11-959-0051. SEE FIXTURE PLAN ON SHEET A2 -1 FOR FIXTURE LAYOUT.
2. SEE REFLECTED CEILING PLAN ON SHEET A3 -0 FOR SOFFIT AND LIGHTING INFORMATION.
3. NOTIFY ARCHITECT IMMEDIATELY OF ANY INCONSISTENCIES OR DISCREPANCIES WITH PLANS IN RELATION TO EXISTING
FIELD CONDITIONS.
4. WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALE ON THE CONSTRUCTION DOCUMENTS. DO NOT SCALE.
5. DIMENSIONS ARE FROM THE FACE OF FINISHED WALL (GWB) TO FACE OF FINISHED WALL (GWB) UNLESS OTHERWISE
NOTED ON PLANS.
6. ALL MANUFACTURED ARTICLES, MATERIALS AND EQUIPMENT SHALL BE APPLIED. INSTALLED, CONNECTED, ERECTED,
USED, CLEANED, AND CONDITIONED IN ACCORDANCE WITH THE MANUFACTURER'S WRITTEN SPECIFICATIONS OR
INSTRUCTIONS.
7. ALL WORK SHALL BE EXECUTED IN A MANNER ACCEPTABLE TO THE TENANT.
8. UNLESS NOTED OTHERWISE, THE GENERAL CONTRACTOR SHALL PROVIDE AND PAY ALL LABOR, MATERIALS
EQUIPMENT, TOOLS, CONSTRUCTION EQUIPMENT, MACHINERY, TRANSPORTATION, PERMITS AND OTHER SERVICES AND
FACILITIES NECESSARY FOR PROPER AND TIMELY EXECUTION OF WORK.
9. THE TENANTS CONTRACTOR WARRANTS TO THE OWNER AND TO THE ARCHITECT THAT ALL MATERIALS AND
EQUIPMENT FURNISHED UNDER THE CONTRACT ARE NEW UNLESS OTHERWISE SPECIFIED AND THAT ALL WORK WILL
BE AS SPECIFIED AND FREE OF DEFECTS.
10. FOR ALL WOOD MEMBER REQUIRED BY CODE TO BE FIRE RETARDANT TREATED, PROVIDE PRESSURE IMPREGNATION
WITH FIRE RETARDANT CHEMICALS TO PROVIDE UL PRS FIRE HAZARD CLASSIFICATION, ALL WOOD SHALL BE
IDENTIFIED WITH A UL LABEL CERTIFYING THIS CLASSIFICATION AND FM DIAMOND.
11. APPROVED FIRE EXTINGUISHERS SHALL BE INSTALLED AS REQUIRED BY LOCAL AUTHORITY, COORDINATE WITH
ARCHITECT AND BUILDING INSPECTOR ON LOCATION OF FIRE EXTINGUISHER.
12. ALL PENETRATIONS OF FIRE RESISTIVE FLOOR OR SHAFT WALLS SHALL BE PROTECTED BY MATERIALS AND
INSTALLATION DETAILS THAT CONFORMS TO UL STANDARDS FOR THROUGH PENETRATION FIRESTOP SYSTEMS. THE
CONTRACTOR SHALL SUBMIT SHOP DRAWING DETAILS WHICH SHOW COMPLETE CONFORMANCE TO THE UL LISTING TO
THE ARCHITECT. SUCH DRAWINGS SHALL BE AVAILABLE-TO ANY CITY INSPECTORS. THE DRAWINGS SHALL BE
SPECIFIC FOR EACH PENETRATION WITH ALL VARIABLES DEFINED.
13. ALL OUTSIDE CORNERS AT DRYWALL PARTITIONS AND FURRINGS TO HAVE METAL CORNER BEADS SPACKLE AND
SMOOTH, UNLESS OTHERWISE NOTED.
14. HVAC CONTRACTOR TO SUBMIT SHOP DRAWINGS FOR INTENDED DUCT, DIFFUSER, AND THERMOSTAT LOCATIONS, ETC.
FOR REVIEW PRIOR TO FABRICATION AND INSTALLATION OF SAME.
15. THE CONTRACTOR IS TO REPLACE ANY FIREPROOFING REMOVED FROM THE BUILDING STRUCTURE DURING
DEMOLITION /CONSTRUCTION.
16. ACCESS PANELS IN WALL FOR PLUMBING, MECHANICAL OR ELECTRICAL ACCESS PANEL TO BE FLUSH FRAMELESS
GYP. BD. PANELS. SUBMIT SPECS. TO ARCHITECT FOR REVIEW PRIOR TO INSTALLATION.
17. ALL GLASS, INTERIOR AND EXTERIOR AND ALL STOREFRONT METAL TO BE CLEANED WITH A LIQUID DETERGENT AT
COMPLETION OF CONSTRUCTION.
18. PROVIDE DIAGONAL BRACING TO STRUCTURE ABOVE ALL DOORS, GLAZING HEADS AND JAMBS AS REQUIRED TO
MAKE ASSEMBLY RIGID.
19. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING INTEGRITY OF RATED PARTITIONS & STRUCTURE PARTICULARLY
WHERE PENETRATED BY VARIOUS TRADES AND SERVICES.
20. THE GENERAL CONTRACTOR TO PROVIDE AND INSTALL PAPER COVERING APPLIED TO THE STOREFRONT GLAZING
DURING MERCHANDISING.
21. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE FINAL CLEAN UP OF THE ENTIRE PREMISES TO INCLUDE BY
NOT LIMITED TO FLOORS, MILLWORK, FIXTURES, ETC. FOLLOWING THE INSTALLATION OF THE MILLWORK.
22. G.C. SHALL SUPPLY & INSTALL PROPER AND ADEQUATE WOOD BLOCKING TO SUPPORT ALL OWNER SUPPLIED AND
MWC APPLIED & INSTALLED ITEMS FOR FIRM AND SECURE INSTALLATION ON WALLS, COLUMNS, ETC. GC SHALL
COORDINATE WITH MWC FOR REQUIRED LOCATIONS AND ADEQUACY OF BLOCKING REQUIREMENT AND PROVIDE ALL
SUCH BLOCKING PRIOR TO CLOSING UP ANY AND ALL WALLS, COLUMNS, ETC. IF REQUIRED BY CODE AND LOCAL
BUILDING OFFICIAL, SUCH BLOCKING SHALL BE FIRE RETARDANT TREATED OR METAL TO MEET SUCH REQUIREMENT.
CONSTRUCTION PLAN GENERAL NOTES SCALE: 4
1. EXAMINE ALL SURFACES TO BE PAINTED UNDER THIS CONTRACT AND SEE THAT THE WORK OF OTHER TRADES HAVE BEEN LEFT OR INSTALLED IN
A SATISFACTORY CONDITION TO RECEIVE PAINT OR SPECIFIED FINISH.
2. INTERIOR GYPSUM WALL BOARD SURFACES SHALL BE WIPED WITH A DAMP CLOTH, JUST PRIOR TO APPLICATION OF THE FIRST COAT OF PAINT IN
ORDER TO LAY FIAT ANY NAP WHICH MAY HAVE FORMED IN SANDING.
3. PAINTER SHALL BE RESPONSIBLE FOR THE REMOVAL. OF HARDWARE, SWITCH, AND OUTLETS COVERS., ETC, AND RE- INSTAUATION OF SAME AFTER
PAINTING.
4. PAINTING APPLICATION SCHEDULE: (1) COAT PRIMER, (2) COATS FINISH PAINT, LEVEL 5
5. AT COMPLETION OF PAINTING ALL PAINT MATERIALS AND EQUIPMENT SHALL BE REMOVED. ALL PAINT SPOTS REMOVED AND ALL AREAS
THOROUGHLY CLEANED. XW DIRT OR DEBRIS CAUSED BY WORK SHALL BE CLEANED UP AS WORK PROGRESSES.
6. RETOUCH OR REFINISH SURFACES DAMAGED BY SUBSEQUENT WORK AS DIRECTED BY GENERAL CONTRACTOR. THE COST OF SUCH RESTORATION
WORK SHALL BE BORNE BY CONTRACTOR.
7. WIPE CLEAN ALL SURFACES WITH DAMP CLOTH.
8. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING PROPER PROTECTION AGAINST DAMAGE TO EXISTING FURNITURE, ADJACENT FINISHED WORK,
FLOORING, ETC.
9. REFER TO AO-3 FOR APPLICABLE FLOOR TRANSITION DETAILS, U.N.O.
10. SEE SHEET A2 -2 FOR FLOOR FINISHES.
11. THE FLOORING CONTRACTOR SWILL HAVE A MINIMUM OF FIVE YEARS EXPERIENCE WORKING WITH THIS TYPE OF PRODUCT.
12. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE MAINTENANCE OF THE FINISHES IN THE STORE. WALLS FLOOR AND CEILING PRIOR
TO TURNOVER. GC SHALL TOUCH -UP ALL CORNER BEADS, WALLS, CEILING AND FLOORING AS REQUIRED PRIOR TO TURNOVER AND ANY DAMAGE
CAUSED BY OTHER TRADES INCLUDING MILLWORKER.
13. GENERAL CONTRACTOR SHALL CAULK BETWEEN MILLWORK AND GYPSUM BOARD WALLS IF REQUIRED TO CREATE A SMOOTH FINISH.
CONSTRUCTION PLAN FINISH NOTES SCALE: 3
C1 ALL WORK TO REMAIN TYPICAL THROUGHOUT, U.N.O.
C2 NOT USED.
O (N) IMPACT RESISTANT STOREFRONT - SEE SECTION ON A4-1
C4 PATCH & REPAIR WITH STUCCO TO MATCH (E) WHERE (E) AWNING SCREWS WERE REMOVED.
0
O WALL MOUNTED FIRE EXTINGUISHER. COORDINATE QUANTITY & LOCATION WITH LOCAL FIRE MARSHAL
C6 (N) ELEC. PANEL ' SEE ELECTRICAL DWGS.
C7 (N) LOCATION OF RELOCATED TRANSFORMER. SEE ELECTRICAL DWGS.
O G.C. TO MODIFY (E) PLUMBING IN ORDER TO ACCOMODATE (N) 3 COMP. SINK, (N) HANDSINK, &
(N) E.W.H. SEE PLUMBING DWGS.
C9 (E) BATHROOM PLUMBING TO REMAIN. CLEAN ALL REPAIR AS NEC.
C10 LINE OF NEW GYP. BD. SOFFIT ABOVE. SEE REFLECTED CEILING PLAN.
C11 (N) RECORD DRAWINGS HOLDER. SEE 4/A6 -1
C1 G.C. TO MAINTAIN EXISTING WATERPROOFING SYSTEM. REPAIR & REPLACE AS NECESSARY PER
LANDLORD REQUIREMENTS. NOTIFY ARCHITECT AS NECESSARY.
C13 PROVIDE 6' -0" PLASTIC CORNER GUARD.
PROVIDE (N) CONCRETE SLAB INFILL WITH WATERPROOFING & FIRE RATINGAT ELECTRICAL CONDUIT AND
C14 PLUMBING TRENCH PER LANDLORD REQUIREMENTS. X -RAY SLAB PRIOR TO ANY CONSTRUCTION /DEMO.
C15 HOLD GYP. BD. TIGHT TO (E) COLUMN. SEE 4/A6 -2.
C16 HOLD GYP. BD. TIGHT TO (E) STANDPIPE.
C17 (E) IMPACT RESISTANT STOREFRONT TO REMAIN. TOUCH UP FINISH AS NECESSARY TO -LIKE -NEW"
CONDITION.
C18 (E) IMPACT RESISTANT STOREFRONT DOORS/ SIDELIGHTS TO REMAIN. TOUCH UP FINISH AS NECESSARY
TO "LIKE -NEW" CONDITION.
C19 PROVIDE (N) BRUSHED ALUMINUM FACE PLATE WHERE (E) ALARM PAD WAS REMOVED.
CONSTRUCTION PLAN KEY NOTES �S� "`E'
LEASE LINE
i 2•
2?
EXTERIOR MALL
COMMON AREA
2 I CONSTRUCTION PLAN
O
c�
J
O
ENTRY
11\1
C4
� C14
` � I
J "'
<A
12
DJACENT
L3
J.6
LEASE LINE
(E) NEU
PIER
. w t
� 0 i
i
3
•mss
■ ', v►
IN
o ff°
OO
4 3/4" v/ F Cl
C4
� 100'_5 114" LEASE LINE TO
J
\
C15
I.F.
v
5
z
(E) STANDPIPE;
V.I.F.
z
MUM
0 ENTRY
11' -5 1/4- V.I.F.
C16 H 2
3 \ 5-
4-
3 \
DISCLAIMER: G.C. TO VERIFY ALL
DIMENSIONS AND CONCEALED -
ELEMENTS AT CEILINd!3q _
COLUMNS, AND WALLS, Pt 3S't--
DEMOLITION. NOTIFY ARCHITECT
OF ALL FINDINGS AND
DISCREPANCIES WITH DRA,WWdS" _
SEE SHEET AO -3 FOR DOOR
SCHEDULE.
SEE SHEET A6 -0 FOR PARTITION
TYPES.
'K
COVERED
EXTERIOR MALL
COMMON AREA
0 1
<y 4-
C15
SIM.
i
�O
�o
J
C4
�m
v.
EXTERIOR MALL
COMMON AREA
L
�1Ty pF
$V'LO IVG OEP rAMt
STRUCTURAL SF T,
CT�pN
;lOVE
LXISTJJt 0 P Pflt±n l IONS OF BUILDINGS SHALL CO PL
1,71 i H TIME 1 JVI.C.10"!C3 OF 0000PAHCIG
. S' 'n-,7 ':011M; lit ;12 rLO;'hI Jii k li;:_ Pl'r_V"_'WTl0N COD
•�Y�'�'T''• ; +. rwT -^ �.( TT^ T^ i _T__��:T'�+•^�.s.wt- lv.._.a-{'A
N
SCALE:
77770"
JC�H -NO.:
11025
.DRAWN /CHECKED BY:
CML /DZK
I SCALE:
AS NOTED
ISSUE FOR:
PERMIT
09/14/11
.--� O_ M O
00
C) 0
A M 0
0
0/ M I
ON
Q _P
Q ON cN
p .,-^�
0) J W
�✓ LL Lf')
X
cy
d N d (CL.1
I
N
co \ Z mo I
ON
a o GN
cu
QA .o
_ O
U (f)
LLJ CD
U
n,,
H W
U u
Q Q
O
LU M
CD Q p M
LL J W r
CD CL M
> I LU
CD � U.
� Z 0
LU O W
LU I.. (D Q
O
= Q =
z Oro
z ^ = O O
LU
SHEET N0:
A2 -0
TITLES CONSTRUCTION
PLAN