Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
05-893-012
N M L K J H G F E 0 F <B is Z ,A 9 1 2 3 4 5 7 A @� q I 10 11 12 13 14 N1 G ___� ENERAL HVAC NOTES 1. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR DEMOLITION AND REMOVAL OF EXISTING DUCTWORK, DIFFUSERS, GRILLES, CONTROLS, ETC., AS REQUIRED TO FACILITATE NEW INSTALLATiONS. 2. NEW DUCTS USED TO CONVEY THE CONDITIONED AIR SUPPLY AND VENTILATION AIR ARE TO BE MADE OF CONTINUOUS SHEET METAL 3. DUCT LININGS (THERMAL AND ACOUSTICAL), FLEXIBLE VIBRATION 1 ISOLATION CONNECTORS, DUCT CONNECTORS, AND DUCT TYPE TO BE APPROVED BY CODE AND LANDLORD. LINER SHALL COMPLY WITH SMOKE DEVELOPMENT AND FLAME SPREAD RATING FOR MALL 4. CONTRACTOR SHALL VERIFY ALL AS —BUILT SITE CONDITIONS PRIOR TO BID AND INCLUDE IN BID ALL COSTS TO MAKE FIELD COORDINATION AND ADJUSTMENT TO DUCTWORK FOR FIT INTO EXISTING STRUCTURE. CONTRACTOR SHALL VERIFY AND FIELD COORDINATE FINAL LOCATION OF MECHANICAL EQUIPMENT. 5. MECHANICAL PLANS ARE DIAGRAMMATIC, NOT SHOWING EVERY ITEM IN EXACT LOCATION OR DETAIL MEASUREMENTS AND LOCATIONS MUST BE FIELD VERIFIED AND COORDINATED WITH ARCHITECTURAL, HVAC, FIRE PROTECTION, STRUCTURAL, ELECTRICAL AND OTHER BUILDING DRAWINGS. 6. TENANT MECHANICAL CONTRACTOR SHALL PROVIDE FIRE DAMPERS AND FIRE STOPS AS REQUIRED BY CODE, COORDINATE WITH LOCAL BUILDING OFFICIAL AND MALL ENGINEER. 7, FLEX CONNECTIONS TO DIFFUSERS ARE INSULATED FLEX WITH A MAXIMUM LENGTH OF 5 FT. 8. ALL WORK SHALL BE IN STRICT ACCORDANCE WITH ALL APPLICABLE CODES AND ORDINANCES. 9. MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF ALL TRADES, LANDLORD REQUIREMENTS, CEILING HEIGHTS AND EXISTING STRUCTURAL CONDITIONS PRIOR TO FABRICATION OF ANY DUCTWORK OR ORDERING OF ANY EQUIPMENT. 10. MECHANICAL CONTRACTOR TO PROVIDE TENANT WITH AS —BUILT DRAWINGS, ALL EQUIPMENT SHOP DRAWINGS, INFORMATION ON THERMOSTATS, CONTROL WIRING DIAGRAMS AND OTHER PERTINENT INFORMATION AT COMPLETION OF PROJECT. 11. ROUND RIGID SUPPLY AIR DUCTS SHALL BE EXTERNALLY INSULATED WITH 1" THICK, 1.5 LBS. DENSITY FOIL FACED FIBERGLASS INSULATION. 1 1 2 1 3 1 4 1 311 OF CHILLED WATER AT 45 F EVff @ 12 FT. FD. WrV. SEE SHEET M201 FOR MECHANICAL CODED NOTE 0T' CHILLED WATER BLOWER COIL UNIT SCHEDULE DESIGN DRAWINGS ARE SCHEMATIC. THIS CONTRACTOR SHALL VISIT THE UNIT NUMBER TRANE MODEL SUPPLY FAN VOLTAGE ELECTRIC HEAT CHILLED WATER COIL CONDITIONS. CONTRACTOR SHALL VERIFY EXACT LOCATIONS AND HP z SP RPM KW S ROWS GPM W TOTAL MBH O.A. CFM NOTES 1 AHU -1 39LA012 5 5100 2..96-111791 ANY DISCREEPPANCIES 1 VEERGININGG COODDES AND EDESIGN 480/30 19.0 4 6/14/FC 31.1 2.4 186.53 870 G) © (3) BRANCH DUCT SPIN —IN FITTING AND VOLUME DAMPER CHILLED WATER COIL 1. Capacity based on 45 EWT 57 LWT. 2. Control valve 2 Way NOTES: 1. Unit shall be packaged blower coil unit. 2. Furnish unit with the following factory installed options. — Thermostat control interface package. — Electric heater (If required). 3. Fumish with the following field Installed options: — Factory fabricated piping package Including, 2 position 24V control valve, flow setting device, inlet ball valve and strainer. — 2 position outside air damper actuator. — Programmable night setback thermostat. 4. Installing contractor shall provide all low voltage wiring. Startup and first year labor warranty is provided by unit manufacturer. 5 A 7 CHILLED WATER SEQUENCE OF OPERATION 1) UNIT SHALL BE ACTIVATED BY THE TiME SCHEDULE PROGRAMMED INTO THE LANDLORDS BUILDING MANAGEMENT SYSTEM. DDC CONTROLLER SHALL MODULATE CHILLED WATER CONTROL VALVE BASED ON THE TEMPERATURE IN THE SPACE IR TEMPERATURE SENSOR. BASE S TPOIN OF 0 D SHALL BE ESTABLISHED AT THE THE UNIT IS DEACTIVATED THE 1 CONTROL VALVE�SHALL BE CLOSED. 2) THE FOLLOWING PARAMETERS SHALL BE REPORTED BACK TO THE BUILDING MANAGEMENT SYSTEM: RETURN AIR TEMPERATURE, MIXED AIR TEMPERATURE, COIL LEAVING AIR TEMPERATURE, FILTER DIRTY CONDITION, UNIT STATUS, AND VALVE PERCENT OPEN. 3) UNIT AND LOCAL SMOKE DETECTORS PROVIDED BY THE FIRE AND SMOKE ALARM SYSTEM SHALL SHUT DOWN THE UNIT DIRECTLY ACCORDING TO FIRE AND SMOKE ALARM CRITERIA ESTABLISHED BY THE FIRE AND SMOKE SYSTEM INSTALLER. LANDLORD NOTE 1. TENANT'S CHILLED WATER PIPING MUST BE CLEANED AND FLUSHED BY LANDLORD APPROVED CONTRACTOR, PRIOR TO FINAL CONNECTION TO MALL PIPING. NQjE; IT IS REQUIRED THAT THE MECHANICAL DESIGN DRAWINGS ARE SCHEMATIC. THIS CONTRACTOR SHALL VISIT THE CONTRACTOR MUST VISIT THE JOB SITE TO SITE PRIOR TO BIDDING OR AWARD OF CONTRACT TO INSPECT EXISTING FAMILIARIZE HIMSELF WITH MAJOR ITEMS SUCH AS FIELD CONDITIONS. THIS CONTRACT SHALL INCLUDE ALL LABOR AND STRUCTURAL ELEMENTS, PLUMBING LOCATIONS AND MATERIALS NECESSARY FOR FIELD MODIFICATIONS DUE TO EXISTING ELECTRICAL RUNS. ADDITIONALLY MECHANICAL CONDITIONS. CONTRACTOR SHALL VERIFY EXACT LOCATIONS AND THE CONTRACTOR SHALL CONTACT THE ARCHITECT, ENGINEER OR OWNER DIMENSIONS OF SUCH ITEMS AS HVAC UNITS, PRIOR TO BIDDING FOR INTERPRETATIONS AND CLARIFICATIONS OF THE DUCTWORK, ETC. PRIOR TO BID, AND CONTACT THE DESIGN AND INCLUDE IN HIS BID ALL COSTS TO MEET THE DESIGN INTENT. CLARIFICATIONS MADE BY THE ARCHITECT, ENGINEER OR OWNER OWNERS CONSTRUCTION REP./ ARCHITECT / ENGINEER AFTER BIDDING WILL BE FINAL AND SHALL BE IMPLEMENTED AT AND REPORT ANY DIFFERENCES/ DISCREPANCIES IN CONTRACTORS COST. THE DRAWINGS FOR A DECISION. BIDDING CONTRACTORS SHALL HAVE A WORKING KNOWLEDGE OF LOCAL MECHANICAL PLANS ARE DIAGRAMMATIC, NOT SHOWING CODES AND ORDINANCES AND SHALL INCLUDE IN THEIR BIDS THE EVERY ITEM IN EXACT LOCATION OR DETAIL COSTS FOR ALL WORK INSTALLED IN STRICT ACCORDANCE WITH MEASUREMENTS AND LOCATIONS MUST BE FIELD GOVERNING CODES, THE PLANS AND SPECIFICATIONS NOT WITHSTANDING. CONTRACTOR ARCHITECT, OF VERIFIED AND COORDINATED WITH ARCHITECTURAL, ANY DISCREEPPANCIES 1 VEERGININGG COODDES AND EDESIGN HVAC, FIRE PROTECTION, STRUCTURAL, ELECTRICAL INTENT. AND OTHER BUILDING DRAWINGS. SYMBOL SCHEDULE SYMBOL DESCRIPTION ® SUPPLY AIR DIFFUSER HVAC EQUIPMENT AS NOTED zRETURN AIR GRILL OR DUCT JJJ JJ J TURNING VANES TV OT THERMOSTAT (S— DENOTES SENSOR) A DUCT TRANSITIONS DUCT SMOKE DETECTOR BRANCH DUCT SPIN —IN FITTING AND VOLUME DAMPER VERIFY ALL CONDITIONS IN �7 10 11 FIELD ,2 I PRIOR TO 13 11 BID ,a M— Ketall tnglneering, Inc. MPE Systems Engineering 750 Brooksedge Blvd. Westerville, OH 43081 614.818.2323 Fax: 614.818.2337 eoldenburg®m— corporations.com 17 1524 Delancey Street Philadelphia, PA 19102 www.epg3.com t. 215.735.1524 L 215.735.4949 05.26.05 FIRE REVIEW COMMENTS 1 04.19.05 ISSUED FOR TENANT AND BUILDING DEPARTMENT N/A REVIEW Date Issue Rev. No. U P Against The Wall Space No. A -10 The Shops at Sunset Place South Miami, FL Mechanical 1,1 No.: 0504005 Plan E°0 3 ONO, qD1 15 16 17