05-893-000r
May 25, 2005
Attn: H. Borrego
Via: Expeditor hand delivery
Re: Up Against the Wall
The Shops at Sunset Place
Space No. A -10
_Fire Protection Plan Review Comments Response
FD Tracking Number: 06080
Dear Mr. Borrego
- tio(� *.... :
sees
•
0000..
0000
see•
e
•• •
• • •
sees
•0.000
•
•
••
• . .
0000
0000
• e
see•
The following is in response to your comments dated May 20, 2005:
• 1. Please refer to the revised Sheet G.003 Door Schedule and Finish Legend for
revised door sizes.
2. Please refer to Sheet D.101 Demolition Plan and Elevation for revision indicating
demolition of existing partition between the sales area and bathroom corridor.
3. Please refer to Sheet A.101 Floor Plan and Partition Details for revised egress
corridor width along toilet rooms and relocation of H.C. fitting room door to
provide a clear egress path.
4. Please refer to Sheet A.201 Reflected Ceiling Plan for revised lighting layout
per relocation of toilet room corridor wall.
5. Please refer to Sheet A.301 Interior Elevations for revisions reflecting new wall
and fitting room door locations.
6. Please refer to Sheet A.502 Miscellaneous Details for revised fitting room
door and bench width.
a�
r
0000.
0000.
0000..
•
sees••
•
sees••
•
0000
0000
Miami -Dade County
1524„ y sheet
Fire Engineering & Water Supply Bureau
Ph�ladrlphia, phia, PA 19102
� g PP Y
11805 SW 26 Street, Suite 150
w"."3 com
Miami, FL 33175
1 215 735 1524
f. 2 t : 735 4949
Attn: H. Borrego
Via: Expeditor hand delivery
Re: Up Against the Wall
The Shops at Sunset Place
Space No. A -10
_Fire Protection Plan Review Comments Response
FD Tracking Number: 06080
Dear Mr. Borrego
- tio(� *.... :
sees
•
0000..
0000
see•
e
•• •
• • •
sees
•0.000
•
•
••
• . .
0000
0000
• e
see•
The following is in response to your comments dated May 20, 2005:
• 1. Please refer to the revised Sheet G.003 Door Schedule and Finish Legend for
revised door sizes.
2. Please refer to Sheet D.101 Demolition Plan and Elevation for revision indicating
demolition of existing partition between the sales area and bathroom corridor.
3. Please refer to Sheet A.101 Floor Plan and Partition Details for revised egress
corridor width along toilet rooms and relocation of H.C. fitting room door to
provide a clear egress path.
4. Please refer to Sheet A.201 Reflected Ceiling Plan for revised lighting layout
per relocation of toilet room corridor wall.
5. Please refer to Sheet A.301 Interior Elevations for revisions reflecting new wall
and fitting room door locations.
6. Please refer to Sheet A.502 Miscellaneous Details for revised fitting room
door and bench width.
a�
r
0000.
0000.
0000..
•
sees••
•
sees••
•
0000
0000
ti
P
Enclosed please find three revised sets of signed and sealed revised coordinated
Architectural and MEP Drawings for your review.
Sincerely,
PV Aa�
Richard Gelber, AIA
SPG3
......
......
-41
SIMON"
,iiii
a
Heather Raylinsky
SPG3
1524 Delancey St.
Philadelphia, PA 19102
Phone #: (215) 735 -1524
Reference: PRELIMINARY DESIGN REVIEW •� ;..000 6666:0.
Up Against The Wall Shops at Sunset Place #0303; • • '
Space #: OA10 South Miami, FL :' •
.. 0000
0000
Dear Ms. Raylinsky: " • • • • ' •
Your preliminary design documents have been reviewed and they are approved 11VIA16ted. One set of •�
• plans marked with review comments is enclosed for your records. Additional comments are as listed
herein:
See comments on enclosed drawings
You should now proceed to develop construction documents incorporating these comments and submit
them for final review not later than 04/20/2005. Please note that we require one reproducible set and
three sets of prints for that review.
'Final construction documents must Include the completed Mechanical and Electrical Checklist
forms, complete design documentation, and calculation forms. The Landlord - supplied Load
Calculation Summary, Mechanical System Summary, and Electrical Load Summary forms must be
completed. Failure to include this information with the submittal will delay the approval process.
Please contact me if you require any additional information to facilitate your final submittal.
• Sincerely,
obert L. or ay
Sr. Tenant Coordinator 317 - 263 -7916
Copy: Tenant File
TCO21 /ssk
115 West Washington Street, Indianapolis, IN 46204
317 6361600 1 www simon com
0000.
;•��•;
•�•*4pril 4, 2005 ;
:60.6:
ViaalL - 2ncfday.
•
• : .
0 •
0000 .0600.
• .
.
.••• • 0660.9
0000
6.6.'
Reference: PRELIMINARY DESIGN REVIEW •� ;..000 6666:0.
Up Against The Wall Shops at Sunset Place #0303; • • '
Space #: OA10 South Miami, FL :' •
.. 0000
0000
Dear Ms. Raylinsky: " • • • • ' •
Your preliminary design documents have been reviewed and they are approved 11VIA16ted. One set of •�
• plans marked with review comments is enclosed for your records. Additional comments are as listed
herein:
See comments on enclosed drawings
You should now proceed to develop construction documents incorporating these comments and submit
them for final review not later than 04/20/2005. Please note that we require one reproducible set and
three sets of prints for that review.
'Final construction documents must Include the completed Mechanical and Electrical Checklist
forms, complete design documentation, and calculation forms. The Landlord - supplied Load
Calculation Summary, Mechanical System Summary, and Electrical Load Summary forms must be
completed. Failure to include this information with the submittal will delay the approval process.
Please contact me if you require any additional information to facilitate your final submittal.
• Sincerely,
obert L. or ay
Sr. Tenant Coordinator 317 - 263 -7916
Copy: Tenant File
TCO21 /ssk
115 West Washington Street, Indianapolis, IN 46204
317 6361600 1 www simon com
9411. W. a �' %
r f Miami -Dade DERM
NOTICE OF NESHAP REQUIREMENTS AND Air Facilities section
33 AFFIDAVIT FOR ASBESTOS SURVEY MMiami,VFllorriidaa3330 -1540 g
1. Project Type: [ ] Demolition Renovation [ ] Roofing DERM Process Number
2. Project Address S sA'7_ Lw-
City State /Z Zi p Code '7 t
�` l 21 County/) l /i+lh,i - C.4oc
3. Project Dates (mm /dd. /yy): Start Q (0 Finish ;)3 h SIC-)
U
4. Contractor
Florida License #
i. Give a brief Description of work to be done at the above mentioned address- (Include scope of work, and the estimated
area in square feet that will be impacted by the project) _
A r-) ?3 E- rA I1,AYOvr i1 4
tom+ I ITT t 1Lrt't f-J- ,1t— .tE./V /t- sic- iU ir:,r t- iI\ I ,: -JI ru',.4-- fv' ��•i i ;► �.
I the undersigned hereby attest that I am aware of the following:
1. Pursuant to 40 CFR 61, subpart M, section 145 (a) and 469.001 -015 Florida Statutes an asbestos survey at the above
referenced property may be required prior to any renovation or demolition activity.
2. Pursuant to 40CFR 61, subpart M, section 145 (c) and 469.001 -015 Florida Statutes, all regulated asbestos containing
materials (RACM) must be removed prior to any renovation activity that may impact the RACM at the above
referenced property.
3. Pursuant to 40CFR 61 subpart M, section 145 (c) and 469 001 -015 Florida Statutes, all regulated asbestos containing
materials (RACM) must be removed prior to any demolition activity that impacts the (RACM) at the above referenced
property.
4. Pursuant to 40 CFR 61 subpart M, section 145 (b) and 469 001 -015 Florida Statutes, a written notification must be
submitted to DERM at least 10 working days prior to demolition or asbestos abatement activity at the above referenced
property.
Additionally I am aware that violations of the above referenced regulations may result in civil or criminal prosecution or
both or penalties and fines of up to $25,000 per day per violation.
Name in Print (Owner, Lessee or uthorized Representative) /Title Business Name
+ -� ig,i ltUIef(Qwner, Lessee 0 uthorized Representative) Telephone Number
QNbNGrizedAyihorization Letter is required)
T;AT,IY 0j ,FLORIDA )
T `�PM Y P, I,b.ADP_ ) ss.- Permit Applicant, if different (Print Name and Signature)
TI>p &r$gbin'g- &sstrument was acknowledged before me this day of 11 , 200•, by-
who has produced, as identification and who did did not take an oath.
:. • rte I Carter
'rr, „�..;•,i _ti. t ( Catherine W.
t'1s e' Notary Public, District of Columbia
Notary Publie;` S�'e
,. , • r, f, r. My Commission Expires 01 -14 -2009
I•recewed- ttie,signed- Asbestos affidavit from
�and•offered him. a with a copy of the above - mentioned applicable regulations
Name of DERM P• rsonne / Section -( Dated Signature
r _ + ('
jThIS IS NOT A NESHAP NOTIFICATION
r '- ' See Reverse Side for Additional Information
I r
NRW
. �'
USE OF LICENSED ASBESTOS PROFESSIONALS
Effective July 1, 1994, Florida Statutes 469.001 -015 require that no person shall conduct an asbestos
survey, develop an operations and maintenance plan, prepare abatement specifications, or monitor and
evaluate asbestos abatement, unless licensed as an asbestos consultant by the State of Florida. No
person shall conduct asbestos abatement unless licensed as an asbestos contractor by the State of
Florida.
NOTIFICATIONS
Effective April 1, 1999, all NESHAP Notifications for projects in Miami -Dade County must be
submitted along with the applicable fees to:
Department of Environmental Resources Management
Air Facilities Section
33 SW 2nd Avenue
Miami, FL 33130
FOR INFORMATION PERTAINING TO ASBESTOS REGULATIONS, CONTACT
DERM'S AIR FACILTIES SECTION STAFF AT (305) 372 -6925
• VIOLATIONS OF FEDERAL NESHAP REGULATIONS, 40 CFR 61 SUB PART M, SUCH AS, FAILURE
TO MAKE PROPER ADVANCE NOTIFICATION OF RENOVATION AND DEMOLITION OPERATIONS
INVOLVING ASBESTOS MAY RESULT IN SUBSTANTIAL PENALTIES AND OR CRIMINA_ L'-
CHARGES.
• A CITY /COUNTY DEMOLITION OR RENOVATION PERMIT DOES NOT CONSTITUTE A NESHAP
NOTIFICATION.
THIS IS NOT A NESHAP NOTIFICATION
See Reverse Side for Additional Information
MIAMI -DADE COUNTY FIRE RESCUE
i
1
REQUEST FOR MUNICIPALITY PLANS RE`
1
11Fire Dept. Plan Tracking # (FOR OFFICE USE.)
re FOR REWORK OR REVISION.)
\'\'F tion #
Pe mit'T e (CHECK ONE.)
Building Permit
0 Fire Alarm Permit
0 Sprinkler System Permit
0 Fire Suppression/System Type:
❑ Water Main Ext./Fire Hydrant
❑ Other Permit
Review Status (CHECK ALL THAT APPLY.)
ew Permit Application
work of a plan still in process
OpReyision to an existing permit
0 Ex fired Permit or Renewal
0
of Jkpplicable for Fire Review
Permit Information (CHEC Olu d
Stand -alone Permit
❑ Subsidiary Permit -
0 Master Permit �I
SCOPE OF WORK: 1v -a7Z�2
PLEASE PRINT ALL INFORMATION CLEARLY
Project Name: L2Q 11641Aie,7- /;4 OA l/
i
Job Address: 57vo
Municipality of: G'/ OF /�/ �'/ /A/Yr i State: Zip:
Contact Person: GuAyNe l-4 �F.it- Company Name: if&
Phones: #1 (?S"-/ ) a415-- # 2
Permit Relationship: (i.e. Owner, Arch., Eng Expeditor Contractor, etc.)
Cost of Contract: S 17&0aa dam Square Footage: 3,;?6"e
Number of Heads/Devices: Number of Units:
Number of Stories:
: Our department will snake every effort to have Fast Track review within 3 -5 business days and Drop Off review within 9 business
1 have read the above NOTE and I am requesting a Special Request Plans Review to be scheduled as soon as possible
the rate of $190 for the first hour and $65 per each additional hour in addition to the review fees. Minimum charge
Signature: &/lQ — Print Name: &)A3sjR 2-47-7-1'6z
For Office Use Only
Registered by: / Date: D ��
Drop Off Review: erack Review: N /A:
L
Approved Disapproved N/A Fee S
For plan review information call Miami -Dade County Fire Engineering (786) 315 -2771
a
For inspections call Miami -Dade County Fire Prevention (786) 3314799 '4,
-DARE CO
Fire Dept. Plan Tracking # (FOR OFFICE USE.)
Previous Track # (FOR REWORK OR REVISION.)
Fire Dept. Application #
CHECK ONE.)
)wilding Permit
D Fire Alarm Permit
D Sprinkler System Permit
0 Fire Suppression/System Type:
❑ Water Main Ext Mit-e Hydrant Permit
0 Other Perm
.iECK ONE.)
XS`tand -a
• Subsidi
• Master
FIRE RESCUE
aD
- **70E
Aen
Review Status (CHECK ALL THAT APPLY.)
0 New Permit Application
0 Rework of a plan still in process
D Revision to an existing permit
D Expired Permit or Renewal
0 Restamp
0 Not Applicable for Fire Review
0 Other
SCOPE ,% WORK:
PLEASE PRINT ALL INFORMATION CLEARLY
Project Name: G x//(e
Job Address: S290 SuM/S,rr
Municipality of: fW%Xiw State: Zip:
Contact Person: 4_')xymt Zw MZ 2 Company Name:
Phones: #1 (2f�) �?`�s� 0` 513 it 2 (9SY
Permit Relationship: (i.e. Owner, Arch., Et , Expeditor ontractor, etc.)
Cost of Contract: $_ 17S /Gg9, CO Square Footage: 3aR0 Number of Stories:
Number of Heads/Devices:
Number of Units:
Our deportment will make every effort to have Fast Track review within 3 -5 business days and Drop Off review within 9 business
have read the above NOTE and I am requesting a Special Request Plans Review to be scheduled as soon as possible
he rate of $190 for the first hour and $65 per each additional hour in addition to the review fees. Minimum charge
e
o -hour.
Signature: '� Print Name: ;z/Bj9��
or Office Use Onlyf
egistered by: Date: U
i)a__' . Drop Off Review: S Fastrack Review: N /A:
Approved Disapproved N/A Fee S
For plan review information call. Miami -Dade County Fire Engineering (786) 315 -2771
For inspections call: Miami -Dade County Fire Prevention (786) 3 4798
r
r�
h
ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION
Florida Department of Community Affairs
EnergyGauge FlaCom v1.22 FORM 40OB -2001
Selected Component Compliance for Commercial Buildings
Jurisdiction: SOUTH MIAMI, DADE COUNTY, FL (233300)
Short Desc: 0504005 Project: UP AGAINST THE WALL•
Owner: U13 AGAINST THE WALL
• • • • •
• • • :'
Address: SOUTH MIAMI, FL .. •
; :
•
5701 SUNSET DRIVE ; :
• ""
•
City: SOUTH MIAMI :. •..: • • • •
•
: :
:...
State: FLORIDA PermitN ��60
o: O
0000..
•
Zip: 33143 Storeys: l• '. 0
••••
Type: Retail (mercantile) GrossArea: 3LL7.. off:** • •' 0
. ; ..
Class: Addition to existing Building Net Area: 3117 :00000
0000..
Max Tonnage: 0 fif�lffprent, write in)
•
..�
Compliance Summary' 0000
0000
...
• • • 0000
••
:
Component Design � • • criteria
Re t' .'
� •
•
• WHOLE OR ENVELOPE Compliance
Not Requested
Other Envelope Requirements
Not Requested
LIGHTING POWER 10,730.40 17,456.04
PASSES
LIGHTING CONTROLS
PASSES
"
EXTERNAL LIGHTING
Not Requested
HVAC SYSTEM
PASSES
PLANT
Not Requested
WATER HEATING SYSTEMS
PASSES
PIPING SYSTEMS
Not Requested
Mc' all required compliance from Check List?
Yes/No/NA
IMPORTANT NOTE: An input report Print -Out from EnergyGauge FlaCom of
this design building must be submitted along with this Compliance Report.
4/14/2005
EnergyGauge FlaCom FLCCSB v1.22
�z
COMPLIANCE CERTIFICATION:
I hereby certify that the plans and
Review of the plans and specifications covered by this
specifications covered by this calculation are
calculation indicates compliance
with the Florida Energy
in compliance with the Florida Energy
Code. Before construction is completed, this building will be
Efficiency Code.
inspected for compliance in accordance with Section
553.908, F.S.
PREPARED BY: DAVID F. GONZALEZ
BUILDING OFFICIAL:
(W) (W) (W)
DATE:
DATE:
•
Circulation Area) Applicable
.•••••
I hereby certify that this building is in compliance
•
..
with the Florida Energy Efficiency Code.
• • • •
;
' . :.: 000900
OWNER AGENT•
s
. • • • • ;
• •..
DATE:
•
If required by Florida law, I hereby certify (') that the system design 1s' 1A
• • • • :.
;...VEGIS'i`� ..f ON
compliance with the Florida Energy Code.
• •
No.
ARCHITECT:
ELECTRICAL SYSTEM DESIGNER: DAVID F. GONZALEZ '
s e oo
• .. •54327
• •
LIGHTING SYSTEM DESIGNER:
41 0090 •• •
MECHANICAL SYSTEM DESIGNER: DAVID F. GONZALEZ
•' 54327
PLUMBING SYSTEM DESIGNER: DAVID F. GONZALEZ
(') Signature is required where Florida Law requires design to be performed by registered design professionals.
Typed names and registration numbers may be used where all relevant information is contained on signed /sealed
plans.
Project: 0504005
Title: UP AGAINST THE WALL
Type: Retail (mercantile)
Location: SOUTH MIAMI, DADE COUNTY, FL (233300)
(WEA File: Miami.tmy)
Lighting Power Compliance
Space Ashrae Description Area Height No. of AF Design Effective Allowance
ID (sq.ft) (ft) Spaces
(W) (W) (W)
UATW 98 Retail Establishments 3,117 18.0 1 1.00
12624 10730 17,456
(Merchandising &
Circulation Area) Applicable
to all lighting, including
accen
Design 12624 (V)
PASSES
Effective: 10730.4 M
Allowance: 17456.04
4/14/2005 EnergyGauge FlaCom FLCCSB v1.22 2
r
4/14/2005 EnergyGauge FlaCom FLCCSB v1.22 3
•
•
•
•
••
•
•
Project: 0504005
Title: UP AGAINST THE WALL
APR 19 2005
Type: Retail (mercantile)
Location: SOUTH MIAMI, DADE COUNTY, FL (233300)
Sp93
(WEA File: Miami.tmy)
I
Lighting Controls Compliance
Acronym Ashrae Description
Area No. of Design Min Compli-
ID
(sq.ft) Tasks CP CP ance
UATW 98 Retail Establishments
3,117. 1 87 9 7Ppsy's
(Merchandising & Circulation
.....
". •
•
Area) Applicable to all lighting,
, .
including accen
• • • "'
:L
PASS S .'
•
Project: 0504005
. •
Title: UP AGAINST THE WALL
•
Type: Retail (mercantile)
." . • • • ;
Location: SOUTH MIAMI, DADE COUNTY, FL (233300)
(WEA File: Miami.tmy)
"660%
. _ ::0
,
System Report Comphainie •
UATW System 1
Constant Volume Packaged ;0.00f Units
System 1
Component Category Capacity
Design Eff Design IPLV Comp -
Eff Criteria IPLV Criteria fiance
Cooling System Water Cooled < 65000 Btu/h
9.50 9.30 9.50 8.30 PASSES
Cooling Capacity
Air Handling Air Handler (Supply) -
0.80 0.80 PASSES
System - Supply Constant Volume
PASSES
Project: 0504005
Title: UP AGAINST THE WALL
Type: Retail (mercantile)
Location: SOUTH MIAMI, DADE COUNTY, FL (233300)
(WEA File: Miami.tmy)
Water Heater Compliance
Description Type Category
Design Min Design Max Comp
Eff Eff Loss Loss lance
Water Heater 1 Instantaneous Water All ratings
PASSES
heaters - Electric
PASSES
4/14/2005 EnergyGauge FlaCom FLCCSB v1.22 3
•
•
•
•
••
•
•
t '
!R
Mechanical Compliance Certificate
2003 IECC
COMcheck- EZSoftware Version 3.0 Release 1
Data filename: comuatw.cck
Section 1: Project Information
Permit Number
Checked By/Date
Protect Name: UP AGAINST THE WALL
-
THE SHOPS AT SUNSET PLACE
5780 SUNSET DRIVE, SOUTH MIAMI, FL
Designer /Contractor: M- RETAIL ENGINEERING INC.
750 BROOKSEDGE BLVD.
WESTERVILLE, OH 43081
Document Author: DAVID KELLER
•
_
Section 2: General Information
•
•
• • •
Building Location (for weather data): South Miami, Florida
""
; • • • •;
Climate Zone: lb
• •
'
Heating Degree Days (base 65 degrees F): 200
. .
'....'
.. .
'
......
•
Cooling Degree Days (base 65 degrees F): 4198
•
.
Project Type: Addition
:
•
9600:6
.';
. •
•
Section 3: Mechanical Systems List
..
` Quantity
System Jae & Description
0000
.. •
- 1 HVAC System 1: Heating: Other, Electric / Cooling: Hydronic Coil, Capacity >
=135 - <240 kBtu/h,
` Water - Cooled Condenser / Single Zone
• •
Section 4: Requirements Checklist
Bldg.
Dept.
Use
Requirements Specific To: HVAC System 1
[ ] 1. Balancing and piessure test connections on all hydromc terminal devices
Generic Requirements: Must be met by all systems to which the requirement is applicable
[ ] 1. Load calculations per 1997 ASHRAE Fundamentals
[ ] 2. Plant equipment and system capacity no greater than needed to meet loads
- Exception: Standby equipment automatically off when primary system is operating
- Exception: Multiple units controlled to sequence operation as a function of load
[ ] 3. Minimum one temperature control device per system
[ ] 4. Minimum one humidity control device per installed hurmdification/dehumidification system
[ ] 5. Thermostatic controls has 5 deg. F deadband
i
I
- Exception: Thermostats requiring manual changeover between heating and cooling
' [ ] 6.
Automatic Controls: Setback to 55 deg. F (heat) and 85 deg. F (cool); 7 -day clock,
-
2 -hour occupant override, 10 -hour backup
'
- Exception: Continuously operating zones
- Exception: 2 kW demand or less, submit calculations
[ ] 7.
Automatic shut -off dampers on exhaust systems and supply systems with airflow >3,000 cfm
[ ] 8.
Outside -air source for ventilation; system capable of reducing OSA to required minimum
[ ] 9.
R -5 supply and return air duct insulation in unconditioned spaces
R -8 supply and return air duct insulation outside the building
R -8 insulation between ducts and the building exterior when ducts are part of a building assembly
- Exception: Ducts located within equipment
`
- Exception: Ducts with interior and exterior temperature difference not exceeding 15 deg. F.
[ J 10.
Ducts sealed - longitudinal seams on rigid ducts; transverse seams on all ducts;
UL 181A or 181B tapes and mastics
- Exception: Continuously welded and locking -type longitudinal joints and seams on ducts
operating at static pressures less than 2 inches w.g. pressure classification
[ ] 11.
Mechanical fasteners and sealants used to connect ducts and air distribution equipment
[ ] 12.
Hot water pipe insulation: 1 in. for pipes < =1.5 in. and 2 in. for pipes >1.5 in.
Chilled water /refiigerantfbrine pipe insulation: 1 in. for pipes < =1.5 in. and 1.5 in. for pipes >1.5 in.
_
Steam pipe insulation: 1.5 in. for pipes < =1.5 in. and 3 in. for pipes >1.5 in.
- Exception: Piping within HVAC equipment • • • • ..
- Exception: Fluid temperatures between 55 and 105 deg. F • • • •
...... ....
- Exception: Fluid not heated or cooled
•
- Exception: Runouts <4 ft in length
[ ] 13.
•
Operation and maintenance manual provided to building owner
[ ] � 14.
. • •
. .
Balancing devices provided in accordance with IMC 603.15 • • • • ....
[ J 15.
Stair and elevator shaft vents are equipped with motorized dampers •
] � 16.
• ••
Three -pipe systems not used
Section 5: Compliance Statement
....
The proposed mechanical design represented in this document is consistent with the building pla Ls� racificatioris died
-other calculations submitted with this permit application. The proposed mechanical systems have been designed to meet
- the 2003 IECC requirements in COM check -EZ Version 3.0 Release I and to comply with the mandatory requirements in
the Requirements Checklist.
�'Qia1 WJ gYl C,s � 6J
Principal Niec-haifl Deslgn kHge Signature Date
•••••
AL
Mechanical Requirements Description
2003 IECC
Lo
COMcheck- EZSoftware Version 3.0 Release 1
Data filename: comuatw.cck
The following list provides more detailed description of the requirements in Section 4 of the Mechanical Compliance
Certificate.
Requirements Specific To: HVAC System 1
1. Hydronic heating and cooling coils must be equipped with a way to pressure test connections and measure and
balance water flow and pressure.
- Generic Requirements: Must be met by all systems to which the requirement is applicable
1.
Design heating and cooling loads for the building must be determined using procedures equivalent to those in
Chapters 27 and 28 of the ASHRAE Handbook of Fundamentals or an approved equivalent calculation procedure.
2.
All equipment and systems must be sized to be no greater than needed to meet calculated loads. A single piece of
equipment providing both heating and cooling must satisfy this provision for one function with the capacity for the
other function as small as possible, within available equipment options.
•
-
- Exception: The equipment and/or system capacity may be greater than calculated loads fors os
���JY PAP g�•
.
Standby equipment must be automatically controlled to be off when the primary equipment and/or system 7s opg*ting.
- Exception: Multiple units of the same equipment type whose combined capacities exceed tlie'oaleulated loadese
• •
allowed if they are provided with controls to sequence operation of the units as the load incrdases or decreales? •
•...:
3.
Each heating or cooling system serving a single zone must have its own temperature control device.
0
4.
Each humidification system must have its own humidity control device. 0 . �'.
"• • •'
5.
*0000
Thermostats controlling both heating and cooling must be capable of maintaining a 5 degreeF deadband (g range
of
temperature where no heating or cooling is provided). "' • • •
• • 0 •
- Exception: Deadband capability is not required if the thermostat does not have automatic cbadge*er capability
•
between heating and cooling. 0 - 00 •
....
6.
The system or zone control must be a programmable thermostat or other automatic control mgertigg the following
_
••••
criteria:a) capable of setting back temperature to 55 degree F during heating and setting up % 83 degree F &&jpt
••••
-
coolingb) capable of automatically setting back or shutting down systems during unoccupierbhom* using 7 different
-
day schedulesc) have an accessible 2 -hour occupant overrided) have a battery back -up capable of maintaining
• • • . •
-
programmed settings for at least 10 hours without power.
- Exception: A setback or shutoff control is not required on thermostats that control systems serving areas that operate
continuously.
- Exception: A setback or shutoff control is not required on systems with total energy demand of 2 kW (6,826 Btu/h)
or less.
7.- Outdoor -air supply systems with design airflow rates >3,000 cfin of outdoor air and all exhaust systems must have
dampers that are automatically closed while the equipment is not operating.
8. The system must supply outside ventilation air as required by Chapter 4 of the International Mechanical Code. If the
- ventilation system is designed to supply outdoor -air quantities exceeding minimum required levels, the system must
be capable of reducing outdoor -air flow to the minimum required levels.
9. Air ducts must be insulated to the following levels:a) Supply and return air ducts for conditioned air located in
unconditioned spaces (spaces neither heated nor cooled) must be insulated with a minimum of R -5. Unconditioned
spaces include attics, crawl spaces, unheated basements, and unheated garages.b) Supply and return air ducts and
plenums must be insulated to a minimum of R -8 when located outside the building.c) When ducts are located within
exterior components (e.g., floors or roofs), minimum R -8 insulation is required only between the duct and the
building exterior.
- Exception: Duct insulation is not required on ducts located within equipment.
- Exception: Duct insulation is not required when the design temperature difference between the interior and exterior of
v
the duct or plenum does not exceed 15 degree F.
10. All joints, longitudinal and transverse seams, and connections in ductwork must be securely sealed using weldments;
mechanical fasteners with seals, gaskets, or mastics; mesh and mastic sealing systems; or tapes. Tapes and mastics
must be listed and labeled in accordance with UL 181A or UL 181B.
- Exception: Continuously welded and locking -type longitudinal joints and seams on ducts operating at static
pressures less than 2 inches w.g. pressure classification.
11. Mechanical fasteners and seals, mastics, or gaskets must be used when connecting ducts to fans and other air
distribution equipment, including multiple -zone terminal units.
12. All pipes serving space - conditioning systems must be insulated as follows:
Hot water piping for heating systems:
1 in. for pipes < =1 1 /2 -in. nominal diameter
2 in. for pipes >1 1 /2 -in. nominal diameter.
Chilled water, refrigerant, and brine piping systems:
1 m. insulation for pipes < =1 1 /2 -in. nominal diameter
1 1/2 in. insulation for pipes >1 1 /2 -in. nominal diameter.
Steam piping:
1 1/2 in. insulation for pipes < =1 1 /2 -in. nominal diameter
3 in. insulation for pipes >1 1 /2 -in. nominal diameter.
- Exception: Pipe insulation is not required for factory- installed piping within HVAC equipment.
- Exception: Pipe insulation is not required for piping that conveys fluids having a design operating temperature range
between 55 degrees F and 105 degrees F. 000000 *. 0
- Exception: Pipe insulation is not required for piping that conveys fluids that have not been heated or cooleii tv&gh
. .
.
e use of fossil fuels or electric power. .9900*0 .
- Exception: Pipe insulation is not required for runout piping not exceeding 4 ft in length and 1 in..in diameter 0
between the control valve and HVAC coil. . e 0
13. Operation and maintenance documentation must be provided to the owner that includes at leatir& following 0
infonnation:a) equipment capacity (input and output) and required maintenance actionsb) equipment op4at py and
maintenance manualsc) HVAC system control maintenance and calibration information, inc udmg:w=g diagrams,
schematics, and control sequence descriptions; desired or field- determined set points must b@ �ernmanently =eporded on
control drawings, at control devices, or, for digital control systems, in programming commextsd) compleis w6altive
of how each system is intended to operate. • 0 S 0 0 0 0
14. Each supply air outlet or diffuser and each zone terminal device (such as VAV or mixing box) mult have iU8*n
balancing device. Acceptable balancing devices include adjustable dampers located within the ductwork, terminal
devices, and supply air diffusers.
15. Stair and elevator shaft vents must be equipped with motorized dampers capable of being automatically closed during
normal building operation and interlocked to open as required by fire and smoke detection systems. All gravity
outdoor air supply and exhaust hoods, vents, and ventilators must be equipped with motorized dampers that will
automatically shut when the spaces served are not in use.
Exceptions:
- - Gravity (non - motorized) dampers are acceptable in buildings less than three stones in height above grade.
- Ventilation systems serving unconditioned spaces.
16. Hydronic systems that use a common return system for both hot water and chilled water must not be used.
S****
000005
Soso
Soo*
.0