Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
07-638-026
75 0 h' 3 0 �i 0 A c co F) (D m LLI Cd 0 Z' 9 iL a) m m 0 0 8 • ..v• YY u4 u v� vv `v.uu A5 SERIES GENERAL NOTES Off. • y Y y u 4 4 V r U y • y 0900, u u V U W we* A. CEILING INSTALLATION CONTRACTOR IS TO FIRST VERIFY THE AVAILA5LE • • "+ ` 4 CLEARANCES 6ETWEEN THE EXISTING SLAG STRUCTURE A50VE FROM THE FINISHED FLOOR TO DETERMINE FEASI6ILITY OF PROVIDING 11' -0" CEILINGS IN,,, THE MAIN DINING ROOM AND 6AR AREAS, AND TO NOTIFY ARCHITECT IF'TFSE DESIRED HEIGHT CANNOT 6E 06TAINED 4 u4 4 u V Y 4 � • Vfi Y ur yu uV u • 6, GENERAL CONTRACTOR TO COORDINATE THE INSTALLATION OF THE MECHANICAL, FLECTRICAL, AND FIRE SPRINKLER SYSTEMS WITH THE CEILING INSTALLATION CONTRACTOR TO OVERSEE THE COOPERATION 6ETWEEN THE VARIOUS TtOES W VYYV TO INSURE THAT ALL POSSIBLE MEANS AND METHODS OF INSTALLATtQ% WtRE Y IMPLEMENTED TO ACHIEVE THE DESIRED CEILING HEIGHTS, AND TO NOTIFY- THE V r r V Y V ARCHITECT IF THE DESIRED HEIGHT CANNOT 6 °_ 051 AIN>rD. V off, V V 4 4 v u V u u V u 4 V U u • PARTIAL BUIL©ING SECTION r 11...0. Seel �A YE n Mark S. Eggl ARCHITECT 211 Esc ■read $V"t Greenvift, SG 2M1 T. U4=.8200 F. U4.232.7587 Project i ITALIAN 6RILl. South Miami, FL Project Number 06165 Drawn By JRG Checked By MSE Date 23 Mar 07 Revisions 1 MJD 18 May 2007 FS Rev. *9 and Ownar Changes i Drawing Partial Building Sections .K n Fr'�fr6S�!l1 +R�j� JUN 0 1 2007 Mark S. Eggl ARCHITECT 211 Esc ■read $V"t Greenvift, SG 2M1 T. U4=.8200 F. U4.232.7587 Project i ITALIAN 6RILl. South Miami, FL Project Number 06165 Drawn By JRG Checked By MSE Date 23 Mar 07 Revisions 1 MJD 18 May 2007 FS Rev. *9 and Ownar Changes i Drawing Partial Building Sections