02-830-032c
N
x
0
M
I
w
t
i
a
rL
N
ul
12
N
0
N
0
rn
t\
0
rn
3
v
0
ul
a
I
00
N
0
ul
00
N
3
3
w
C3
z
U
0
M
z3
�0
J
r m
SHEET METAL JOINT COVER
PLATE 6" WIDE MIN. -SET
IN TWO BEADS OF SEALANT
PRE -FIN ALUM. PARAPET CAP
HIGH - DOMED, CAPPED,
GASKETED FASTENERS
(APPROX. 18" O.C.)
VERIFY W/ STRUCT.
CONTINUOUS SHEET MEMBRANE
LINER
FASTENERS ® 8" O.C.
CONTINUOUS TAPERED P.T. WOOD SHIM
D.T. WOOD NAILER
'RIME CONCRETE
UULTIPLE -PLY BUILT -UP ROOF
SYSTEM ON RIGID INSUL. ON
VITL. ROOF DECK
NOTES:
1. THIS DETAIL SHOULD BE USED ONLY WHEN THE ROOF DECK
IS SUPPORTED BY THE WALL.
2. ATTACH NAILER TO DECK WITH SUITABLE FASTENERS.
3. OPTION: IF WOOD NAILERS ARE NOT USED, A FIBER CANT
STRIP SET IN BITUMEN OR ADHESIVE MAY BE USED.
rli"WRAPET CAP/ BASE FLASHING
504 SCALE: N.T.S.
13 MACHINE
504 SCALE: N.T.S.
8" BELOW MACHINE
ROOM BAR JOIST
INSULATION - FILL
AFTER TUBING IS
INSTALLED
14 GAUGE ALUMINUM
2" x 13" 14 GAUGE
ALUMINUM CAP
SCREW SECURE
- 3' -4 "W x 8 "H OPENING
14 GAUGE
ALUMINUM
14 GAUGE ALUMINUM 1' -0' 0' 2 x 12 PT BLOCKING
HOOD - 4' -0 "W. FLASH I MOUNT TO ROOF DECK
® TOP AND SIDES FIBER CANT (CONT.)
FELT FELT
FLASHING BUILT -UP ROOF
I— VENTED BASE SHT.
REFRIGERATION PIPING
BY WINN -DIXIE
ri" OPENING THROUGH REAR WALL
504 SCALE: 3/4 "= 1' -0"
NOTE:
EMERGENCY GENERATOR, TRANSFER SWITCH,
SPECIAL ACCESSORIES FOR GENERATOR &
UNDER VOLTAGE SENSING UNIT TO BE
FURNISHED & INSTALLED BY CONTRACTOR.
. V.T
SUPPORT BY
THREADED ROD
& CLAMP
1 1/4" RESIDENTIAL
MUFFLER
SHORT RADIUS
90'ELBOW
MACHINE ROOM
S.S. FLEX —
1 1/4" NPT.x
EMERGENCY
GENERATOR
—MACHINE ROOM 2' -0' min.
FINISH FLOOR
EMERGENCY GENEF
)04/ SCALE: N.T.S.
EXHAUST TO BE 3" MINIMUM
BEYOND WALL, 6" MAXIMUM
THIS SECTION OF DUCT TO
BE INSTALLED IN SUCH A WAY
THAT IT CAN BE REMOVED
FOR SERVICE.
FASTEN TO WALL
ON OUTSIDE
3' x 3' ALUMINUM
LOUVERED GRILLE
SEALANT BEHIND FLANGE
TOR DETAIL
ATTACH RTU TO CURB ASS'Y. W
ROOF TOP #10 -16 METAL SCREWS @ 16 "O.C. MAX.
MECHANICAL - - - -- ROOF CURB: ATTACH TO STEEL ANGLE
SUPPORTS W/ POWER DRIVEN FASTENERS
UNIT "RTU . "PDF" (0.177" SHANK DIA.) ® 32" O.C. MAX.
SIZE & LOC. /OPG. VARY L3xVTx1 /4; VT. LEG MAY VARY W/
ROOF CONST. AND MECH.-
COORD. W/ MECH. G.C. SHALL COORD.
CONTRACTOR t I
— L4x4x1 /4 —
JOIST: SEE PLAN
T FAN DETAILS
NOTE:
PROVIDE #3 BAR ® 6" O.C.
EA. WAY AT ALL MECHANICAL
OPENINGS
2 x 6 PT WOOD BLOCKING, I LROOF INSULATION
SCREW FASTEN 0 12" O.C.
STAGGERED SIDE TO SIDE. METAL DECK
COUNTERSINK SCREWHEADS.
NOTE: REFRIG'N TUBING & HOLES WILL BE CUT BY TENANT.
4 THROUGH ROOF REF. PIPING ENCLOSURE
504 SCALE: N.T.S.
NOTE: CREATE A FOAM SEAL AT ALL PENETRATIONS THROUGH ROOF AND
WALLS ( PREFAB OR OTHER WISE ) OPENINGS AFTER WINN -DIXIE HAS
INSTALLED AND INSPECTED THE LINES FOR LEAKS. VERIFY WITH
WINN- DIXIE.
NON- SHRINK GROUT-
POURABLE SEALER -
PITCH PAN
ROOF CEMENT OR -
SEALANT AT
PENETRATION TO
MEMBRANE JUNCTION
MODIFIED BITUMEN -
FLASHING
PLY FELT FLASHING
BUILT -UP ROOF ---n
2 ", 4" . 4" . 4"
VENTED BASE
SHEET
ROOF INSULATION
PENETRATION
LZPT WOOD BLOCKING
METAL ROOF
DECK
r9_'_JYP. ROOF PENETRATION
504 SCALE: 1 1/2"= 1' -0"
NOTE: THIS DETAIL MAY BE REQUIRED IN LIEU OF THE STANDARD
CURB DETAIL. CONSULT YOUR LOCAL BUILDING OFFICIALS.
BRACKET WITH 9/16"
Rw
a
OLT, LOCKWASHERS,
w
0 ,I
,
o
eee••
V%
VENTED BASE
SHEET
ROOF INSULATION
PENETRATION
LZPT WOOD BLOCKING
METAL ROOF
DECK
r9_'_JYP. ROOF PENETRATION
504 SCALE: 1 1/2"= 1' -0"
NOTE: THIS DETAIL MAY BE REQUIRED IN LIEU OF THE STANDARD
CURB DETAIL. CONSULT YOUR LOCAL BUILDING OFFICIALS.
ri ROOF TOP UNIT CURB DTL.
504 SCALE: N.T.S.
UNIT MOUNTING CURB
SEALING MATERIAL
P.T. WOOD NAILER —
z_
0
-SHEET METAL FLASHING
RECEIVER
HIGH - DOMED, CAPPED,
- GASKETED FASTENERS
(APPROX. 18" O.C.)
VERIFY W/ STRUCT.
REMOVABLE SHEET METAL
COUNTER FLASHING
FASTENERS APPROX.
8" 0. C.
MULTIPLE -PLY MEMBRANE
BASE FLASHING
H I MULTIPLE -PLY BUILT -UP ROOF
SYSTEM ON RIGID INSUL. ON
MTL. ROOF DECK
ALTERNATE CURB BEARING
LOCATION FOR HEAVY WEIGHT
NOTES: LOADING CONDITIONS
1. THE CURB'S TOP WOOD NAILER, AND SEAL STRIP ARE TO BE
SUPPLIED BY THE CURB MANUFACTURER.
2. ATTACH NAILER TO DECK WITH SUITABLE FASTENERS.
3. WHEN POSSIBLE, THE MECHANICAL UNITS SHOULD NOT
BE SET UNTIL THE ROOF MEMBRANE AND
FLASHING HAVE BEEN INSTALLED.
19 CURB DETAIL FOR R.T.U.'S
504 SCALE: N.T.S.
PT BLOCKING FOR
FAN SUPPORT
�§Allffllffl"FWE
FAN BASE, SECURE TO
ROOF SYSTEM (MINIMUM
OF TWO PLACE SIDE)
FLASHING
CANT STRIP
CONTINUOUS
BUILT -UP ROOF
rlo_' TYP. FAN CURB DETAIL
504 SCALE: 1"= 1' -0"
SEALANT
DRAW BAND
POURABLE
SEALANT
NON- SHRINK
GROUT
ROOF CEMENT OR
SEALANT AT
PENETRATION TO
MEMBRANE JUNCTURE
WATERTIGHT SHEET METAL
RAIN COLLAR OVERLAPPING
PENETRATION POCKET
SHEET METAL PITCH PAN,
SOLDERED /WELDED WATERTIGHT
(4" MIN. HEIGHT)
4" MIN. FLANGE,
SET IN ROOF CEMENT OVER
BUILT -UP ROOFING PLIES,
PRIME FLANGE BEFORE
STRIPPING
MULTIPLE -PLY MEMBRANE
STRIPPING PLIES
MULTIPLE -PLY BUILT -UP
ROOF MEMBRANE
LL-THERMAL INSULATION
1" MIN. ROOF DECK
PIPE DIAMETER
20 ELECTRICAL CONDUIT ROOF PENETRA
504 SCALE: N.T.S.
acN
N
t� W
r1 ~
U
I-
Wo W
W 0
0 ItJ In
In
l W
(n
H o- I
Q 00
Ln
U N W r.
°
o Z J MO
0
U p� -
QQI rQ �
�Q � I�
Lo -
ry - }
-;; 111 � • `••: 4'
ENGINEERS
REVISIONS:
N cv
M
LM
c q
Eoz
L
A C �"
0
L73CL i wM
�-Z4 A,
w N co) w0) 0. cis r4 w
o: v O LLJ
z
o
®o
v
0
® o
v
q
0
0
a
BRACKET WITH 9/16"
Rw
a
OLT, LOCKWASHERS,
w
0 ,I
,
o
AND NUTS (TYP.).
V%
LL
CABLE "LOOPED"
THROUGH BRACKET
AND CLAMPED (TYP.)
1/4" AIRCRAFT
— STRANDED/ TWISTED
z
S.S. CONTROL CABLE
z 0
D
BRACKET WITH 9/16"
BOLT CABLE BRACKET
O
OLT, LOCKWASHERS,
THROUGH CURB AND
AND NUTS (TYP.)
NAILER
9/16" BOLT, LOCKWASHERS,
METAL CURB
AND NUTS (TYP.)
NOTES:
L3x3x3/16
1. METAL CURBS MUST BE
WELD TO ROOF
SECURELY FASTENED TO
OPENING FRAME
STRUCTURAL STEEL.
2. CABLE RESTRAINTS TO BE
PROVIDED AT EACH CORNER
AND AT THE MIDPOINTS OF
EACH UNIT (TOTAL OF SIX)
AND SHALL LIMIT VERTICAL
MOVEMENT TO NO MORE
THAN 5/8 INCH.
ri ROOF TOP UNIT CURB DTL.
504 SCALE: N.T.S.
UNIT MOUNTING CURB
SEALING MATERIAL
P.T. WOOD NAILER —
z_
0
-SHEET METAL FLASHING
RECEIVER
HIGH - DOMED, CAPPED,
- GASKETED FASTENERS
(APPROX. 18" O.C.)
VERIFY W/ STRUCT.
REMOVABLE SHEET METAL
COUNTER FLASHING
FASTENERS APPROX.
8" 0. C.
MULTIPLE -PLY MEMBRANE
BASE FLASHING
H I MULTIPLE -PLY BUILT -UP ROOF
SYSTEM ON RIGID INSUL. ON
MTL. ROOF DECK
ALTERNATE CURB BEARING
LOCATION FOR HEAVY WEIGHT
NOTES: LOADING CONDITIONS
1. THE CURB'S TOP WOOD NAILER, AND SEAL STRIP ARE TO BE
SUPPLIED BY THE CURB MANUFACTURER.
2. ATTACH NAILER TO DECK WITH SUITABLE FASTENERS.
3. WHEN POSSIBLE, THE MECHANICAL UNITS SHOULD NOT
BE SET UNTIL THE ROOF MEMBRANE AND
FLASHING HAVE BEEN INSTALLED.
19 CURB DETAIL FOR R.T.U.'S
504 SCALE: N.T.S.
PT BLOCKING FOR
FAN SUPPORT
�§Allffllffl"FWE
FAN BASE, SECURE TO
ROOF SYSTEM (MINIMUM
OF TWO PLACE SIDE)
FLASHING
CANT STRIP
CONTINUOUS
BUILT -UP ROOF
rlo_' TYP. FAN CURB DETAIL
504 SCALE: 1"= 1' -0"
SEALANT
DRAW BAND
POURABLE
SEALANT
NON- SHRINK
GROUT
ROOF CEMENT OR
SEALANT AT
PENETRATION TO
MEMBRANE JUNCTURE
WATERTIGHT SHEET METAL
RAIN COLLAR OVERLAPPING
PENETRATION POCKET
SHEET METAL PITCH PAN,
SOLDERED /WELDED WATERTIGHT
(4" MIN. HEIGHT)
4" MIN. FLANGE,
SET IN ROOF CEMENT OVER
BUILT -UP ROOFING PLIES,
PRIME FLANGE BEFORE
STRIPPING
MULTIPLE -PLY MEMBRANE
STRIPPING PLIES
MULTIPLE -PLY BUILT -UP
ROOF MEMBRANE
LL-THERMAL INSULATION
1" MIN. ROOF DECK
PIPE DIAMETER
20 ELECTRICAL CONDUIT ROOF PENETRA
504 SCALE: N.T.S.
acN
N
t� W
r1 ~
U
I-
Wo W
W 0
0 ItJ In
In
l W
(n
H o- I
Q 00
Ln
U N W r.
°
o Z J MO
0
U p� -
QQI rQ �
�Q � I�
Lo -
ry - }
-;; 111 � • `••: 4'
ENGINEERS
REVISIONS:
N cv
M
LM
c q
Eoz
L
A C �"
0
L73CL i wM
�-Z4 A,
w N co) w0) 0. cis r4 w
o: v O LLJ
z
o
®o
v
0
® o
v
q
0
0
a
r �
DATE:
JUNE 17, 2002
DRAWN BY.
CHECKED BY:
DIVISION
MIAMI
LOCATION NO.
285
W.D. GUIDE PLAN
PROJECT NO.
WD #0704
DRAWING NO.
A -M of
SHEET NO.
OF
Rw
a
w
0 ,I
,
o
V%
LL
.�„ Ul
z
2
z 0
D
j 00
O
4
r �
DATE:
JUNE 17, 2002
DRAWN BY.
CHECKED BY:
DIVISION
MIAMI
LOCATION NO.
285
W.D. GUIDE PLAN
PROJECT NO.
WD #0704
DRAWING NO.
A -M of
SHEET NO.
OF