Loading...
02-830-079Il N x 0 M 1 w s i 0- 0 0 �t 0 N �O 0 3 v Ni 0 Ii I mi 00 N 0 ul 00 N D 3 v 3 w DOWN IN WALL CONNECT TO CASES AS REOUIRED.- NOTE: RUN WATER LINES DOWN IN WALL CONNECT TO SINKS AND EQUIPMENTS AS REQUIRED. (TYPICAL) DOWN IN WALL CONNECT TO ............... ; }1/2„ A 1 -1 /2" -� NEW EMERGENCY EMERGENCY GENERATOR GENERATOR (338 GPH.) ¢ 2' SEDIMENT TRAP(TYP.) / :V 120 GALLON GAS TANK. lU SEDIMENT TRAP(TYP.) 1 -1/2" PRESSURE REGULATOR U. L. GAS COCK VALVE EXIST. RELOCATED 120 GALLON GAS TANK ­_ GAS PIPING ISOMETRIC DIAGRAM NOT TO SCALE NOTE: GAS PIPE LONGEST RUN 80'(LF)(338 G.P.H.) EXISTING MEZ TO EMAI GAS PIPING LAYOUT SCALE I /8' = 1' -0" DOWN IN WALL CONNECT TO PROVIDE 5/8" HOT do COLD WATER TO -A(EW MOP SINK SUPPLY PIPING PLAN SCALE 3/32" = 1' -0" SPRINKLER NOTES CONTRACTOR SHALL BE RESPONSIBLE FOR ADJUSTING EXISTIND SPRINKLER HEADS THROUGHOUT THE EXISTING BUILDING AS REQUIRED TO CONFORM TO NEW FINISH CEILING HEIGHTS. ANT MODIFICATION TO THE EXISTING SYSTEM SHALL CONFORM TO ALL CODES AND N.F.P.A. #13 AND SHALL BE APPROVED AND ACCEPTED BY THE INSURANCE CARRIER. CONTRACTOR TO EXTEND SPRINKLERS IN ADDITION SPACES IN A MANNER TO MEET ALL LOCAL, AND NATIONAL CODES. CONTRACTOR TO INSULATE PIPING IN THE VESTIBULE WITH 1/2" ARMAFLEX. ADJUST NEW SPRINKLER HEADS TO MEET NEW CEILING CONDITION. (SUBMIT SHOP DRAWING FOR REVIEW) PLUMBING REMODELING NOTES I . ALL WORK PERFORMED UNDER THIS CONTRACT SHALL COMPLY WITH ALL LOCAL LAWS, THE SOUTH FLORIDA BUILDING CODE, THE RULES AND REGULATIONS OF THE LOCAL UTILITY COMPANIES AND ALL THE STANDARD OF CONSTRUCTION ESTABLISHED 13Y THE EXISTING INSTALLATION. 2. ALL MATERIALS AND LABOR UNDER THIS PROJECT SHALL BE IN STRICT COMPLIANCE WITH THE REQUIREMENTS ESTABLISHED BY THE EXISTING INSTALLATION. THE INTEGRITY OF ALL EXISTING SYSTEMS MUST BE MAINTAINED. 3. THE CONTRACTOR SHALL VISIT THE SITE AND FAMILIARIZE HIMSELF WITH THE LOCATION OF ALL EXISTING UTILITIES STUB OUTS, PIPING, EQUIPMENT, ETC., AND /OR ANY CONDMON THAT MAY AFFECT HIS WORK. ALL THE NECESSARY REROUTING, RELOCATING, AND /OR REMOVAL OF EXISTING PIPING, EQUIPMENT, ETC.. SHAL BE INCLUDED IN THE SCOPE OF WORK. 4. ALL SERVICES INTERRUPTIONS SHALL BE SCHEDULED WITH THE AUTHORIZED REPRESENTATIVE OF THE BUILDING MANAGEMENT ORGANIZATION. ALL REMOVAL AND DISPOSAL WORK SHALL BE COORDINATED WITH THE AITHORIZED REPRESENTATIVE OF THE BUILDING MANAGEMENT ORGANIZATION. 5. ALL PLUMBING FIXTURES SHALL BE PROVIDED WITH ALL NECESSARY ACCESSORIES SUCH AS STOP VALVES, -P' TRAPS, SUPPORTS. P & T VALVES, ETC. AS REQUIRED. ALL EXPOSED PIPING AT FIXTURES AND EQUIPMENT SHALL BE CHROME PLATED BRASS PIPE OR TUBE. 6. THE CONTRACTOR SHALL PAY ALL INSPECTION FEES, ALL COSTS OF PERMITS AND ALL OTHER COSTS INCIDENTAL TO THE COMPLETION AND TESTING OF THIS WORK. UPON FINAL ACCEPTANCE, A CERTIFICATE FROM THE LOCAL INSPECTION AUTHORITY SHALL. BE FURNISHED TQ THE OWNER. 7. CEILING SPACE IS TO BE USED AS RETURN AIR PLENUM. NO COMBUSTIBLE MATERAL IS TO BE INSTALLED IN CEILING SPACE UNLESS FIREPROOFED AS PER CODE REQUIREMENTS. ANY EXISTING CONDITION MUST BE BROUGHTTO THE ATTENTION OF THE-ARCHITECT /ENGINEER AND REMEDIED AT ONCE. S. CONTRACTOR SHALL VERIFY SLOPE AND DEPTHS AND LOCATIONS OF CONNECTION POINTS TO EXISTING PRESSURE OR DRAINAGE LINES BEFORE STARTING WORK. MACHINE ROOM PLAN SCALE: 3/32 " =1' -0" DRAWING NOTES ( 3 /4 "CW DOWN IN WALL TO PHARMACY WHC AND SINK. ROUTE 1 /2 "HW FROM WHC TO SINK. SINK AND WHC FURNISHED AND INSTALLED BY CONTRACTOR. • .• lo O2 1 "CW DOWN WALL. ROUTE 3 /4 "CW TO (2) FROST PROOF WALL HYDRANTS. ROUTE 3 /4 "CW TO PHOTO WHC & SINK AND ROUTE 3 /4 "HW FROM WHC TO SINK. SINK AND WHC FURNISHED AND INSTALLED BY CONTRACTOR. O3 OMIT a0 3 /4 "CW /HW DOWN TO THERMOSTATIC MIXING VALVE IN RECESSED ACCESS BOX, SET TEMP. TO 857. SEE DETAIL ON P -402 FOR SPEC ON MIXING VALVE. Q 3 /4 "CW /HW DOWN WALL TO BELOW SLAB, ROUTE 3 /4 "CW /HW FROM BELOW SLAB IN 3" PVC CONDUIT TO SINK. Q 1 /2 "CW DOWN WALL TO "KLEANSTEAM" SYSTEM MOUNTED ON WALL. ROUTE 1 /2 "CW FROM "KLEANSTEAM" SYSTEM TO PROOFER. SEE WATER DISTRIBUTION NOTE 9. Q 3 /4 "CW DOWN, ROUTE 3 /4 "CW TO FROST PROOF WALL HYDRANT & 3 /4 "CW TO OVEN. TERMINATE W/ BALL VALVE AT OVEN. ® 3 /4 "CW /HW DOWN WALL TO UTILITY SINK, SEE WATER DISTRIBUTION NOTE 10. s0 NOT USED. to ROUTE 3 /4 "CW DOWN WALL TO BELOW SLAB. ROUTE 3/4" PIPE FROM BELOW SLAB IN 1" PVC CONDUIT TO HOT DELI CASE. tt OMIT t2 3 /4 "CW DOWN WALL TO BELOW SLAB. ROUTE 3 /4 "CW FROM BELOW SLAB IN 2" PVC CONDUIT TO LUNCHEON MEAT CASE (STUB -UP). TERMINATE W/ BALL VALVE. t3 3 /4 "CW DOWN WALL TO EVERPURE FILTER QC7 -1 SINGLE HEAD W/ CV FILTER MOUNTED -ON WALL. ROUTE 3/4" FILTERED WATER TO BELOW SLAB AND RUN PIPE IN 1" PVC CONDUIT TO PRODUCE SPRAY SYSTEM. to 1 "CW /HW DOWN WALL, ROUTE 3 /4 "CW /HW TO UTENSIL SINK, ROUTE 3 /4 "CW /HW TO HOSE BIBB. SEE WATER DISTRIBUTION NOTE 10. t5 1 /2 "CW DOWN WALL TO "KLEANSTEAM" SYSTEM MOUNTED ON WALL. ROUTE 1 /2 "CW FROM "KLEANSTEAM" SYSTEM TO LOBSTER STEAMER. SEE WATER DISTRIBUTION NOTE 9. is 3 /4 "CW DOWN WALL TO BELOW SLAB. ROUTE 3 /4 "CW FROM BELOW SLAB IN 2" PVC CONDUIT TO SEAFOOD CASE (STUB -UP). TERMINATE W/ BALL VALVE. t� 3 /4 "CW DOWN WALL TO BELOW SLAB. ROUTE 3 /4 "CW FROM BELOW SLAB IN 2" PVC CONDUIT TO MEAT CASE (STUB -UP). TERMINATE W/ BALL VALVE. 3 /4 "CW DOWN WALL TO FROST PROOF WALL HYDRANT. t9 3 /4 "CW DOWN WALL TO BELOW SLAB. ROTE 3 /4 "CW FROM BELOW SLAB IN 2" PVC CONDUIT TO (2) FLOOR HYDRANTS. 20 3 /4 "CW DOWN WALL TO BELOW SLAB. ROUTE 3 /4 "CW FROM BELOW SLAB IN 2" PVC CONDUIT TO DAIRY CASE (STUB -UP). TERMINATE W/ BALL VALVE. 2t 120 GALLON U.G. PROPANE TANKS FURNISHED & INSTALLED BY PLUMBING SUBCONTRACTOR(NOT LEASED). GAS DEMAND IS FOR STAND -BY GENERATOR ONLY. 2© OMIT 23 OMIT 2a OMIT 2s OMIT 2s OMIT ©i ROUTE 3/4" TRAP PRIMER BELOW SLAB. CONNECT TO FLOOR DRAIN. 2s INSTALL SHUT -OFF VALVE AT THIS POINT. 29 OMIT 30 1 "CW /HW DOWN WALL. ROUTE 3 /4 "CW /HW TO UTENSIL SINK AND 3 /4 "CW /HW TO HOSE BIBB. SEE WATER DISTRIBUTION NOTE 10. 3t OMIT 32 OMIT 33 1 /2 "CW DOWN WALL TO ADF /DF. 3a 3 /4 "CW DOWN WALL TO BELOW SLAB. ROUTE 3 /4 "CW FROM BELOW SLAB IN 2" PVC CONDUIT TO PRODUCE CASE (STUB -UP). TERMINATE W/ BALL VALVE. 35 OMIT 3s 3 /4 "HW /CW DOWN WALL TO UTILITY SINK. Q OMIT 38 3 /4 "CW /HW, EXPOSED, DOWN TO THERMOSTATIC MIXING VALVE IN ACCESS BOX. SET TEMP. TO 857, ROUTE 1 /2 "CW /HW, EXPOSED. OVER TO HS /EWS. SEE DETAIL ON P -402 FOR SPEC ON MIXING VALVE. 3s EXPOSED 1 "CW /HW DOWN WALL, ROUTE 3 /4 "CW /HW TO UTENSIL SINK, ROUTE 3 /4 "CW /HW TO HOSE BIBB. SEE WATER DISTRIBUTION NOTE 10. WATER DISTRIBUTION NOTES 1. PROVIDE 1/2" COLD WATER STUB -UP WITH SHUT -OFF VALVE AND CONNECT TO HOSE REEL AT PRODUCE CASES. 2. PROVIDE HOT AND COLD WATER SUPPLY TO LAVATORIES, MEAT CUTTING ROOM, BAKERY SINKS, DELI SINKS, HAND SINKS, SEAFOOD SINK, HOSE BIBBS, MOP RECEPTORS, SERVICE FAUCETS, AND LOBSTER STEAMER 3. PROVIDE COLD WATER SUPPLY TO PRODUCE SINK (BOTH SIDES OF FAUCETS),EXTERIOR HOSE BIBBS, WATER CLOSETS, URINALS, DRINKING FOUNTAIN, STEAMERS, OVENS, HOT DELI CASE. PRODUCE CASES, FLOOR AND WALL HYDRANTS, FLORAL WORK TABLE, WALK -IN OVEN AND PHOTO BOOTH. 4. ALL WATER LINES SHALL BE RUN OVERHEAD UNLESS OTHERWISE NOTED. INSULATE ALL WATER LINES (SEE SPECS.) INSULATE ALL FITTINGS THAT ARE NOT CHROME PLATED. 5. ALL WATER PIPING SHALL BE COPPER. 6. PROVIDE AND INSTALL STOPS FOR WATER SUPPLIES AT EACH FIXTURE. 7. PROVIDE AND INSTALL ADEQUATE WATER HAMMER AND ANTI - SIPHON PROTECTION ON ALL FAUCETS. SIZE IN ACCORDANCE WITH LOCAL CODES. 8. CONTRACTOR SHALL FURNISH AND INSTALL WATER PRESSURE REGULATOR, STANDPIPE, AND SHUT -OFF VALVE FOR LOBSTER COOKER AND STEAMERS. 9. WATER FILTERS SHALL BE FURNISHED BY WINN -DIXIE AND INSTALLED BY CONTRACTOR FOR THE FOLLOWING EQUIPMENT. LOCATION TO BE DETERMINED BY WINN -DIXIE MAINTENANCE SUPERVISOR (RECOMMENDED FILTER: EVERPURE KLEANSTEAM SYSTEM IVIVUCL AM-A.) UJC II'11J JiJICIVI it' prl CAI.CCUJ /.J VIVLi. rum ALL VIf9CIS rur%"VJCJ USE ONLY THE FILTER, EVERPURE FILTER QC7 -1 SINGLE HEAD W/ CV FILTER. SEE DETAIL ON SHEET P -401. A. PROOFERS B. STEAMERS C. MISTERS 10. PROVIDE CHECK VALVES ON HW AND CW LINES SERVING 2 AND 3 COMPARTMENT SINKS AND MOP RECEPTORS. 11. ALL EXPOSED COPPER PIPE IN FOOD PREP AREAS SHALL BE POLISHED WITH EMERY CLOTH AND ONE COAT CLEAR LACQUER APPLIED. a� N w v1 � U O W W O �g Oo M F-I Q (A LL_ 00 Lo • �� �V U NO W _ �Y O Ln • _JO Z� t� iO I""'ll IIIU p�� QI rl Q J LLJ Q t0 M ENGINEERS N oL n NMN� Ewa cnM� o M _ ov LaJ L"*C 4 J � 0�w' Zo- J in W 0 REVISIONS: I- z w -i 0 w z 0 WIT o • y+ ^� rM o rn 1 J DRAWING TITLE WATER DISTRIBUTION P LAN GAS PIPING 1. GAS PIPING SHALL BE INSTALLED IN ACCORDANCE WITH NFPA -54, AND THE Q F STANDARD GAS CODE. DATE: Q� w JUNE 17, 2002 O INSTALLATION OF GAS PIPING. O DRAWN BY: 3. THE INSTALLATION SHALL BE FOR NATURAL GAS OR PROPANE. 4. V) LL CHECKED BY: W �� THE BUILDING SHALL BE PAINTED WITH BLACK RUSTOLEUM PAINT. 5. � INVERTED TRAP CONNECTION AT THE MAIN. - 'r °t�.., .. DIVISION 6. PROVIDE THE FOLLOWING IN ORDER AT EACH PIECE OF EQUIPMENT: GAS COCK, t MIAMI _W x SEDIMENT TRAP, UNION, AND FLEXIBLE CONNECTION. µ, «� „� `'' UIDCATION NO. 7, ALL GAS EQUIPMENT SHALL BE AGA APPROVED. Q 285 Q � V) :" „� • D. GUIDE PLAN Z o F- Z LO :D co O PROJECT NO. DRAWING TITLE WATER DISTRIBUTION P LAN DRAWING NO. P -103 of SHEET NO. OF , GAS PIPING 1. GAS PIPING SHALL BE INSTALLED IN ACCORDANCE WITH NFPA -54, AND THE STANDARD GAS CODE. DATE: 2. THE INSTALLING SUBCONTRACTOR SHALL BE LICENSED BY THE STATE FOR THE JUNE 17, 2002 INSTALLATION OF GAS PIPING. DRAWN BY: 3. THE INSTALLATION SHALL BE FOR NATURAL GAS OR PROPANE. 4. GAS PIPING SHALL BE SCHEDULE 40 SEAMLESS, BLACK STEEL. GAS PIPING OUTSIDE CHECKED BY: �� THE BUILDING SHALL BE PAINTED WITH BLACK RUSTOLEUM PAINT. 5. RUNOUT PIPING, FROM THE MAIN PIPING TO APPLIANCES, SHALL BE WITH AN INVERTED TRAP CONNECTION AT THE MAIN. - 'r °t�.., .. DIVISION 6. PROVIDE THE FOLLOWING IN ORDER AT EACH PIECE OF EQUIPMENT: GAS COCK, t MIAMI SEDIMENT TRAP, UNION, AND FLEXIBLE CONNECTION. µ, «� „� `'' UIDCATION NO. 7, ALL GAS EQUIPMENT SHALL BE AGA APPROVED. 285 8. WHERE PROPANE IS USED IN LEIU OF NATURAL GAS, ALL TANKS, PIPING, AND APPURTENANCES SHALL BE PROVIDED AND INSTALLED IN ACCORDANCE WITH NFPA 58. :" „� • D. GUIDE PLAN PROJECT NO. WD #0704 DRAWING NO. P -103 of SHEET NO. OF ,