Loading...
04-04-023TOP OF SLAT EXISTING 1 THIRD FLOOR EL. +31' -0" ly EXISTING TO REMAIN I� 71 �i EXISTING ROOF 0015TURDED) NUE GYP. W 4' GEILIN6 LEVEL TOP OF SLAGS - I 50HEMLED - • SECOND FLOOR - EL. +IV-O" II IN 11 E 15TIN6 2ND FLOOR f SLAB TO REMAIN II ii II I I EXISTING STRUCTURE I I T REMAIN I ( YOND) I i TOP TRACK FASTENED TO I I E51 DE OF SLAB II 112" RIGID INSULATION DIRECTLY I I ADHERED TO EXISTING CMU WALL WITH A TOTAL R VALUE OF -75 ALL EXTERIOR I I CONTINUE 6YP, EV 4' FINISHES r0 REMAIN f I P T 6EILIN6 LEVEL UNDISTURBED I ( (7 P) L - II it ( II I I NEW SUSPENDED ACGOUSTIG I I GEILINO SYSTEM SEE I REFLECTED CEILING PLAN ON I I SHEET A3D SERIES I I EX15TIN6 b" CNU BLOCK WALL TO REMAIN I (1) LAYER OF 6YP, BD OVER 113 1/2" METAL STUDS - SEE IP I I J PW55 FOR FIN15HE-5 II EXIT REMOVE EXISTING j CORRIDOR SLAB - SEE DEMO I I 1/2" PRE MOLDED PLAN ON SHEET AI.I EXPANSION ,JOINT I I BOTTOM TRACK I I FASTENED TO SLAB SCHEDULED EXI5TING SIPEWALK TO�i NG. 5LAB REMAIN / / j �OV�F� b, MIL. VAPOR TOP OF SL" /.BARRIER OVER COMP. 1 FIR5T FLOOR EL. +0'-6 REMOVE SOIL AS REQUIREP TO AGGOMODATE NEW SLAB (74 WALL SECTION SCALE: 3 /b" = 1' -0" U_ U_ C 1 NEW SUSPENDED AGGOUSTIG EXISTING ROOF SLAB W/ .145 I E ROOFG EXISTING GEILI146 5Y5TEM SEE I I 6" TRACK FASTENED TO b" MTL. STUDS W/ x10 TEK SGREW5 REFLECTED GEILIN6 PLAN ON (UNDISTURBED) I I I 1 I 12" R161D INSULATION DIRECTLY II SHEET A3D SERIES I WITH A TOTAL R VALUE OF 1.5 - I I CONTINUE TO UNDERSIDE OF I I EX16TIN6 b" GMU BLOCK it II U U U EXI5TIN6 12" GMU II I II I ! WALL TO REMAIN WALL TO REMAIN I i II I ALL EXTERIOR I 1 1/2" RI610 INSULATION II III 5 /6" GYP. BO. OVER 1/2" PLYWOOD, FINISHES TO REMAIN ATTACH TRACK TO EX151N6 FRICTION FIT BETWEEN "Z" EXTERIOR MASONRY WALL I I UNDISTURBED FURRING GHANNEL5 - TOTAL ACTUATED FASTENERS • b" I I I I !I R VALUE OF 75 Q [ 1 1/2" RI610 INSULATION DIRECTLY i I (1) LAYER OF 6YP. BD OVER ADHERED TO EXISTING CMU WALL BASKETBALL II I I 1 112' 'Z" CHANNEL FURRING 0 WITH A TOTAL R VALUE OF 1-5 1 1/2" RI610 INSULATION DIRECTLY I 24' O.G. - SEE ID PW65 FOR BOTTOM TRACK FASTENED TO WITH A TOTAL R VALUE OF '15 _ FINISHES EXI5TINc5 I I I I �v 5PINNING I I 5 /5" GYP. BD. OVER 1/6" METAL BASE AS SCHEDULED I I FURRING AT 24' O.G. I I NEW FLOOR FIN15H AS II I I TOP TRACK FASTENED TO TOP OF SLAGS - I 50HEMLED - • SECOND FLOOR - EL. +IV-O" II IN 11 E 15TIN6 2ND FLOOR f SLAB TO REMAIN II ii II I I EXISTING STRUCTURE I I T REMAIN I ( YOND) I i TOP TRACK FASTENED TO I I E51 DE OF SLAB II 112" RIGID INSULATION DIRECTLY I I ADHERED TO EXISTING CMU WALL WITH A TOTAL R VALUE OF -75 ALL EXTERIOR I I CONTINUE 6YP, EV 4' FINISHES r0 REMAIN f I P T 6EILIN6 LEVEL UNDISTURBED I ( (7 P) L - II it ( II I I NEW SUSPENDED ACGOUSTIG I I GEILINO SYSTEM SEE I REFLECTED CEILING PLAN ON I I SHEET A3D SERIES I I EX15TIN6 b" CNU BLOCK WALL TO REMAIN I (1) LAYER OF 6YP, BD OVER 113 1/2" METAL STUDS - SEE IP I I J PW55 FOR FIN15HE-5 II EXIT REMOVE EXISTING j CORRIDOR SLAB - SEE DEMO I I 1/2" PRE MOLDED PLAN ON SHEET AI.I EXPANSION ,JOINT I I BOTTOM TRACK I I FASTENED TO SLAB SCHEDULED EXI5TING SIPEWALK TO�i NG. 5LAB REMAIN / / j �OV�F� b, MIL. VAPOR TOP OF SL" /.BARRIER OVER COMP. 1 FIR5T FLOOR EL. +0'-6 REMOVE SOIL AS REQUIREP TO AGGOMODATE NEW SLAB (74 WALL SECTION SCALE: 3 /b" = 1' -0" U_ U_ C 1 I L NEW STEEL JOISTS - SEE STRUCTURAL ON65 FOR 51ZE I AND CONNECTIONS II I I 3 1/2' MTL STUDS r 24' O.G. X15TIN6 5° Mu I I I OGK WALL O REMAIN I I I - - - - -- II DRYWALL GL6. II SEE REFLECTED MECHANICAL III GL6. PLAN N DUGRHORK - SEE 51b" 6YP. BD, OVER 3 112" MECHANICAL DWC75 I I METAL STUDS AT 24" O.G. SEE I I ID PW65 FOR FINISHES II NEW 2HR FIRE I I FREE WEIGHT5/ o ,� RATED CHASE WALL I i CIRCUIT TRAINING U_ PER UL #436 I I Q < II REMOVE TH II SPINNING PORTION OF BASE A5 50HEDULED EXISTING SL B - BASE AS SEE FLOOR AN5 I " I I NEW 4 1/2" GONG. 5LA13 OVER 2" DE =-P SCHEDULED FOR EXACT PNG COMPOSITE METAL DECK - SEE DIMENSION I I 5TR)CTURAL OW65 FOR MORE NEW FLOOR I I INFORMATION FINISH AS SCHEDULED= FINISH FLOOR AS SECHEDULE EXISTING 2ND I I + FLOOR SLAB I I + L TO REMAIN I I I NEW STEEL JOISTS -SEE I I STRUCTURAL DWGS FOR SIZE RECESS MTL STUDS I I AND CONNECTIONS 50 GYP. BD ON I I ( I POOL EQUIP. ROOM ALI6145 W/ OPENIN6 I I I I TOP TRACK FASTENED TO EDGE I I I I EXI5TING BEAM (TYP) EXI5TIN5 CONCRETE BEAM TO REMAIN i i I I EXI5TING I I 3 112" METAL STUDS TO I I CONCRETE BEAM I I CONTINUE AND BRACE TO I I TO REMAIN I I EXISTING STRUCTURE NO 6YP. W THIS I ► I I SIDE ABOVE GEILIN6 I f I I 3 I/2" MTL STUDS 3 1/2" MTL STUDS I I l l • 24" O.G. i 24" O.G. I I EXI5TIN6 b" CMU I I BLOCK WALL TO - - -- I I REMAIN I I _--- -- DRYWALL CLB C I I I I I I I DRYWALL GL6. FED 5EE RE GL6. PLAN SEE REFLECTED I I I I CL6. PLAN (1) LAYER OF GYP. I I I I SET MTL 5TUD5 1 /6" AWAY BD EACH 51DE, I I I I FROM BEAM FACE A5 SHOWN OVER 3 1/2" METAL I I EXISTING I I 5TUD5 PER WALL CONCRETE BEAM TYPE ON SHEET I I TO REMAIN ---- -� 5 /b" 6YP - BD. OVER l /b" METAL A5.0 I I FURRING -� AT 24' O.G, I I WOMEN'S WOMEN II POOL VESTIBULE U_ 0RE55INC-7 EQUIP. 5 1b" 6YP. BD. OVER 3 1/2" METAL STUDS AT 24" 04. - !SEE I I ID DWC.�S FOR FIN15HE5 I I EXISTING b" GMU I i I I WALL TO REMAIN I I BASE AS I I I I SCHEDULED I I I I BASE AS SCHEDULED I I NEW b" NEW 6" GONG. AB NEW FLOOR I I CONCRETE CURB NEW FLOOR OVER 6 MIL. POR FINISH AS I I FINISFI A5 SCHEDULED- I I 5CHEDULED BARRIER OVER, COMP. r I I FILL (TYP) 3 WALL SECTION ,453 SCALE: 3/b" = 1' -0" O r� T EXISTING i ROOF (UNDISTURBED) . I I I U U U �I 1 1/2' R1610 INSULATt N DIRECTLY ADHERED TO EX15TIN6 CMU WALL W1TH A TOTAL R VALUE OF -75 - CONTINUE TO UNDER IDE OF EXI5TIN6 STRUCTURE 1 I �I ,I EXTEND 6YP. BD. 4' ABOVE GEILINC L L EXISTING CONCRETE BEAM TO REMAIN r-- I NEW SUSPENDED ACGOUSTIC I I CEILING SYSTEM SEE I I REFLECTED CEILINr7 PLAN ON I I SHEET A3.0 SERIES I ATTACH VERTICAL METAL STUD TO i 3 5 /b" METAL TRACK WITH #10 TEK iI I SCREWS. ATTACH 3 5/6" METAL TRACK TO EX15TING GONG. BEAM WITH .145 I POWDER ACTUATED FASTENERS • b" I I O.G. 5TAG0ERED if o II �I II II I I ... 1 1/2' RI6112 INSULATION DIRECTLY ADHERED TO EXI5TIN6 GMU WALL I WITH A TOTAL R VALUE OF '15 I I I IL < 5 /b" GYP. BD. OVER 16 6A, 3 1/2" METAL STUDS AT 24" O.G. -SEE ID I I -- DW65 FOR FIN15HE5 II AEROBICS I i ROOM II ATTACH VERTICAL METAL STUD TO I 1 3 5/V METAL TRACK WITH #10 TEK AEROBICS FLOOR I 1 SCREWS. SYSTEM PER LA FITNESS I i ATTACH 3 S /b" METAL TRACK TO SPECIFICATIONS I I EXISTING GONG. BEAM WITH .145 NEW 4 I/2" GONG. BASE AS POWDER ACTUATED FASTENERS • b" SLAB OVER 2" DEEP SCHEDULED I i O.C. STAGGERED COMPOSITE METAL D��UGTURAL DW65 i I PARKING C�ARhGE 2 \ w m FOR MORE I 3RD LEVEL N �3 OF DEPRESSED INFORMATION I ! M'IDISTURBED) NEN )a • THIRD FLOOR - EL. +30' -•41 1/2" NEW STEEL JOISTS - SEE STRUCTURAL pWGS FOR SIZE AND CONNECTIONS 3 1/2" METAL STUDS TO CONTINUE AND BRACE TO EXISTING STRUCTURE - r W J W w i A EXISTING ROOF "DISTURBED) 6" 18 6A. TOP TRACK FASTENEP TO II II II II I EXISTING ROOF SLAB W/ .145 I E ROOFG EXISTING b" 04-STAGGERED. I I 6" TRACK FASTENED TO b" MTL. STUDS W/ x10 TEK SGREW5 I I (UNDISTURBED) I I I 1 I 12" R161D INSULATION DIRECTLY II ADHERED TO EXISTING CMU WALL I WITH A TOTAL R VALUE OF 1.5 - I I CONTINUE TO UNDERSIDE OF I I EXI5TIN6 STRUCTURE it II U U U EXI5TIN6 12" GMU II I II I ! TOP TRACK FASTENED TO WALL TO REMAIN I i II I I I EXI5TIN6 BEAM (TYP) ATTACHED TO 6" STUDS II III 5 /6" GYP. BO. OVER 1/2" PLYWOOD, I I ATTACH TRACK TO EX151N6 OVER 16 GA 3 1/2" METAL 5TUD5 EXTERIOR MASONRY WALL I I i I AT 24" O.G. - SEE ID DW65 FOR ACTUATED FASTENERS • b" I I I I !I FINISHES ATTACH TRACK TO 16 6A. I I 1 1/2" RI610 INSULATION DIRECTLY i I III ADHERED TO EXISTING CMU WALL BASKETBALL II I I fl WITH A TOTAL R VALUE OF 1-5 1 1/2" RI610 INSULATION DIRECTLY I ADHERED TO EXISTING GMU WALL BOTTOM TRACK FASTENED TO WITH A TOTAL R VALUE OF '15 I I II EXISTING BEAM (TYP) EXI5TINc5 I I I I I I CONCRETE BEAM I I 5 /5" GYP. BD. OVER 1/6" METAL TO REMAIN I I FURRING AT 24' O.G. I I 7T II I I TOP TRACK FASTENED TO I I III EXIS71N6 BEAM (TYP) STUDS W/ #10 TEK 5GREW5 I I SET MTL STUDS T/b" AWAY OF I I II I I I I II II BEAM FACE AS SHOWN II III 5 /6" 6YP. BP, OVER 1/2" PLYWOOD, DECK - SEE I I I I OVER Ib GA 3 1/2" METAL STUDS MORE INFORMATION FLOOR AS I 1 I I AT 24" O.G. - SEE ID DWGS FOR I I FINISHES ALL EXTERIOR I I FINI5HE5 TO REMAIN I I I UNDISTURBED I I f 11/2" RIGID INSULATION DIRECTLY ADHERED TO EXI5TIN6 CMU WALL _ I I WITH A TOTAL R VALUE OF 15 EXISTING 12" CMU II II I I WALL TO REMAIN I I I ( BASKETBALL COURT EXI5TIN6 II I I CONCRETE BEAM V I I TO REMAIN I I I I II BASE AS SCHEDULED EXISTING III NEW 4 1/2" GONG. SLAB OVER 2" DEEP I I C-OMP051TE METAL DECK - SEE ROOF I f 5TRUGTURAL PW55 FOR MORE (UNDISTURBED) I I INFORMATION I I BASKETBALL FLOOR PER J I III LA FITNESS SPECIFICATIONS I L NEW STEEL JOISTS - SEE STRUCTURAL ON65 FOR 51ZE I AND CONNECTIONS II I I 3 1/2' MTL STUDS r 24' O.G. X15TIN6 5° Mu I I I OGK WALL O REMAIN I I I - - - - -- II DRYWALL GL6. II SEE REFLECTED MECHANICAL III GL6. PLAN N DUGRHORK - SEE 51b" 6YP. BD, OVER 3 112" MECHANICAL DWC75 I I METAL STUDS AT 24" O.G. SEE I I ID PW65 FOR FINISHES II NEW 2HR FIRE I I FREE WEIGHT5/ o ,� RATED CHASE WALL I i CIRCUIT TRAINING U_ PER UL #436 I I Q < II REMOVE TH II SPINNING PORTION OF BASE A5 50HEDULED EXISTING SL B - BASE AS SEE FLOOR AN5 I " I I NEW 4 1/2" GONG. 5LA13 OVER 2" DE =-P SCHEDULED FOR EXACT PNG COMPOSITE METAL DECK - SEE DIMENSION I I 5TR)CTURAL OW65 FOR MORE NEW FLOOR I I INFORMATION FINISH AS SCHEDULED= FINISH FLOOR AS SECHEDULE EXISTING 2ND I I + FLOOR SLAB I I + L TO REMAIN I I I NEW STEEL JOISTS -SEE I I STRUCTURAL DWGS FOR SIZE RECESS MTL STUDS I I AND CONNECTIONS 50 GYP. BD ON I I ( I POOL EQUIP. ROOM ALI6145 W/ OPENIN6 I I I I TOP TRACK FASTENED TO EDGE I I I I EXI5TING BEAM (TYP) EXI5TIN5 CONCRETE BEAM TO REMAIN i i I I EXI5TING I I 3 112" METAL STUDS TO I I CONCRETE BEAM I I CONTINUE AND BRACE TO I I TO REMAIN I I EXISTING STRUCTURE NO 6YP. W THIS I ► I I SIDE ABOVE GEILIN6 I f I I 3 I/2" MTL STUDS 3 1/2" MTL STUDS I I l l • 24" O.G. i 24" O.G. I I EXI5TIN6 b" CMU I I BLOCK WALL TO - - -- I I REMAIN I I _--- -- DRYWALL CLB C I I I I I I I DRYWALL GL6. FED 5EE RE GL6. PLAN SEE REFLECTED I I I I CL6. PLAN (1) LAYER OF GYP. I I I I SET MTL 5TUD5 1 /6" AWAY BD EACH 51DE, I I I I FROM BEAM FACE A5 SHOWN OVER 3 1/2" METAL I I EXISTING I I 5TUD5 PER WALL CONCRETE BEAM TYPE ON SHEET I I TO REMAIN ---- -� 5 /b" 6YP - BD. OVER l /b" METAL A5.0 I I FURRING -� AT 24' O.G, I I WOMEN'S WOMEN II POOL VESTIBULE U_ 0RE55INC-7 EQUIP. 5 1b" 6YP. BD. OVER 3 1/2" METAL STUDS AT 24" 04. - !SEE I I ID DWC.�S FOR FIN15HE5 I I EXISTING b" GMU I i I I WALL TO REMAIN I I BASE AS I I I I SCHEDULED I I I I BASE AS SCHEDULED I I NEW b" NEW 6" GONG. AB NEW FLOOR I I CONCRETE CURB NEW FLOOR OVER 6 MIL. POR FINISH AS I I FINISFI A5 SCHEDULED- I I 5CHEDULED BARRIER OVER, COMP. r I I FILL (TYP) 3 WALL SECTION ,453 SCALE: 3/b" = 1' -0" O r� T EXISTING i ROOF (UNDISTURBED) . I I I U U U �I 1 1/2' R1610 INSULATt N DIRECTLY ADHERED TO EX15TIN6 CMU WALL W1TH A TOTAL R VALUE OF -75 - CONTINUE TO UNDER IDE OF EXI5TIN6 STRUCTURE 1 I �I ,I EXTEND 6YP. BD. 4' ABOVE GEILINC L L EXISTING CONCRETE BEAM TO REMAIN r-- I NEW SUSPENDED ACGOUSTIC I I CEILING SYSTEM SEE I I REFLECTED CEILINr7 PLAN ON I I SHEET A3.0 SERIES I ATTACH VERTICAL METAL STUD TO i 3 5 /b" METAL TRACK WITH #10 TEK iI I SCREWS. ATTACH 3 5/6" METAL TRACK TO EX15TING GONG. BEAM WITH .145 I POWDER ACTUATED FASTENERS • b" I I O.G. 5TAG0ERED if o II �I II II I I ... 1 1/2' RI6112 INSULATION DIRECTLY ADHERED TO EXI5TIN6 GMU WALL I WITH A TOTAL R VALUE OF '15 I I I IL < 5 /b" GYP. BD. OVER 16 6A, 3 1/2" METAL STUDS AT 24" O.G. -SEE ID I I -- DW65 FOR FIN15HE5 II AEROBICS I i ROOM II ATTACH VERTICAL METAL STUD TO I 1 3 5/V METAL TRACK WITH #10 TEK AEROBICS FLOOR I 1 SCREWS. SYSTEM PER LA FITNESS I i ATTACH 3 S /b" METAL TRACK TO SPECIFICATIONS I I EXISTING GONG. BEAM WITH .145 NEW 4 I/2" GONG. BASE AS POWDER ACTUATED FASTENERS • b" SLAB OVER 2" DEEP SCHEDULED I i O.C. STAGGERED COMPOSITE METAL D��UGTURAL DW65 i I PARKING C�ARhGE 2 \ w m FOR MORE I 3RD LEVEL N �3 OF DEPRESSED INFORMATION I ! M'IDISTURBED) NEN )a • THIRD FLOOR - EL. +30' -•41 1/2" NEW STEEL JOISTS - SEE STRUCTURAL pWGS FOR SIZE AND CONNECTIONS 3 1/2" METAL STUDS TO CONTINUE AND BRACE TO EXISTING STRUCTURE - r W J W w i A EXISTING ROOF "DISTURBED) 6" 18 6A. TOP TRACK FASTENEP TO II II II II I EXISTING ROOF SLAB W/ .145 I POWDER ACTUATED FASTENERS • EXISTING b" 04-STAGGERED. I I 6" TRACK FASTENED TO b" MTL. STUDS W/ x10 TEK SGREW5 I I STAC3C3ERED I I I 1 I 12" R161D INSULATION DIRECTLY II ADHERED TO EXISTING CMU WALL I WITH A TOTAL R VALUE OF 1.5 - I I CONTINUE TO UNDERSIDE OF I I EXI5TIN6 STRUCTURE I I II II II I 16 6A. b" METAL 5TU05 AT I I 16" O.G. PROVIDE BRAGIN6 a v i w A5 5HOM I i II I ib 6A. b" METAL BRACE II I I II I I ATTACHED TO 6" STUDS I I WITH 4 #10 TEK SCREWS. I I ATTACH TRACK TO EX151N6 I 1 EXTERIOR MASONRY WALL I I WITH .145 POWDER ACTUATED FASTENERS • b" I I . II ._I ATTACH TRACK TO 16 6A. I I 6" METAL BRACE WITH #10 i I TEK 50'REW5 I BASKETBALL II I I COURT I II II 1 1/2" RI610 INSULATION DIRECTLY I ADHERED TO EXISTING GMU WALL EXISTING WITH A TOTAL R VALUE OF '15 I I II 5 1a" 6YP. BD. OVER 1/2" I I PLYWOOD OVER Ib 6A. b" METAL I I STUDS AT 24" O.G. SEE ID ON55 FOR FINISHES I I II 6" 0 6A. BOTTOM TRACK I I FASTENED TO EXISTING SLAB W/ I I .145 POWDER ACTUATED FASTENERS I I • b" O.G. STAG6ERED. I I b" TRACK FASTENED TO 6" MTL. STUDS W/ #10 TEK 5GREW5 I I 5TACGOERED I I II I NEW 4 1/2" GONG. SLAB I I I OVER 2" DEEP BASE AS COMP051TE METAL SCHEDULED if DECK - SEE I I STRUCTURAL DW65 FOR FINISH MORE INFORMATION FLOOR AS I 1 5EGHEDULE 1 I TON OF EXI5TIN6 SEAM -_ -Y-- EL. +31'-0" TOIP OF NEw NRESSED SLAB THIRD FLOOR NEW 3RD FLOOR I I ( EL. +30' -q 112" STRUCTURE -SEE STR. DW6S I II I 2AGGE55 PANEL I II - - METAL TRACK ATTACHED TO 2 3 I12" MTL STUDS ' � M - _ _ - -' -• GONG. 5LAB WITH .145 POWDER I I 3 1/2' TL STUP5 I - I I AGTUATEP FASTENERS • b" O.G. • 24 " OG. I I 2 • 24' O.G. I fII STAGGERED. I ATTACH VERTICAL METAL STUD TO ATTACH STUDS TO TRACK WITH *IO - - -- - -' - =77 - I 3 5 /b" METAL TRACK WITH #10 TEK I 1 TEK SCREWS DRYWALL GLG. DRYWALL GL6. I I A RAWS 3 5 /b" METAL TRACK TO SEE REFLECTED I I II ell GLGRPLANGTED EXISTING CONC. BEAM WITH .145 GL6. PLAN I POWDER ACTUATED FASTENERS • b" I I O.G. 5TAG6ERED I ( 1 1/2' RIGID INSULATION DIRECTLY INTAKE AIR CHASE - ALL 1 _' ADHERED TO EXISTING GMU WALL ATTACH HORIZONTAL METAL SURFACES TO BE GLEAN I I 1I WITH A TOTAL R VALUE OF 13 I I TRACK TO EACH VERTICAL DRYWALL FINISHED I I I I I I STUD WITH 4 #10 TEK 5CREW�j FREE WEIGHTS/ FREE WEIGHTS/ I i EXISTING 12' GMU I I I CIRCUIT TRAINING I I CIRCUIT TRAINING 1 BLOCK WALL TO O U. I EXISTING 12" CMU O U_ I I REMAIN 51b "' GYP. W. OVER 3 1/2" - 5 /b" 6YP. BD. OVER 3 1/2' ,q < I I BLOCK WALL TO 4 lir II METAL STUD�a AT 24" O.G. - REMAIN METAL STUDS AT 24" O.G. - SEE ID OW65 FOR FINISHES I 1 = SEE IP PW65 FOR FINISHES ATTACH VERTICAL METAL STUD TO I I I II BASE AS SCHEDULED 3 5 /b" METAL TRACK WITH #10 TEK BASE AS SCHEDULED I I 1 TOP OF NEW I I SCREWS. NEW 4 I/2'" GONG. SLAB OVER I I _ COINER NEW 4 1/2" GONG. SLAB OVER ATTACH 3 5/b" METAL TRACK TO CONG. I I I I I II EL. +20' -O.. 2" DEEP COMP051TE METAL SLAB WITH .145 POWDER ACTUATED 2" DEEP COMPOSITE METAL DECK - 5EE 5TRUCTURAL FINISH I I _ FASTENERS • b" O-G. STAGGERED DECK - SEE STRUCTURAL FINISH DW65 FOR MORE FLOOR AS 01465 FOR MORE FLOOR AS I ( N TON OF EXISTING INFORMATION SEGHEDULE I INFORMATION SEGHEDULE I I I...1. BEAM t x. TON OF SLAB I TOP OF 5LA5 I I I) TOP OF SLAB A 5EGOND FLOOR _ 1 SECOND FLOOR • SEC FLOOR EL. +Ib' -O" EL. +Ib'- O "- "- -x -x - EL. +la' -O" EXISTING + I I CONCRETE BEAM TO REMAIN NEW STEEL JOISTS -SEE TON OF EXI5TI% EXI571NC 12' CMU STRUCTURAL DW65 FOR 51ZE BEA..t - NEW 2ND FLOOR L BLOCK WALL AND GONNEGTION5 EL. +Ib' -O" STRUCTURE - SEE REMAIN 3 1/2" METAL STUDS TO STR. DW65 CONTINUE AND BRAGS TO 11/2" R161D INSULATION FRICTION FIT EXISTING STRUCTURE i BEAM I TO REMAIN CONCRETE -- TOTAL R VALUE OF '75 CHANNELS CONTINUE ATTACH HORIZONTAL METAL EXI5TIN6 COLUMN 1I RI61D INSULATION TO UNDERSIDE OF TRACK TO EACH VERTICAL BEYOND TO EXISTING BEAM STUD WITH 4 #10 TEK SCREWS REMAIN ATTACH 3 1/2" MTL STUDS I I ! 3 5/6" METAHORIZONTAL RACK METAL TH #10TE TO 1 24" O.G. I I EXISTING 12" GMU 3 I /2" MTL STUDS SCREWS. BLOCK WALL TO • 24" O.G. - - - - -- I REMAIN - - - - -_ - _--- _ -_ -__ -__ -_- �I ATTACH 35/b" METAL TRACK7 EXISTING MASONRY WALL WITH .11 45 POWDER ACTUATED FASTENERS 0 6" DRYWALL CLB. = SEE REFLECTED I I DRYWALL GL6. �I O.G. STAGGERED CLG. PLAN 1 I SEA R1'EjF ^NGTEP 1 1/2" R1011? INSULATION DIRECTLY 11 ATTACH VERTICAL METAL STUD TO 2 ADHERED TO EXISTING GMU WALL 0 3 5 1b" METAL TRACK WITH #10 TEK NEW DECORATIVE I) PATCH AND REPAIR WITH A TOTAL R VALUE OF -75 1 1 SOREW5. ARCH BEYOND - SEE EXTERIOR FINISHES I I ATTACH 3 5 /6" METAL TRACK TO REFLECTED GEILIN6 r0 MATCH EXISTING EX15TIN6 GONG. BEAM WITH .145 PLAN ON SHEET A3.1 ADJACENT AREAS I I POWDER ACTUATED FASTENERS • b" I I O.G- STAGGERED 5 /6' M.R. 6YP. BD. OVER i I/2 � Q BOTTOM OF SET MTL STUD5 '1 /b' AWAY I f "Z' METAL FURRING AT 24" J « - - NEW PREGA5T LINTEL. FROM BEAM FACE AS SHOWN O.C. PER WALL TYPE ON w I I SHEET A5.0 EL. +T' -O 5 /ts" w( 5 /b' M.R. GYP. W. OVER T /b" I I NEW PRECAST GONG LINTEL O iL METAL FURRING AT 24' O.C. ' - 5EE STRUCTURAL PW65 V POOL AREA EXISTING CONCRETE I 5/6' M.R. 6 BEAM TO REMAIN YP. BD. OVER 3 1/2" NEW MIAMI -DADE PRODUCT A OVER METAL 5TUD5 AT 24" O.G. - I DOOR UNIT - SEE DOOR SCHEDULE a SEE 1D PW65 FOR FINISHES PARKING GARAGE BASE AS SCHEDULED FIR5T LEVEL NEW 6" GONG. SLAB EXIT AT 1 2' DRAIN SEE ID I I (UNDISTURBED) OVER 6 MIL. VAPOR POOL AREA 01-455. FOR FIN15H I I BARRIER OVER COMP. ALUMINUM HRESHOLD r REMOVE SLAB A5 REQUIRED I 1 FILL (TYP) ATTACH VERTICAL METAL STUD r0 2" DRAIN SEE ID OVER FULL BED OF Lp TO ACCOMMODATE NEW I ( 3 5 /b" METAL TRACK WITH *10 TEK PWGS. FOR FINISH MASTIC w r SWIMMIN6 POOL w r FOOL DECK FINISH FLOOR I SCREWS. BASE AS / POOL pEGK I ATTACH 3 5 /5" METAL TRACK TO CONC. POOL PECK 5GHE0ULE EL. FINISHES BY POOL I I 5LAB AND EXI5TING GONC. BEAM WITH FINISHES BY POOL (BEYOND) SLOPE TOP OF DEPRESSED CONTRALTO 145 POWDER ACTUATED FASTENERS • GONT RAC TO K w 1,50 MAX NEW 5LA5 b' O.G. 5TA66ERED s EXIT RAMP • BUILDIND • POOL DECK EL. +0' -3 1/2" -\�\ \�\�\ \.\L'. \L EL. O -5 112 NEW POOL RETENTION WALL - SEE STRUCTURAL • - -. - � . ' _ : _ . � - - _ - ; -.. ..-.�. -- , - CONCRETE - . -. _.. NEW 6" pW65 . • .: - . , .:. .. -. • -., ...- NEW POOL ... .. RA SEE .. RETENTION 1 STRUCTURE FOR R INF WALL -5EE E 1 STRUCTURAL • i .c . E 1 i EXPANSION GUT EXISTING i., JOINT _ i 2 -00AT5 OF BITUMASTIG CUT EX1 TIN A5 WATERPROOFING MEMBRANE ALL AROUND AG , . E NEW W ,.... I I GOMOPAT EXIT DOOR POOL RETENTION WALLS. I NEW 6" CONC. SLAB 4 2-GOATS OF BITUMASTIG WATERPROOFING EXISTING 5HEARWALL TO REMAIN OVER 6 MIL. VAPOR � MEMBRANE ALL AROUND BARRIER OVER COMP. POOL RETENTION WALLS. FILL (TYP) I- ' 2 WALL SECTION WALL SECTION SCALE: 3 1b" = I' -0" SCALE: 3 /b" = I' -0" J J • • i SALTZ MICHELSON A R C H I T E C T S 3501 Griffin Road Ft. Lauderdale, FL 33312 (954) 266 -2700 Fx: (954) 266 -2701 sma@saltzrnichelson.com AA- 0002897 Mark L. Saltz AR0007171 NOTE: HORIZONTAL STEEL MEMBER5 (GIRDER AND J015T5) TO HAVE 5PRAYED APPLIED EIRE RE515T I VE MATERIAL PER UL No. NbI6 s s Q 3' Project No.: II �I 2003 -160 Drawn By: EXISTING LV, CLB, KM CONCRETE BEAM 4VA,f1,` VV TO REMAIN L-I - -- -I. v W • ..00 O i•ir y V• v a• 09 V • EXISTING 12" GNU V 12- -16 -03 PERIVESEt - -- i- - BLOCK WALL i•i•Yi w • Y • • ri,i • r REMAIN .w�,q • .II i•••rw � Y Vf.•V • a v i w V w 4• i G T r�•i •Gw(. i r �I EXISTING CONCRETE BEAM ITO REMAIN i F.1 . II ._I i I EXISTING 12' GNU -- _- - BLOCK WALL ........... REMAIN ,II �I EXISTING CONCRETE BEAM TO REMAIN TON OF EXI5TIN6 SEAM -_ -Y-- EL. +31'-0" TOIP OF NEw NRESSED SLAB THIRD FLOOR NEW 3RD FLOOR I I ( EL. +30' -q 112" STRUCTURE -SEE STR. DW6S I II I 2AGGE55 PANEL I II - - METAL TRACK ATTACHED TO 2 3 I12" MTL STUDS ' � M - _ _ - -' -• GONG. 5LAB WITH .145 POWDER I I 3 1/2' TL STUP5 I - I I AGTUATEP FASTENERS • b" O.G. • 24 " OG. I I 2 • 24' O.G. I fII STAGGERED. I ATTACH VERTICAL METAL STUD TO ATTACH STUDS TO TRACK WITH *IO - - -- - -' - =77 - I 3 5 /b" METAL TRACK WITH #10 TEK I 1 TEK SCREWS DRYWALL GLG. DRYWALL GL6. I I A RAWS 3 5 /b" METAL TRACK TO SEE REFLECTED I I II ell GLGRPLANGTED EXISTING CONC. BEAM WITH .145 GL6. PLAN I POWDER ACTUATED FASTENERS • b" I I O.G. 5TAG6ERED I ( 1 1/2' RIGID INSULATION DIRECTLY INTAKE AIR CHASE - ALL 1 _' ADHERED TO EXISTING GMU WALL ATTACH HORIZONTAL METAL SURFACES TO BE GLEAN I I 1I WITH A TOTAL R VALUE OF 13 I I TRACK TO EACH VERTICAL DRYWALL FINISHED I I I I I I STUD WITH 4 #10 TEK 5CREW�j FREE WEIGHTS/ FREE WEIGHTS/ I i EXISTING 12' GMU I I I CIRCUIT TRAINING I I CIRCUIT TRAINING 1 BLOCK WALL TO O U. I EXISTING 12" CMU O U_ I I REMAIN 51b "' GYP. W. OVER 3 1/2" - 5 /b" 6YP. BD. OVER 3 1/2' ,q < I I BLOCK WALL TO 4 lir II METAL STUD�a AT 24" O.G. - REMAIN METAL STUDS AT 24" O.G. - SEE ID OW65 FOR FINISHES I 1 = SEE IP PW65 FOR FINISHES ATTACH VERTICAL METAL STUD TO I I I II BASE AS SCHEDULED 3 5 /b" METAL TRACK WITH #10 TEK BASE AS SCHEDULED I I 1 TOP OF NEW I I SCREWS. NEW 4 I/2'" GONG. SLAB OVER I I _ COINER NEW 4 1/2" GONG. SLAB OVER ATTACH 3 5/b" METAL TRACK TO CONG. I I I I I II EL. +20' -O.. 2" DEEP COMP051TE METAL SLAB WITH .145 POWDER ACTUATED 2" DEEP COMPOSITE METAL DECK - 5EE 5TRUCTURAL FINISH I I _ FASTENERS • b" O-G. STAGGERED DECK - SEE STRUCTURAL FINISH DW65 FOR MORE FLOOR AS 01465 FOR MORE FLOOR AS I ( N TON OF EXISTING INFORMATION SEGHEDULE I INFORMATION SEGHEDULE I I I...1. BEAM t x. TON OF SLAB I TOP OF 5LA5 I I I) TOP OF SLAB A 5EGOND FLOOR _ 1 SECOND FLOOR • SEC FLOOR EL. +Ib' -O" EL. +Ib'- O "- "- -x -x - EL. +la' -O" EXISTING + I I CONCRETE BEAM TO REMAIN NEW STEEL JOISTS -SEE TON OF EXI5TI% EXI571NC 12' CMU STRUCTURAL DW65 FOR 51ZE BEA..t - NEW 2ND FLOOR L BLOCK WALL AND GONNEGTION5 EL. +Ib' -O" STRUCTURE - SEE REMAIN 3 1/2" METAL STUDS TO STR. DW65 CONTINUE AND BRAGS TO 11/2" R161D INSULATION FRICTION FIT EXISTING STRUCTURE i BEAM I TO REMAIN CONCRETE -- TOTAL R VALUE OF '75 CHANNELS CONTINUE ATTACH HORIZONTAL METAL EXI5TIN6 COLUMN 1I RI61D INSULATION TO UNDERSIDE OF TRACK TO EACH VERTICAL BEYOND TO EXISTING BEAM STUD WITH 4 #10 TEK SCREWS REMAIN ATTACH 3 1/2" MTL STUDS I I ! 3 5/6" METAHORIZONTAL RACK METAL TH #10TE TO 1 24" O.G. I I EXISTING 12" GMU 3 I /2" MTL STUDS SCREWS. BLOCK WALL TO • 24" O.G. - - - - -- I REMAIN - - - - -_ - _--- _ -_ -__ -__ -_- �I ATTACH 35/b" METAL TRACK7 EXISTING MASONRY WALL WITH .11 45 POWDER ACTUATED FASTENERS 0 6" DRYWALL CLB. = SEE REFLECTED I I DRYWALL GL6. �I O.G. STAGGERED CLG. PLAN 1 I SEA R1'EjF ^NGTEP 1 1/2" R1011? INSULATION DIRECTLY 11 ATTACH VERTICAL METAL STUD TO 2 ADHERED TO EXISTING GMU WALL 0 3 5 1b" METAL TRACK WITH #10 TEK NEW DECORATIVE I) PATCH AND REPAIR WITH A TOTAL R VALUE OF -75 1 1 SOREW5. ARCH BEYOND - SEE EXTERIOR FINISHES I I ATTACH 3 5 /6" METAL TRACK TO REFLECTED GEILIN6 r0 MATCH EXISTING EX15TIN6 GONG. BEAM WITH .145 PLAN ON SHEET A3.1 ADJACENT AREAS I I POWDER ACTUATED FASTENERS • b" I I O.G- STAGGERED 5 /6' M.R. 6YP. BD. OVER i I/2 � Q BOTTOM OF SET MTL STUD5 '1 /b' AWAY I f "Z' METAL FURRING AT 24" J « - - NEW PREGA5T LINTEL. FROM BEAM FACE AS SHOWN O.C. PER WALL TYPE ON w I I SHEET A5.0 EL. +T' -O 5 /ts" w( 5 /b' M.R. GYP. W. OVER T /b" I I NEW PRECAST GONG LINTEL O iL METAL FURRING AT 24' O.C. ' - 5EE STRUCTURAL PW65 V POOL AREA EXISTING CONCRETE I 5/6' M.R. 6 BEAM TO REMAIN YP. BD. OVER 3 1/2" NEW MIAMI -DADE PRODUCT A OVER METAL 5TUD5 AT 24" O.G. - I DOOR UNIT - SEE DOOR SCHEDULE a SEE 1D PW65 FOR FINISHES PARKING GARAGE BASE AS SCHEDULED FIR5T LEVEL NEW 6" GONG. SLAB EXIT AT 1 2' DRAIN SEE ID I I (UNDISTURBED) OVER 6 MIL. VAPOR POOL AREA 01-455. FOR FIN15H I I BARRIER OVER COMP. ALUMINUM HRESHOLD r REMOVE SLAB A5 REQUIRED I 1 FILL (TYP) ATTACH VERTICAL METAL STUD r0 2" DRAIN SEE ID OVER FULL BED OF Lp TO ACCOMMODATE NEW I ( 3 5 /b" METAL TRACK WITH *10 TEK PWGS. FOR FINISH MASTIC w r SWIMMIN6 POOL w r FOOL DECK FINISH FLOOR I SCREWS. BASE AS / POOL pEGK I ATTACH 3 5 /5" METAL TRACK TO CONC. POOL PECK 5GHE0ULE EL. FINISHES BY POOL I I 5LAB AND EXI5TING GONC. BEAM WITH FINISHES BY POOL (BEYOND) SLOPE TOP OF DEPRESSED CONTRALTO 145 POWDER ACTUATED FASTENERS • GONT RAC TO K w 1,50 MAX NEW 5LA5 b' O.G. 5TA66ERED s EXIT RAMP • BUILDIND • POOL DECK EL. +0' -3 1/2" -\�\ \�\�\ \.\L'. \L EL. O -5 112 NEW POOL RETENTION WALL - SEE STRUCTURAL • - -. - � . ' _ : _ . � - - _ - ; -.. ..-.�. -- , - CONCRETE - . -. _.. NEW 6" pW65 . • .: - . , .:. .. -. • -., ...- NEW POOL ... .. RA SEE .. RETENTION 1 STRUCTURE FOR R INF WALL -5EE E 1 STRUCTURAL • i .c . E 1 i EXPANSION GUT EXISTING i., JOINT _ i 2 -00AT5 OF BITUMASTIG CUT EX1 TIN A5 WATERPROOFING MEMBRANE ALL AROUND AG , . E NEW W ,.... I I GOMOPAT EXIT DOOR POOL RETENTION WALLS. I NEW 6" CONC. SLAB 4 2-GOATS OF BITUMASTIG WATERPROOFING EXISTING 5HEARWALL TO REMAIN OVER 6 MIL. VAPOR � MEMBRANE ALL AROUND BARRIER OVER COMP. POOL RETENTION WALLS. FILL (TYP) I- ' 2 WALL SECTION WALL SECTION SCALE: 3 1b" = I' -0" SCALE: 3 /b" = I' -0" J J • • i SALTZ MICHELSON A R C H I T E C T S 3501 Griffin Road Ft. Lauderdale, FL 33312 (954) 266 -2700 Fx: (954) 266 -2701 sma@saltzrnichelson.com AA- 0002897 Mark L. Saltz AR0007171 NOTE: HORIZONTAL STEEL MEMBER5 (GIRDER AND J015T5) TO HAVE 5PRAYED APPLIED EIRE RE515T I VE MATERIAL PER UL No. NbI6 s s Q 3' Project No.: 2003 -160 Drawn By: LV, CLB, KM Checked By: 4VA,f1,` VV • �' • v W • ..00 O i•ir y V• v a• 09 V • w V V• i• r V 12- -16 -03 PERIVESEt •i 0?-1,36-C4 BID cFT, i V i•i•Yi w • Y • • ri,i • r • .w�,q • • " iii•s• i•••rw � Y Vf.•V • a v i w V w 4• i G ••• V i r�•i •Gw(. i • • V V REVISIONS: COORDINATION 1 1 -22 -04 ABLDG. DEPT. 2 2 -27 -04 WALL SECTIONS X5.1 23 o1~ 33