACCORDANCE WITH THE FLORIDA BUILDING CODE 2001 EDITION. 1.2 SCOPE OF WORK : PROVIDE THE FOLLOWING COMPLETE SYSTEMS A. SANITARY COLLECTION. B. DOMESTIC HOT AND COLD WATER. C. AIR CONDITIONING CONDENSATE. 1.3 PAY FOR ALL FEES, INSPECTIONS AND CONNECTION CHARGES REQUIRED. 1.4 VERIFY AT JOB SITE ALL SPACE CONDITIONS, DIMENSIONS WITH PIPE, FIXTURES, AND EQUIPMENT SIZES PRIOR TO FABRICATION OR INSTALLATION. COORDINATE REQUIREMENTS TO AVOID INTERFERENCE WITH OTHER TRADES. 1.5 SUBMIT SHOP DRAWINGS FOR ARCHITECT / ENGINEER APPROVAL BEFORE PROCEEDING WITH THE PURCHASE OR INSTALLATION OF EQUIPMENT AND MATERIALS. 1.6 GUARANTEE ALL WORK FREE OF DEFECTS IN MATERIALS AND WORKMANSHIP FOR A PERIOD OF ONE YEAR FROM DATE OF ACCEPTANCE. 2.0 MATERIALS 2.1 PROVIDE SHUT -OFF VALVES FOR EACH FIXTURE AND AIR CHAMBERS WHERE SHOWN AND WHERE REQUIRED FOR PROPER PERFORMANCE OF THE SYSTEM. 2.2 PROVIDE DIELECTRIC FITTINGS TO CONNECT PIPING TO EQUIPMENT OF DISSIMILAR METALS. USE CLAMPS AND FASTENERS OF SIMILAR METALS OR ISOLATE THEM FROM PIPING AND SLABS TO PREVENT CORROSION. 2.3 PIPING 2.3.1 DOMESTIC HOT AND COLD WATER: COPPER TUBING TYPE "K" OR "L" WITH SOLDER JOINTS. WOG BRONZE VALVES 125 P.S.I. MIN. PROVIDE PRE - MOLDED FIBERGLASS INSULATION FOR HOT WATER LINES. 2.3.2 SANITARY WASTE AND VENT: CAST IRON PIPING UNDER SLABS, CAST IRON NO -HUB OR COPPER D.W.V. ABOVE P.V.C. DRAIN PIPE AND FITTINGS MAY BE USED WHEN ALLOWED BY THE LOCAL JURISDICTION. 2.3.3 A/C CONDENSATE: PVC SCEDULE 40 PIPE AND FITTINGS. 18'MIN GOING TO THE TOP 16' O o \ II 1 O GOING TO THE TOP 16' NEW 3/4 "0 COLD WATER NEW PLUMBING (AREA 3) SC 3/16 " =1' M M CQ 1FLI W.c t 2"0 2"0 VENT M O NEW BATHROOM 1/2"0 COLD WATER 0 EXIST. 3 "0 DRAINAGE EXIST. 4 "0 SEWER LINE " • ._ _ PLUMBING FIXTURE SCHEDULE QTY. SYMBOL FIXTURE TYPE TRA SIZE C W H W IX UNIT VALUE TOTAL NIT DESCRIPTION 3 WC WATER CL05ET 3" 3 24" - .'00 3 TANK TYPE 3 LAV LAVATORY - 11/22" 3 24" 1/24" 3 W1 ANTI -SCALD VALVE O O _1 I FD I FLOOR DRAIN -3 112" - a Q O O 00 Q TOTAL FIXTURE UNIT VALUE - 6 1- 6" PIPE TO BAR FROM WALK IN 3- 3" PIPES FROM "SODA GUN" TO BAR STATION 54'MIN TOILLET 'MIN 36' MIN CAPER II IN 33-36 17 -19 SIDE WALL 7/ -2N 15» 5' -2.5' T )of I _ GL- -E -AR 4_5' 12A' 42" = t v i a e y y R � • �s r A 'Y • f a• REVISIONS: r. t Y. Rte V 0 fib � ..T' • •� , Q .. Q . r• w N 1 ' n L J a .'00 W ..(_0 O O O _1 W 00 L a Q O O 00 Q LO U W O L 0 N -j , a� O > � I 0 U) z O Q .. Q . r• w O .'00 W ..(_0 _1 W 00 Q Ln O 00 LO W 0 , a� Z. o z W 0� J V) a- LL O I C) — O ry Q DRAWN E a.. ,G SCALE al AS SHOWN DATE '• 10 -04