07-1661-002, I RESPONSIBILITY SCHEDULE I DLSC,AItdEB; THIS RESPONSIBILITY SCHEDULE IS NOT INTENDED TO DENOTE ALL RESPONSIBILITIES INVOLVED IN THE COMPLETION OF THIS PROJECT. THE GENERAL CONTRACTOR SHALL REVIEW ALL ATTACHED DOCUMENTATION AND RENEW EXISTING SITE CONDITIONS PRIOR TO BID SUBMISSION. ALL CLARIFICATION AND QUESTIONS RELATED TO SCOPE OF WORK AND THIS RESPONSIBILITY SCHEDULE SHALL BE DIRECTED TO ARCHITECT PRIOR TO SUBMISSION OF GENERAL. CONTRACTOR'S BID. CSI DIVI - Oo s- y� oa _ 0 �o Q2 p pU ��v � 4 z � f 0 0 o o�od 0 ob F 4F �y A. m ,, a ., o��o � 'b J�� jA , Jam? J�Zj� J� yv o�� DESCRIPTION oo J� o 0 30� s .z o 3 REMARKS # finish grade SPOT existing grade ELEVATIONS existing grade 1 PERMITS, FEES & INSURANCE a O - LIST OWNER AND ARCHITECT AS ADDITIONAL INSURED Q D' y W Z LL fA 2 SHORING, RETANNAGE, DRAINAGE & UNDERPINNING U) NOT APPLICABLE 2 SIDEWALKS, PAVERS & ACCESSORIES NOT APPLICABLE 2 jFENCES & GATES NOT APPLICABLE 2 LANDSCAPING NOT APPLICABLE 2 AWNINGS AND CANOPIES 3 CONCRETE FLOOR SLABS & REINFORCEMENT G.C. TO PATCH AND REPAIR TO MEET REQUIREMENTS OF NEW TENANT FLOOR PLAN 3 CONCRETE PATIO DECKS & REINFORCEMENT G.C. TO PATCH AND REPAIR TO MEET REQUIREMENTS OF NEW TENANT FLOOR PLAN 3 EXPANSION JOINTS G.C. TO PATCH AND REPAIR TO MEET REQUIREMENTS OF NEW TENANT FLOOR PLAN / EXISTING TO REMAIN 3 CEMENTIIOUS UNDERLAYMENT FOR FLOOR DRAINAGE NOT APPLICABLE 3 CEMENTITTOUS OVERLAYMENT & CONCRETE STAIN NOT APPLICABLE 4 CONCRETE CMU CONSTRUCTION & REINFORCEMENT NOT APPLICABLE 4 BRICK VENEER CONSTRUCTION & REINFORCEMENT NOT APPLICABLE 4 MASONRY CLEANING NOT APPLICABLE 5 STRUCTURAL METAL FRAMING 5 IMETAL DECKING NOT APPLICABLE 5 INTERIOR METAL FOOTRAILS & HANDRAILS 5 STEEL STAIRS NOT APPLICABLE 6 ROUGH CARPENTRY 6 ARCHITECTURAL WOODWORK AND MILLWORK 6 WOOD BLOCKING FOR ARCHITECTURAL WOODWORK 6 STONE MILLWORK TOPS 6 WOOD VENEER AND PLAM MILLWORK TOPS 6 PLYWOOD BACKING FOR UTILITY PANELS 7 THERMAL & SOUND INSULATION 7 SILICONE SEALANT O JOINT W/ BASE IN KITCHEN 7 WATER REPELLENT SHEATHING & COATINGS 7 ROOFING & SHEATHING MATERIALS COORDINATE WITH LANDLORD FOR SPECIFIC SUBCONTRACTOR TO USE AT ROOF PATCHES. 8 HOLLOW METAL DOORS, FRAMES & HARDWARE 8 WOOD DOORS, FRAMES & HARDWARE 8 INTERIOR WOOD WINDOWS & GLAZING 8 ENTRANCES, STOREFRONTS & EXTERIOR GLAZING G.C. TO VERIFY DOOR TYPES & HARDWARE PROVIDED BY LANDLORD TO MEET REQUIREMENTS OF NEW TENANT. 9 ACOUSTICAL. TILE CEILING SYSTEMS 9 GYPSUM BOARD SHEATHING & FRAMING 9 CERAMIC & QUARRY TILE & ACCESSORIES 9 RESILIENT FLOORING & ACCESSORIES 9 IGOOLER FLOORING 9 CARPETING 9 PAINTING & WALLCOVERINGS 9 SPECIAL WALL FINISHES 9 SPECIAL CEILING TREATMENTS 9 FABRIC PANEL SYSTEMS NOT APPLICABLE 10 TOILET COMPARTMENTS & LAVATORY ACCESSORIES 10 STAINLESS STEEL CORNER GUARDS IN KITCHEN 10 INTERIOR SIGNAGE & GRAPHICS 10 1EXTERIOR SIGNAGE & GRAPHICS GC TO COORDINATE ELECTRICAL AND INSTALLATION WITH SIGN CONTRACTOR 10 EMPLOYEE LOCKERS & ACCESSORIES 10 INTERIOR SHUTTERS NOT APPLICABLE 11 KITCHEN EQUIPMENT 11 IKrrCHEN EQUIPMENT DISCONNECT 11 WALK -IN COOLERS & REFRIGERATION 11 WASTE COMPACTORS NOT APPLICABLE 11 SECURITY SYSTEM GC TO COORDINATE WITH OWNER'S SECURITY SYSTEM CONTRACTOR 11 CABLE /SATEUJTE TELEVISION SYSTEM GC TO COORDINATE WITH OWNER'S CATV CONTRACTOR 11 SOUND SYSTEM EQUIPMENT & SPEAKERS GC TO COORDINATE WITH OWNER'S SOUND SYSTEM CONTRACTOR 11 POS /PRE -CHECK SYSTEM GC TO COORDINATE WITH OWNER'S POS SYSTEM CONTRACTOR 12 FURNITURE & FURNISHINGS 12 RECEIPT & ASSEMBLY OF FURNITURE & FURNISHINGS 12 INTERIOR ARTWORK GC TO COORDINATE BLOCKING (IF APPLICABLE) AS REQUIRED. 12 WINDOW TREATMENTS & DRAPERY TREATMENTS 12 DECORATIVE MIRRORS 13 STAINLESS STEEL PANELS AT KITCHEN 14 ELEVATORS & DUMBWAITERS NOT APPLICABLE 14 JWHEEL CHAIR LIFTS NOT APPLICABLE 14 IMATERIAL HANDUNG LIFTS NOT APPLICABLE 15 PLACEMENT OF ON -SITE MECHANICAL EQUIPMENT 15 PLACEMENT OF KITCHEN ROOFTOP EQUIP. 15 SPRINKLER SYSTEM DESIGN & INSTALLATION 15 PLUMBING FIXTURES & ACCESSORIES 15 WATER HEATER SYSTEM 15 PLUMBING CONNECTIONS TO KITCHEN EQUIPMENT 15 HEATING, VENTILATION & AIR CONDITIONING 15 COOKING HOODS & TRIM 15 1COOKING HOOD EXHAUST SYSTEM 15 AIR CURTAIN UNIT O EXTERIOR DOOR NOT APPLICABLE 15 REGISTERS, GRILLES & DIFFUSERS 15 AIR PURIFICATION SYSTEMS NOT APPLICABLE 15 CARBONATED BEVERAGE SYSTEM GC TO COORDINATE WITH LOCAL SODA VENDOR 15 113AR EQUIPMENT 15 ICAULKING KITCHEN EQUIPMENT 15 BLACK IRON DUCTWORK 15 EXHAUST FANS 16 POWER & LIGHTING CONDUIT & JUNCTION BOXES 16 LIGHTING 16 LIGHTING SPECIFIED AS "BY OWNER" 16 LIGHTING SYSTEM DIMMING PANELS 16 TELEPHONE /DATA CONDUrr GC TO COORDINATE WITH OWNER'S TELEPHONE SYSTEM VENDOR 16 TELEPHONE /DATA WIRING 16 FIRE ALARM DESIGN, WIRING & CONNECTION 16 CONDUIT FOR SOUND SYSTEM WIRING 16 SOUND SYSTEM WIRING GC TO COORDINATE WITH OWNER'S SOUND SYSTEM CONTRACTOR 16 PAY TELEPHONE CONDUIT & JUNCTION BOXES NOT APPLICABLE 16 ELECTRICAL CONNECTION KITCHEN /BAR EQUIPMENT FINAL CLEANING OF RESTAURANT ON -SITE CREW DURING GRAND OPENING PARTY GC TO PROVIDE ELECTRICIAN, PLUMBER, HVAC JOURNEYMEN GENERAL CONDITIONS (SECTION 01000 1. APPLICATION OF SECTION 01000 THESE GENERAL CONDITIONS SHALL APPLY TO ALL WORK AND ALL DRAWINGS IN THIS SET AND SHALL EXTEND TO ANY CHANGES, EXTRAS OR ADDITIONS AS AGREED TO DURING THE COURSE OF THE WORK. 2. INSPECTION OF SITE BIDDERS ARE INSTRUCTED TO VISIT AND INSPECT THE PREMISES PRIOR TO SUBMITTING THEIR PROPOSALS AND TO FAMILIARIZE THEMSELVES WITH THE CONDITIONS UNDER WHICH THE WORK WILL BE PERFORMED. NO SUBSEQUENT EXTRAS OR ADDITIONS WILL BE ALLOWED ON ANY CLAIM OF LACK OF KNOWLEDGE OF CONDITIONS OR CIRCUMSTANCES ABOUT WHICH THE BIDDER COULD HAVE INFORMED THEMSELVES. 3. MODIFICATIONS BIDDERS SHALL MAKE KNOWN ANY LIMITATIONS, EXCLUSIONS, OR MODIFICATIONS TO THE PROJECT DURING THE PRICING PHASE OF THE PROJECT. UNLESS NOTED ALL WORK SHOWN ON THE DRAWINGS WILL BE PRESUMED TO BE INCLUDED. 4. INSURANCE ALL CONTRACTORS INVOLVED IN THIS WORK SHALL CARRY PROPERTY DAMAGE AND PUBLIC LIABILITY INSURANCE AS REQUIRED BY OWNER & GOVERNMENTAL AGENCIES HAVING JURISDICTION AND COMPLY WITH STATUTORY REQUIREMENTS FOR DISABILITY AND WORKMEN'S COMPENSATION. THEY WILL COMPLY WITH ALL RULES AND REGULATIONS DICTATED BY THE OWNER AND THE CONDITIONS OF THE JOB. INSURANCE SHALL PROTECT THE OWNER, THE TENANT, ARCHITECT AND OTHER GROUP(S) TO BE NAMED FROM LIABILITY TO THE CONTRACTOR'S NEGLIGENCE. 5. AIA DOCUMENT THE AIA STANDARD DOCUMENT A201 SHALL BE MADE PART OF THE GENERAL CONDITIONS. 6. DIMENSIONING DO NOT SCALE DRAWINGS: DIMENSIONS SHALL GOVERN. DETAILS SHALL GOVERN OVER PLANS AND ELEVATIONS; LARGE SCALE DETAILS GOVERN OVER SMALL SCALE DETAILS. IF THERE IS A DISCREPANCY, YOU ARE REQUIRED TO NOTIFY THE ARCHITECT IMMEDIATELY. 7. SUBSTITUTION OF MATERIALS THERE SHALL BE NO SUBSTITUTION OF MATERIALS WHERE A MANUFACTURER IS SPECIFIED. 8. REVIEW OF PLANS THE GENERAL CONTRACTOR SHALL, BEFORE COMMENCING WORK, REVIEW ALL PLANS AND SPECIFICATIONS AND VERIFY ALL GOVERNING DIMENSIONS AT THE BUILDING. THE GENERAL CONTRACTOR SHALL EXAMINE ALL ADJOINING WORK OR AREAS UPON WHICH THE PERFORMANCE OF THEIR WORK IS IN ANY WAY DEPENDENT. ANY VARIATIONS OR DISCREPANCIES SHALL BE REPORTED, WITH ALL DUE EXPEDIENCY, TO ARCHITECT PRIOR TO THE FABRICATION OR ERECTION OF THE WORK IN QUESTION. 9. DISTRIBUTION OF DRAWINGS THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE DISTRIBUTION OF DRAWINGS TO ALL TRADES UNDER THEIR EMPLOY. 10. ADDITIONAL INFORMATION ANY INFORMA11ON REQUIRED BY CONTRACTORS THAT IS NOT SHOWN ON THE DRAWINGS OR CONTAINED IN OTHER CONTRACT DOCUMENTS SHALL BE REQUESTED BY THE GENERAL CONTRACTOR FROM ARCHITECT. 11. SUBCONTRACTORS LIST THE GENERAL CONTRACTOR SHALL SUPPLY, PRIOR TO THE COMMENCEMENT OF WORK, A LIST OF ALL SUBCONTRACTORS TO ARCHITECT. THE NAME OF THE PRINCIPAL CONTACT, THE ADDRESS AND PHONE NUMBER OF EACH SUBCONTRACTOR SHALL BE INCLUDED ON THE LIST. 12. MATERIAL SAMPLES THE GENERAL CONTRACTOR SHALL FURNISH SAMPLES TO ARCHITECT OF VARIOUS MATERIALS, TOGETHER WITH FINISHES, IF NOT ALREADY SPECIFIED IN THE CONTRACT DOCUMENTS, AND INTENDED FOR USE IN THE WORK BEFORE THE COMMENCEMENT OF THE SPECIFIED WORK. 13. G.C. REPRESENTATIVE A REPRESENTATIVE OF THE GENERAL CONTRACTOR AUTHORIZED TO DISCUSS THE WORK AND RECEIVE INFORMATION FROM ARCHITECT SHALL BE AVAILABLE AT ALL TIMES THAT WORK IS IN PROGRESS. 14. DAMAGES TO SITE GREAT CARE SHALL BE EXERCISED TO ASSURE THAT THE BUILDING SHALL BE PROTECTED FROM DAMAGE THAT COULD OCCUR BECAUSE OF THIS WORK. CONTRACTORS SHALL PROVIDE PROTECTION FOR EXISTING AREAS AND NEW WORK AREAS. ANY DAMAGES CAUSED BY THIS WORK OR ACCIDENTS SHALL BE REPAIRED, REPLACED OR PATCHED TO THE SATISFACTION OF ARCHITECT AND THE OWNER. CONTRACTORS SHALL BEAR FINANCIAL RESPONSIBILITY FOR SUCH DAMAGE AND ANY WORK UNDERTAKEN TO CORRECTIT. 15. DAMAGES TO MATERIALS THE CONTRACTORS SHALL EXERCISE GREAT CARE IN PROTECTION FROM DAMAGE ALL MATERIALS EXISTING ON THE JOB AND SHALL MAINTAIN PROTECTION FOR ALL TRAFFIC AREAS OF THE BUILDING TO BE USED DURING THE EXECUTION OF WORK RELATING TO THIS CONTRACT WITH THE UNDERSTANDING THAT THE CONTRACTOR'S WILL RECTIFY ANY DAMAGE ATTRIBUTABLE TO THEIR OPERATION. 16. SHOP DRAWINGS THE CONTRACTORS SHALL SUBMIT SHOP DRAWINGS FOR SUCH WORK AS MAY BE SPECIFICALLY REQUESTED IN THE DRAWINGS, OR ELSEWHERE IN THE CONTRACT DOCUMENTS, TO ARCHITECT FOR REVIEW. SHOP DRAWINGS SHALL SHOW ALL DIMENSIONS AND CONDITIONS AND SHALL BE SUBMITTED IN THE FORM OF TWO (2) BLUEUNE PRINTS AND ONE (1) PAPER SEPIA (FACSIMILE COPIES ARE UNACCEPTABLE). WHEN ARCHITECT REQUIRES THE REVISION AND RESUBMISSION OF SHOP DRAWINGS, SUCH RESUBMISSION SHALL OCCUR WITHIN ONE (1) WEEK OF NOTIFICATION OF SUCH REQUIREMENT. INITIAL SHOP DRAWINGS SHALL BE SUBMITTED (2) WEEKS PRIOR TO THEIR CRITICAL PATH RETURN DATE. FOR INITIAL AND RESUBMISSIONS, THE GENERAL CONTRACTOR IS TO PREVIEW AND MARK UP THE SHOP DRAWINGS PRIOR TO SUBMITTAL TO THE ARCHITECT. 17. QUALIFICATIONS ALL WORK SHALL BE PERFORMED BY SKILLED AND QUALIFIED WORKMEN AND IN ACCORDANCE WITH THE BEST PRACTICES OF THE TRADES INVOLVED. CARE SHALL BE TAKEN TO ENSURE COMPLIANCE WITH BUILDING REGULATIONS AND /OR GOVERNMENTAL LAWS, STATUTES, OR ORDINANCES CONCERNING THE USE OF UNION LABOR. 18. QUALITY OF MATERIALS ALL MATERIALS SHALL BE NEW, UNUSED, AND OF THE HIGHEST QUALITY IN EVERY RESPECT UNLESS OTHERWISE NOTED. MANUFACTURED MATERIALS AND EQUIPMENT SHALL BE INSTALLED AS PER THE MANUFACTURER'S RECOMMENDATIONS AND INSTRUCTIONS UNLESS OTHERWISE NOTED. 19. QUALITY OF WORK ALL WORK SHALL BE ERECTED AND INSTALLED PLUMB, LEVEL, SQUARE AND TRUE, AND IN PROPER ALIGNMENT. 20. CODE COMPLIANCE SEE COVER SHEET GENERAL NOTES FOR CODE COMPLIANCE. 21. WORKFORCE THE GENERAL CONTRACTOR SHALL KEEP SUFFICIENT WORKMEN ON THE JOB SITE AT ALL TIMES TO PERFORM THE WORK IN THE MOST EXPEDITIOUS MANNER CONSISTENT WITH GOOD WORKMANSHIP, GOOD BUSINESS PRACTICE AND THE BEST INTERESTS OF THE OWNER. 22. SCHEDULING OF TRADES EACH TRADE WILL BE EXPECTED TO PROCEED IN A FASHION THAT WILL NOT DELAY OR DETAIN THE TRADES FOLLOWING THEM. 23. EXTRA WORK THE CONTRACTORS SHALL NOT PROCEED WITH ANY ADDITIONAL WORK OR CHANGES FOR WHICH THEY EXPECT ADDITIONAL COMPENSATION BEYOND THE CONTRACT AMOUNT WITHOUT WRITTEN AUTHORIZATION FROM OWNER. FAILURE TO OBTAIN SUCH AUTHORIZATION SHALL INVALIDATE ANY CLAIM FOR EXTRA COMPENSATION. 24. WARRANTEE ALL WORK AND MATERIALS SHALL BE GUARANTEED AGAINST DEFECTS IN DESIGN, WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE (1) YEAR. 25. WASTE THE CONTRACTORS SHALL AT ALL 11MES KEEP THE PREMISES FREE OF THE ACCUMULATION OF WASTE MATERIALS OR RUBBISH CAUSED BY THEIR OPERATIONS. THE CONTRACTORS SHALL CONFINE THEIR OPERATIONS FOR REMOVAL TO SUCH METHODS AS MAY BE AGREEABLE WITH THE OWNER. THE PROJECT SHALL BE LEFT CLEAN AND CLEAR, TO THE SATISFACTION OF THE OWNER, AND THE DISPOSITION OF ALL SALVAGED MATERIALS IS TO BE CLEARED WITH THE OWNER PRIOR TO REMOVAL THE PREMISES SHALL BE SWEPT CLEAN DAILY OF RELATED CONSTRUCTION DEBRIS. 26. PUNCH-LIST UPON SUBSTANTIAL COMPLETION OF THE WORK, THE GENERAL CONTRACTOR SHALL NOTIFY ARCHITECT TO SCHEDULE A "PUNCH LIST" WALK THROUGH 27. RESPONSIBILITIES OF SCOPE IT IS INTENDED THAT THE GENERAL CONTRACTOR PROVIDE A COMPLETE JOB AND ANY OMISSIONS IN THESE NOTES OR IN THE OUTLINE OF WORK SHALL NOT BE CONSTRUED AS RELIEVING THE GENERAL CONTRACTOR OF SUCH RESPONSIBILITIES IMPLIED BY THE SCOPE OF WORK EXCEPT FOR ITEMS SPECIFICALLY NOTED. 28. UNENFORCEABLE DOCUMENTS SHOULD ANY PORTION OF THE CONTRACT DOCUMENTS PROVE TO BE, FOR WHATEVER REASON, UNENFORCEABLE, SUCH UNENFORCEABILITY SHALL NOT EXTEND TO THE REMAINDER OF THE CONTRACT NOR SHALL IT VOID ANY OTHER PROVISIONS OF THE CONTRACT. 29. CURRENT DOCUMENTS THE GENERAL CONTRACTOR SHALL HAVE A COPY OF THE LATEST SET OF CONTRACT DOCUMENTS ON THE JOB SITE AT ALL TIMES FOR REVIEW BY ARCHITECT. 30. COMPLIMENTARY DOCUMENTS ALL DRAWINGS AND CONSTRUCTION NOTES ARE COMPLIMENTARY AND WHAT IS CALLED FOR BY ONE SHALL BE BINDING AS IF CALLED FOR BY ALL 31. RECORD DOCUMENTS COMPLETE RECORD DOCUMENTS TO BE MAINTAINED SEPARATELY FROM THE FIELD SET. THE RECORD SET SHALL HAVE ALL FIELD CHANGES DOCUMENTED AND WILL BE HELD BY ARCHITECT AT THE COMPLETION OF PROJECT. 32. MATERIAL STORAGE THE GENERAL CONTRACTOR SHALL RECEIVE MATERIALS TO JOB SITE ONLY Vr N READY FOR INSTALLATION. THE GENERAL CONTRACTOR IS TO PROVIDE A ;CLEAN, SECURE & LOCKE_C STORAGE AREA FOR SUCH MATERIALS AS REQUIRED. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL MATERIAL DELIVERED & SIGNED FOR AT JOB SITE. 33. SCOPE OF WORK THE WORK INCLUDES THE FURNISHING OF ALL LABOR, MATERIALS, EQUIPMENT AND SERVICES NECESSARY FOR, AND REASONABLY INCIDENTAL TO, THE COMPLETION IN PLACE OF ALa -WORK ILLUSTRATED AND DESCRIBED IN THE DRAWINGS AND SPECIFICATIONS. ALLI SUCH WORK IS TO BE DONE UT THE CONTRACTORS UNLESS OTHERWISE NOTED. nverA �ArAlte Iture &� Design, III. 34. LEAD -TIMES THE GENERAL CONTRACTOR SHALL SUBMIT CONFIRMATIONS WITH DELIVERY DATES OF ORDERS 6675 \\V/estlwood 91vo. Suite 140 FOR MATERIALS AND EQUIPMENT ON ANY LONG LEAD -TIME ITEMS. Or ando,lorido 32821 DRAWING SYMBOLS rd ROOM NAME ® ROOM NUMBER ODOOR MARK -� PARTITION TYPE HR OMATERIAL -X FINISH MARK OEQUIPMENT MARK 'COL. COLUMN LINES COL. WORKING POINT OR DATUM -Q MATCH LINE NORTH ARROW -D FIRE EXTINGUSHER X number BUILDING 7 sheet SECTION X number WALL sheet SECTION X number DETAIL sheet MARK r 01 EL .X.X 0 INTERIOR EVATIONS 0 1 REVISION # finish grade SPOT existing grade ELEVATIONS existing grade CONTOURS finish grade a O - T. 407.351.878/ I�. 40/.351.9254 �: Info @Mavei icy}- �rcl�Des.com AA. 26000903 91835 a conceptua ly inJepenlnt forum r O M M 4_0 -L N O C �_ (n E M -w p L0 � O U) 0 CD C* 0 0 Co L�IVI�r. � %eF, I � OF 1 a A Responsibility Schedule General Condition T i 1 ■ Drawing No. 1 I , f�/ H C 0 W a O - _ Q D' y W Z LL fA W0 LU U) Ir Q � %eF, I � OF 1 a A Responsibility Schedule General Condition T i 1 ■ Drawing No. 1 I , f�/