05-41(2)-013CALCULATIONS FOR PANEL A
TOTAL AREA 2100
5N /5a.FT.
5a.FT
6.5 KW
REFRIGERATOR
I.O KW
APPL I ANGE5 (4) 6 O KW
DISHWASHER
I.O KW
GARBAGE DISPOSAL
GKT
SERVES
GB
I.O
KW
M I GROWAVE
GKT.
5ERVE5
GB
P
KW
TRA5H COMPACTOR
1
KW
- GLOTHE5 WASHER
1.5
KW
DRYER
2
AG #2 AHU
-
5.0
KW
GOOK TOP
8.0
KW
DOUBLE OVEN
5 0
KW
WATER HEATER (2)
q O
KW
OARAOE DOOR MOTOR
2.0
KW
JAGUZZ I
5
KW
JAGUZZ I BOOSTER HTR.
2
KI„ �
I RON I NO BOARD
6
KW
POOL EQUIPMENT
2
KW
SPRINKLER PUMP
7
KW
LANDSGAPE L I TES
1.5
KJnI
POOL HTR.
8
K1„I
15
1
KW
PNL B W/O
9
WATER HTR #1
DIVERSIFICATION
6.-10
KW
#10 -1/2
10
KW
50
2
KW
#10 -1/2
11
KW
20
2
KW
TOTAL CONNECTION LOAD = 50.5KN
200 A. M.L.❑ EXIST. PANEL A 120/240V, 1 3 "W.
FLUSH
GKT
SERVES
GB
P
VA
WIRE -GOND.
GKT.
5ERVE5
GB
P
KVA
WIRE -GOND.
1
AG #1 AHU
2
2
1.0
#12 -1/2
2
AG #2 AHU
15
2
11.6
#6 -314
3
BATH REGPT.
20
1
1.5
#12 -1/2
4
LIGHTS /RGPT.
15
I
#14-1/2
5
1 AG #I G. U.
20
2
5.0
#12 -1/2
6
AG #2 G.U.
4
2
7.5
#8 -1/2
7
WHIRLPOOL
20
2
1.5
#12 -1/2
8
LIGHTS /RCPT.
15
1
O.8
#14-1/2
9
WATER HTR #1
5
2
4.5
#10 -1/2
10
WATER HTR #
50
2
4.5
#10 -1/2
11
5PR1 NKLER
20
2
1.5
-
12
1
15
l
#14-1/.2
13
DOUBLE OVEN
40
2
6.0
# a-1/2
14
GOOK TOP
50/2
I
.O
#6 -514
15
ool future
20
2
1
16
5PAGES
17
REFRIG.
20
1
1.5
#12 -1/2
18
UG REFRIO.
20
1
1.5
#12 -1/2
19
DISHWASHER
20
1
1.5
#12 -1/2
20
WINE
20
1
1.5
#12 -1/2
21
WA5HER
20
1
1.5
#12 -1/2
22
ICE
20
1
1.5
#12 -1/2
23
DRYER
3
5.0
#10 -1/2
24
SPACE
25,
26
SPACE
27
APPLIANCES
20
1
1.5
#12 -1/2
28
LT5 /REGEPT
15
1
0.76
#14 -1/2
29
30
LT5 /REGEPT
15
1
0.76
#14 -1/2
31
32
LT5 /REGEPT
15
1
0.76
#14 -142
33
34
BATH REGPT.
20
1
1.5
#12 -1/2
35
36
LT5 /REGEPT
15
1
0.16
#14 -1/2
37
LT5 /REGEPT
15 1
I
0.16
#14 -1/2
5a
LT5 /REGEPT
15
I
0.7
#14 -1/2
3 9
LT5 /REGEPT
15
1
0.-16
#14-1/2
40
PNL B
80
2
10.6
5#4-1"C.
41
LTS /REGEPT
15
1
0.76
#14 -1/2
42
CONNECTED K.V.A. = TOTAL AMPS = -
FEE 5 #2/0,1 #6
NOTES
I. ALL WIRING SHALL BE COPPER THWN
2. ALL AIR CONDITIONING EQUIPMENT SHALL BE
FUSED AS PER MANUFACTURERS SPECIFICATIONS.
3.SMOKE DETECTOR 110 VOLT BATTERY SACK -UP 8 LINKED TOGETHER SOURCE TO BATH /KITCHEN, LIGHT CIRCUIT
NO CFI AS PER SFBC.
4. GFI PROTECTION FOR ALL RECEPTACLES IN BATHROOMS, WITHIN 6' OF
KITCHEN 4 WET BAR, SINKS 4 OUTSIDE.
150 A. M.L.❑ NEW PANEL B 120/240V. 1� 3 1/W. FLUSH
GKT.
5ERVE5
GB
P
VA
WIRE -GOND.
GKT.
5ERVE5
GB
P
KVA
WIRE -CND.
1
BATH REGPT.
20
1
1.5
#12 -1/2
2
LIGHTS /RCPT.
15
1
0.8
#14 -1/2
3
BATH REGPT.
20
1
1.5
#12 -1/2
4
LIGHTS /RGPT.
15
I
#14-1/2
5
L I GHT5 /RGPT.
15
I
O,a
#-
6
L I OHT5 /RGPT.
15
I
o.a
#14-1/2
7
WHIRLPOOL
20
2
1.5
#12 -1/2
8
LIGHTS /RCPT.
15
1
O.8
#14-1/2
9 L
GF I
10
LIGHTS /RGPT.
15
I
g
#14-1/2
11
5PR1 NKLER
20
2
1.5
-
12
L 1 GHT5 /RGPT.
15
I
#14-1/.2
13
14
LIGHTS /RGPT.
15
I
Ob
#14-1/2
15
ool future
20
2
1.5
16
5PAGES
17
L
18
5PAG5
19
20
5PAGES
21
5PAGE5
22
SPACES
23
5PAGE5
24
5PAGES
CONNECTED KVA= 6.70 TOTAL AMPS= 30
PANEL B LOAD CALCULATI ❑NS;
TOTAL AREA 834 SQ. FT.
3W/ SF -------------------------------------- 2.52 KW
JACUZZI ------------------------------------ 1,2KW
POOL PUMP ---------------------------- 1,5KW
SPRINKLER PUMP ---------------------------- 1,5KW
TOTAL DEMAND LOAD= 6.70VA/240 KW. =30 AMPS
5. ALL WORK SHALL BE DONE IN CONDUIT UNLE55 WRITTEN PERM1551ON FROM ARCHITECT.
FLEXIBLE CONDUIT SHALL BE USED ON MOVEABLE OR VIBRATING EQUIPMENT. , I - #1 $2 -1 /0 W/ #6 5RD.I -1/2" C.
2 -5/0 $ 1 -2/0 W/ #6(ORD.) -2" G.
EXIST. PANEL A
200 AMP PANEL
2/0 � 1/0 - I -1/2" G.
GARAGE WALL
3
�t
�f7
®7/21/04
FURTHER DEMAND
FIRST 10.0 KW @ 100%' I O.O KW
0 JORGE x -
REST @ 40%
16.2 KW NEW PANEL NEW 200 A. D IS JORGE N U H I T E C T
A/C a 65%, 12.0 KW 150 AMP PANEL NEW 15m A. DISC.
METER CAN `
TOTAL DEMAND LOAD = 55.2 KW
2-#14 1 - #2 W/ -1 1/2" C. a
02 WIRE IN 1/2" PVC. �-
38.2 KW/240V= 160 AMPS
FINISH GRADE
PANEL RISER DIAGRAM
N.T.S. 2/11a000
EXIST. CWP
EXISTING WIRE 4 CONDUIT TO POWER CO.
POINT OF CONNECTION TO REMAIN
TOTAL HOUSE CALCULATION Bl' POWER CO. REGORDSS- IO.��GW
BY NEC 220 -55 EXISTING LOAD @ 12551/6
EX I STI NO <NO 10.6 X 1.25- - - - - -- = 15.25KW
NEW ADDED LOAD (PANEL B) - - -= 11.42<W
24.&'XN/240V =105A
EXI STI NO 200 A SERVICE 15 ADEQUATE
NO CHANGE OF SERV I GE 15 REQU I RED
V
s
V
O
�4.►V
r
a
N
w
SHEET
Ar.,
a�
a
� o �
a..
n ~n
0�
yzn
0
0 a
-1 z •C
z C7
7o M
0 d
3o M
rn z
' r n
`" z