07-638-057HVAC CONTROLS GENERAL 1. ALL CONTROLS SHALL BE FURNISHED AND INSTALLED BY AN INDEPENDENT HONEYWELL AUTHORIZED CONTROLS CONTRACTOR. 2. THE CONTROLS CONTRACTOR SHALL PROVIDE A SHOP DRAWING OF THE PROPOSED CONTROLS TO THE ENGINEER FOR REVIEW AND APPROVAL. 3. LOW VOLTAGE (24V) CONTROL WIRING SHALL BE PROVIDED BY THE CONTROLS SUBCONTRACTOR. THE ELECTRICAL SUBCONTRACTOR SHALL PROVIDE CONDUIT FOR ALL CONTROL WIRING, AS COORDINATED WITH THE CONTROLS SUBCONTRACTOR. ALL CONDUIT SHALL BE RUN SQUARE WITH BUILDING LINES. 4. LINE VOLTAGE (120V AND HIGHER) CONTROL AND POWER WIRING AND CONDUIT SHALL BE PROVIDED BY THE ELECTRICAL SUBCONTRACTOR UNLESS THE CONTROLS CONTRACTOR IS LICENSED FOR SUCH WORK, DEVICES 5. THE THERMOSTATS SHALL BE HONEYWELL, DIGITAL, 7 -DAY PROGRAMMABLE WITH 4 MODES PER DAY AND MULTI STAGE CAPACITY. 6. TEMPERATURE SENSORS SHALL BE WALLPLATE STYLE, HONEYWELL MODEL #C7772, 7. ALL THERMOSTATS SHALL BE LOCATED IN THE OFFICE, ABOVE THE DOOR AS SHOWN ON THE PLANS. 8. ALL SENSORS SHALL BE 60" AFF. 15EQUENCE OF OPERATION 9. ALL OF THE BUILDING'S EXHAUST AND INTAKE EQUIPMENT SHALL BE INTERLOCKED TO MAINTAIN POSITIVE BUILDING AIR BALANCE WHILE THE HOODS ARE IN OPERATION. AS SHOWN ON THE CONTROL WIRING DIAGRAM ON SHEET M1.1, THE 24V CONTROL SIGNAL FROM THE GREASE FILTRATION UNIT CONTROL PANEL TO THE UNIT SHALL BE INTERCEPTED AND USED TO POWER A SERIES OF RELAYS (ONE PER THERMOSTAT). THE RELAYS SHALL ENERGIZE THE "OCCUPIED" STATUS OF THE THERMOSTATS THEREBY FORCING THE SYSTEM FANS TO RUN AND THE OUTSIDE AIR DAMPERS TO OPEN, REGARDLESS OF THE TIME OF DAY. ANOTHER RELAY SHALL BE PROVIDED TO INTERLOCK THE PUBLIC TOILET EXHAUST FAN. 10. THE GREASE FILTRATION UNIT CONTROL PANEL SHALL BE USED TO ENERGIZE THE THE ANSUL SYSTEM (WHICH SHALL BE PRE -PIPED IN BOTH THE HOODS AND THE GREASE FILTRATION UNIT). IF THE HOOD SYSTEM IS RELEASED, THE SYSTEM IN THE GREASE FILTRATION UNIT SHALL ALSO RELEASE, BUT IF THE SYSTEM IN THE GREASE FILTRATION UNIT IS RELEASED, IT SHALL NOT RELEASE THE SYSTEM UNDER THE HOODS. THE GREASE FILTRATION UNIT CONTROL PANEL SHALL ALSO BE CONFIGURED TO START THE FAN IF IT IS NOT ALREADY RUNNING, OR KEEP IT RUNNING, IF EITHER FIRE SUPPRESSION SYSTEM IS RELEASED. 11. SEE ELECTRICAL (FIRE ALARM) DRAWINGS FOR SMOKE DETECTOR LOCATIONS. THE FIRE ALARM CONTRACTOR SHALL FURNISH ALL SMOKE DETECTORS, THE MECHANICAL CONTRACTOR SHALL INSTALL THEM IN THE DUCTWORK, AND THE FIRE ALARM CONTRACTOR SHALL WIRE THEM, INSTALLATION DOC MENTAION 12. PROVIDE A LAMINATE PLACARD WITH THE EQUIPMENT TAG FOR EACH PIECE OF SCHEDULED EQUIPMENT AND FOR EACH THERMOSTAT (IN THE MANAGER'S OFFICE). ALTERNATELY, EQUIPMENT MAY BE STENCILED. 13. LOCATE A LAMINATED COPY OF THE "CONTROL WIRING DIAGRAM" k THE CONTROLS NOTES ON THE WALL OF THE MECHANICAL ROOM ABOVE THE SPACE. DOCUMENT ALL AS BUILT MODIFICATIONS AND /OR SPECIFIC UNIT CONFIGURATION NOTES AS NECESSARY, THERMOSTAT OCCUPIED SETTING OVERRIDE TERMINAL NOTE; NEITHER STANDARD HEATING / COOLING CONTROL WIRING NOR REMOTE SENSOR WIRING SHOWN FOR CLARITY INTERLOCK RELAY (ONE PER _UNIT): BY ELECTRICAL CONTRACTOR, SINGLE i I POLE (24V), SINGLE THROW 1 (NORMALLY OPEN). I / `AHU -1-'` AHU -2 AHU -3 AHU -4 AHU -5 / RELAY RELAY RELAY RELAY RELAY I 0­1 i--o ( O--I I--o o--I I--O O--I w 0_1 �_o 24V FROM OUTPUT � SIGNAL ON GFU CONTROL PANEL (USE TERMINALSI FOR "FAN CABINET ") TEE OAF- -1 MUF -1 RELAY OUTSIDE AIR STARTER STARTER DAMPER CONTROL CONTROL O- -IF--O I ACTUATOR COIL COIL LOCATE RELAYS AT EACH THERMOSTAT. CONTROL DIAGRAM SECTION A SCALE: 1/8 " =1' -0" SECTION B SCALE: CHAINLINK FENCE AROUND GREASE r - - -- - -� -- EXHAUST UNIT BY GENERAL CONTRACTOR K c ' t _ f GFU -C ($70' Lt) i / WI [' TRANSITION FLAT 24x24� ON BOTTOM I 36x16 II --- - - -- s, I; ,..,' 7. I GREASE EXHAUST UNIT LOCATIONS SCALE: - --REFRIGERANT PIPING PATE PIPING SEAL WITH STAINLESS STEEL ADJUSTABLE CLAMPS CORE DRILL AND PROVIDE PVC SLEEVE, COORDINATE SIZE AS REQUIRED REFRIGERANT PIPING UNISTRUT SUPPORT: (2) PER FLOOR. OVERSIZE FOR FUTURE REFRIGERANT PIPING. REFRIGERATION PIPING DECK PENETRATION NO SCALE il... I 1 ... -- - I 1 � r +- _--- L�FUTURE CU � -.�,! I -...I 6�FUTURE CU 77 j (7.5 OR 10 TON) (7.5 OR 1D TON) I',' FUTURE OR R 10 TON) 7 STOR 5 10 TO) I + +F r - - -- __ (55Jf LI) - . _... - (1 UT 5 OR 20 TON) '{ FURE CU 1 1 i II 1 i,al 1 i' CU PIPING P I NGµDOWN'THRU : a PARKING DECK ( TYP;) II, x'111 111 I C I X11_ I i i I (558 Lt) I "�,' ,I's_ li it t\ ,r' j i ._CAkRARhA�S -✓� -'' ,I �1 ' i,; -i i .,d' CU -4 -- - - - - - -- (918 Lt) PIPING DOWN TO FIRST FLOOR (TYP): CONTRACTOR SHALL COORDINATE THESE SPECIFIC MULTIPLEICORE DRILLS WITH THE PRECAST MANUFACTURER PRIOR TO DRILLING. i � I CONDENSING UNIT LOCATIONS SCALE: 1/4 " =1' -0" ALL ELBOWS ON THE GREASE DUCT SHALL BE RADIUS TYPE. VERIFY REQUIRED R/D RATIO'S FOR ALL ELBOWS THAT EFFECT VERTICAL CLEARANCE TO THE BOTTOM OF STRUCTURE PRIOR TO FABRICATION. 1404 (1573 FPM) a MAINTAIN 18" CLEAR DISTANCE 14x7 (1753 FPM) ACCESS 4 PANEL ANSUL KID-1 CAB 1 NET FROM COMBUSTIBLES. CEILING HOOD -1 OVEN BRAISING 6- BURNER q PAN COOK TOP F==� F i OVEN COOKLINE HOOD (HOOD -1) ELEVATION SCALE: 1/4 " =1' -0" FIFTH FLOOR EQUIPMENT KEY PLAN N SCALE: 1/32 " =1' -0" I li irll nriiiiillr i il,nr f FM 1CA I RAK REMOTE CONDENSER, X250 ..E8-..__ .. -W A SECURED TO BACK SIDE OF PRECAST CONSTRUCTION, WITH HORIZONTAL DISCHARGE OUT THRU FREE OPENING.- _._._._. t _._._._, ._._ ._...� - I � ,r B -mm GI Ii1 - .. ..... -- ................... .. KAIRAK COMPRESSOR RACK (600 LB): u I' MOUNTED ON CONCRETE DECK OVER OFFICE SECURE TO DECK WITH 3/8" CONCRETE WEDGE ANCHORS (1 PER CORNER) it I , -- _ - - ... 1I CARRABBA S 1117 r i II• II �M "` � �j y.l � .�� Ik "tv�:. °wit at�e^� REFRIGERANT PIPING PLAN Q� SCALE: 1/16 " -1' -0" HVAC GENERAL NOTES 1. WORK SHALL COMPLY WITH APPLICABLE NATIONAL, STATE, AND LOCAL CODES INCLUDING: * 2004 FLORIDA BUILDING CODE WITH 2006 AMENDMENTS * 2004 FLORIDA MECHANICAL CODE WITH 2006 AMENDMENTS * 2004 FLORIDA ENERGY CODE WITH 2006 AMENDMENTS * ALL APPLICABLE NFPA CODES 2. DEFINITIONS: "FURNISH" SHALL MEAN TO PURCHASE AND LOCATE AN ITEM ON THE JOBSITE. "INSTALL" SHALL MEAN TO PHYSICALLY INSTALL AN ITEM, AND TO CONNECT ALL REQUIRED SERVICES TO MAKE THAT ITEM FULLY FUNCTIONAL. "PROVIDE" SHALL MEAN TO BOTH FURNISH AND INSTALL AN ITEM. 3. TEST AND BALANCE SHALL BE PROVIDED BY OUTBACK INC. AND PERFORMED BY MELINK. THE MECHANICAL CONTRACTOR SHALL HAVE ALL SYSTEMS FULLY INSTALLED AND OPERATIONAL, WITH CLEAN FILTERS PRIOR TO TEST AND BALANCE. HVAC EQUIPMENT 1. LENNOX IS THE ONLY APPROVED MANUFACTURER OF THE AIR CONDITIONING EQUIPMENT. CONTACT CURT LAWNICKI (727 -864- 2334). THE AC EQUIPMENT IS FURNISHED AND INSTALLED BY THE CONTRACTOR. 2. ILG, SUPREME, AND EXHAUSTO ARE THE ONLY APPROVED MANUFACTURERS OF THE FANS AND CURBS. CONTACT DIRK BAUMANN AT JD HIGGINS (800 -772- 5452). THE FANS ARE FURNISHED BY THE OUTBACK INC. AND INSTALLED BY THE CONTRACTOR. 3. HALTON IS THE ONLY APPROVED MANUFACTURER OF THE KITCHEN HOODS AND THE GREASE FILTRATION UNIT. CONTACT DIRK BAUMENN AT JD HIGGINS (800'- -772- 5452). THE HOODS ARE FURNISHED BY OUTBACK INC. AND INSTALLED BY THE CONTRACTOR. 4. ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH THE CONDITIONS OF THE LISTING AND THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. 5. THE AIR CONDITIONING EQUIPMENT SHALL BE OPERATED DURING CONSTRUCTION WITH THROWAWAY FILTERS, FILTERS SHALL BE CHANGED DURING CONSTRUCTION IF THEY THROWAWAY FILTERS. FILTERS SHALL BE CHANGED DURING CONSTRUCTION IF THEY BECOME RESTRICTIVE OF AIRFLOW FOR NORMAL OPERATION. PROVIDE 30% PLEATED MEDIA FILTERS, JUST PRIOR TO TEST AND BALANCE. 6. THE MECHANICAL SUBCONTRACTOR SHALL PREPARE PLANS SHOWING THE LOCATIONS AND SIZES OF ALL WALL PENETRATIONS AND ROOF OPENINGS, FOR USE BY THE GENERAL CONTRACTOR. 7. UNITS SHALL BE CLEANED, ALL SCRATCHES SHALL BE PAINTED OVER WITH FACTORY PAINT TO MATCH UNIT, ALL CONDENSER COILS SHALL BE COMBED OUT, AND ALL PANELS AND SCREWS SHALL BE RE- INSTALLED AT COMPLETION OF THE PROJECT. I , I ---- _.__...... -------------------- I I I I 1 i l I I II I I I I I II OUTIACK OUTIACK ` _ / t\ _' _� r/ \�I i (918 Lt) I -- -- ___ - - - - -T - ------ - - - -�- 1-- H-- ---__-- - -__ty - _J I- -- T-- .....1 1 111111 1 II I I 1 OUTIACK -.._.r OUTIACK I (SSi Lt) . L Ili ll� �- rt4 �- -- __- _--_ -7 PIPING DOWN THRU u� III - -- PARKING DECK (TYP) I1IIIIIf,I CARRADA Sr�� l }' t I OUTIACK �1 - "- I: 558 Lt f I , `." `�_ `�_• I 6 i iii 1. IIIIIIIIIIIIII I 1 1111111111;111 I PIPING DOWN TO FIRST FLOOR (TYP) 1, I I I CONDENSING UNIT LOCATIONS SCALE 1/4 " =1' -0" I CARRABBA'S REFRIGERANT PIPING LENGTHS SYSTEM HORIZONTAL HORIZONTAL VERTICAL TOTAL f I I AHU /CU -1 106 11 I L i I AHU /CU- -2 116 18 50 184 AHU /CU -3 130 5 50 185 AHU/CU- -4 132 17 50 199 AHU /CU -5 144 8 50 I KAIRAK 170 0 10 180 - - - I „ Lli I - -- -- _________W__ _! REMOTE CONDENSER -- - - -`-- -- - (IN FOREGROUND - 1 - ----- ------ -- - - ---- --- SEE SECTION A) ., COMPRESSOR RACK t_ _ _ - _ ----- - -_ o , I r I LA r'K'.7 4 1, 5 SECTION B SCALE: CHAINLINK FENCE AROUND GREASE r - - -- - -� -- EXHAUST UNIT BY GENERAL CONTRACTOR K c ' t _ f GFU -C ($70' Lt) i / WI [' TRANSITION FLAT 24x24� ON BOTTOM I 36x16 II --- - - -- s, I; ,..,' 7. I GREASE EXHAUST UNIT LOCATIONS SCALE: - --REFRIGERANT PIPING PATE PIPING SEAL WITH STAINLESS STEEL ADJUSTABLE CLAMPS CORE DRILL AND PROVIDE PVC SLEEVE, COORDINATE SIZE AS REQUIRED REFRIGERANT PIPING UNISTRUT SUPPORT: (2) PER FLOOR. OVERSIZE FOR FUTURE REFRIGERANT PIPING. REFRIGERATION PIPING DECK PENETRATION NO SCALE il... I 1 ... -- - I 1 � r +- _--- L�FUTURE CU � -.�,! I -...I 6�FUTURE CU 77 j (7.5 OR 10 TON) (7.5 OR 1D TON) I',' FUTURE OR R 10 TON) 7 STOR 5 10 TO) I + +F r - - -- __ (55Jf LI) - . _... - (1 UT 5 OR 20 TON) '{ FURE CU 1 1 i II 1 i,al 1 i' CU PIPING P I NGµDOWN'THRU : a PARKING DECK ( TYP;) II, x'111 111 I C I X11_ I i i I (558 Lt) I "�,' ,I's_ li it t\ ,r' j i ._CAkRARhA�S -✓� -'' ,I �1 ' i,; -i i .,d' CU -4 -- - - - - - -- (918 Lt) PIPING DOWN TO FIRST FLOOR (TYP): CONTRACTOR SHALL COORDINATE THESE SPECIFIC MULTIPLEICORE DRILLS WITH THE PRECAST MANUFACTURER PRIOR TO DRILLING. i � I CONDENSING UNIT LOCATIONS SCALE: 1/4 " =1' -0" ALL ELBOWS ON THE GREASE DUCT SHALL BE RADIUS TYPE. VERIFY REQUIRED R/D RATIO'S FOR ALL ELBOWS THAT EFFECT VERTICAL CLEARANCE TO THE BOTTOM OF STRUCTURE PRIOR TO FABRICATION. 1404 (1573 FPM) a MAINTAIN 18" CLEAR DISTANCE 14x7 (1753 FPM) ACCESS 4 PANEL ANSUL KID-1 CAB 1 NET FROM COMBUSTIBLES. CEILING HOOD -1 OVEN BRAISING 6- BURNER q PAN COOK TOP F==� F i OVEN COOKLINE HOOD (HOOD -1) ELEVATION SCALE: 1/4 " =1' -0" FIFTH FLOOR EQUIPMENT KEY PLAN N SCALE: 1/32 " =1' -0" I li irll nriiiiillr i il,nr f FM 1CA I RAK REMOTE CONDENSER, X250 ..E8-..__ .. -W A SECURED TO BACK SIDE OF PRECAST CONSTRUCTION, WITH HORIZONTAL DISCHARGE OUT THRU FREE OPENING.- _._._._. t _._._._, ._._ ._...� - I � ,r B -mm GI Ii1 - .. ..... -- ................... .. KAIRAK COMPRESSOR RACK (600 LB): u I' MOUNTED ON CONCRETE DECK OVER OFFICE SECURE TO DECK WITH 3/8" CONCRETE WEDGE ANCHORS (1 PER CORNER) it I , -- _ - - ... 1I CARRABBA S 1117 r i II• II �M "` � �j y.l � .�� Ik "tv�:. °wit at�e^� REFRIGERANT PIPING PLAN Q� SCALE: 1/16 " -1' -0" HVAC GENERAL NOTES 1. WORK SHALL COMPLY WITH APPLICABLE NATIONAL, STATE, AND LOCAL CODES INCLUDING: * 2004 FLORIDA BUILDING CODE WITH 2006 AMENDMENTS * 2004 FLORIDA MECHANICAL CODE WITH 2006 AMENDMENTS * 2004 FLORIDA ENERGY CODE WITH 2006 AMENDMENTS * ALL APPLICABLE NFPA CODES 2. DEFINITIONS: "FURNISH" SHALL MEAN TO PURCHASE AND LOCATE AN ITEM ON THE JOBSITE. "INSTALL" SHALL MEAN TO PHYSICALLY INSTALL AN ITEM, AND TO CONNECT ALL REQUIRED SERVICES TO MAKE THAT ITEM FULLY FUNCTIONAL. "PROVIDE" SHALL MEAN TO BOTH FURNISH AND INSTALL AN ITEM. 3. TEST AND BALANCE SHALL BE PROVIDED BY OUTBACK INC. AND PERFORMED BY MELINK. THE MECHANICAL CONTRACTOR SHALL HAVE ALL SYSTEMS FULLY INSTALLED AND OPERATIONAL, WITH CLEAN FILTERS PRIOR TO TEST AND BALANCE. HVAC EQUIPMENT 1. LENNOX IS THE ONLY APPROVED MANUFACTURER OF THE AIR CONDITIONING EQUIPMENT. CONTACT CURT LAWNICKI (727 -864- 2334). THE AC EQUIPMENT IS FURNISHED AND INSTALLED BY THE CONTRACTOR. 2. ILG, SUPREME, AND EXHAUSTO ARE THE ONLY APPROVED MANUFACTURERS OF THE FANS AND CURBS. CONTACT DIRK BAUMANN AT JD HIGGINS (800 -772- 5452). THE FANS ARE FURNISHED BY THE OUTBACK INC. AND INSTALLED BY THE CONTRACTOR. 3. HALTON IS THE ONLY APPROVED MANUFACTURER OF THE KITCHEN HOODS AND THE GREASE FILTRATION UNIT. CONTACT DIRK BAUMENN AT JD HIGGINS (800'- -772- 5452). THE HOODS ARE FURNISHED BY OUTBACK INC. AND INSTALLED BY THE CONTRACTOR. 4. ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH THE CONDITIONS OF THE LISTING AND THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. 5. THE AIR CONDITIONING EQUIPMENT SHALL BE OPERATED DURING CONSTRUCTION WITH THROWAWAY FILTERS, FILTERS SHALL BE CHANGED DURING CONSTRUCTION IF THEY THROWAWAY FILTERS. FILTERS SHALL BE CHANGED DURING CONSTRUCTION IF THEY BECOME RESTRICTIVE OF AIRFLOW FOR NORMAL OPERATION. PROVIDE 30% PLEATED MEDIA FILTERS, JUST PRIOR TO TEST AND BALANCE. 6. THE MECHANICAL SUBCONTRACTOR SHALL PREPARE PLANS SHOWING THE LOCATIONS AND SIZES OF ALL WALL PENETRATIONS AND ROOF OPENINGS, FOR USE BY THE GENERAL CONTRACTOR. 7. UNITS SHALL BE CLEANED, ALL SCRATCHES SHALL BE PAINTED OVER WITH FACTORY PAINT TO MATCH UNIT, ALL CONDENSER COILS SHALL BE COMBED OUT, AND ALL PANELS AND SCREWS SHALL BE RE- INSTALLED AT COMPLETION OF THE PROJECT. I , I ---- _.__...... -------------------- I I I I 1 i l I I II I I I I I II OUTIACK OUTIACK ` _ / t\ _' _� r/ \�I i (918 Lt) I -- -- ___ - - - - -T - ------ - - - -�- 1-- H-- ---__-- - -__ty - _J I- -- T-- .....1 1 111111 1 II I I 1 OUTIACK -.._.r OUTIACK I (SSi Lt) . L Ili ll� �- rt4 �- -- __- _--_ -7 PIPING DOWN THRU u� III - -- PARKING DECK (TYP) I1IIIIIf,I CARRADA Sr�� l }' t I OUTIACK �1 - "- I: 558 Lt f I , `." `�_ `�_• I 6 i iii 1. IIIIIIIIIIIIII I 1 1111111111;111 I PIPING DOWN TO FIRST FLOOR (TYP) 1, I I I CONDENSING UNIT LOCATIONS SCALE 1/4 " =1' -0" I CARRABBA'S REFRIGERANT PIPING LENGTHS SYSTEM HORIZONTAL HORIZONTAL VERTICAL TOTAL AT LEVEL 1 AT ROOF AHU /CU -1 106 11 50 167 AHU /CU- -2 116 18 50 184 AHU /CU -3 130 5 50 185 AHU/CU- -4 132 17 50 199 AHU /CU -5 144 8 50 202 KAIRAK 170 0 10 180 THE VELOCITY THRU THE GREASE DUCT SERVING THE NOTE: THE PIZZA OVEN SHALL BE PROVIDED WITH A SUPPLEMENTAL PIZZA OVEN, PER THE MANUFACTURER'S UL LISTING, FACTORY HOOD, MODEL #SG- BDL -O -WS- °42.5 -PPA, UL LISTED: MH13522, CANNOT BE SET TO A MINIMUM AS WITH STANDARD TYPE I, UL LISTED FILTERS, FLANGED COLLAR, AND FIRE GREASE DUCT. THE EXAHUST CFM HAS TO BE FIELD SUPPRESSION SYSTEM. BALANCED TO ACHIEVE A NEGATIVE 0.1 "WC AT THE OVEN MANUFACTURER IS "WOOD STONE" -- WWW.WOODSTONE- CORP.COM, OVEN EXHAUST COLLAR FOR PROPER OVEN OPERATION. 1- 800 - 988 -8103. MAINTAIN 18" CLEAR / 8x10 DISTANCE / (1530 FPM) FROM COMBUSTIBLES.- � 8x20 14x10 (1530 FPM) (1646 FPM) - - -- SLOPE ALL DUCTWORK B !� �j i Lx EXHAUST DUCT: 8x8 BACK TO DISHWASHER KtD -2A 8 x 1 0 Q AT 1 4' MINIMUM 0.044" STAINLESS STELL / ' E (1530 FPM) 4 4 OR MINIMUM 16 GA. (0.055 ") 6x 11x12 CARBON STEEL, ALL JOINTS AND (1746 FPM) KID -26 KID -2C KiD -�0 SEAMS 100% WELDED LIQUID TIGHT. CEILING 2x12 CEILING WOOD -2A HOOD -21 HOOD -2C NE - STETRANSITION FROM ELBOWDUCTWORK SHALL DAMPER TO COLLAR BY BE ALUMINUM, ________ DAMPER MANUFACTURER WITH ALL JOINTS CHEESEMELTER SEALED WITH LANCED COLLAR ( "LIQUID IRON" 6" 00 FRYERS FRYERS ao DISHWASHER -� - "WOODSTONE" OVEN CHARBROILER 8- BURNER 8- BURNER 8- BURNER REFRIG. SUPPLIED BY OWNER COOK TOP COOK TOP COOK TOP FLOOR DISHWASHER COOKLINE HOOD (HOODS -2A, 213,2C) ELEVATION ELEVATION SCALE: 1/4 " =1' -0" SCALE: 1/4 " =1' -0" „Y V '. V V ♦ � U � V V v U V V V .� •ry v Yr " • Y • V V M VVVYy y Y 4 :. 3 Y Y e. W Q Y• W w y O .� 1- „ kO � co y e 4 C�- C `�Zw CO « �,Z U'zHC'7► ' • Y � C)xaca�`� A �xx��'� a U F-I O OE W to LQ7� x A I E SeBI x 0 x Mark S. Egg10 ARCHITECT (Y`� Q 211 East Broad Stmt Greenville, SC 2MI or. T. 6i4.232.1111200 F. ii4.232.75i7 LL Project 0 ff rc Rupi 624-ILL W W z W W 5829 SW 73rd STREE100 RESTAURANT SUITE 10 SOUTH MIAMI, FL 3313 Project Number 06165 Drawn By rw Checked By Gr. W Date 12 Apr 07 2: 0 6 -26 -07 BLDG DEPT COMMENTS U) W U/ 0 Drawing Partical Garage Mechanical Plan li 1.2 I i / i�