Loading...
02-830-0775 N v x 0 M •I W s i a CL ul ai •M o tV .O tT 3 (V O 0- I 00 N ul 00 N v 3 DRAWING NOTES O TEMPERATURE AND RELIEF DRAIN PIPE AND DRAIN PAN PIPE FROM WATER HEATERS TO TERMINATE OVER FLOOR DRAIN. -- 2Q OMIT O3 ROUTE 3" VENT UP W/I WALL AND OFFSET ABOVE FINISH CEILING. Q ROUTE 3" VENT W/I COLUMN ENCLOSURE, COORDINATE W/ ARCHITECTURE. Q OMIT Qs PHARMACY SINK FURNISHED BY TENANT AND INSTALLED BY CONTRACTOR, PIPE TO DRAIN TO CD W/ INDIRECT CONNECTION. Q OMIT ® OMIT OMIT To COORDINATE DRAIN LOCATION W/ EQUIPMENT PRIOR TO INSTALLATION. 1T SANITARY PIPING UP TO MACHINE ROOM TO FIT INSIDE CHASE PROVIDED. t2 18 "x18 "x18" SUMP PIT WITH PUMP. SEE DETAIL ON SHEET P -401 FOR SPECIFICATIONS. T3 ROUTE 3"VENT UP EXPOPSED ON WALL. to ROUTE 3" VENT UP W/I WALL AND OFFSET ABOVE FINISH CEILING CEILING. GENERAL NOTES 1. CONTRACTOR SHALL NOT POUR ANY PORTION OF CONCRETE FLOOR SLAB UNTIL UNDERGROUND UTILITIES ARE CHECKED BY WINN- DIXIE'S MAINTENANCE SUPERINTENDENT. ALLOW A MINIMUM OF TWO (2) WEEKS NOTICE PRIOR TO CHECKING. 2. IT IS RECOMMENDED THAT THE SUB - CONTRACTOR ARRANGE A PRE -JOB CONFERENCE W /WINN- DIXIE'S CONSTRUCTION SUPERVISOR FOR REVIEW AND C:1 ARIFICATION BEFORE STARTINC WORK. CALL: PETE ONORATI (054) 783 -2836 3. THE DRAINAGE SYSTEM AS SHOWN IS FUNCTIONAL AND MOST DESIREABLE. IF SUCH IS NOT LOCALLY ACCEPTABLE, THE CONTRACTOR SHALL INSTALL OTHER DRAINS AS REQUIRED. HE SHALL INSTALL ANY VENTS WHICH ARE REQUIRED BY CODE (WHETHER SHOWN OR NOT). ANY PROPOSED SYSTEM OR CHANGES SHALL BE APPROVED BY WINN -DIXIE BEFORE ANY WORK IS STARTED. THE ENTIRE PLUMBING SYSTEM SHALL CONFORM WITH ALL STATE AND LOCAL CODES. 4. PVC SHALL BE USED FOR SALES AREA DISPLAY CASE CONDENSATE DRAIN LINES. CARE SHALL BE USED WHEN LAYING PIPE OVER FILL. FILL SHALL BE MECHANICALLY COMPACTED. 5. PIPE NOTE: A. INSTALL 1/2" C.W. AT RIGHT SIDE OF FIXTURE. B. RUN 1 1/2" PIPE 0 1 /4 " /FT. FIXTURE ARM. C. RUN 2" PIPE 0 1 /4 " /FT. D. RUN 3" PIPE 0 1 /8 " /FT. E. RUN 4" & 6" PIPE ® 1 /8 " /FT. F. PROVIDE CLEANOUT AT BASE OF EACH SOIL AND WASTE STACK. 6. ALL DRAINS SHALL BE P- TRAPPED AT THEIR ORIGIN (WHERE CODES PERMIT). 7. DO NOT POUR CONCRETE WITHIN 2' OF FLOOR DRAINS UNTIL DRAINS ARE INSTALLED. 8. TOP OF FLOOR DRAINS IN AREAS WITH SLOPED FLOORS SHALL BE SET BY FLOOR SLOPE OF 1/16" MIN. PER FOOT IN THOSE AREAS. 9. ALL EXPOSED COPPER IN FOOD PREP AREAS (PRODUCE, MEAT, SEAFOOD, DELI BAKERY, ETC.) SHALL BE POLISHED WITH EMERY CLOTH AND ONE COAT CLEAR LACQUER APPLIED. 10. ALL CASE HUB DRAINS SHALL BE 3" BELL FITTINGS. 11. HUB DRAINS FOR COOLER CONDENSATE SHALL BE INSTALLED TIGHT TO WALL AND IN CONCRETE CURB. 12. SLEEVES IN CONCRETE BLOCK WALLS, FOUNDATIONS AND FLOORS TO BE PROVIDED BY PLUMBING CONTRACTOR. 13. ALTERATIONS TO EXISTING WORK BEING OF SUCH NATURE THAT ALL FACETS OF THE WORK BEING IMPOSSIBLE TO DETAIL AND SPECIFY,IT IS THEREFOR. THE RESPONSIBILITY OF THE CONTRACTOR TO CAREFULLY EXAMINE THE BUILDING AND FAMILIARIZE HIMSELF WITH THE CONDITIONS AND RELATE THESE CONDITIONS TO THE SCOPE OF THE PROPOSED WORK. 14. CONTRACTOR SHALL VERIFY LOCATION OF EXISTING DRAIN LINES AND SEWER LINE. HE MAY ROUTE NEW WORK THROUGH THEM IN THE MOST ECONOMICAL MANNER . IN THE EVENT THE PLUMBING SYSTEM SHOWN CANNOT BE INSTALLED PROPERLY . IT IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO INSTALL A WORKABLE SYSTEM WITHOUT EXTRA COST TO THE LAND LORD OR TENANT AND CONFORMS TO ALL STATE AND LOCAL CODES. 15. ANY PROPOSED SYSTEM OR CHANGES SHALL BE APPROVED BY WINN -DIXIE BEFORE ANY WORK IS STARTED. 16 ALL DIMENSIONS ON THIS DRAWING ARE CUMULATIVE AND ARE TAKEN FROM FINISH FACE OF MASONRY AND FINISHED WALLS. UNLESS NOTED OTHERWISE. DIMENSIONS INDICATED FROM THE WALL SEPARATING THE SALES AREA FROM THE STOCKROOM AREAS ARE TAKEN FROM THE FINISHED FACE OF WALL ON THE SALES AREA SIDE. THE WALL ON EACH SIDE OF CUTTING ROOM IS FIGURED AT 7" INCLUDING FINISHES. CONTRACTOR SHALL VERIFY DIMENSIONS W /DRAIN DETAIL AND ACTUAL JOB CONDITIONS. 11. ANY EXISTING DRAINS IN SALES AREA AND BACK ROOM NOT TO BE RE- USED, SHALL BE PLUGGED BELOW FLOOR AND FINISHED PER FINISH SCHEDULE. 18. CONTRACTOR TO CLEAN OUT ALL EXISTING DRAIN LINES TO INSURE PROPER FLOW, FLUSH DRAIN AS REQUIRED. 19. ALL NEW AND EXISTING SOIL LINES SHALL BE PROPERLY VENTED AND HAVE A FLOOR CLEAN OUT (F C /O) AT THE END OF ALL RUNS. 20. ALL NEW DRAIN LINES TO BE A MINIMUM OF 4" IN DIAMETER. 21. ALL DRAINAGE PIPING SHALL BE PVC. DWV SCH. 40 IF ALLOWED BY CODE. CAST IRON SOIL PIPE WITH PUSH JOINTS UNDERGROUND AND NO -HUB JOINTS ABOVEGROUND MAY BE USED. CARE IS TO BE COMPACTFD Mtt,MANIL;ALL T. 22. CONTRACTOR SHALL FURNISH AND INSTALL ANY NECESSARY CLEANOUTS NOT SHOWN ON PLANS. CLEANEST SHALL NOT EXCEED 50' -0" UN CENTERS. 23. CONTRACTOR SHALL VERIFY DIMENSIONS W/ DRAIN DETAILS ACTUAL JOB CONDITIONS, AND ACTUAL CASE ROUGH -IN REQUIREMENTS. 24. CONTRACTOR SHALL VISIT JOB SITE PRIOR TO BIDDING, TO FULLY FAMILIARIZE HIMSELF WITH SCOPE OF WORK, WORKING CONDITIONS, AND EXISTING UTILITIES. 25. ANY CONFLICT NOT ADDRESSED IN THESE DRAWINGS SHOULD BE BROUGHT TO THE ENGINEERS ATTENTION IN A TIMELY MANNER TO LET THE ENGINEER MAKE AN ASSESSMENT OF THE PROBLEM AND MAKE A DECISION ON THE COURSE OF ACTION TO TAKE. 26. CONTRACTOR SHALL COORDINATE ALL WORK WITH ALL TRADES, AND WITH EXISTING CONDITIONS. 27. CONTRACTOR SHALL COORDINATE ALL WORK WITH WINN -DIXIE AUTHORITIES TO MINIMIZE DISRUPTION OF NORMAL STORE OPERATIONS. 28. CONTRACTOR SHALL SAW CUT OR CORE DRILL EXISTING SLABS TO INSTALL NEW WORK. PATCH SLAB TO MATCH EXISTING ONCE PLUMBING IS INSPECTED, AND FIRE SEAL ALL PENETRATIONS THROUGH FIRE RATED WALLS TO MAINTAIN FIRE RATING. 29. ALL ROOF DRAIN LINES ON EXISTING MASONRY WALL TO BE REMOVED TO BE RE ROUTED AND RE CONNECTED TO UNDER GROUND LINES. (TYPICAL) LOCATION SHOWN FOR EXISTING PLUMBING FIXTURES, DCD, FLOOR DRAINS, ETC. ARE APPROXIMATE. R IS CONTRACTOR RESPONSIBILITY TO VERIFY EXIST. LOCATIONS IN FIELD, ADJUST OR RELOCATE IF REQUIRED FOR NEW LAYOUT OR EQUIPMENT. IF EXISTING IS NOT THERE PROVIDE NEW. VERIFY ALL EXISTING CONDITIONS IN FIELD AND INCLUDE IN BID ANY NECESSARY ADJUSTMENTS. INFORM ENGINEER AND ARCHITECT IF ANY MAJOR DISCREPANCIES ARF FOl1NTl_ EMM4 t• S NITNiY PPE I EXNSTHD CO. L� I EXISTING CREASE -� I [K TO REAM i/ -bll �am+o 4L• SANRMY Poi J- L/- --� CONNECT NEW 4• S WARY TEXISTNO �' sANRARr PIPE PPE TO EXMTP4 4• SANITARY PIPE O STUB UP NOTE 1. ALL NEW UTILITIES (DRAINS, WATER, ETC.) FOR NEW EQUIPMENT MUST BE VERIFIED WITH EQUIPT. SPECS AND OR TEMPLATES PRIOR TO COMMENCING ANY WORK. ADJUST IF REQUIRED. INFORM ARCH /ENG. OF DISCREPANCIES AND INCLUDE IN BID. 2. IF EXISTING UTILIIES BEING CALLED TO BE REUSED OR RELOCATED. CAN NOT BE REUSED CONTRACTOR TO PROVIDE NEW AS REQUIRED. 3. CONTRACTOR MUST CONTACT EQUIPMENT REP OF REFRIG. CASES AND EQUIPMENT AND OBTAIN SPECS AND SHOP' DRAWINGS OF THE ACTUAL EQUIPMENT BEING DELSVERED TO BE USED IN THE STORE AND COORDINATE LOCATION OF EQUIPMENT WITH ARCHITECT. ARCHITECT WILL PROVIDE TAKE OFF POINTS FOR CONTRACTOR TO LOCATE EQUIPMENT AND COORDINATE FINAL AND EXACT LOCATION OF UTILITIES (ELECTRICAL, PLUMBING REFRIG. ETC.). PLEASE CONTACT ARCHITECT AND ENGINEER WITH AND PROVIDE A WEEK NOTICE FOR MEETING. LEGEND Z ABBREVIATION SYMBOL DESCRIPTION F ALL EXISTI GREASE WASTE SAN z PS NOT BEIN REUS D OVERFLOW LOCA SECONDARY DRAINAGE PIPING FIELD I TR GH TH STOR SFD ® LEGEND Z ABBREVIATION SYMBOL DESCRIPTION GW O J LL GREASE WASTE SAN z SANITARY STORM X LL PRIMARY DRAINAGE PIPING OVERFLOW E�z SECONDARY DRAINAGE PIPING EXISTING ® SFD O EXISTING FLOOR DRAIN TO REMAIN SFD ® NEW FLOOR DRAIN (TYP.) co EXISTING TO BE REMOVED CONTRACTOR TO MANIFOLD TWO CASE DRAINS PER ONE FLOOR DRAIN. lb. VTR 0 Lr 1 � ar- N W V1 � V) U(0 o 0 1- M W O Lr_I 0 J O 0 1 0� M �� I Q 00 • "t - (. � N W -, U ° Y o • O Z u �0 �- � � Lo SEAL r' i -A Jy ..rit. , , .�f •„ _ d. Cli �LjEnMo M _ vv Liz f LA 2 _1 0 M a� Ln F ME z Z� o W 8 Nh REVISIONS: Z p w C (A O J LL 0 W z Z X LL E�z 0. EXISTING CREASE LRAP TO REM/JN EXISTING O TO REMAIN VERIFY 6 IN FIELD. (TYPICAL) to VTR 0 Lr 1 � ar- N W V1 � V) U(0 o 0 1- M W O Lr_I 0 J O 0 1 0� M �� I Q 00 • "t - (. � N W -, U ° Y o • O Z u �0 �- � � Lo SEAL r' i -A Jy ..rit. , , .�f •„ _ d. Cli �LjEnMo M _ vv Liz f LA 2 _1 0 M a� Ln F ME z Z� o W 8 Nh REVISIONS: W cy- ij W p QD C (A O J LL W � X LL E�z 0. �CL co o O = � to co z � LLI o im lb. I w '{� O w LLJ � CD i o E I Q j ®o v ® 0 O v 4 0 ka W cy- ij W p O W (A O J LL W � X LL 0. z Z O = � to O DRAWING TITLE PLUMBING PLAN DATE: JUNE 17, 2002 DRAWN BY: CHECKED BY: DIVISION A'x MIAMI ; 4'.Q 'ION NO. =285 D:; BVIDE' PLAN v- •r -�► PROJECT NO. WD #0704 DRAWING NO. P -102 of SHEET NO. OF