02-830-066I
1
a
ti
a
3t
F
N
X
0
. M
I
w
s
i
Q
[L
0)
M
t,p
O
N
0
r`
0
3
v
I
co
N
0
Lo
co
N
3
v
3
w
hviLVl I ^NlI V^LL I 'L.^N
SCALE 3/32° = 1' -0-
NOTE:
EXISTING DIFFUSERS NOT BEING
REUSED IN AREAS BEING
REMODELED OR DEMOLISHED ARE
TO BE REMOVED AND CAPPED OFF
AS REQUIRED. VERIFY IN
FIELD. (TYPICAL)
FOR REFRIGERANT PIPE,
COMPRESSORS AND
CONDENSER SIZES SEE
SHEET E -06
OUTSIDE AIR CALCULATIONS
320 PERSONS ® 20 CFM = 6400 CFM
OUTSIDE AIR FROM A.C.
EXISTING AC -1 - 4,200 CFM
EXISTING AC -2 - 2,000 CFM
NEW RTU 200 CFM
TOTAL 6,400 CFM
LEGEND
_••___••••__••___••• EXISTING DUCT TO REMAIN
NEW DUCT
DRAWING NOTES
10 ROUTE DUCTWORK IN JOIST AREA. REFER TO
DETAILS C & D ON THIS DWG.
20 ROUTE DUCT UP TO UNIT. TRANSITION
TO FULL SIZE OF UNIT CONNECTION
O3 CONNECT TO WALL PLENUM. REFER TO
DETAIL ON DWG. M -502
O4 8'0 ALUMINUM EXHAUST DUCT UP TO FAN
ON ROOF. (NOTE TO INSPECTORS. THIS IS OVER
A STEAM PRODUCING EQUIPMENT. NO GREASE
LADEN VAPORS.
O MOUNT THERMOSTAT 60" A.F.F.
O6 DIVISION 16 DUCT SMOKE DETECTORS.
O ELECTRIC DUCT HEATER. REFER TO
EDH SCHEDULE DWG M -503
® 7'0 FLU THRU ROOF, SEE OVEN FLU
DETAIL ON SHEET M -501.
O9 8'0 EXHAUST FAN THRU ROOF STEAM HOOD,
SEE OVEN FLU DETAIL ON SHEET M -501.
10 WALL LOUVER PROVIDED AS PART OF
ARCHITECTURAL WORK
11 PRESSURE SENSOR IN RETURN DUCT.
I
GENERAL NOTES
1. ALL WORK SHALL COMPLY WITH APPLICABLE NATIONAL, STATE, AND LOCAL CODES.
THIS IS TO INCLUDE THE STANDARD BUILDING CODE, THE STANDARD MECHANICAL
CODE, APPLICABLE NFPA CODES, NATIONAL ELECTRICAL CODE, AND THE STATE
ENERGY CODE.
2. DEFINITIONS; 'FURNISH" SHALL MEAN TO PURCHASE AND LOCATE AN ITEM ON THE
JOBSITE. "INSTALL" SHALL MEAN TO PYHSICALLY INSTALL THE ITEM, & TO CONNECT
ALL REQUIRED SERVICES TO MAKE THAT ITEM FULLY FUNCTIONAL. "PROVIDE' SHALL
MEAN TO BOTH FURNISH AND INSTALL AN ITEM.
3. ALL ELECTRICAL EQUIPMENT SHALL BE UL CLASSIFIED OR LISTED.
4. THE MECHANICAL SUBCONTRACTOR SHALL PREPARE PLANS SHOWNG THE LOCATION AND
SIZES OF ALL RDOF OPENINGS, FOR USE BY THE STRUCTURAL STEEL SUBCONTRACTOR.
STEEL SUPPORT FRAMES SHALL BE PROVIDED BENEATH THE FULL PERIMETER OF ALL
ROOF CURBS. SEE ARCHITECTURAL PLANS FOR BURGLAR BAR REQUIREMENTS.
5. THE MECHANICAL SUBCONTRACTOR SHALL PREPARE PLANS SHOWING THE LOCATIONS AND
SIZES OF ALL WALL OPENINGS, FOR USE BY THE GENERAL CONTRACTOR.
6. THE BUILDING IS FULLY SPRINKLED. THE MECHANICAL SUBCONTRACTOR SHALL
COORDINATE WITH THE SPRINKLER SUBCONTRACTOR TO PREVENT INTERFERENCES
BETWEEN DUCTWORK & GRILLES AND THE SPRINKLER PIPING & HEADS
7. TEST AND BALANCE SHALL BE PERFORMED BY A TEST & BALANCE COMPANY WHICH IS
A MEMBER OF AABC OR NEBB, AND APPROVED BY THE ENGINEER. THE MECHANICAL
CONTRACTOR SHALL HAVE ALL SYSTEMS FULLY INSTALLED AND OPERATIONAL, WITH
CLEAN FILTERS, PRIOR TO TEST & BALANCE. FURNISH (1) COPY TO WIN-DIXIE STORES INC.
STORE DESIGN DEPT. PO BOX B JACKSONVILLE, FL 32205 -3699
8. EXAMINE EXISTING DUCTS. PATCH AND REPAIR ANY LEAKING
DUCTS AND TORNED INSULATION.
., 9. PROVIDE THE NECESSARY FIRE RESISTANT EQUIPMENT, MATERIALS
AND INSTALLATION FOR NFPA TO MEET ANY REQUIRED FIRE RATING.
AIR CONDITIONING EQUIPMENT
1. SEASONS- 4 IS THE 'BASIS OF DESIGN'
THE ELECTRICAL SUBCONTRACTOR SHALL REVIEW AND APPROVE THE SUBMITTALS FOR IMPACT
ON THE ELECTRICAL, PRIOR TO ORDERING EQUIPMENT. TRANE, CARRIER, AND YORK ARE
APPROVED FOR RTU -2, RTU -3, AND RTU -4
2. THE MANUFACTURER FOR RTU -1 MA'i BE CONTACTED AT;
SEASONS -4, INC.
4500 INDUSTRIAL ACCESS ROAD
DOUGLASVILLE, GEORGIA 30134
770 -489 -0716
3. ALL EQUIPMENT SHALL MEET THE MINIMUM REQUIREMENTS OF THE STATE ENERGY CODE.
4. ALL ROOFTOP UNITS SHAD. BE SET LEVEL, WITH FACTORY CURBS DESIGNED TO ACCOUNT
FOR THE 2 PERCENT (1/4" PER FOOT) ROOF PITCH ON THE PROJECT.
5. CONDENSATE DRAIN PIPING SHALL BE FURNISHED AND INSTALLED FOR ALL ROOFTOP
UNITS AND ROUTED TO ROOFDRAIN (TERMINATE AT STORM DRAIN). PIPING SHALL BE DWV COPPER,
SUPPORTED ON PRESSURE TREATED BLOCKS, AND SLOPED WITH THE ROOF PITCH.
CONDENSATE PIPING SHALL BE INSTALLED BY THE PLUMBING CONTRACTOR.
6. HEAT RECLAIM PIPING SHALL BE PROVIDED BY THE REFRIGERATION SUBCONTRACTOR
TO THE HEAT RECLAIM WIL tURNIbHLU IN THE ROOFTOP UNIT (RTU -1). PIPING SHALL BE
ROUTED BELOW THE ROOF FROM THE COMPRESSOR MACHINE ROOM TO THE ROOFTOP
UNIT. PIPING SHALL ENTER THE ROOFTOP UNIT FROM THE BOTTOM.
7. THE ROOFTOP UNIT (RTU -1) SHALL BE PROVIDED VWTH A FACTORY MOUNTED, SINGLE POINT
SERVICE, FUSED DISCONNECT SWITCH,
& THE ROOFTOP UNIT RTU -1) SHALL BE PROVIDED COMPLETE WITH FACTORY INSTALLED
TEMPERATURE CONTROLS, IN ACCORDANCE WITH WINN -DIXIE SPECIFICATIONS. .
9. AIR CONDITIONING EQUIPMENT SHALL BE OPERATED WITH THROWAWAY FILTERS DURING
CONSTRUCTION. PRIOR TO TEST AND BALANCE, 2' PLEATED MEDIA FILTERS SHALL
BE PROVIDED IN ALL AIR CONDITIONING UNITS.
10. THE AIR CONDITIONING UNITS SHALL HAVE A CHECK, TEST, & START BY THE
MECHANICAL SUBCONTRACTOR WTH A WRITTEN REPORT SUBMITTED AS PART OF THE
TEST & BALANCE REPORT AT COMPLETION OF THE PROJECT, THE REPORT SHALL BE
ON FORMS FURNISHED BY THE ROOFTOP UNIT MANUFACTURER THE REPORT SHALL
NOTE THE START -UP DATE FOR THE COMMENCEMENT OF THE UNIT WARRANTY.
TEMPERATURE CONTROLS
1. TEMPERATURE CONTROLS FOR THE ROOFTOP UNITS SHALL BE WITH FACTORY INSTALLED
24 VOLT CONTROL SYSTEMS, IN ACCORDANCE IWTH W1NN -DIXIE SPECIFICATIONS.
2. SPACE TEMPERATURE AND DEWPOINT SENSORS SHALL BE FURNISHED MATH THE ROOFTOP
UNIT (RTU -1) AND FIELD INSTALLED BY THE MECHANICAL SUBCONTRACTOR AT LOCATIONS
SHOWN ON THE PLAN. MOUNT ALL SENSORS TO' AFF. WIRING FOR TEMPERATURE
SENSORS (2 -WIRE SHIELDED) AND DEWPOINT SENSORS (4 -WIRE) SHALL BE AS
RECOMMENDED BY THE ROOFTOP UNIT MANUFACTURER.
3. THE ELECTRICAL SUBCONTRACTOR SHALL PROVIDE THE 208 /1 VOLT FIELD WIRING
MACHINE ROOM AND THE ROOFTOP UNIT (RTU -1) THE COMPRESSOR RACKS IN THE
4. DUCT SMOKE DETECTORS SHALL BE PROVIDED BY DIVISION 161 & INSTALLED IN THE RETURN
AIR AND THE SUPPLY AIR DUCT OF THE RTU -1, 2 & 3 BY MECHANICAL CONTRATOR.
5. THE ROOM THERMOSTAT FOR RTU -2 & RTU -3, SHALL BE A HONEYWELL
T87 SERIES THERMOSTAT WITH AN 'AUTO -ON' FAN SWITCH AND A
'COOL- HEAT - OFF - AUTO'S FAN SWITCH.
6. TOILET EXHAUST FANS SHALL BE SIMTCHED WITH THE LIGHTS AS
SHOWN ON THE ELECTRICAL FLOOR PLANS.
7. REFER TO DWG M -501 FOR EXHAUST HOOD OPERATIONS.
& THE MECHANICAL SUBCONTRACTOR SHALL PROVIDE ALL STARTERS.
9. THE ELECTRICAL SUBCONTRACTOR SHALL PROVIDE ALL DISCONNECT SWITCHES.
10. LOW VOLTAGE (24 VOLT) CONTROL WRING AND CONDUIT SHALL BE PROVIDED BY THE
MECHANICAL SUBCONTRACTOR.
11. LINE VOLTAGE (110 VOLT AND HIGHER) POWER WIRING & CONDUIT SHALL BE
PROVIDED BY THE ELECTRICAL SUBCONTRACTOR
12. THE MECHANICAL SUBCONTRACTOR SHALL VERIFY OPERATION OF ALL CONTROLS
AT THE COMPLETION OF THE PROJECT.
NOTE
GENERAL CONTRACTOR SHALL SUBMIT IN WRITING TO WNN -DIXIE
MAINTENANCE /CONSTRUCTION SUPERVISOR THAT ALL PENETRATIONS
THRU WALLS (INTERIOR & EXTERIOR) AND ROOF BY ANY AND ALL
TRADES INCLUDING WINN -DIXIE HAVE BEEN PROPERLY SEALED BY
FOAM. THIS SHALL BE PERFORMED PRIOR TO ANY TESTING OF
HVAC SYSTEMS.
• � >: ^ _ _ . :. `'',; fir- #.', � � . .
- • -- - .._. ., ...o .- ...,..... mow•• »...,,. 'a'p't
a�
N
t� W
r/ 1
O
t\
�M
O W O
o W
O Q O�
I (f) LL
HQ� uj
• �' (� L0
W
O �
U 2Y
• O Z� v
U 0) 2
QI I\ Q J
Q Lo 2 1-
SEAL
a
y
W
o.
I
1
a
ti
a
3t
F
N
X
0
. M
I
w
s
i
Q
[L
0)
M
t,p
O
N
0
r`
0
3
v
I
co
N
0
Lo
co
N
3
v
3
w
hviLVl I ^NlI V^LL I 'L.^N
SCALE 3/32° = 1' -0-
NOTE:
EXISTING DIFFUSERS NOT BEING
REUSED IN AREAS BEING
REMODELED OR DEMOLISHED ARE
TO BE REMOVED AND CAPPED OFF
AS REQUIRED. VERIFY IN
FIELD. (TYPICAL)
FOR REFRIGERANT PIPE,
COMPRESSORS AND
CONDENSER SIZES SEE
SHEET E -06
OUTSIDE AIR CALCULATIONS
320 PERSONS ® 20 CFM = 6400 CFM
OUTSIDE AIR FROM A.C.
EXISTING AC -1 - 4,200 CFM
EXISTING AC -2 - 2,000 CFM
NEW RTU 200 CFM
TOTAL 6,400 CFM
LEGEND
_••___••••__••___••• EXISTING DUCT TO REMAIN
NEW DUCT
DRAWING NOTES
10 ROUTE DUCTWORK IN JOIST AREA. REFER TO
DETAILS C & D ON THIS DWG.
20 ROUTE DUCT UP TO UNIT. TRANSITION
TO FULL SIZE OF UNIT CONNECTION
O3 CONNECT TO WALL PLENUM. REFER TO
DETAIL ON DWG. M -502
O4 8'0 ALUMINUM EXHAUST DUCT UP TO FAN
ON ROOF. (NOTE TO INSPECTORS. THIS IS OVER
A STEAM PRODUCING EQUIPMENT. NO GREASE
LADEN VAPORS.
O MOUNT THERMOSTAT 60" A.F.F.
O6 DIVISION 16 DUCT SMOKE DETECTORS.
O ELECTRIC DUCT HEATER. REFER TO
EDH SCHEDULE DWG M -503
® 7'0 FLU THRU ROOF, SEE OVEN FLU
DETAIL ON SHEET M -501.
O9 8'0 EXHAUST FAN THRU ROOF STEAM HOOD,
SEE OVEN FLU DETAIL ON SHEET M -501.
10 WALL LOUVER PROVIDED AS PART OF
ARCHITECTURAL WORK
11 PRESSURE SENSOR IN RETURN DUCT.
I
GENERAL NOTES
1. ALL WORK SHALL COMPLY WITH APPLICABLE NATIONAL, STATE, AND LOCAL CODES.
THIS IS TO INCLUDE THE STANDARD BUILDING CODE, THE STANDARD MECHANICAL
CODE, APPLICABLE NFPA CODES, NATIONAL ELECTRICAL CODE, AND THE STATE
ENERGY CODE.
2. DEFINITIONS; 'FURNISH" SHALL MEAN TO PURCHASE AND LOCATE AN ITEM ON THE
JOBSITE. "INSTALL" SHALL MEAN TO PYHSICALLY INSTALL THE ITEM, & TO CONNECT
ALL REQUIRED SERVICES TO MAKE THAT ITEM FULLY FUNCTIONAL. "PROVIDE' SHALL
MEAN TO BOTH FURNISH AND INSTALL AN ITEM.
3. ALL ELECTRICAL EQUIPMENT SHALL BE UL CLASSIFIED OR LISTED.
4. THE MECHANICAL SUBCONTRACTOR SHALL PREPARE PLANS SHOWNG THE LOCATION AND
SIZES OF ALL RDOF OPENINGS, FOR USE BY THE STRUCTURAL STEEL SUBCONTRACTOR.
STEEL SUPPORT FRAMES SHALL BE PROVIDED BENEATH THE FULL PERIMETER OF ALL
ROOF CURBS. SEE ARCHITECTURAL PLANS FOR BURGLAR BAR REQUIREMENTS.
5. THE MECHANICAL SUBCONTRACTOR SHALL PREPARE PLANS SHOWING THE LOCATIONS AND
SIZES OF ALL WALL OPENINGS, FOR USE BY THE GENERAL CONTRACTOR.
6. THE BUILDING IS FULLY SPRINKLED. THE MECHANICAL SUBCONTRACTOR SHALL
COORDINATE WITH THE SPRINKLER SUBCONTRACTOR TO PREVENT INTERFERENCES
BETWEEN DUCTWORK & GRILLES AND THE SPRINKLER PIPING & HEADS
7. TEST AND BALANCE SHALL BE PERFORMED BY A TEST & BALANCE COMPANY WHICH IS
A MEMBER OF AABC OR NEBB, AND APPROVED BY THE ENGINEER. THE MECHANICAL
CONTRACTOR SHALL HAVE ALL SYSTEMS FULLY INSTALLED AND OPERATIONAL, WITH
CLEAN FILTERS, PRIOR TO TEST & BALANCE. FURNISH (1) COPY TO WIN-DIXIE STORES INC.
STORE DESIGN DEPT. PO BOX B JACKSONVILLE, FL 32205 -3699
8. EXAMINE EXISTING DUCTS. PATCH AND REPAIR ANY LEAKING
DUCTS AND TORNED INSULATION.
., 9. PROVIDE THE NECESSARY FIRE RESISTANT EQUIPMENT, MATERIALS
AND INSTALLATION FOR NFPA TO MEET ANY REQUIRED FIRE RATING.
AIR CONDITIONING EQUIPMENT
1. SEASONS- 4 IS THE 'BASIS OF DESIGN'
THE ELECTRICAL SUBCONTRACTOR SHALL REVIEW AND APPROVE THE SUBMITTALS FOR IMPACT
ON THE ELECTRICAL, PRIOR TO ORDERING EQUIPMENT. TRANE, CARRIER, AND YORK ARE
APPROVED FOR RTU -2, RTU -3, AND RTU -4
2. THE MANUFACTURER FOR RTU -1 MA'i BE CONTACTED AT;
SEASONS -4, INC.
4500 INDUSTRIAL ACCESS ROAD
DOUGLASVILLE, GEORGIA 30134
770 -489 -0716
3. ALL EQUIPMENT SHALL MEET THE MINIMUM REQUIREMENTS OF THE STATE ENERGY CODE.
4. ALL ROOFTOP UNITS SHAD. BE SET LEVEL, WITH FACTORY CURBS DESIGNED TO ACCOUNT
FOR THE 2 PERCENT (1/4" PER FOOT) ROOF PITCH ON THE PROJECT.
5. CONDENSATE DRAIN PIPING SHALL BE FURNISHED AND INSTALLED FOR ALL ROOFTOP
UNITS AND ROUTED TO ROOFDRAIN (TERMINATE AT STORM DRAIN). PIPING SHALL BE DWV COPPER,
SUPPORTED ON PRESSURE TREATED BLOCKS, AND SLOPED WITH THE ROOF PITCH.
CONDENSATE PIPING SHALL BE INSTALLED BY THE PLUMBING CONTRACTOR.
6. HEAT RECLAIM PIPING SHALL BE PROVIDED BY THE REFRIGERATION SUBCONTRACTOR
TO THE HEAT RECLAIM WIL tURNIbHLU IN THE ROOFTOP UNIT (RTU -1). PIPING SHALL BE
ROUTED BELOW THE ROOF FROM THE COMPRESSOR MACHINE ROOM TO THE ROOFTOP
UNIT. PIPING SHALL ENTER THE ROOFTOP UNIT FROM THE BOTTOM.
7. THE ROOFTOP UNIT (RTU -1) SHALL BE PROVIDED VWTH A FACTORY MOUNTED, SINGLE POINT
SERVICE, FUSED DISCONNECT SWITCH,
& THE ROOFTOP UNIT RTU -1) SHALL BE PROVIDED COMPLETE WITH FACTORY INSTALLED
TEMPERATURE CONTROLS, IN ACCORDANCE WITH WINN -DIXIE SPECIFICATIONS. .
9. AIR CONDITIONING EQUIPMENT SHALL BE OPERATED WITH THROWAWAY FILTERS DURING
CONSTRUCTION. PRIOR TO TEST AND BALANCE, 2' PLEATED MEDIA FILTERS SHALL
BE PROVIDED IN ALL AIR CONDITIONING UNITS.
10. THE AIR CONDITIONING UNITS SHALL HAVE A CHECK, TEST, & START BY THE
MECHANICAL SUBCONTRACTOR WTH A WRITTEN REPORT SUBMITTED AS PART OF THE
TEST & BALANCE REPORT AT COMPLETION OF THE PROJECT, THE REPORT SHALL BE
ON FORMS FURNISHED BY THE ROOFTOP UNIT MANUFACTURER THE REPORT SHALL
NOTE THE START -UP DATE FOR THE COMMENCEMENT OF THE UNIT WARRANTY.
TEMPERATURE CONTROLS
1. TEMPERATURE CONTROLS FOR THE ROOFTOP UNITS SHALL BE WITH FACTORY INSTALLED
24 VOLT CONTROL SYSTEMS, IN ACCORDANCE IWTH W1NN -DIXIE SPECIFICATIONS.
2. SPACE TEMPERATURE AND DEWPOINT SENSORS SHALL BE FURNISHED MATH THE ROOFTOP
UNIT (RTU -1) AND FIELD INSTALLED BY THE MECHANICAL SUBCONTRACTOR AT LOCATIONS
SHOWN ON THE PLAN. MOUNT ALL SENSORS TO' AFF. WIRING FOR TEMPERATURE
SENSORS (2 -WIRE SHIELDED) AND DEWPOINT SENSORS (4 -WIRE) SHALL BE AS
RECOMMENDED BY THE ROOFTOP UNIT MANUFACTURER.
3. THE ELECTRICAL SUBCONTRACTOR SHALL PROVIDE THE 208 /1 VOLT FIELD WIRING
MACHINE ROOM AND THE ROOFTOP UNIT (RTU -1) THE COMPRESSOR RACKS IN THE
4. DUCT SMOKE DETECTORS SHALL BE PROVIDED BY DIVISION 161 & INSTALLED IN THE RETURN
AIR AND THE SUPPLY AIR DUCT OF THE RTU -1, 2 & 3 BY MECHANICAL CONTRATOR.
5. THE ROOM THERMOSTAT FOR RTU -2 & RTU -3, SHALL BE A HONEYWELL
T87 SERIES THERMOSTAT WITH AN 'AUTO -ON' FAN SWITCH AND A
'COOL- HEAT - OFF - AUTO'S FAN SWITCH.
6. TOILET EXHAUST FANS SHALL BE SIMTCHED WITH THE LIGHTS AS
SHOWN ON THE ELECTRICAL FLOOR PLANS.
7. REFER TO DWG M -501 FOR EXHAUST HOOD OPERATIONS.
& THE MECHANICAL SUBCONTRACTOR SHALL PROVIDE ALL STARTERS.
9. THE ELECTRICAL SUBCONTRACTOR SHALL PROVIDE ALL DISCONNECT SWITCHES.
10. LOW VOLTAGE (24 VOLT) CONTROL WRING AND CONDUIT SHALL BE PROVIDED BY THE
MECHANICAL SUBCONTRACTOR.
11. LINE VOLTAGE (110 VOLT AND HIGHER) POWER WIRING & CONDUIT SHALL BE
PROVIDED BY THE ELECTRICAL SUBCONTRACTOR
12. THE MECHANICAL SUBCONTRACTOR SHALL VERIFY OPERATION OF ALL CONTROLS
AT THE COMPLETION OF THE PROJECT.
NOTE
GENERAL CONTRACTOR SHALL SUBMIT IN WRITING TO WNN -DIXIE
MAINTENANCE /CONSTRUCTION SUPERVISOR THAT ALL PENETRATIONS
THRU WALLS (INTERIOR & EXTERIOR) AND ROOF BY ANY AND ALL
TRADES INCLUDING WINN -DIXIE HAVE BEEN PROPERLY SEALED BY
FOAM. THIS SHALL BE PERFORMED PRIOR TO ANY TESTING OF
HVAC SYSTEMS.
• � >: ^ _ _ . :. `'',; fir- #.', � � . .
- • -- - .._. ., ...o .- ...,..... mow•• »...,,. 'a'p't
a�
N
t� W
r/ 1
O
t\
�M
O W O
o W
O Q O�
I (f) LL
HQ� uj
• �' (� L0
W
O �
U 2Y
• O Z� v
U 0) 2
QI I\ Q J
Q Lo 2 1-
SEAL
W
o.
I`
0
T_
I`
�--
C
LL
CL
�
„yr
I FFRS
. 00
d_ N Our) M
^� N him a
tn
wM
ZacnMo
v
v
w W-L
fr- v
NLL M
rn
M
W v 3'C- �
z Z E
v
REVISIONS:
o
o
�r
�00
0
w
rr J
�F+
W
o.
I`
0
T_
I`
�--
C
LL
CL
�
Z�
M
w
J
X
0
cy-
w
.�
,...
z
O
G
a
Z
o
o
�r
�00
0
w
rr J
DRAWING TITLE
MECHANICAL
P LAN
DATE:
JUNE 17, 2002
;'DRAWN, BY:
3
_CHECKED BY:
DIVISIQN
'MIAMI
�;k •4CATION NO.
.285
J ?n -
s .l
D. GUIDE PLAN
i
OF
PROJECT NO.
WD#0704
DRAWING NO.
M -101 of
SHEET NO.
OF
a
W
W
o.
W
0
T_
O'i
�--
V)
LL
U
�
W_
M
X
Z
�V)
.O
_
F-
Z
Ln
Z)
L0
O
DRAWING TITLE
MECHANICAL
P LAN
DATE:
JUNE 17, 2002
;'DRAWN, BY:
3
_CHECKED BY:
DIVISIQN
'MIAMI
�;k •4CATION NO.
.285
J ?n -
s .l
D. GUIDE PLAN
i
OF
PROJECT NO.
WD#0704
DRAWING NO.
M -101 of
SHEET NO.
OF
a