Loading...
07-1661-059OUTSIDE AIR CALCULATIONS (BASED ON ASHRAE 82 -04, TABLE 6.1) AREA SERVED AREA SERVED OR UNIT TAG NET OCCUPIABLE AREA SQ.FT. TOTAL NO. OF PEOPLE VENTILATION RATE CFM VENTILATION RATE CFM SF TOTAL CFM 0 A REQUIRED TOTAL CFM O A PROVIDED NOTES VENTILATION REQ'D AC /HR OR CFM BAR 113 2900.0 250.0 7.5 0.18 2397 2400 3210 50/WC STOR.121 145 - - 0.12 17.0 20 - 50/WC BAR 108,110 3450.0 350.0 7.5 0.18 3248 3250 - - 8900 - STORAGE 2 183 - - 0,12 19 20 - "CC� ENTRANCE AREA 3750 200 5 0.06 1225 1225 - r MGR OFF 103A 300 3 5 0.05 33 35 - KITCHEN 117 1335 20 390.0 390 - STATI STATION 1 900 23 7.5 0.18 344 350 - STORAGE 1 921 - - 0.12 111 115 - OFFICE 91 1 5 0.08 10 10 - CORRIDOR 207 - Q 0.08 12 15 - v m V LU m 0 d � NOTES- TOTAL 7830.0 1. CALCULATIONS ARE BASED ON ESTIMATED MAX. OCCUPANCY RATES PER ARCHITECTURAL. PLANS AND ASHRAE 62 -04 VENTILATION RATES PER ASHRAE 62 -04 2. FOR OFFICE AND OTHER SIMILAR AREAS CALCULATIONS ARE BASED ON CONTINUOUS OCCUPANCY AIR BALANCE SCHEDULE AREA SERVED EXHAUST AIR CALCULATIONS OUTSIDE AIR CFM MAKE -UP AIR CFM SPACE SERVED OR UNIT TAG SPACE AREA SQ.FT. ) SPACE HEIGHT (FT) SPACE VOLUME (CU.FT. VENTILATION REQ'D AC /HR OR CFM TOTAL CFM REQUIRED TOTAL CFM PROVIDED NOTES MECHANICAL ROOF PLAN MENS RESTROOM 321 10 3210 50/WC 500 700 X ENTRANCE AREA RpESTR00M 614 10 61140 50/WC 650 1300 X KITCHEN 117 AH -4 KSF/KEF AC -1 3900 - 3000 440 - 440 - 7000 - - 8900 - SERVICE STATION 1 STORAGE 1 LL NOTES: 1. CALCULATIONS ARE BASED ON LOCAL CODE REQUIREMENTS, FLORIDA BUILDING CODE 2004 (TABLE 403.3) AND ASHRAE 52 -01. AIR BALANCE SCHEDULE AREA SERVED EQUIPMENT TAG SUPPLY AIR CFM OUTSIDE AIR CFM MAKE -UP AIR CFM EXHAUST AIR CFM BAR 113 AH -1 OAU -1 4500 2000 420 2000 - - - - STORAGE 121 MECHANICAL ROOF PLAN BAR 108,110 AH -2 OAU -1 4500 2740 530 2740 - - - - STORAGE 2 MECHANICAL DETAILS ENTRANCE AREA AH -5 AH -3 OAU -1 EF -1 4500 4500 260 - 500 500 260 - - - - - - - - 2000 MGR OFF 103A RESTROOMS KITCHEN 117 AH -4 KSF/KEF AC -1 3900 - 3000 440 - 440 - 7000 - - 8900 - SERVICE STATION 1 STORAGE 1 LL OFFICE 1 CORRIDOR BALANCE DAMPER BM -1 M "CC� 0 2700 TOTAL 7830.0 7000 13600.0 NOTES' 1. AREA IS 7,830 +7,000 - 13,6001,230 POSITIVE WHEN ALL EXHAUST FANS OPERATING MECHANICAL NOTES 1. THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, AND EQUIPMENT NECESSARY FOR THE INSTALLATION OF A COMPLETE SYSTEM IN ACCORDANCE WITH THESE DRAWINGS, THE FLORIDA BUILDING CODE 2004 AND ALL OTHER APPLICABLE STATE, COUNTY AND LOCAL ORDINANCES AND THE LATEST ADDITION OF THE FOLLOWING PUBLICATIONS; SMACNA -85, 92, 95; ASHRAE 15-01, 34-01, 62 -01; NFPA 70-02, 72 -02, 9OA -02, 9OB -02, 91 -99, 96 -01; ANSI Z10.1 -98, Z10.3 -98, Z21.8 -94, Z21.83 -98. 2. THE OWNER SHALL PAY ALL COSTS OF PERMIT, INSPECTIONS AND ALL OTHER COSTS INCIDENTAL TO THE COMPLETION AND TESTING OF THIS WORK. 3. THE CONTRACTOR SHALL VISIT THE SITE AND COORDINATE WORK WITH OTHER TRADES. 4. THE CONTRACTOR SHALL SUPPLY THE ARCHITECT WITH "AS- BUILT' DRAWINGS. 5. CONTRACTOR SHALL SUBMIT, FOR APPROVAL FIVE [5] COPIES OF MANUFACTURER'S DRAWINGS FOR EACH PIECE OF EQUIPMENT AND CONTROLS INCLUDED IN CONTRACT. 6. ALL MATERIAL SHALL BE NEW OF U.S. MANUFACTURER OF GOOD QUALITY. ALL WORK SHALL BE PERFORMED AT INDUSTRY STANDARD QUALITY LEVEL BY CERTIFIED PROFESSIONALS. ALL EQUIPMENT SHALL BE UL OR ETL LISTED. 7. DUCTWORK: & ALL (UNEXPOSED) AIR CONDITIONING DUCT WORK SHALL BE OF 1" (R -4.2) SPECIAL DUTY FSK FOIL REINFORCED FIBERGLASS WITH MANUFACTURER'S LOGO PRINTED ON VAPOR BARRIER, WITH A HIGH - TENSILE, RESISTANT MAT COATING, EQUAL TO "SUPERDUCT" BY MANVILLE OR "TOUGHGARD" BY CERTAINTEED, AND ANTI- MICROBIAL PROPERTIES. ALL FLEXIBLE DUCT TO BE R -4.2 WITH A MAX. TOTAL LENGTH NOT TO EXCEED 15 FT. INSTALL UL LISTED FOR PLENUM, FLEXIBLE DUCTWORK ELBOW SUPPORTS AT EACH DIFFUSER, GRILLE, AND REGISTER EQUAL TO "FLEXFLOW ELBOW AS MANUFACTURED BY "THERMAFLEX". LL ALL EXPOSED DUCTWORK SHALL BE GALVANIZED UNINSULATED SHEETMETAL THE CONTRACTOR SHALL PROVIDE ALL SHEETMETAL DUCTWORK, HANGERS, AUX. SUPPORT STEEL, ETC., ALL METAL DUCTS SHALL BE FABRICATED IN ACCORDANCE WITH LATEST EDITION OF S.M.A.C.N.A. ARCHITECT TO VERIFY FINAL COLOR OF EXPOSED DUCTWORK. REFER TO DEMOUTIN SHEET MD2.1 FOR EXISTING DUCTWORK INFORMATION. SMACNA DUCT PRESSURE CLASSES BASED ON OPERATING PRESSURE ARE: 1/2", 1 ", 2 ", 3 4", 6% AND 10 ". EACH DUCT SYSTEM SHALL BE CONSTRUCTED FOR THE SPECIFIC DUCT PRESSURE CLASS SHOWN ON PLANS. WHERE NO PRESSURE CLASS IS SPECIFIED FOR CONSTANT VOLUME SYSTEMS, 1" W.G. PRESSURE CLASS IS THE BASIS OF COMPLIANCE WITH THE SMACNA STANDARDS REGARDLESS OF VELOCITY. ALL DUCTWORK SHALL BE SEALED TO SMACNA "HVAC DUCT CONSTRUCTION STANDARDS' FOR ITS PRESSURE CLASS SEALING METHODS. 8. ALL EXHAUST DUCTS, SMOKE MAKE UP, AND OUTSIDE AIR DUCTS SHALL BE GALVANIZED SHEET METAL WITH SEALED SEAMS AND JOINTS. ALL OUTSIDE AIR DUCT SHALL BE INSULATED WITH EXTERNAL BLANKET INSULATION R -6 MIN. ALL METAL EXHAUST, MAKE -UP OR OTHERWISE DUCTS INSTALLED IN LOCATIONS WHERE DEWPOINT CONDITIONS CAN OCCUR INSIDE THE DUCT SHALL BE EXTERNALLY INSULATED WITH R -6 MIN. ALL METAL DUCTS SHALL BE FABRICATED IN ACCORDANCE WITH LATEST EDITION OF S.M.A.C.N.A. 9. OUTSIDE AIR INTAKES SHALL BE SCREENED WITH A CORROSION RESISTANT MATERIAL NOT LARGER THAN 1/2" MESH. 0/A INTAKES SHALL NOT BE TAKEN FROM A LOCATION CLOSER THAN 10 FT. FROM ANY CHIMNEY, VENT OUTLET OR SANITARY SEWER VENT OUTLET, UNLESS SUCH VENT IS NOT LESS THAN 24 INCHES ABOVE THE OUTSIDE AIR VENT. OUTSIDE NR INTAKE VENTS LOCATED ON ROOFS WILL BE PROPERLY MARKED WITH A UNIVERSAL MARKING "INTAKE% PERMANENTLY ATTACHED PER FMC 2004, SEC. 401.5.1. COORDINATE WITH BASE BUILDING PLANS FOR LABELS AND MATERIALS 10. DUCT SIZES SHOWN ARE INSIDE DIMENSIONS. 11. ALL NR DEVICES (DIFFUSERS, REGISTERS AND GRILLES) SHALL BE ALL ALUMINUM CONSTRUCTION WITH EXPOSED SURFACE OFF WHITE BAKED ENAMEL FINISH OR AS SPECIFIED BY ARCHITECT. DEVICES SHALL BE AS SPECIFIED OR EQUAL TO TITUS OR METALAIRE. PROVIDE OPPOSED BLADE DAMPERS AT ALL DIFFUSERS AND REGISTERS AS INDICATED ON PLANS. PROVIDE BALANCING DAMPERS FOR ALL SUPPLY AND RETURN DIFFUSERS AND REGISTERS TO ENSURE COMPLAINCE WITH FMC 2004, PAR. 801.4 AND PAR. 803.15 FOR BALANCED AIR FLOW. 12. THERMOSTAT A. SHALL BE COMBINATION COOUNG/HEATING, WITH SYSTEM "COOL -AUTO- HEAT -OFF" AND FAN "ON -AUTO" SELECTOR SWITCHES. PROVIDE PROGRAMMABLE TYPE AS RECOMMENDED BY MANUFACTURER, HONEYWELL OR EQUAL PROVIDE TAMPER PROOF COVERS. 13. THERMOSTAT LOCATION SHALL BE APPROVED BY OWNER AND ENGINEER BEFORE INSTALLATION. INSTALL THERMOSTAT 48" TO 54" A.F.F. PER A.D.A REQUIREMENTS WHERE APPLICABLE. MECHANICAL CONTRACTOR SHALL COORDINATE WITH ELECTRICAL CONTRACTOR ALL REQUIREMENTS FOR JUNCTION BOXES, CONDUITS, CONTROL WIRING, POWER, ETC. AND DEFINE RESPONSIBILITIES AND SCOPE OF WORK FOR EACH TRADE PRIOR TO ANY PURCHASING OR INSTALLATION. 14. ALL BRANCH TAKE -OFFS TO BE PROVIDED W/ MANUAL VOLUME DAMPERS. PROVIDE RADIUS ELBOWS WHERE FEASIBLE, SQUARE ELBOWS AND TEE'S SHALL BE FURNISHED W /SINGLE FOIL TURNING VANES. PROVIDE MANUAL VOLUME DAMPERS WITH EXTRACTOR AT ALL FLEX TAKE -OFFS. PROVIDE REMOTE, CABLE OPERATED VOLUME DAMPERS IN INACCESIBLE AND HARD CEILING AREAS, "YOUNG REGULATOR" OR EQUAL. 15. PROVIDE NEW FILTERS FOR ALL AIR CONDITIONING EQUIPMENT BEFORE START -UP, REPLACE PRIOR To FINAL ACCEPTANCE BY OWNER. 16. PROVIDE SMOKE DETECTORS WITH SERVICE ACCESS DOORS IN ALL SUPPLY AIR DUCTS FOR FANS AND AHU'S SERVING A COMMON PLENUM OF 2000 CFM OR ABOVE. FOR SMOKE DETECTORS NOT VISIBLE, IN CONCEALED SPACES, PROVIDE REMOTE ANNUNCIATION /TEST STATION AS REQUIRED BY AUTHORITY HAVING JURISDICTION, COORDINATE PRIOR TO INSTALLATION. DETECTORS SHALL BE BY ONE MANUFACTURER, COORDINATE VOLTAGE ETC. WITH ELECTRICAL CONTRACTOR AND FIRE ALARM SYSTEM BEFORE ORDERING. UPON DETECTION, SMOKE DETECTORS SHUT DOWN ASSOCIATED AIR MOVING EQUIPMENT AND ALL AIR MOVING EQUIPMENT SERVING THAT COMMON PLENUM. 17. PROVIDE TYPE "B" DYNAMIC FIRE DAMPERS WITH SERVICE ACCESS DOORS IN ALL DUCTS AND OPENINGS PENETRATING FIRE RATED WALLS, MECHANICAL AND ELECTRICAL EQUIPMENT ROOMS, TENANT SEPARATION, PARTITIONS, FLOOR OR ROOF SLABS AND AT OUTSIDE AIR INTAKES AS REQUIRED. PROVIDE RADIATION DAMPERS IN RATED CEILINGS FOR ALL CEILING OPENINGS, CEILING FANS, DIFFUSERS OR GRILLES RATED FOR USE IN THE CEILING ASSEMBLY. PROVIDE LOW- LEAKAGE CLASS DAMPERS FOR ALL SITUATIONS WHERE THE AIRFLOW CFM HAS TO BE CONTROLLED. VERIFY AND REPLACE AS REQUIRED FOR EXISTING SYSTEMS. 18. HVAC CONTRACTOR SHALL PROVIDE A T & B REPORT PER F.B.C. 2004, CH. 13, 410.1.ABCD.4 (THE T & B REPORT SHALL BE INDEPENDENT FOR SYSTEMS OVER 15 TONS) FOR ALL MECHANICAL EQUIPMENT, AIR DEVICES, DAMPERS, AHU'S AND FANS. THE TEST AND BALANCE REPORT SHALL BE IN ACCORDANCE WITH THE AIR BALANCE COUNCIL STANDARDS AND SHALL INCLUDE AIR QUANTITIES FOR ALL SUPPLY GRILLES, RETURN GRILLES AND EXHAUST GRILLES AND THE LEAVING AND ENTERING AIR TEMPERATURE (T) FROM SUPPLY GRILLES AND EVAPORATORS. 19. RUN INSULATED FIRE RATED CONDENSATE DRAINS AS REQUIRED. 20. ALL INSULATION WILL HAVE FIRE /SMOKE RATING LESS THAN 25/50. 21. MECHANICAL EQUIPMENT ON ROOF OR ELEVATED STRUCTURES SHALL COMPLY WITH FBC 2004 PAR. 306.5 IF INSTALLED HIGHER THAN 16 FEET A.F.F. MECHANICAL EQUIPMENT INSTALLED IN ATTICS SHALL MEET THE REQUIREMENTS OF FBC 2004 PAR. 306.3 IF THE EQUIPMENT CAN NOT BE SERVICED/REMOVED THROUGH REQUIRED OPENING. MECHANICAL EQUIPMENT SHALL BE PROTECTED WITH MECHANICAL BARRIERS IF EXPOSED TO MECH. DAMAGE. ALL EQUIPMENT SHALL BE INSTALLED ON 6" CONCRETE PAD AT GRADE LEVEL . SPECIAL NOTE• ALL WIND LOAD AND OTHER COMPLIANCE CALCULATIONS AND /OR INSTALLATION DETAILS FOR ROOF MOUNTED EQUIPMENT AS REQUIRED BY FBC 2004, SEC. 1509, 1522 AND CHAPTER 16, SHALL BE PROVIDED BY STRUCTURAL ENGINEER / ARCHITECT. 22. PROVIDE A MIN. OF 36" CLEARANCE IN FRONT OF ALL 120 -208 VOLT PANELS AND MIN. 42" CLEARANCE IN FRONT OF ANY 240 -480 VOLT PANEL PROVIDE ADEQUATE SIDE CLEARANCE PER NEC. 23. MECHANICAL PLANS IN GENERAL, ARE DIAGRAMMATIC IN NATURE, AND ARE TO BE READ IN CONJUNCTION WITH ARCHITECTURAL, PLUMBING, ELECTRICAL, FIRE SPRINKLER, AND STRUCTURAL PLANS AND SHALL BE CONSIDERED AS ONE SET OF DOCUMENTS. DUCT AND PIPING OFFSETS, BENDS AND TRANS171ONS SHALL BE REQUIRED TO PROVIDE AND INSTALL A COMPLETE FUNCTIONAL SYSTEM AND SHALL BE PROVIDED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER. CHANGES IN DUCTWORK SIZE AND ROUTE WILL BE REQUIRED TO AVOID STRUCTURAL, PLUMBING, FIRE SPRINKLER AND ARCHITECTURAL BUILDING FEATURES. DUCTWORK CHANGES MAY BE MADE BY CONTRACTOR USING EQUIVALENT SIZED DUCT. CONTACT ENGINEER IF DUCT AREA WILL NOT FIT. 24. THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONS PRIOR TO BIDDING, ORDERING, FABRICATION OR INSTALLATION OF MATERIALS OR EQUIPMENT. 25. NO COMBUSTIBLE MATERIALS ARE ALLOWED IN RETURN AIR PLENUMS OR ABOVE CEILINGS USED AS RETURN AIR PLENUM. IF SPACE WITH RETURN AIR PLENUM HAS ANY DECK TO DECK PARTITIONS, AIR TRANSFER DUCTS MUST BE INSTALLED. WHEN CPVC PIPING IS USED FOR FIRE SPRINKLER SYSTEMS, THE R/A GRILLES LAYOUT SHALL BE (FIELD) COORDINATED WITH SUCH PIPING SO THAT NO PORTION OF THE GRILLES WILL BE DIRECTLY BELOW THE CPVC PIPING. 26. CONDENSATE DRAIN PIPING TO BE AS SPECIFIED PER PLUMBING PLANS, IF NOT SPECIFIED TO BE TYPE "L" COPPER OR PVC WHERE ALLOWED BY CODE WITH 1/2" ARMAFLEX INSULATION. PROVIDE APPROVED WATER LEVEL DETECTOR OR FLOAT SWITCH TO AUTOMATICALLY SHUT DOWN THE AIR COND. UNIT, AS A SECONDARY DRAIN SYSTEM TO COMPLY WITH FMC 2004, SEC. 307 SUPPLY CONDENSATE PUMP WHERE NECESSARY AS IMPOSED BY FIELD CONDITIONS OR INSTALLATION CHANGES AND PIPE TO CONDENSATE DRAIN PER PLUMBING PLANS. 27. MANUFACTURER'S WARRANTY: CONTRACTOR SHALL PROVIDE WARRANTY FOR A PERIOD OF (1) ONE YEAR AFTER BUILDING C.O. FOR ALL MECHANICAL SYSTEMS, DUCTWORK, CONTROLS ACCESSORIES AND ALL OTHER EQUIPMENT, PARTS AND LABOR UNDER THESE DRAWINGS AND AND SPECIFICATIONS. CONTRACTOR SHALL PROVIDE WARRANTY FOR COMPRESSORS FOR (5) FIVE YEARS. ANY REPAIRS REQUIRING SYSTEM SHUTDOWN WILL BE DONE DURING NON - OPERATIONAL PERIODS OR AS AGREED WITH OWNER. 28. THIS IS A REMODEL OF AN EXISTING SPACE. CONTRACTOR TO VISIT SITE PRIOR TO BID. CONTRACTOR SHALL INSPECT ALL EXISTING AND NEW COMPONENTS OF THE MECHANICAL SYSTEMS AND ENSURE THAT ALL ARE OPERATIONAL AND WORKING AS SHOWN ON THE APPROVED CD PLANS AT THE TIME OF C.O. 29. AUXILARY DRAIN PANS SHALL. BE INSTALLED UNDER ALL COILS ON WHICH CONDENSATION CAN OCCUR AND UNDER ALL UNITS IN CONCEALED SPACES OR ANY AREA WHERE BLDG. DAMAGE CAN OCCUR AS A RESULT OF AN OVERFLOW, TO COMPLY WITH FBC 2004, PAR. 307.2. 31. CHILLED WATER PIPING SHALL BE BLACK STEEL SCHAO OR TYPE "L" COPPER WITH 2 LB. DENSITY IN CLOSED CELL FOAMGLASS, WITH FIRE RESISTING FLAME PROOF ALUMINUM FOIL VAPOR SEAL JACKET AND IT MUST CONFORM TO NFPA 90 -A. 32. INTEGRATE ALL SMOKE CONTROL EQUIPMENT OPERATION (I.E. SUPPLY, RETURN, MAKE -UP, EXHAUST FAN(S), MOTORIZED DAMPERS AND ETC.) WITH EXISTING SHELL SMOKE EXHAUST SYSTEM OPERATION, SMOKE MANAGEMENT SYSTEM CONTROL PANEL AND EMERGENCY POWER. MECHANICAL SHEET INDEX SHEET# DESCRIPTION MOA MECHANICAL NOTES, LEGEND do INDEX M2.1 MECHANICAL PLAN M2.2 MECHANICAL HYDRONIC PLAN MD2.1 MECHANICAL DEMOU71ON PLAN MD2.2 MECHANICAL DEMOU71ON PLAN M3.1 MECHANICAL ROOF PLAN M4.1 ENLARGED PLANS do SECTIONS M6.1 MECHANICAL SCHEDULES M7.1 MECHANICAL DETAILS M7.2 MECHANICAL DETAILS independent forum MECHANICAL LEGEND ® NEW S/A CEILING DIFFUSER «1-U/1C NEW R/A CEIUNG GRILLE ® EXISTING S/A CEILING DIFFUSER ® EXISTING R/A CEILING GRILLE ®� SLOT / LINEAR DIFFUSER f J WALL LOUVER / WALL DIFFUSER. OT VOLUME CONTROL DAMPER ► REDUCER OR INCREASER NEW FLEX DUCT EXISTING FLEX DUCT 1•� NEW DUCTWORK EXISTING DUCTWORK DEMO DUCTWORK "Z" BOOT TRANSFER DUCT O ROUND UP BELLMOUTH TAP SHOE TAP DAMPER FIRE DAMPER `F � FIRE SMOKE DAMPER RETURN AIR FIRE SMOKE DAMPER ®� DUCT SMOKE DETECTOR 4 CEIUNG EXHAUST: FAN Fal INUNE EXHAUST FAN 0 ROOF EXHAUST FAN m VARIABLE FREQ. DRIVE CONTROL PANEL «1-U/1C SUPPLY AIR ® DIFFUSER OR GRILLE DESIGNATION ® AIR ®� DIFFUSER GRILLE DIFFUSER OR GRILLE DESIGNATION gyp_ X EQUIPMENT TAG OT THERMOSTAT OH HUMIDISTAT ® WALL SWITCH -(� POC- POINT OF CONNECTION SUPPLY AIR ''I' RETURN AIR «1-U/1C DOOR UNDER CUT B.O.D. AP - ACCESS PANEL -� SECTION MARK ®� SMOKE DAMPER SMOKE DAMPER(S) FIRE -SMOKE DAMPER • MOTORIZED DAMPER G GATE VALVE BUTTERFLY VALVE N CHECK VALVE BALANCING VALVE RE RELOCATED EXISTING N NEW B.O.D. BOTTOM OF DECK AFF ABOVE FINISHED FLOOR NOT ALL SYMBOLS MAY APPLY TO THESE PLANS HVAC DESIGN REQUIRES YES NO DUCT SMOKE DETECTOR • Suite 140 FIRE DAMPER(S) • SMOKE DAMPER(S) • FIRE RATED ENCLOSURE E: • FIRE RATED ROOF / FLOOR CEILING ASSEMBLY AA. 26000903 AR. • FIRE STOPPING • SMOKE CONTROL independent forum • 000� 00,0<1 00 1 0111111 .0001, .0(0 11111100,00 0000 10 - J CITY Cyr ;)t)UTH MIAMI SECTION �> ISSUED FOR PERMIT Oct 08, 2007 ISSUED FOR CONSTRUCTION - -I K AMM CONSULTING PROJECT #: 2007 -0307 PROJECT MANAGER: Nicholas Melisiotis, P E ffff 1407 West N e ac , M Deerfield BC2•�•y " Phone 954.949 C ' F ' �'•y �,' ' - Fax954.949.220L OIISY engineering@katbm ' Certificativn'ofAuth 619 ' DIRECTOR OF ELECTRICAL ENGINEERING D„ fete ; Y' 7r,9.00.7-:-' Lon T. Carter Florida License #35249 " DIRECTOR OF MECHANICAL ENGINEERING '- Mircea Pella Florida License #48798 �F�fr sig�rC ..• �� 004,8#80604 Its%% ,,, �• Maverick Architecture & Design, Ilc. 6675 Westwood Blvd. Suite 140 Orlando, Florida 32821 T: 407.351.8787 F: 407.351.9254 E: Info @MaverickArchDes.com AA. 26000903 AR. 91835 a conceptually independent forum M M > M .a CU � sL 0 Cl) LL p •E /: h c M "CC� 0 G I -_ LID r 0 m O c o Q x n Q v m V LU m 0 d � I HEREBY CERTIFY THAT THESE DRAWINGS AND SPECIFICATIONS WERE PREPARED UNDER MY DIRECT SUPERVISION AND TO THE BEST OF MY KNOWLEDGE COMPLY WITH THE STATE BUILDING AND ZONING ORDINANCES. SIGNED STATE REGISTRATION DATE MECHANICAL NOTES mom Drawing No.