Loading...
04-04-014I�1.(11T�1111�1 r111T>'Tll11TfJ1 L• J L. L. J L. J L,J DA5HED LINE 15 FOR REFERENCE \\ ONLY. 1 r. 1 r -T1` \ It J if Va T\ — � \ \K\ �1 I \ r . SECOND FLOOR REFLECTED CEILING PLAN A3.4/ SCALE: 00," = I' -O" i A D, /f- CEILING FINISHES 5TANDARD ARMSTRONG "SECOND LOOK 11" #21618, 24'x4b' C _' A PERFORATED LAY IN PANEL5 WITH A FACTORY APPLIED WHITE G" FI 15 ES O E GL 55 "B" TO METAL 5TUD FRAME 01b" O.G. FRAME PLY WI H F 5PEG5. 14.1 5 /5" GYP5UM BOARD ON 3 5 /15"- 25 GA. METAL STUDS *IV O.G. DA5HED LINE 15 FOR REFERENCE \\ ONLY. 1 r. 1 r -T1` \ It J if Va T\ — � \ \K\ �1 I \ r . SECOND FLOOR REFLECTED CEILING PLAN A3.4/ SCALE: 00," = I' -O" i A D, /f- CEILING FINISHES 5TANDARD ARMSTRONG "SECOND LOOK 11" #21618, 24'x4b' C _' A PERFORATED LAY IN PANEL5 WITH A FACTORY APPLIED WHITE FINISH WITH HHITE M015TURE RE515TANT GRID SUSPENSION 5Y5TEM. 5EE 5PECIFICATION FOR ADDITIONAL INFORMATION r (g ARMSTRONG "CLEAN ROOM VL' #510, 24 "x4b" LAY IN PANEL5- NON PERFORATED WiTH VINYL FACED MEMBRANE C -Z DIAMOND ME5H LATH AND 5 /6" PLASTER ON 3 5/6' -25 GA 1-0 METAL 5TUD FRAME 01b" O.G. FRAME C_3 EXPOSED CONSTRUCTION TO UNDERSIDE OF DECK ABOVE, SEE ❑ 5PEG5. C-4 5 /5" GYP5UM BOARD ON 3 5 /15"- 25 GA. METAL STUDS *IV O.G. FRAME C -5 5 /b" M.R. GYPSUM BOARD ON 3 5/6' -25 GA. METAL 5TUD5 0I6" •rrf ruuV O.C. FRAME C -b SAUNA CEILING BY SAUNA MANUFACTURER. PROVIDE 6" 20 GA. i GL6, JO15T5 i 16" D.G. SPAN "5T5 PARALLEL TO THE LONG r r t r Project No.: °••. DIMEN51ON OF THE 5PACE. TO RECEIVE SAUNA CEILING. C -7 LUCITE PANEL, PATTERN *12, WHITE, .125 INE05 A(RYLIC5 C-8 RACQUETBALL COURT PANEL BY MANUFACTURER, SEE SPECS C -9 CERAMIC, TILE ON DIAMOND ME5H LATH AND 5/b' PLA5TER ON b" -Ib GA METAL STUD FRAME AIb' O.G. C-10 5/b' GYP. BD OVER 1 1/2" PLYWOOD ON 3 5/b' -25 GA METAL Drami STUD FRAME • 16' O.G. LEGEND D2'X4' FLUORE5GENT LIGHT PENDANT HUNG LIGHT A ® RECESSED LIGHT 1-0 WALL 5GONGE O REGE%ED LIGHT ❑ EXIST. EXTERIOR • V u _ Mark L. Saltz� AR' �007l 11 • y • SOFFIT LIGHT I--� FLUORESCENT 5TRIP •rrf ruuV ® RETURN AIR i r r t r Project No.: °••. • r �..fyW DIFFUSER f• mlrr 2901 -1'50 � 2x4 LAY -IN CLG. �yrf SUPPLY AIR By: •m•• • DIFFUSER Drami DECORATIVE LV, iMB, KM 5URFAGE MOUNTED FLUORESCENT CEILING LIGHT FIXTURE TELEVISION TRACK LIGHTING 5URFAGE MOUNTED 04 CAN 5TYLE WALL FLOURESGENT WA5HER NEW GWB 5TL. STUD WALL SOUND BATT INSULATION REFLECTED CEILING -PLAIN NQTE!5 I. 5EE ELECTRICAL PLAN5 FOR LIGHTING 2. 5EE MECHANICAL PLAN5 FOR HVAG EQUIPMENT 3. 5EE SHEET A1_I FOR TYPICAL DETAILS OF FRAMING AT CEILING SPRINKLER HEAD PLACEMENT i SPRINKLER SYSTEM CONTRATOR TO PLACE: SPRINKLER HEAL) i AT CENTER OF 2'X 2' 5EGTION OF DIN/IDED 2'X 4' TILE LOCATION OF SUPPLY RETURN 2x4 TEE BAR SUSPENDED GEILINO SUPPLY/RETURN DIFU5ER TV MOUNTING LOCATION I i PLACE TELEVISION — •_ -•_ -. _. _ _.__._ AT CENTER OF 2'X 2' SEGTION OF DIVIDED 2' X 4' TILE YJ • • —7 L— � 1 • J SALTZ MICHELSON A R C H I T E C T S 3501 Griffin Road Ft. Lauderdale, FL 33312 (954) 266 -2700 Fx: (954) 266 -2701 sma @saltzmichelson.com AA- 0002897 a 0 12 -16 -03 PERMIT SET 02 -06 -04 BID SET REVISIONS: 21FIRE DEPT. 1-19-04 ALA FITNESS 1 -22 -04 L 32 -2� DEBT. 2-27 -04 SECOND FLOOR REFLECTED CEILING PLAN A3.4 14 OF 33 A -,a r V • V u _ Mark L. Saltz� AR' �007l 11 • y • r y L... y •rrf ruuV �' • m y y i r r t r Project No.: °••. • r �..fyW f• mlrr 2901 -1'50 � �yrf ••••• By: •m•• • Drami y�,rro LV, iMB, KM • Checked By: MA, DW a 0 12 -16 -03 PERMIT SET 02 -06 -04 BID SET REVISIONS: 21FIRE DEPT. 1-19-04 ALA FITNESS 1 -22 -04 L 32 -2� DEBT. 2-27 -04 SECOND FLOOR REFLECTED CEILING PLAN A3.4 14 OF 33