Loading...
04-04-052PLUMBING FIXTURE SCHEDULE TAG DESCRIPTION MINIMUM CONNECTION SIZE, U.N.O. REMARKS WASTE VENT CW -_ HW WC -1 WATER CLOSET 4" 2" 1" ACCESS PANEL FLOOR MOUNT, FLUSH VALVE WC -2 WATER CLOSET — HANDICAP 4" 2" 1" FLOOR MOUNT, FLUSH VALVE WC-3 WATER CLOSET— CHILDREN 4" 2" 1" -- FLOOR MOUNT, FLUSH VALVE UR -1 URINAL 2" 2" 0 PRV PRESSURE REDUCING VALVE UR -2 URINAL — HANDICAP 2" 211 1" °- 00 L-1 LAVATORY 136ty 11/Z" }t" J�" INTEGRAL BOWL W /COUNTER TOP. L -2 LAVATORY 11/2 11/2 }i "2" u WALL HUNG SH -1 SHOWER 2" 2" COLD WATER .Vj STORM DRAIN SH -2 SHOWER — HANDICAP 2" 2" DN DOWN T & P SS -1 SERVICE SINK 3" 2" Xi" Y2" JUICE BAR SS -2 MOP SINK 3" 21' UR U ue1j00 JANITORS CLOSET DF -1 ELECT. WATER COOLER - HANDICAP 2" 2" Y2" �— VENT THROUGH ROOF S -1 3— COMPARTMENT SINK 1 %" OW) — }t2" Y2" (2) FAUCETS REQUIRED S -2 PREP SINK 1%- (IW) — y2" X" FLOW SWITCH S -3 DROP IN SINK 1W OW) i%11 k2" X11 GCO S -5 HAND SINK 1 " 11f2 Xz" X11 - NOTE ALL PLUMBING FIXTURES SHALL COMPLY WITH FBC PLUMBING TABLE 604.4 U W 0 6t :j UOn �j HD - 0 v � 0 OU Oy AFG JUc7 HWR HOT WATER RETURN_ AP ACCESS PANEL J INVERT ELEVATION B/F BELOW FLOOR IW INDIRECT WASTE BFP BACKFLOW PREVENTER J 0 •] LAVATORY B G BELOW GRADE � 1000 BTU /HR BOP 0 V E} U u � 0 0 d 0 PRV PRESSURE REDUCING VALVE q CENTER. LINE 000 U O U -00 CONDENSATE DRAIN 00 REDUCED PRESSURE ZONE BACKFLOW PREVENTER CO CLEANOUT 0 SANITARY CONN +� u SHOWER CONT CONTINUATION SOV u U ti V CUBIC FEET PER HOUR 0 SPRINKLER CW COLD WATER .Vj STORM DRAIN D DRAIN TP TRAP PRIMER DN DOWN T & P TEMPERATURE &PRESSURE EL I ELEVATION TSW TAMPER SWITCH UOU0 EMERGENCY STORM DRAIN TYP TYPICAL - EWC ELECTRIC WATER COOLER UR U ue1j00 FCO U006U JoDU VENT FD FLOOR DRAIN VTR VENT THROUGH ROOF FF FINISHED FLOOR ABBREVIATIONS JJJJ A/C ABOVE CEILING HD HUB DRAIN AFF ABOVE FINISHED FLOOR HW HOT WATER AFG ABOVE FINISHED GRADE HWR HOT WATER RETURN_ AP ACCESS PANEL IE INVERT ELEVATION B/F BELOW FLOOR IW INDIRECT WASTE BFP BACKFLOW PREVENTER LAV LAVATORY B G BELOW GRADE MBH 1000 BTU /HR BOP BOTTOM OF PIPE OD EMERGENCY ROOF DRAIN BV BALANCING VALVE PRV PRESSURE REDUCING VALVE q CENTER. LINE RD ROOF DRAIN CD CONDENSATE DRAIN RPBP REDUCED PRESSURE ZONE BACKFLOW PREVENTER CO CLEANOUT S SANITARY CONN CONNECTION SHO SHOWER CONT CONTINUATION SOV SHUTOFF VALVE CFH CUBIC FEET PER HOUR SP SPRINKLER CW COLD WATER ST STORM DRAIN D DRAIN TP TRAP PRIMER DN DOWN T & P TEMPERATURE &PRESSURE EL I ELEVATION TSW TAMPER SWITCH EST EMERGENCY STORM DRAIN TYP TYPICAL - EWC ELECTRIC WATER COOLER UR URINAL FCO FLOOR CLEANOUT V VENT FD FLOOR DRAIN VTR VENT THROUGH ROOF FF FINISHED FLOOR W WASTE FFE FINISHED FLOOR ELEVATION WC WATER CLOSET FS FLOOR SINK- W.C. WATER COLUMN FSW FLOW SWITCH WCO WALL CLEANOUT G GAS -- LOW PRESSURE WHA I WATER HAMMER ARRESTOR GCO GRADE CLEANOUT UNO UNLESS NOTED OTHERWISE HB HOSE BIBS WALL HYDRANT - - ADDITIONAL PLUMBING FIXTURE SCHEDULE EQUIP. NO. DRAINAGE ABOVE FLOOR Oc DRAIN WITH TRAP MINIMUM CONNECTION SIZE, U.N.O. TAG FIXTURE DESCRIPTION MODEL NUMBER GAS — LOW PRESSURE ( UP TO 14" WC) - RISER UP (ELBOW) — — — — — — VENT -- BRANCH CONNECTION — BOTTOM TEMP, COLD WATER WASTE VENT CW HW HB55 HOSE AND SUPPLY BOX STAINLESS STEEL HOSE BOX WITH WALL FLANGE AND DOOR, -'4" MALE HOSE THREAD, VACUUM BREAKER, VANDAL ACORN 81514" NO, DIRECTION OF PIPE SLOPE -� CHECK VALVE TEMP., PIPE CAP RESISTANT LOCKSHIELD, LOOSE KEY WHEEL HANDLE AND SCREWDRIVER STOP GATE VALVE PRESSURE GAUGE W/ SHUTOFF VALVE KW GLOBE VALVE WH WALL HYDRANT FREEZELESS, AUTOMATIC DRAINING TYPE WALL HYDRANT, VACUUM BREAKER, VALVE PLUNGER, LOOSE KEY, WOODFORD MODEL B65 0 0 040000 0 0 0000 STRAINER - BALANCING VALVE OF FLOOR DRAIN WITH TRAP FLUSH MOUNTING WALL BOX AND DOOR PRESSURE REDUCING VALVE 090 SHOWER VALVE HB HOSE BIBB WALL FAUCET W /VACUUM BREAKER, MALE HOSE THREAD, WHEEL HANDLE, VALVE STEM ASSEMBLY WOODFORD MODEL 24P 100 420 Wl 70' - DRAINAGE PRODUCT SCHEDULE 199 4.5" MIN 1 0 311 1 " A.O.SMITH BTH 199 Q3 FD -1 FLOOR DRAIN SEE SPECIFICATION SECTION 15400 WITH TRAP PRIMER J.R.SMITH 2005 —A 4" 2° 94% 199 FD -2 FLOOR DRAIN P BODY, FLANGE AND 12" DIAMETER HEAVY DUTY CAST IRON GRATE, SEDIMENT BUCKET WITH CAST IRON DEEP J.R.SMITH 2233 4" 2" Q WH -2 JUICE BAR 50 TRAP PRIMER 120' 70' 100% 9 208 3 3" 1%" FS -1 FLOOR SINK SEE SPECIFICATION SECTION 15400 WITH TRAP PRIMER J.R.SMITH 3100 2" CAST IRON BODY Y WITH FLANGE, FLASHING CLAMP WITH INTEGRAL GRAVEL STOP, ALUMINUM DOME, ADJUSTABLE RD ROOF DRAIN EXTENSION -FOR! SUMP RECEIVER, UNDERDECK CLAMP J.R.SMITH 1015 VARIES OD OVERFLOW DRAIN SAME AS ROOF' DRAIN EXCEPT DRAIN TO BE PROVIDED WITH ADJUSTABLE 4" HIGH OVERFLOW STANDPIPE J.R.SMITH 1070 VARIES HB HUB DRAIN HUB DRAIN SET 1" ABOVE FINISH FLOOR WITH LOOSE SET BAR GRATE -- 6" 3" GENERAL NOTES 1. CONTRACTOR SHALL PROVIDE PRICE BREAKOUT FOR WORK TO PROVIDE UNDERSLAB ROUGH —IN FOR 18 STUB -UPS AT TOILET AREAS. PROVIDE PRICE INFORMATION TO ARCHITECT, 2. THESE DRAWINGS ARE SCHEMATIC IN NATURE AND ARE NOT INTENDED TO SHOW ALL POSSIBLE CONDITIONS. IT IS INTENDED THAT A COMPLETE PLUMBING AND FIRE PROTECTION SYSTEM BE PROVIDED WITH ALL NECESSARY EQUIPMENT, APPURTENANCES AND CONTROLS COMPLETELY COORDINATED WITH ALL DISCIPLINES. ALL PARAMETERS GIVEN IN THESE DOCUMENTS SHALL BE STRICTLY CONFORMED TO. ANY ITEMS AND LABOR REQUIRED FOR A COMPLETE PLUMBING & FIRE PROTECTION SYSTEM IN ACCORDANCE WITH ALL APPLICABLE CODES, STANDARDS, LOCAL AUTHORITIES AND THESE CONTRACT DOCUMENTS SHALL BE FURNISHED WITHOUT INCURRING ANY ADDITIONAL COST TO THE OWNER. CAREFULLY REVIEW ALL CONTRACT DOCUMENTS AND THE DESIGN OF OTHER TRADES BEFORE PREPARING SHOP DRAWINGS. 3. COORDINATE ALL WORK WITH ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL TRADES. PIPE ROUTING SHOWN IS DIAGRAMMATIC. PROVIDE ALL OFFSETS, ETC., TO AVOID INTERFERENCE WITH EQUIPMENT, PIPING, DUCTWORK, LIGHTS, CONDUIT, STRUCTURAL MEMBERS, ETC. 4. COORDINATE ALL FLOOR PENETRATIONS WITH STRUCTURAL DRAWINGS. SET SLEEVES IN FLOORS AND WALLS AND ATTACHMENTS FOR HANGERS AS CONSTRUCTION PROGRESSES. COORDINATE THE EXACT SIZE AND LOCATION -.OF ALL SLEEVES WITH STRUCTURAL ENGINEER. ALL PENETRATIONS MUST BE SEALED AND HELD AS TIGHT TO COLUMNS OR WALLS AS POSSIBLE. 5. PROVIDE ACCESS PANELS FOR VALVES, SHOCK ABSORBERS, AND TRAP PRIMERS LOCATED ABOVE NON ACCESSIBLE CEILINGS, EXACT LOCATION MUST BE COORDINATED WITH ARCHITECTURAL DRAWINGS AND APPROVED BY ARCHITECT PRIOR TO INSTALLATION. 6. ALL PIPING SHALL BE CONCEALED INSIDE WALLS AND PIPE CHASES OR ABOVE CEILINGS. LOCATE ALL UTILITY SHUT —OFF VALVES WITHIN 1' -0" FROM ACCESS POINT. HOLD ALL OTHER PIPING ABOVE CEILING AS HIGH AS POSSIBLE. ALL DRAINAGE PIPING 4" AND LARGER SHALL SLOPE AT )9' PER FOOT AND 3" AND SMALLER AT Y4" PER FOOT MINIMUM UNLESS OTHERWISE NOTED. 7. COORDINATE ALL UNDERGROUND PIPING WITH ALL .STRUCTURAL CONDITIONS. REFER TO ARCHITECTURAL PLANS AND ELEVATIONS FOR LOCATION OF ALL PLUMBING FIXTURES. EXACT LOCATION OF ALL PLUMBING FIXTURES MUST BE VERIFIED IN FIELD PRIOR TO INSTALLATION. FINAL LOCATION SHALL BE AS DIRECTED BY ARCHITECT. 8. DO NOT RUN PIPING THROUGH ELECTRICAL ROOMS /CLOSETS OR ELEVATOR EQUIPMENT ROOMS. 9. ALL STRUCTURAL PENETRATIONS (SLEEVES, BLOCKOUTS, ETC,) ARE TO BE LOCATED AND COORDINATED IN THE FIELD BY THE CONTRACTOR IN RELATION TO THE REQUIREMENTS OF FINAL EQUIPMENT AND FIXTURES SELECTED. 10. PROVIDE AN EXPANSION JOINT OR FABRICATED EXPANSION LOOP ON ALL PIPING SYSTEMS THAT CROSS BUILDING EXPANSION JOINTS. 11. PROVIDE A VALVED BYPASS AT ALL WATER HEATERS FOR MAINTENANCE OF EQUIPMENT. 12. UPON COMPLETION OF THE PLUMBING SYSTEM, AND BEFORE PIPING IS COVERED UP, IT SHALL BE HYDROSTATICALLY TESTED AT 125 PSI FOR A MINIMUM OF TWO HOURS. ALL COMPONENTS WHICH MAY NOT BE RATED TO WITHSTAND THE TEST PRESSURE MUST BE ISOLATED AND PROTECTED FROM DAMAGES. COPIES OF THE TEST REPORT AND APPROVAL BY THE LOCAL INSPECTOR MUST BE SUBMITTED TO THE OWNER'S REPRESENTATIVE. 13. ALL PIPING MATERIALS EXPOSED WITHIN PLENUMS SHALL BE OF NONCOMBUSTIBLE OR SHALL HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 25 AND SMOKE DEVELOPED INDEX OF NOT MORE THAN 50 IN ACCORDANCE WITH ASTM 84. 14. ALL FLOOR DRAINS AND ALL FLOOR SINKS SHALL HAVE TRAP PRIMERS UNLESS LOCAL AHJ SPECIFICALLY PROHIBITS THEIR INSTALLATION. 15. SEE ARCHITECTURAL DRAWINGS FOR EXACT LOCATIONS OF ALL DRAINS. 16. GAS PIPING SHALL BE SCHEDULE 40 SEAMLESS BLACK STEEL WITH SCHEDULE 40 WELDING FITTINGS, LEGEND EQUIP. NO. DRAINAGE ABOVE FLOOR Oc DRAIN WITH TRAP FLOW GPM DRAINAGE BELOW FLOOR C RISER DOWN (ELBOW) G GAS — LOW PRESSURE ( UP TO 14" WC) - RISER UP (ELBOW) — — — — — — VENT -- BRANCH CONNECTION — BOTTOM TEMP, COLD WATER I BRANCH CONNECTION ° TOP J HOT WATER (1207) FLUE DIRECTION OF FLOW - -- HOT WATER RETURN (1207) NO, DIRECTION OF PIPE SLOPE -� CHECK VALVE TEMP., PIPE CAP EFFICIENCY GATE VALVE PRESSURE GAUGE W/ SHUTOFF VALVE KW GLOBE VALVE - UNION_ VALVE IN RISER 0 0 040000 0 0 0000 STRAINER - BALANCING VALVE OF FLOOR DRAIN WITH TRAP x1000 PRESSURE REDUCING VALVE 090 SHOWER VALVE WATER HEATER SCHEDULE EQUIP. NO. LOCATION SERVICE TYPE OF PUMP FLOW GPM HEAD FEET ELECTRIC NATURAL GAS ELECTRICAL CP -1 POOL EQUIPMENT ROOM EQUIP. LOCATION NOMINAL MIN. DISC . TEMP, J MANUFACTURER NOTES BTU PRESS. FLUE J. NO, STORAGE REC. TEMP., .RISE EFFICIENCY 0 U U a 0 0 U KW V O Quuo 0 0 0 0 0 0 0 040000 0 0 0000 (GAL) (GPH) OF OF x1000 IN. W.C. SIZE )00,)00 0 2 & MODEL WH -1A POOL EQUIPMENT ROOM 100 420 120' 70' 94% 199 4.5" MIN 1 0 120 A.O.SMITH BTH 199 Q3 WH -1B POOL EQUIPMENT ROOM 100 420 120' 70' 94% 199 4.5" MIN Q 120 A.O.SMITH BTH '199 Q WH -2 JUICE BAR 50 53 120' 70' 100% 9 208 3 A.O.SMITH DEL 50 d d 3" PVC EXHAUST AND 3" PVC AIR INTAKE PER HEATER Q NOT USED Q MANIFOLD KIT #78692 Q NOT USED Q SIMULTANEOUS DUAL ELEMENT OPERATION (4.5 KW EACH) PUMP SCHEDULE EQUIP. NO. LOCATION SERVICE TYPE OF PUMP FLOW GPM HEAD FEET ELECTRIC NOTES Hp CP -1 POOL EQUIPMENT ROOM 120' HOT WATER RETURN IN LINE 3 15 1/25 LLJ 3501 Griffin Road Ft. Lauderdale, FL 33312 (954) 266 -2700 Fx: (954) 266-2701 sma@saltzmichelson.com AA- 0002897 7 ' r 7 Project No.: 7� Drawn By: TKN � 0 J� o o X h eIdI By:n 0 0 J B o a 0 0 00 0 0000 U D U U O 0 J. 00 0 0 LLJ 3501 Griffin Road Ft. Lauderdale, FL 33312 (954) 266 -2700 Fx: (954) 266-2701 sma@saltzmichelson.com AA- 0002897 7 ' r 7 GENERAL INFORMATION PLUMBING PO.1 x x Project No.: 2003 -160 Drawn By: TKN � 0 o o X h eIdI By:n 0 0 B o a 0 0 00 0 0000 U D U U O 0 0 G fl 0 0 0 0 0 0 0 0 0 0 U V 0 00013 00 0 0 0 U U a 0 0 U 0 00 00 0 1,2 -16 -03 PERMIT SET Quuo 0 0 0 0 0 0 0 040000 0 0 0000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 )00,)00 0 2 000000 0.000 0 0 o 0 00o� 00 O U 0 0 0 0 0 00 0 00 €100.0 0 0 0 0000 0 1 0 REVISIONS: GENERAL INFORMATION PLUMBING PO.1 x x