Loading...
11-959-004G.C. TO CO NTA CT ITSUGAR CPM J.6 = TO VERIFY USAGE OF GRAPHICS PER LANDLORD APPROVAL. Al -1 LEASE LINE T. TE`1wmARY�BARR uix (E) NEUTRA PIER ADJ C T \ TE AN N. (o CUP CY • ") / ' �� — \ E H. C. \ ; 2 \\ TOILET RM. D9 K D2 \ 1 COVERED \ 2 V', �- D10 TYP �� EXTERIOR MALL. 021 \ NON AREA x'13 24 � \ �' _ D2 D9 � � - \ � -SAL \ D1 0 07 14 �� COMMON AREA D21 0 �. 0 15 \ � \ �= 2 TYP. VARIES -SEE PLAN ' �� �'' �n� LEASE LINE �� �• " 16 2 \ \\ 2 1 1 1 gD2 1 \ o -5- (P - D5 D19 / / 29 // 17 ® ,, J D2 2 (E) STANDPIPE, 2 V.I.F. 20 L DEMOLITION PLAN SCALE: 4 „ 1/4 =1� -0� , 1. THE G.C. IS RESPONSIBLE FOR REMOVAL OF ALL TRASH, DEBRIS, AND FIXTURES FROM EXISTING SPACE. COORDINATE TRASH REMOVAL WITH LANDLORD. SALES AREA / 2. CONTRACTOR AND DEMOLITION CONTRACTOR TO REVIEW SITE FOR FAMILIARIZATION WITH THE PROJECT SCOPE PRIOR TO 2 2 / D1 D2 TYP. D7 NP• / / \ D6 2 SUBMITTING BID. TYP. 1 D8 2 D15 ENTRY ` . . / / 25 / 3. PATCH AND /OR REPAIR ALL EXISTING FIRE PROOFING DISTURBED DURING DEMOLITION TO MAINTAIN REQUIRED RATING. D1 / D3 D2 TYP. - (E) STAND C - -�r -1 \ V.I.F. J E, 20 4. DURING THE CONSTRUCTION OF THIS PROJECT, THE MALL AND ALL TENANTS, ARE TO REMAIN OPERATIONAL AT ALL TIMES. \ (E) STANDPIPE, D3 PROVIDE ADDITIONAL TEMPORARY BARRICADES, PEDESTRIAN ACCESS WAYS, AND PROTECTION AS REQUIRED, COORDINATE \ V.I.F. 20 / ® LEASE LINE WITH THE LANDLORD OPERATIONS MANAGEMENT, FIRE DEPARTMENT, AND LOCAL CODES. FIRE SPRINKLER AND OTHER LIFE SAFETY SYSTEM TO REMAIN FULLY FUNCTIONAL AT ALL TIMES. Tim I I _ i / / D3 / D19 D2 / \ I I I D3 � / D18 5. G.C. SHALL INSTALL CONSTRUCTION FILTERS ON ALL RETURN AIR DEVICES PRIOR TO START OF DEMOLITION. UNIT MUST BE TURNED OFF DURING PAINTING OPERATIONS. 18 ��-L -� 8 / �\ / \ / \ / / ��� D16 EXTERIOR MALL D16 ` ��� / \� 6. CAP, REMOVE OR RELOCATE ANY ELECTRICAL POWER, PLUMBING, MECHANICAL AND /OR SUCH DEVICES AS REQUIRED FOR NEW CONSTRUCTION. DO NOT LEAVE ABANDONED ITEMS• COMMON AREA / D18 , ` v \ D < D16 ��2 / \ �".. / i / 8 1 , ,1� J • / / (< \ / / �' �h / / IN THE SPACE - REMOVE ENTIRELY BACK TO SOURCE. 'F¢. / / 1 D3 D3 D16 1 \ \ 18 / 8 r 18 D1 7. WHETHER INDICATED OR NOT, LIFE SAFETY SYSTEMS SUCH AS FIRE SPRINKLER, FIRE ALARM SYSTEM, AND EMERGENCY �` /�' L D16 �' = 11 , / \ D19 D17 11 / LIGHTING SYSTEM SHALL BE ADJUSTED AS NECESSARY AND AS REQUIRED TO MEET CODES IN COORDINATION WITH THE 2 `� / I I I 1 11 / I \\ CITY OF SOUTH MIAMI ENTIRE BUILDING. �'� 25 �� 2 I / 11 25 BUILDING DEPT. 8. PATCH AND REPAIR ALL CONSTRUCTION IN THE AREAS OF �O n 1� ; � 4 3/4 , 2 �'� STRUCTURAL SECTION DEMOLITION, AS NECESSARY TO ACCOMMODATE NEW WORK AND FINISHES. `\ 2 1 25 D19 I 1 ENTRY 26 1 D19 1 � 9. MAINTAIN ADEQUATE SUPPORT, INSULATION, WATERPROOFING, EMERGENCY LIGHTING, SECURITY, ALARMS, ETC. FOR ALL • ► I n1,'- 51/4" , �' EXTERIOR MALL �9VED BY: 1 COMMON AREA ITEMS OR PARTS OF ITEMS, WHICH ARE TO REMAIN. n 100'-5 r 5 I ' 1 / 4y - .1 I ®2 TYP. 10. REFER TO MECHANICAL / ELECTRICAL/ PLUMBING FOR LEASE LINE _ _ _ _ J TYP. TO LEAS SPECIFIC DISPOSTION OF EXISTING SYSTEMS AND INE, 30 CONSTRUCTION ITEMS. I.F. TYP. 11. WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALE ON THE CONSTRUCTION DOCUMENTS. DO NOT SCALE. / DEMOLITION P LAN SCALE: 2 12. ALL MANUFACTURED ARTICLES, MATERIALS AND EQUIPMENT SHALL BE APPLIED, INSTALLED, CONNECTED, ERECTED, USED, CLEANED, 1/4!'= 1' -9' AND CONDITIONED IN ACCORDANCE WITH THE MANUFACTURER'S WRITTEN SPECIFICATIONS OR INSTRUCTIONS. D1 ALL ITEMS TO REMAIN U.N.O. PROTECT DURING CONSTRUCTION D19 (E) LANLORD, BASE BUILDING PILASTER - PROTECT AS NECESSARY DURING CONSTRUCTION , _ _ 15' -9" A.F.F. V.I.F. T.O. TEMP. BARRICADE 13. ALL WORK SHALL BE EXECUTED IN A MANNER ACCEPTABLE TO THE TENANT. D2 REMOVE ANY (E) SALES AREA & NON -SALES AREA FIXTURES. DISPOSE OF OFF SITE. 20 V.I.F. (E) STANDPIPE LOCATION. NOTIFY ARCHITECT OF FINDINGS IMMEDIATELY 3/4" EXTERIOR GRADE PLYWOOD OVER 3 -5/8" 20 14. UNLESS NOTED OTHERWISE, THE GENERAL CONTRACTOR SHALL PROVIDE AND PAY ALL LABOR, MATERIALS EQUIPMENT, TOOLS, D3 REMOVE (E) FULL HEIGHT STOREFRONT WALLS SHOWN DASHED &ALL ASSOCIATED WIRING. TERMINATE WIRING BACK TO (E) PANEL D21 REMOVE (E) ELEC. PANLES. SEE ELEC. DEMO PLAN GA MTL. STUDS AT 16" O.C. SECURE TO EXISTING CONSTRUCTION EQUIPMENT, MACHINERY, TRANSPORTATION, PERMITS AND OTHER SERVICES AND FACILITIES NECESSARY FOR PROPER AND TIMELY EXECUTION OF WORK. D4 REMOVE (E) VINYL TILE AND BASE TO A SMOOTH CONCRETE FLOOR FINISH. ®2 REMOVE (E) WALL SHOWN DASHED & DISPOSE OFF -SITE BULKHEAD. G.C. TO REMOVE BARRICADE AT SUPPORTS, 15. THE TENANTS CONTRACTOR WARRANTS TO THE OWNER AND TO D5 REMOVE (E) DOOR & FRAME. DISPOSE OF OFF SITE. ®2 LANDLORD MALL COMMON AREA TILE FLOORING DURING CONSTRUCTION. AND PATCH & REPAIR (E) \ STUCCO & PAINT TO PROTECT (E) MATCH EXISTING. THE ARCHITECT THAT ALL MATERIALS AND EQUIPMENT FURNISHED TMAND D6 (E) COLUMN TO REMAIN CAREFULLY REMOVE (E) SURROUND TO REMAIN. PROTECT DURING CONSTRUCTION. V.I.F. EXACT LOCATION. 24 REMOVE SECTION OF (E) STUD WALL AS DIMENSIONED I % ANDETHAT ALL WORK WILL BE AS SPECIFIED FREE OF DEFECTS. D7 O REMOVE (E) SALES AREA CARPET & WOOD FLOORING NON -SALES AREA VCT & BASE TO FLOOR SLAB. CLEAN (E) CONC. FLOOR SLAB 13'-0- A.F.F. V.I.F. 16. FOR ALL WOOD MEMBER REQUIRED BY CODE TO BE FIRE TO ACCEPT (N) FINISH FLOORING. CONCRETE SHALL BE SMOOTH, LEVEL & FREE OF ANY DEPRESSIONS. ®2 (E) IMPACT RESISTANT STOREFI�ONT WINDOW TO REMAIN. T.O. VERT. SECTION OF� RETARDANT TREATED, PROVIDE PRESSURE IMPREGNATION WITH FIRE RETARDANT CHEMICALS TO PROVIDE UL PRS FIRE HAZARD D8 THROUGHOUT (E) SALES AREA REMOVE (E) GYP. BD. CEIUNGS & ALL ASSOCIATED SUPPORT WIRES/FRAMES; (E) LIGHTS; (E) SPEAKERS. ALL SPRINKLER HEADS & LIFE SAFETY DEVICES TO BE PROTECTED TO REMAIN FOR MODIFICATION. 26 REMOVE (E) ALARM PAD & ALL ASSOCIATED WIRING. TERMINATE WIRING BACK TO (E) PANEL \-3/4- BARRICADE CLASSIFICATION, ALL WOOD SHALL BE IDENTIFIED WITH A UL LABEL CERTIFYING THIS CLASSIFICATION AND FM DIAMOND. D9 (E) DEMISING WALL TO REMAIN. MAINTAIN ONE -HOUR SEPARATION TYP. PATCH /REPAIR AS NECESSARY. PROTECT DURING CONSTRUCTION. PROVIDE (N) TEMPORARY BARRICADE. SEE 4/A1 -1. EXTERIOR GRADE PLYWOOD, READY TO RECEIVE 17. ALL PENETRATIONS OF FIRE RESISTIVE FLOOR OR SHAFT WALLS SHALL BE PROTECTED BY MATERIALS AND INSTALLATION 10 REMOVE (E) SINK & (E) COUNTERTOP. REMOVE (E) PLUMB. LINES BACK TO ORIGIN. SEE PLUMBING DEMO PLAN. X -RAY FLOOR & CORE DRILL FLOOR FOR (N) CASH WRAP OUTLETS. G.C. TO COORDINATE WORK WITH ADDITIONAL 3 -5/8" 20 GA GRAPHICS, OVER 3 -5/8. 20 GA MTL STUDS AT 16" O.C. DETAILS THAT CONFORMS TO UL STANDARDS FOR THROUGH PENETRATION FIRESTOP SYSTEMS. THE CONTRACTOR SHALL D11 O REMOVE E PHONE BOARD & DISPOSE OFF -SITE ( ) TENANT BELOW & EXISTING STRUCTURE. PATCH /REPAIR AND /OR REPLACE CEILING & FINISHES AS NECESSARY AT TENANT BELOW. MTL STUDS AT SECURE TO EXISTING BULKHEAD. G.C. TO REMOVE BARRICADE AT SUBMIT SHOP DRAWING DETAILS WHICH SHOW COMPLETE CONFORMANCE TO THE UL LISTING TO THE ARCHITECT. SUCH 12 (E) IMPACT RESISTANT DOORS TO REMAIN. 29 HATCHED AREA SHOWN INDICATES ALLOWABLE TOTAL AREA FOR CORE DRILL OF FLOOR. NOT ENTIRE 16" O.C. SECURE TO EXISTING SUPPORTS, AND PATCH & PAINT TO MATCH EXISTING. DRAWINGS SHALL BE AVAILABLE TO ANY CITY INSPECTORS. THE DRAWINGS SHALL BE SPECIFIC FOR EACH PENETRATION WITH ALL 13 SALVAGE (E) TRANSFORMER FROM ABOVE CEILING TO BE RELOCATED TO FLOOR. SEE A2 -0 FOR (N) LOCATION AREA NEED BE USED. V.I.F. EXACT LOCATION PRIOR TO CUTTING FLOOR WITH CASH WRAP VENDOR & ITSUGAR CPM.. BULKHEAD. G.C. TO REMOVE / / (E) MALL COMMON VARIABLES DEFINED. D14 O SEE M.E.P. DRAWINGS FOR EXTENT OF M.E.P. DEMOLITION. 30 ® CAREFULLY REMOVE E &. . . () EXTERIOR AWNINGS FRAME AND RETURN TO LANDLORD TYP OF 5 BARRICADE AT SUPPORTS, AND 61-O " / AREA 18. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING INTEGRITY OF RATED PARTITIONS & STRUCTURE PARTICULARLY WHERE PENETRATED BY VARIOUS TRADES AND SERVICES. 15 SALVAGE ANY (E) FIRE EXTINGUISHER FOR RE -USE. SEE FLOORPLAN FOR NEW LOCATIONS. VERIFY IF OPERATIONAL & PATCH & REPAIR (E) STUCCO & / / / G.C. TO PROVIDE INDOOR/ TESTED. REPLACE & TEST AS NECESSARY. // OUTDOOR CARPET WHERE METAL TRACK & SLOTS BEAR ON 19 THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE FINAL CLEAN D16 REMOVE (E) WINDOW & DISPOSE OF SITE. SALVAGE (E) MARBLE TO RE -USE FOR (N) SCOPE. MATCH / (E) MALL TILE FLOOR. REPAIR FLOOR UP OF THE ENTIRE PREMISES TO INCLUDE BY NOT LIMITED TO FLOORS, MILLWORK, FIXTURES, ETC. FOLLOWING THE INSTALLATION 17 (E) STEEL POSTS, BOTH VERTICAL & HORIZONTAL, IN (E) STOREFRONT TO REMAIN // AS NECESSARY AFTER REMOVAL OF THE MILLWORK. D18 REMOVE (E) STEEL POSTS, BOTH VERTICAL & HORIZONTAL IN SAID BAY & DISPOSE OFF -SITE — — — — — — 0' -0" A.F.F. V.I.F. E FINISH FLOOR DEMOLITION PLAN GENERAL NOTES SCALE: 3 DEMOLITION PLAN KEY NOTES SCALE: A BARRICADE SECTION SCALE: 1 1 O iv-B NO.: 11025 =DRAWN /CHECKED BY: _CML /DZK SCALE: � AS NOTED ISSUE FOR: PERMIT 09/14/11 00 C ("� CD a) I d- Q ON co i n _O :3 LL_ in c 1 v N C X - l� Q p W (U d (u co 3 r 0 cd z as N On J Q c/) A `° F— -C U (/) :3 n=n,, U W H 01 U -C u Q 0 Q mg O W M LL Q p M z J W r c:) �- M W (y) °z W > J � U) Q L L Z � w O W w 1.. C/) Q O cq C.5 (n z N Oro z ^ =�O Lli AUG 1. �Gttr .•y0 ,• ,�..��.G�S SHEET N0: Al -1 TITLE: DEMOLITION PLAN