Loading...
11-516-010Ln EXG ROOF DECK 3E ROOF DECK W3E ROOF DECK EXG ROOF 20 HOLD GYP BD 1/2" ROOF 203 ROOF STRUCTURE 7 777 FROM ROOF DECK. DO STRUCTURE STRUCTURE NOT ATTACH TO TRACK J T I.L-1- _7777 .. .. ... ...... ....... CD A C) ATTACH MTL ATTACH MTL _____X ATTACH MTL C14 TRACK TO TRACK TO TRACK TO ROOF DECK ROOF DECK Ln ROOF DECK 1 7 WALL N EL (BOTH SIDES) 01 twtL' RUN STUDS UP 1 RUN STUDS UP META1,L'GY,SUM BD'FURRING RUN STUDS UP E ALONG SIDES OF ALONG SIDES O S�LSUSPENDED ROM ROOF ALONG SIDES OF F7 ROOF STRUCTURE. ROOF STRUCTURE. STRUCTURE W/ZNGER ROOF STRUCTURE. E HOLD 1/2- SHORT PROVIDE CROSS WIRES ig 2 0 L) ' 4" (BOTH PROVIDE CROSS E OF ROOF DECK BRACING FOR IDES) BRACING FOR STABILITY STABILITY TO ALLOW FOR MOVEMENT. PROVIDE CROSS BRACING FOR A STABILITY 5/5" TYPE "X" GYP BD 5/8" TYPE "X" GYP BD 1__ m s. 0,0 _jk! 1,4*wpi 1 �f N w9w 41*900,111 41, 1 # ,*k • L ROOF DECK— al ININ DIN TSK QUEUING ENTRY-VE511BUL T0, ILET l I T01 ALCOVE C14 5/8" FIRE RETARDANT N --5/8 FIRE RETARDANT PL0" i'I YWOOD LYWOOD 5 a CEMENTITIOUS BOARD 5/8" CEMENTITIOUS BOARD ANCHOR ANCHOR MTL 5/8- CEMENTITIOUS BOARD ANCHOR MTTL —5 CEMENTITIOUS BOARD MTL /8 ANCHOR MTL TRACK TO CONC TRACK TO,,CONC.',:,. TRACK TO.CON6- TRACK TO,,CONC,,��- SLAB 0 1 G" 0 C SLAB @ 16" C SLAB 0 16 D.C. SLAB 0 16" O,C I - EXG ROOF DECK EXG ROOF STRUCTURE ATTACH MTL TRACK GYP BID CEILING 70 _109 ANCHOR MTL TRACK TO C SLAB 0 16" EXG GYP BID CEILING TO REMAIN 5/8" TYPE 'Y' GYP BD — ;,: --l'c ; • " ROOF DECK 3E r ,, "20 ROOF 20 , STRUCTURE % ITIT _T A- r ATTACH MTL G" BLEE-S ' TRACK architecture - ofani'Aa • inijrdt sign ROOF DECK RUN STUDS UP ALONG SIDES OF ROOF STRUCTURE. PROVIDE CROSS BRACING FOR STABILITY METAL .GYPSUM BD,,FURRjNG PATRICK G. BLEES, ARCHITECT T'S SUSPENDED FROM -ROOF tlwuV STRUCTURE W/ HANGER 219 N.-2t:b ST., GbITE0 301 ,.WIRES '0'24" MINNEAPOLIS 1`�LN 5540't E:.... (6 2) 8'— 6 671 WALL CHANNEL :� PHON 1 FAX: (612) 338-2995 SUSPEND , ED ACOUSTIC TILE E—MAIL: info0cmarch.com CEILING, SEE REFLECTED CEILING' PLAN 5/8" TYPE 'Y' GYP BD CONSULTANTS: JAMES H. ART, PE T O_ ELF I TS WILLIAM F. THIESSE, PE 305 2ND ST NW, SUITE 105 5/8" FIRE RETARDANT FIRE RETARDANT NEW BRIGHTON, MN 55112 PLYWOOD PLYWOOD -2300 us PHONE: (651) 532 5/5" CEMENTITIOUS BOARD 5/8- CEMENTITIOUS BOARD J FAX: (651) 632-23137 ANCHOR MTL--,---- TRACK TO , CON SLAB 16 b.c. 4E f 4E 'r N �4E r4FN---\ "'I. 41 4E 1�i9 -0 20 k�g 20 20 2-1/2" MTL STUD 6" MTL STUD 2-1/2" MTL STUD 6" MTL STUD 2-1/2" MTL STUD V MTL STUD 2-1/2" MTL STUD D2 6" MTL STUD 2-1/2" MTL STUD E2 6- MTL STUD 2-1/2" MTL STUD F2 5" MTL STUD Al r 3-5/8" MTL STUD A3 8- MTL STUD B1 3-5/8" MTL STUD B3 8" MTL STUD C1 3-5/8" MTL STUD C3 8" MTL STUD D1 3-5/8" MTL STUD D3 8" MTL STUD E1 3-5/8" MTL STUD E3 8- MTL STUD F1 3-5/8" MTL STUD F3 8- MTL STUD ROOF DECK 3E Sim ROOF DECK Sim ROOF DECK 3E Sim EXG ROOF DECK 3E Sim EXG ROOF DECK 3E Sim EXG ROOF DECK 3E Sim ROOF 20 HOLD GYP BD 1/2" ROOF HOLD GYP BID 1/2" ROOF 20 HOLD GYP BD 1/2" EXG ROOF W2_0W EXG ROOF 20 HOLD GYP BID 1/2- EXG ROOF 20 FROM ROOF DECK. DO FROM ROOF DECK. DO FROM ROOF DECK. DO FROM ROOF DECK. DO STRUCTURE STRUCTURE STRUCTURE STRUCTURE STRUCTURE STRUCTURE % NOT ATTACH TO TRACK NOT ATTACH TO TRACK NOT ATTACH TO TRACK NOT ATTACH TO TRACK IT ATTACH MTL ATTACH ATTACH MTL-----. T V\ ATTACH MTL ATTACH ATTACH MTL I , . , TRACK TO TRACK TO TRACK TO TRACK TO TRACK TO lmp�um lu SUSPENDED ACOUSTIC TILE ROOF DECK ROOF DECK ROOF DECK ROOF DECK ROOF DECK Q ROOF DECK CEILING, SEE REFLECTED 114� � i,; F, METAL GYPSUM BID FURRING CEILING PLAN WALL., CHANNEL, T'S SUSPENDED FROM ROOF SEAL: 0 STRUCTURE W1 HANGER RUN STUDS WALL CHANNEL RUN STUDS UP METAL. GYPSUM BID FURRING RUN STUDS UP RUN STUDS UP RUN STUDS UP RUN STUDS UP 4 fj/ F ALONG SIDES OF METAL GYPSUM BD FURRING ALONG SIDES OF T'S, SUSPENDED FROM ROOF ALONG SIDES OF ALONG SIDES OF ALONG SIDES OF WIRES 0 24" D.C. ALONG SIDES 0 ROOF STRUCTURE. TW/ :HANGER ROOF STRUCTURE. ROOF STRUCTURE. 5/8%,TYPE�,�N* ,GYP BD ROOF STRUCTURE. ROOF STRUCTURE. ROOF STRUCTURE. STRUCTURE WALL CHANNEL T'S SUSPENDED FROM ROOF SHORT PROVIDE CROSS HOLD 12- SHORT PROVIDE CROSS HOLD 1/2 STRUCTURE W/ HANGER "Y FOR BRACING FOR lw� � � ­ll`�!,i, �! P. BRACING OF ROOF DECK OF ROOF DECK OF ROOF DECK 1� WIRES @ 24" O.C. + STABILITY STABILITY TO ALLOW FOR SUSPENDED ACOUSTIC TILE TO ALLOW FOR TO ALLOW FOR CEILING, SEE REFLECTED HOLD 1/2- SHORT WIRES 24",,�6.c. HOLD 1/2" SHORT TO ALLOW FOR SUSPENDED ACOUSTIC TILE OF ROOF DECK SUSPENDED ACOUSTIC TILE ---: ; SUSPENDED ACOUSTIC TILE CEILING, SEE REFLECTED MOVEMENT. MOVEMENT. C CEILING PLAN (BOTH SIDES) MOVEMENT. MOVEMENT. to c PROVIDE CROSS CEILING,' SEE REFLECTED CrILING: SEE REFLECTED PROVIDE CROSS PROVIDE CROSS PROVIDE CROSS =1!1� EILING PLAN (BOTH SIDES) ,'CEILING PLAN CEILING PLAN (BOTH SIDES) BRACING FOR BRACING FOR BRACING FOR BRACING FOR STABILITY _41.1 5/8" TYPE "X" GYP BD 5/8" TYPE -X" GYP BD STABILITY 5/8" TYPE "X- GYP BO 5/8" TYPE X GYP BD M AT TYPE "X" GYP 13D STABILITY �/8- TYPE "X" GYP BD STABILITY 0 00 COOLED TOILET 00 KITCHEN ENTRANCE POS KITCHEN OFFICE POS =0 DINING --5/8" MOLD RESISTANT 41, 14 1 � 'L� ` 11, FIRE RETARDANT FIRE RETARDANT _____5/8 04 GYP BD MOLD RESISTANT ---5/8 0 PLYWOOD PLYWOOD GYP BD ID--5/8" FIRE RETARDANT —5/8" CEMENTITIOUS BOARD CEMENTITIOUS BOARD 5/8" CEMENTITIOUS BOARD PLYWOOD 5/8" CEMENTITIOUS BOARD 5/8 u 0, -a 1 0 l ANCHOR MTL 5/8" CEMENTITIOUS BOARD ANCHOR MTL S.• 5/8" CEMENTITIOUS BOARD ANCHOR MTL--i-" ANCHOR MTL ANCHOR MTL TRACK TO�T,C( TRACK TO, QONC,i,,T, TRACK TO.CONC, Lo TRACK TO CONC TRACK TO CONC SLAB @ 16" O.C. 7, SLAB @ 16" "to. C �­J SLAB @ 16',0:C. SLAB @ 1 SLAB 0 16" O,C, 4E �4E N f 4F `v- 4E 20 _01 20 'A, 20 2-1/2" MTL STUD G2 6" MTL STUD 2-1/2" MTL STUD H2 6" MTL STUD 2-1/2" MTL STUD J2 6" MTL STUD 2-1/2" MTL STUD K2 G" MTL STUD 2-1/2" MTL STUD L2 6" MTL STUD 3-5/8" MTL STUD G3 8" MTL STUD H1 3-5/8" MTL STUD H3 8" MTL STUD J1 3-5/8" MTL STUD J3 8" MTL STUD K1 3-5/8" MTL STUD K3 8" MTL STUD L1 3-5/8" MTL STUD L3 8" MTL STUD Sim � 3E Sim Sim Sim ROOF DECK _3E� ROOF DECK K3E Sim EXG ROOF DECK ROOF DECK 3E EXG ROOF DECK SE "20 20 HOLD GYP BD 1/2" 20 HOLD GYP BD 1/2" 20 ROOF EXG ROOF ROOF EXG ROOF ROOF FROM ROOF DECK, DO . . ..... FROM ROOF DECK. DO STRUCTURE STRUCTURE STRUCTURE NOT ATTACH TO TRACK STRUCTURE NOT ATTACH TO TRACK STRUCTURE ATTACH MTL� ATTACH MTL--------- % ATTACH MTL ATTACH MTL __x //_ , / ! , ATTACH MTL TRACK TO TRACK TO TRACK TO TRACK TO V.� TRACK TO Pnnp npry ROOF DECK ROOF DECK ROOF DECK onr)c - I 111,q: I . 0 METAL GYPSUM BD FURRING 01 T'S SUSPENDED FROM ROOF C) STRUCTURE W/ HANGER RUN STUDS UP RUN STUDS UP RUN STUDS UP--------/ RUN STUDS UP --------/: RUN STUDS UP WIRES 4) 24" O.C. ALONG SIDES OF q, ALONG SIDES OF ALONG SIDES OF ALONG SIDES OF ALONG SIDES OF ROOF STRUCTURE. 0 ROOF STRUCTURE. ROOF STRUCTURE. ROOF STRUCTURE. ROOF STRUCTURE. WA PROVIDE CROSS PROVIDE CROSS HOLD 1/2" SHORT HOLD 1/2" SHORT PROVIDE CROSS ILL CHANNEL BRACING FOR BRACING FOR OF ROOF DECK OF ROOF DECK BRACING FOR �—SUSPENDED ACOUSTIC TILE SUSPENDED ACOUSTIC TILE T71 SUSPENDED ACOUSTIC TILE SUSPENDED ACOUSTIC TILE — SUSPENDED ACOUSTIC TILE STABILITY STABILITY STABILITY CEILING, SEE REFLECTED TO ALLOW FOR =Zll�_CEILING, SEE REFLECTED TO ALLOW FOR CEILING,' REFLECTED CEILING, SEE REFLECTED CEILING'.ISEE REFLECTED MOVEMENT. MOVEMENT. CEILING PLAN (BOTH SIDES) CEILING PLAN (BOTH SIDES) PROVIDE CROSS CEILING PLAN PROVIDE CROSS CEILING PLAN (BOTH SIDES) CEILING PLAN (BOTH SIDES) A BRACING FOR BRACING FOR h.i STABILITY 5/8" TYPE "X" GYP BD STABILITY 5/8" TYPE "X- GYP 80 10 20 CD 0 I 00 KITCHEN HOOD 91-TCH—EN so KINHLN DINING KITCHEN so OFFICE BAR KITCHEN KI FIRE RETARDANT FIRE RETARDANT 5/8" FIRE RETARDANT 5/8" FIRE RETARDANT 5/8 5/8 PLYWOOD PLYWOOD PLYWOOD FIRE RETARDANT PLYWOOD 0 PLYWOOD 0,j cy, le, 3c 5/8" CEMENTITIOUS BOARD 5/8" CEMENTITIOUS BOARD. 5/8" CEMENTITIOUS BOARD 5/8" CEMENTITIOUS BOARD. �:�5/8" CEMENTITIOUS BOARD 49" AT MOP SINK r. TRACK TO ANCHOR MTL ANCHOR MTL' ANCHOR MTL ---�' ANCHOR MTL ANCHOR MTL TRACK TO CONC TRACK TO CONC io TRACK TO- CONCA�,.,­ CONC TRACK TO.CON61� c14 , �` SLAB 9) 16" O.C. SLAB 0 16""10,C. C, SLAB 8 16" C SLAB QP 16'`"' 9�C. SLAB 16" D.C. J < `_4 E 4E�Y� 4E uo UO 20 0 c� tm 2-1/2" MTL STUD N2 I." MTL STUD 2-1/2" MTL STUD 02 6" MTL STUD 2-1/2" MTL STUD P2 6" MTL STUD 2-1/2" MTL STUD Q2 6" MTL STUD 2-1/2" MTL STUD R2 6• MTL STUD 3-5/8" MTL STUD N3 8' MTL STUD 3-5/8" MTL STUD 15" MTL STUD �? 3-5/8" MTL STUD 8" MTL STUD 3-5/8" MTL STUD Q3 8" MTL STUD R1 3-5/8" MTL STUD R3 8" MTL STUD (n cr, c, l En (A CL 0 tr In (0 0 IL v) z 4A WALL TYPES 1-11 Is sn SCALE BASED ON A �O SCALE 1 1/2 = i —o 30"X42" SHEET SIZE 0 i• —on SCALE BASED ON A 2 3/4" 2x WD FRAMING 30"X42" SHEET SIZE A202 COPYRIGHT PATRICK G. BLEES, AIA 2011 STRUCTURE AT EACH BRACE 3/8"0 BOLT THRU COLUMN AND ----- PROVIDE HILTI X—DNI 32 PBS15 0 S—O" O.C. (ICBO #1663) W/ 1/2" FRAMING (TOP & BOTTOM) 77 HSS 2 1/2" X 2 1/2" 3/16" X wl ATTACH MTL BRACING 0 4'-0" O.C. STEEL POST AT END OF WALL TRACK TO P8S15 @ 3'-0" D.C. AND 96" OC. CORE DRILL AND ROOF DECK TEKS ATTACHED * EA 16" EMBED 5" IN CONC SLAB GROUT -,, Et WALL.. 6ANN , ( 136TIJ.,SIDES) 4E CONNECTION - TYPICAL IN PLACE: W/ NON—SHRINK METAL GYPSUM BD 'FURRING " -2 IF GROUT T'S SUSPENDED FROM 'ROOF METAL GYPSUM BD'.FURRING RUN STUDS UP SEE WALL TYPES STRUCTUREL"W/ HANGER _:-T'S SUSPIENDED, FROM ROOF `STRUCTURE ALONG SIDES OF 7 1/2" 1 X CONTINUOUS SMOOTH FINISH BEECH TRIM WIRES *)24" 01�.`l' '6 W/, HANGER ROOF STRUCTURE. W/ 1/4 ROUND EDGES I. WIRES 6,24",O.C. (BOTH PROVIDE CROSS CN 2 X 4 FRT WOOD PLATE WALC"CHANNEL SIDES) BRACING FOR 2 X 4 FRT WOOD PLATE STABILITY i 1 X 4 CONTINUOUS SMOOTH FINISHED BEECH TRIM n-; SUSPENDED ACOUSTIC TILE MTL TRACK 1 /2" (T Yp.) 1 X 4 CONTINUOUS SMOOTH FINISHED BEECH TRIM CEILING; SEE REFLECTED 0i Pi 1 X 4 CONTINUOUS SMOOTH FINISHED 0 MTL TRACK CEILING PLAN 5/8" TYPE -X- GYP BD � BEECH TRIM WC1 WC1 ININ DIN TSK QUEUING ENTRY-VE511BUL T0, ILET l I T01 ALCOVE C14 5/8" FIRE RETARDANT N --5/8 FIRE RETARDANT PL0" i'I YWOOD LYWOOD 5 a CEMENTITIOUS BOARD 5/8" CEMENTITIOUS BOARD ANCHOR ANCHOR MTL 5/8- CEMENTITIOUS BOARD ANCHOR MTTL —5 CEMENTITIOUS BOARD MTL /8 ANCHOR MTL TRACK TO CONC TRACK TO,,CONC.',:,. TRACK TO.CON6- TRACK TO,,CONC,,��- SLAB 0 1 G" 0 C SLAB @ 16" C SLAB 0 16 D.C. SLAB 0 16" O,C I - EXG ROOF DECK EXG ROOF STRUCTURE ATTACH MTL TRACK GYP BID CEILING 70 _109 ANCHOR MTL TRACK TO C SLAB 0 16" EXG GYP BID CEILING TO REMAIN 5/8" TYPE 'Y' GYP BD — ;,: --l'c ; • " ROOF DECK 3E r ,, "20 ROOF 20 , STRUCTURE % ITIT _T A- r ATTACH MTL G" BLEE-S ' TRACK architecture - ofani'Aa • inijrdt sign ROOF DECK RUN STUDS UP ALONG SIDES OF ROOF STRUCTURE. PROVIDE CROSS BRACING FOR STABILITY METAL .GYPSUM BD,,FURRjNG PATRICK G. BLEES, ARCHITECT T'S SUSPENDED FROM -ROOF tlwuV STRUCTURE W/ HANGER 219 N.-2t:b ST., GbITE0 301 ,.WIRES '0'24" MINNEAPOLIS 1`�LN 5540't E:.... (6 2) 8'— 6 671 WALL CHANNEL :� PHON 1 FAX: (612) 338-2995 SUSPEND , ED ACOUSTIC TILE E—MAIL: info0cmarch.com CEILING, SEE REFLECTED CEILING' PLAN 5/8" TYPE 'Y' GYP BD CONSULTANTS: JAMES H. ART, PE T O_ ELF I TS WILLIAM F. THIESSE, PE 305 2ND ST NW, SUITE 105 5/8" FIRE RETARDANT FIRE RETARDANT NEW BRIGHTON, MN 55112 PLYWOOD PLYWOOD -2300 us PHONE: (651) 532 5/5" CEMENTITIOUS BOARD 5/8- CEMENTITIOUS BOARD J FAX: (651) 632-23137 ANCHOR MTL--,---- TRACK TO , CON SLAB 16 b.c. 4E f 4E 'r N �4E r4FN---\ "'I. 41 4E 1�i9 -0 20 k�g 20 20 2-1/2" MTL STUD 6" MTL STUD 2-1/2" MTL STUD 6" MTL STUD 2-1/2" MTL STUD V MTL STUD 2-1/2" MTL STUD D2 6" MTL STUD 2-1/2" MTL STUD E2 6- MTL STUD 2-1/2" MTL STUD F2 5" MTL STUD Al r 3-5/8" MTL STUD A3 8- MTL STUD B1 3-5/8" MTL STUD B3 8" MTL STUD C1 3-5/8" MTL STUD C3 8" MTL STUD D1 3-5/8" MTL STUD D3 8" MTL STUD E1 3-5/8" MTL STUD E3 8- MTL STUD F1 3-5/8" MTL STUD F3 8- MTL STUD ROOF DECK 3E Sim ROOF DECK Sim ROOF DECK 3E Sim EXG ROOF DECK 3E Sim EXG ROOF DECK 3E Sim EXG ROOF DECK 3E Sim ROOF 20 HOLD GYP BD 1/2" ROOF HOLD GYP BID 1/2" ROOF 20 HOLD GYP BD 1/2" EXG ROOF W2_0W EXG ROOF 20 HOLD GYP BID 1/2- EXG ROOF 20 FROM ROOF DECK. DO FROM ROOF DECK. DO FROM ROOF DECK. DO FROM ROOF DECK. DO STRUCTURE STRUCTURE STRUCTURE STRUCTURE STRUCTURE STRUCTURE % NOT ATTACH TO TRACK NOT ATTACH TO TRACK NOT ATTACH TO TRACK NOT ATTACH TO TRACK IT ATTACH MTL ATTACH ATTACH MTL-----. T V\ ATTACH MTL ATTACH ATTACH MTL I , . , TRACK TO TRACK TO TRACK TO TRACK TO TRACK TO lmp�um lu SUSPENDED ACOUSTIC TILE ROOF DECK ROOF DECK ROOF DECK ROOF DECK ROOF DECK Q ROOF DECK CEILING, SEE REFLECTED 114� � i,; F, METAL GYPSUM BID FURRING CEILING PLAN WALL., CHANNEL, T'S SUSPENDED FROM ROOF SEAL: 0 STRUCTURE W1 HANGER RUN STUDS WALL CHANNEL RUN STUDS UP METAL. GYPSUM BID FURRING RUN STUDS UP RUN STUDS UP RUN STUDS UP RUN STUDS UP 4 fj/ F ALONG SIDES OF METAL GYPSUM BD FURRING ALONG SIDES OF T'S, SUSPENDED FROM ROOF ALONG SIDES OF ALONG SIDES OF ALONG SIDES OF WIRES 0 24" D.C. ALONG SIDES 0 ROOF STRUCTURE. TW/ :HANGER ROOF STRUCTURE. ROOF STRUCTURE. 5/8%,TYPE�,�N* ,GYP BD ROOF STRUCTURE. ROOF STRUCTURE. ROOF STRUCTURE. STRUCTURE WALL CHANNEL T'S SUSPENDED FROM ROOF SHORT PROVIDE CROSS HOLD 12- SHORT PROVIDE CROSS HOLD 1/2 STRUCTURE W/ HANGER "Y FOR BRACING FOR lw� � � ­ll`�!,i, �! P. BRACING OF ROOF DECK OF ROOF DECK OF ROOF DECK 1� WIRES @ 24" O.C. + STABILITY STABILITY TO ALLOW FOR SUSPENDED ACOUSTIC TILE TO ALLOW FOR TO ALLOW FOR CEILING, SEE REFLECTED HOLD 1/2- SHORT WIRES 24",,�6.c. HOLD 1/2" SHORT TO ALLOW FOR SUSPENDED ACOUSTIC TILE OF ROOF DECK SUSPENDED ACOUSTIC TILE ---: ; SUSPENDED ACOUSTIC TILE CEILING, SEE REFLECTED MOVEMENT. MOVEMENT. C CEILING PLAN (BOTH SIDES) MOVEMENT. MOVEMENT. to c PROVIDE CROSS CEILING,' SEE REFLECTED CrILING: SEE REFLECTED PROVIDE CROSS PROVIDE CROSS PROVIDE CROSS =1!1� EILING PLAN (BOTH SIDES) ,'CEILING PLAN CEILING PLAN (BOTH SIDES) BRACING FOR BRACING FOR BRACING FOR BRACING FOR STABILITY _41.1 5/8" TYPE "X" GYP BD 5/8" TYPE -X" GYP BD STABILITY 5/8" TYPE "X- GYP BO 5/8" TYPE X GYP BD M AT TYPE "X" GYP 13D STABILITY �/8- TYPE "X" GYP BD STABILITY 0 00 COOLED TOILET 00 KITCHEN ENTRANCE POS KITCHEN OFFICE POS =0 DINING --5/8" MOLD RESISTANT 41, 14 1 � 'L� ` 11, FIRE RETARDANT FIRE RETARDANT _____5/8 04 GYP BD MOLD RESISTANT ---5/8 0 PLYWOOD PLYWOOD GYP BD ID--5/8" FIRE RETARDANT —5/8" CEMENTITIOUS BOARD CEMENTITIOUS BOARD 5/8" CEMENTITIOUS BOARD PLYWOOD 5/8" CEMENTITIOUS BOARD 5/8 u 0, -a 1 0 l ANCHOR MTL 5/8" CEMENTITIOUS BOARD ANCHOR MTL S.• 5/8" CEMENTITIOUS BOARD ANCHOR MTL--i-" ANCHOR MTL ANCHOR MTL TRACK TO�T,C( TRACK TO, QONC,i,,T, TRACK TO.CONC, Lo TRACK TO CONC TRACK TO CONC SLAB @ 16" O.C. 7, SLAB @ 16" "to. C �­J SLAB @ 16',0:C. SLAB @ 1 SLAB 0 16" O,C, 4E �4E N f 4F `v- 4E 20 _01 20 'A, 20 2-1/2" MTL STUD G2 6" MTL STUD 2-1/2" MTL STUD H2 6" MTL STUD 2-1/2" MTL STUD J2 6" MTL STUD 2-1/2" MTL STUD K2 G" MTL STUD 2-1/2" MTL STUD L2 6" MTL STUD 3-5/8" MTL STUD G3 8" MTL STUD H1 3-5/8" MTL STUD H3 8" MTL STUD J1 3-5/8" MTL STUD J3 8" MTL STUD K1 3-5/8" MTL STUD K3 8" MTL STUD L1 3-5/8" MTL STUD L3 8" MTL STUD Sim � 3E Sim Sim Sim ROOF DECK _3E� ROOF DECK K3E Sim EXG ROOF DECK ROOF DECK 3E EXG ROOF DECK SE "20 20 HOLD GYP BD 1/2" 20 HOLD GYP BD 1/2" 20 ROOF EXG ROOF ROOF EXG ROOF ROOF FROM ROOF DECK, DO . . ..... FROM ROOF DECK. DO STRUCTURE STRUCTURE STRUCTURE NOT ATTACH TO TRACK STRUCTURE NOT ATTACH TO TRACK STRUCTURE ATTACH MTL� ATTACH MTL--------- % ATTACH MTL ATTACH MTL __x //_ , / ! , ATTACH MTL TRACK TO TRACK TO TRACK TO TRACK TO V.� TRACK TO Pnnp npry ROOF DECK ROOF DECK ROOF DECK onr)c - I 111,q: I . 0 METAL GYPSUM BD FURRING 01 T'S SUSPENDED FROM ROOF C) STRUCTURE W/ HANGER RUN STUDS UP RUN STUDS UP RUN STUDS UP--------/ RUN STUDS UP --------/: RUN STUDS UP WIRES 4) 24" O.C. ALONG SIDES OF q, ALONG SIDES OF ALONG SIDES OF ALONG SIDES OF ALONG SIDES OF ROOF STRUCTURE. 0 ROOF STRUCTURE. ROOF STRUCTURE. ROOF STRUCTURE. ROOF STRUCTURE. WA PROVIDE CROSS PROVIDE CROSS HOLD 1/2" SHORT HOLD 1/2" SHORT PROVIDE CROSS ILL CHANNEL BRACING FOR BRACING FOR OF ROOF DECK OF ROOF DECK BRACING FOR �—SUSPENDED ACOUSTIC TILE SUSPENDED ACOUSTIC TILE T71 SUSPENDED ACOUSTIC TILE SUSPENDED ACOUSTIC TILE — SUSPENDED ACOUSTIC TILE STABILITY STABILITY STABILITY CEILING, SEE REFLECTED TO ALLOW FOR =Zll�_CEILING, SEE REFLECTED TO ALLOW FOR CEILING,' REFLECTED CEILING, SEE REFLECTED CEILING'.ISEE REFLECTED MOVEMENT. MOVEMENT. CEILING PLAN (BOTH SIDES) CEILING PLAN (BOTH SIDES) PROVIDE CROSS CEILING PLAN PROVIDE CROSS CEILING PLAN (BOTH SIDES) CEILING PLAN (BOTH SIDES) A BRACING FOR BRACING FOR h.i STABILITY 5/8" TYPE "X" GYP BD STABILITY 5/8" TYPE "X- GYP 80 10 20 CD 0 I 00 KITCHEN HOOD 91-TCH—EN so KINHLN DINING KITCHEN so OFFICE BAR KITCHEN KI FIRE RETARDANT FIRE RETARDANT 5/8" FIRE RETARDANT 5/8" FIRE RETARDANT 5/8 5/8 PLYWOOD PLYWOOD PLYWOOD FIRE RETARDANT PLYWOOD 0 PLYWOOD 0,j cy, le, 3c 5/8" CEMENTITIOUS BOARD 5/8" CEMENTITIOUS BOARD. 5/8" CEMENTITIOUS BOARD 5/8" CEMENTITIOUS BOARD. �:�5/8" CEMENTITIOUS BOARD 49" AT MOP SINK r. TRACK TO ANCHOR MTL ANCHOR MTL' ANCHOR MTL ---�' ANCHOR MTL ANCHOR MTL TRACK TO CONC TRACK TO CONC io TRACK TO- CONCA�,.,­ CONC TRACK TO.CON61� c14 , �` SLAB 9) 16" O.C. SLAB 0 16""10,C. C, SLAB 8 16" C SLAB QP 16'`"' 9�C. SLAB 16" D.C. J < `_4 E 4E�Y� 4E uo UO 20 0 c� tm 2-1/2" MTL STUD N2 I." MTL STUD 2-1/2" MTL STUD 02 6" MTL STUD 2-1/2" MTL STUD P2 6" MTL STUD 2-1/2" MTL STUD Q2 6" MTL STUD 2-1/2" MTL STUD R2 6• MTL STUD 3-5/8" MTL STUD N3 8' MTL STUD 3-5/8" MTL STUD 15" MTL STUD �? 3-5/8" MTL STUD 8" MTL STUD 3-5/8" MTL STUD Q3 8" MTL STUD R1 3-5/8" MTL STUD R3 8" MTL STUD (n cr, c, l En (A CL 0 tr In (0 0 IL v) z 4A WALL TYPES 1-11 Is sn SCALE BASED ON A �O SCALE 1 1/2 = i —o 30"X42" SHEET SIZE 0 ANCHOR MTL 3/8" FIRE RETARDANT TRACK TO CONC u PLYWOOD BEHIND WC1 TO SLAB 0 16" D.C. V MAKE WC1 FLUSH WITH GYP BD ABOVE 4E PATRICK G. BLEES, ARCHITECT 20 2-1/2" MTL STUD M2 6" MTL STUD 3-5/8" MTL STUD M3 8" MTL STUD MAY 20, 2011 DATE ISSUED AR93439 REG, NO. BUILDING STRUCTUr"AL SILC, TION 'Y T STRUCTURAL DECK METAL TRACK WITH 2—#10 TEKS ATTACHED 0 EA 16" O.C. STUD AS REO (ICBO 1 #1976) PROVIDE HILTI X—DNI 32 PBS15 0 3'-0" D.C. (ICBO #1663) W/ 1/2" PENETRATION INTO SLAB _.--vk--'---GYP BD TYP SLIP TRACK - TYPICAL 20 SCALE 1 1/2" = i• —on SCALE BASED ON A 2 3/4" 2x WD FRAMING 30"X42" SHEET SIZE A202 COPYRIGHT PATRICK G. BLEES, AIA 2011 STAGGER SIDES AT EACH BRACE 3/8"0 BOLT THRU COLUMN AND ----- PROVIDE HILTI X—DNI 32 PBS15 0 S—O" O.C. (ICBO #1663) W/ 1/2" FRAMING (TOP & BOTTOM) PENETRATION INTO SLAB HSS 2 1/2" X 2 1/2" 3/16" X METAL STUD DIAGONAL BRACING 0 4'-0" O.C. STEEL POST AT END OF WALL PROVIDE HILTI X—DNI 32 P8S15 @ 3'-0" D.C. AND 96" OC. CORE DRILL AND METAL TRACK WITH 2 —#10 TEKS ATTACHED * EA 16" EMBED 5" IN CONC SLAB GROUT 4E CONNECTION - TYPICAL IN PLACE: W/ NON—SHRINK -2 IF GROUT SEE WALL TYPES PLAN 7 1/2" 1 X CONTINUOUS SMOOTH FINISH BEECH TRIM 7 1/2" 1 X CONTINUOUS SMOOTH FINISH BEECH TRIM W/ 1/4 ROUND EDGES — W/ 1/4 ROUND EDGES CN 2 X 4 FRT WOOD PLATE 2 X 4 FRT WOOD PLATE r7 i 1 X 4 CONTINUOUS SMOOTH FINISHED BEECH TRIM n-; MTL TRACK 1 /2" (T Yp.) 1 X 4 CONTINUOUS SMOOTH FINISHED BEECH TRIM 0i Pi 1 X 4 CONTINUOUS SMOOTH FINISHED 0 MTL TRACK 04 BEECH TRIM WC1 WC1 00 5/8- TYPE 'Y' GYP BD 5/8" TYPE "X" GYP BD 'c 00 -1 3 5/8" MTL STUDS @ 16" D.C. 3 5/8" MTL STUDS @ 16" O,C, of 0 HSS 2 1/2" X 2 1/2" X 3/16" STEEL POST AT HSS 2 1/2" X 2 1/2" X 3/16" STEEL POST AT END OF WALL AND 96" OC. CORE DRILL AND i i END OF WALL AND 96" OC. CORE DRILL AND EMBED 5" IN CONC SLAB GROUT IN PLACE W/ EMBED 5" IN CONC SLAB GROUT IN PLACE W/ NON—SHRINK GROUT NON—SHRINK GROUT CEMENTITIOUS BOARD 5/8" CEMENTITIOUS BOARD ANCHOR METAL TRACK TO CONC SLAB @ 24" D.C. ANCHOR METAL TRACK TO CONC SLAB 9 2*" O.C. L __; 8'-2" HEIGHT 1D 5'-0" HEIGHT Fi1_4'—O" HEIGHT SEE PLANS FOR WALL INSU-ATION LOCATIONS. SEE FINISH SCHEDULE FOR FLOOR AND BASE. VERIFY WALL FINISHES WITH FINISH PLAN AND DETAILS. ANCHOR MTL 3/8" FIRE RETARDANT TRACK TO CONC u PLYWOOD BEHIND WC1 TO SLAB 0 16" D.C. V MAKE WC1 FLUSH WITH GYP BD ABOVE 4E PATRICK G. BLEES, ARCHITECT 20 2-1/2" MTL STUD M2 6" MTL STUD 3-5/8" MTL STUD M3 8" MTL STUD MAY 20, 2011 DATE ISSUED AR93439 REG, NO. BUILDING STRUCTUr"AL SILC, TION 'Y T STRUCTURAL DECK METAL TRACK WITH 2—#10 TEKS ATTACHED 0 EA 16" O.C. STUD AS REO (ICBO 1 #1976) PROVIDE HILTI X—DNI 32 PBS15 0 3'-0" D.C. (ICBO #1663) W/ 1/2" PENETRATION INTO SLAB _.--vk--'---GYP BD TYP SLIP TRACK - TYPICAL 20 SCALE 1 1/2" = i• —on SCALE BASED ON A DRAM BY: 30"X42" SHEET SIZE A202 COPYRIGHT PATRICK G. BLEES, AIA 2011 STAGGER SIDES AT EACH BRACE \4 ----- PROVIDE HILTI X—DNI 32 PBS15 0 S—O" O.C. (ICBO #1663) W/ 1/2" PENETRATION INTO SLAB 45^ 25 ga, 3 5/81, METAL STUD DIAGONAL BRACING 0 4'-0" O.C. GYP BID PROVIDE HILTI X—DNI 32 P8S15 @ 3'-0" D.C. (ICBO #1663) METAL TRACK WITH 2 —#10 TEKS ATTACHED * EA 16" O.C. STUD AS REQ (ICBO #1976) 4E CONNECTION - TYPICAL SCALE 1 1/20 _ 1• —ow SCALE BASED ON A 30"X42" SHEET SIZE BUFFALO WILD WINGS CONSTRUCTION DEPARTMENT 5500 WAYZATA BLVD., STE 1600 MINNEAPOLIS, MN 55416 PHONE (952) 593-9943 FAX (152) 593-9797 THE SHOPS AT SUNSET PLACE 5701 SUNSET DRIVE, #1313A SOUTH MIAMI, FL 33143 FRANCHISEE: SETH DEKANTER EMAIL, aethelek0hatmail.cem FRANCHISE STORE SHEET TITLE: INTERIOR CONSTRUCTION DETAILS PERMIT SET REVISIONS: NO: DATE: BY: PROJECT N0: 11136,001 DRAM BY: EJN A202 COPYRIGHT PATRICK G. BLEES, AIA 2011