05-41(2)-011STRUCTURAL NOTES:
THE STRUCTURAL SYSTEM FOR THE BUILDING HAS BEEN DESIGNED IN
ACCORDANCE WITH THE FLORIDA BUILDING CODE 2001 EDITION.
THE FOLL ❑WING SUPERIMPOSED LOADING HAVE BEEN UTILIZED,
ROOF,
LIVE LOAD, 30 PSF
DEAD LOADS 25 PSF
WIND L❑ADi 146 MPH AS PER ASCE 7 -98
IMPORTANCE FACTORi 1.0
EXPOSURE C
WIND PRESSURE ON ROOF STRUCTURE -47 PSF
1. ALL CONCRETE SHALL REACH A MINIMUM DESIRED ULTIMATE
STRENGTH OF 3000 PSI IN 28 DAYS WITH 5" SLUMP UNLESS
OTHERWISE NOTED IN DRAWINGS OR SPECIFICATIONS .
A) FOOTINGS & SLAB ON GRADE F'c= 3000 PSI
B) COLUMNS, BEAMS F'c= 3000 PSI
ALL CONCRETE MUST BE PLACED WITHIN 90 MIN. OF BATCH TIME
ONE SET OF CYLINDER REQUIRED FOR EVERY 50yd OF CONCRETE OR LESS.
2. REINFORCING STEEL SHALL BE INTERMEDIATE GRADE A.S.T.M. A-
615(60 KSI YIELD) WITH DEFORMATION CONFORMING TO A.S.T.M.
A -305 CURRENT EDITION. PROVIDE DOWELS OF SAME SIZE AND NUMBER AT
ALL POINTS REQUIRED TO CONTINUE CONCRETE PLACEMENT. LAP ALL
REINFORCING 6 1/2 TIMES BAR NUMBER.
3. ALL CONCRETE SHALL BE POURED IN DRY CONDITION & CONTRACTOR
SHALL PROVIDE ADEQUATE DE- WATERING PRIOR TO AND PLACING CONCRETE
4. PROVIDE 2 #5X5' -0" BEND BARS IN ADDITION TO TIE BEAM STEEL AT
EXTERIOR FACE OF ALL BEAMS AT ALL CORNERS WITH 4 #3 STIRRUPS AT
12" O.C.
5. DROP ALL CONCRETE BEAMS OVER THE OPENINGS AND ADD 2 #5 FOR
EVERY 8" INCREMENT WITH MIN. OF 8" BEARING ON EACH SIDE.
6. CONCRETE COVERAGE SHALL BE AS FOLLOWS:
GRADE BEAMS & FOOTINGS:
3" FROM BOTTOM TO TIES OR STIRRUPS.
2" FROM TOP & SIDES
SLAB AT GRADE:
PROVIDE 2" COVER FOR THE BOTTOM STEEL
PROVIDE 1" COVER FOR TOP STEEL WHEN UNDER ENCLOSED PROTECTIVE
COVER.
POLY ETHYLENE SHEET, PLACED CONTINUOUSLY, UNDER CONCRETE SLABS
AND BEAMS PLACED ON THE GROUND SHALL BE A MINIMUM OF 10 MIL
THICK. ALL JOINTS SHALL BE LAPPED A MIN. OF 12 INCHES AND CONTINUOUSLY
TAPED WITH A MIN OF TWO -INCH WIDE VINYL TAPE.
SLAB ABOVE GRADE:
PROVIDE 1 1/2" COVER WHEN EXPOSED TO ELEMENTS FOR TOP
REINFORCING.
PROVIDE 1" COVER TO BOTTOM REINFORCING
PROVIDE 1" COVER TO TOP REINFORCING WHEN UNDER PROTECTIVE
COVER.
ALL OTHER BEAMS & COLUMNS:
1 1/2" COVER TO TIES AND STIRRUPS.
7. PROVIDE KURE -N -SEAL, BY SONNEBORNE, WATERPROOFING ACRYLIC
OVER EXTERIOR SLAB AREA, APPLIED AS PER "SONNEBORN TECHNICAL
DATA INDEX. " THE BE APPLIED WITHIN 24 HOURS OF CONCRETE
PLACEMENT.
8. CONSTRUCTION JOINTS IN SLAB AND BEAMS MAY OCCUR WITHIN THE
MIDDLE 113 PORTION OF THE SPAN. CONSTRUCTION JOINTS SHALL BE
KEYED WITH A 1" TIMES 1/2 DEPTH OF SLAB WITH # 4X6' -0" AT MID
DEPTH 0 24" O.C. IN ADDITION TO ALL STEEL CALLED ON THE DRAWING
THROUGH THE KEYWAY.
9. NO PIPES OR CONDUITS EXCEEDING 1/3 OF THE SLAB THICKNESS IN
OUTSIDE DIAMETER SHALL BE EMBEDED IN THE CONCRETE FLOOR WITHOUT
WRITTEN APPROVAL FROM THE ENGINEER. WHERE PIPES OR CONDUITS ARE
PERMITTED, THEY SHALL BE PLACED NO CLOSER THAN THREE DIAMETERS O.C.
AND SHALL BE LOCATED AS NOT TO IMPAIR THE STRENGHT OF THE STRUCTURE.
10. ALL CONCRETE SHALL BE CURED FOR A MIN. OF SEVEN DAYS. THE CURING
SHALL ENTAIL MAINTENANCE OF THE MOISTURE IN THE CONCRETE. GENERALLY
THIS SHALL BE ACCOMPLISHED BY TREATING THE EXPOSED CONCRETE SURFACES
WITH A CHEMICAL CURING COMPOUND IMMEDIATELY AFTER REMOVAL OF FORMS.
FORMS SHALL BE KEPT MOIST BY FREQUENT WATER SPRAYING PRIOR TO REMOVAL
VERIFY COMPATIBILITY OF CURING COMPOUND WITH PROPOSED FINISHES.
11. MILD REINFORCING ALLOWANCE:
THE CONTRACTOR SHALL PROVIDE 1/4 TON OF TOTAL IN -PLACE STEEL
REINFORCING FOR THE ENGINEER TO USE AT HIS DISCRETION DURING
CONSTRUCTION. THE CONTRACTOR SHALL GIVE CREDIT TO THE OWNER FOR
ANY UNUSED PORTION OF THIS ALLOWANCE AT THE END OF THE PROJECT.
12. STEEL COLUMNS SHALL BE Fy=46 KSI WITH CAP AND BASE PLATES
A -36 & 325 BOLTS( CONCRETE FILLED IN SHOP WITH 1/4" PRESSURE
RELIEF AT TOP MID AND BOTTOM AS PER F.B.CODE, NO HOLES ALLOWED
IN CAP OR BASE PLATES U.O.N. CONTRACTOR SHALL INSTALL TEMPLATE
FOR ANCHOR BOLTS PRIOR TO REQUESTING FOUNDATION INSPECTION.
13. SOIL STATEMENT
INSPECTION OF THE SITE INDICATES SOIL CONSISTING OF UNDISTURBED
SAND & ROCK WHICH IS CAPABLE OF WITH STANDING 2000 PSF (MAX.)
SOIL PRESSURE. SHOULD OTHER CONDITIONS OR MATERIALS BE
ENCOUNTERED, THE ENGINEER SHALL BE NOTIFIED BEFORE PROCEEDING
WITH THE WORK.
AT THE TIME OF CONSTRUCTION, THIS OFFICE WILL PROVIDE TO THE
BUILDING OFFICIAL, A LETTER SIGNED AND SEALED ATTESTING THAT THE
SITE HAS BEEN OBSERVED AND THE FOUNDATION CONDITIONS ARE SIMILAR
TO THE THOSE UPON WHICH THE DESIGNED IS BASED.
14. ALL LUMBER USED FOR FLOOR AND ROOF TRUSSES OR MISCELLANEOUS
ITEMS MUST BE MIN. NUMBER 2 KD SO. PINE OR BETTER U.O.N.,
PROTECT ALL LUMBERS AGAINST CONCRETE WITH METAL OR APPROVED
METHOD.
15. MASONRY BLOCK IS AN INTEGRAL PART OF THIS STRUCTURE AND
PRODUCT
COpE
NVHTA 10
SHALL BE PLACE PRIOR TO PLACING STRUCTURE ABOVE.
'
II TO WALL FMMARKS
80TH 6TRAp8
MIN. COMPRESSIVE STRENGTH F'm =1500 PSI, USE TYPE " S" MORTAR FOR
�pQ
BEARING WALL JOINTS, LAID WITH FULL MORTAR COVERAGE OF THE FACE
7 -
I611 0
DOUBLE STRAP
SHELLS IN BOTH HORIZONTAL AND VERTICAL JOINTS USE TYPE "M" WHEN
A)
6_10d
21330 1943 •
BELOW GRADE.
z
USE HORIZONTAL REINFORCING EVERY OTHER COURSE LADDER TYPE NO. 9
-----
GAUGE WITH VERTICAL STEEL NOTED ON FLOOR FRAMING PLAN & AT EACH
y
SIDE OF OPENING EXCEEDING OR EQUAL 3' -0"
DOUBLE STRAP
16. ROOF & FLOOR TRUSSES (FLOOR TRUSSES N/A FOR THIS JOB)
HEADER
ALL WOOD TRUSSES SHALL BE DESIGNED BY THE FABRICATOR.SHOP
UPLIFT
DRAWINGS BEARING THE SEAL OF AN ENGINEER REGISTERED IN THE STATE
BARKS
USE FOR ALL JACKS BY USP
OF FLORIDA SHALL BE SUBMITTED TO THE ARCHITECT OR ENGINEER FOR
4 -I0d
APPROVAL PRIOR TO FABRICATION TO ASSURE INTEGRITY OF THE
5100
STRUCTURE HAS NOT CHANGED DUE TO THE LOADING CONDITIONS.
8 -10d
ROOF TRUSSES SHALL BE DESIGNED FOR 55 PSF GRAVITY LOADS AND 10
PSF DEAD LOAD RESISTING UP LIFT AS PER FLORIDA BUILDING CODE
AND ASCE7 -98 COMPONENT & CLADDING INTERIOR ZONE
FLOOR TRUSSES OR JOISTS 65 PSF GRAVITY LOADS
ALL GIRDER TRUSSES MUST BE DESIGNED FOR FULL LIVE & DEAD LOAD
WITH NO REDUCTION IN LIVE LOAD.
STAGGERED ALL SPLICES FOR GIRDER TRUSSES WHERE IT IS POSSIBLE TO DESIGN SYM.
17. SLAB ON GRADE CONSTRUCTION JOINTS SHALL BE TOOLED OR SAW CUT
(WITH 24 HOURS OF PLACING CONCRETE) THE JOINT PATTERN SHALL BE SQUARE
AND LIMITED TO THE AREA NOT EXCEEDING 625 SQUARE FEET WITH AN ASPECT
RATIO OF NOT MORE THAN 2:1(N /A TO THIS JOB)
18. CONTRACTOR MUST VERIFY ALL DIMENSIONS AND CONDITIONS BEFORE
PROCEEDING WITH THE WORK AND REPORT ANY DISCREPANCIES TO THE
ARCHITECT AND ENGINEER FOR APPROPRIATE ACTION AND ALL WORK SHALL
BE EXECUTED IN ACCORDANCE WITH ALL LOCAL AND NATIONAL BUILDING
CODES AND GOVERNING REGULATIONS.
19. THESE PLANS COVER STRUCTURAL ENGINEERING ONLY, FIRE
RESISTANCE, INTERIOR FRAMING AND ALL ITEMS NOT SHOWN
SPECIFICALLY ON THESE PLANS ARE NOT PART OF OUR CONTRACT.
ACCURACY:
1. CONTRACTOR TO VERIFY ALL DIMENSIONS AND CONDITIONS BEFORE PROCEEDING
WITH THE WORK, AND REPORT ANY DISCREPANCIES TO THE ARCHITECT AND
ENGINEER FOR APPROPRIATE ACTION.
CODES:
1. ALL WORK SHALL BE EXECUTED IN ACCORDANCE WITH ALL LOCAL AND NATIONAL
BUILDING CODES AND GOVERING REGULATIONS & FLORIDA BUILDING CODE 2001 EDITION
MASONRY
1. HOLLOW LOAD BEARING UNITS SHALL CONFORM TO ASTM C90 NORMAL
WEIGHT, TYPE 11, MINIMUM NET COMPRESSIVE UNIT STRENGTH = 1900
PSI. (NET AREA COMPRESSIVE MASONRY STRENGTH f'm = 1500 PSI).
2. MORTAR SHALL BE TYPE M OR S AND CONFORM TO ASTM C270
(PROPORTION OR PROPERTY SPECIFICATION).
3. COARSE GROUT SHALL CONFORM TO ASTM C476:
a 3000 PSI AT 28 DAYS.
b 1/4" MAXIMUM AGGREGATE.
c) 8" TO 11" SLUMP
PLACE GROUT IN LIFTS NOT EXCEEDING 4' -0"
4. CODES AND STANDARDS:
ACI 530- 95 /ASCE 5 -95-BUILDING CODE REQUIREMENTS FOR MASONRY
STRUCTURES"
ACI 530.1- 95 /ASCE 6 -95 "SPECIFICATIONS FOR MASONRY STRUCTURES"
5. A REINFORCED CONCRETE TIE BEAM SHALL BE PROVIDED IN ALL WALLS
SHOWN ON THE STRUCTURAL DRAWINGS AT EACH FLOOR , THE ROOF, AND
AT TOP OF ANY PARAPET WALL. USE GALVANIZED MESH -TYPE CELL CAPS.
6- A QUALIFIED TESTING LABORATORY SHALL BE RETAINED TO PERFORM
THE FOLLOWING TEST-
A) SAMPLE AND TEST GROUT IN ACCORDANCE WITH ASTM C1019 FOR
EACH 5000 SQ.FT.OF MASONRY
B SLUMP TEST- ASTMC143
C MASONRY PRISM TEST IN ACCORDANCE WITH ASTM E447. METHOD B,
MODIFIED AS FOLLOWS:
1) PRISM SHALL BE STACK BOND, ONE UNIT LONG AND THICK WITH A FULL
MORTAR BED.
2) LIMIT HEIGHT/THICKNESS RATIO FROM 1.33 -5.0
ONE SET OF 3 PRISMS PRIOR TO CONSTRUCTION AND DURING CONSTRUCTION
FOR EACH 5000 SQ. FT OF WALL, OR LESS.
__HURRICANE STRAP SCHEDULE
PRODUCT
COpE
NVHTA 10
FASTM4ERS lOdXlv,'L
UPEE- O WALL
II TO WALL FMMARKS
80TH 6TRAp8
i SEATS
10 -1001
6 -1001
2133 M 1943 •
I611 0
DOUBLE STRAP
NVHTA 12
12 -Imd
6_10d
21330 1943 •
16110
DOUBLE STRAP
NVHTA 14
14 -10d
q
2133 • 1943 0
1611 •
DOUBLE STRAP
CODE
HEADER
JOIST
UPLIFT
GRAVITY
645 0
BARKS
USE FOR ALL JACKS BY USP
JUS24
4 -I0d
2 -1001
5100
SK42BL/R
8 -10d
6 -1601
8l5 •
1160
USE FOR COMER JACKS BY
USP
EHUH 26
20 -1601
10 -1001
1200 •
23850
BY USP
EHUH 28
28 -1601
10 -Imd
1845 +
34100
BY USP
HCL If HCR
6 -16d
6_16d
151 •
NVBH24
12 -10d
12 -10d
1224 0
9540
ALL G0NNEGTOR5 BY NU -1/UE INDU5TRIE5 (U.O.N)
LAP SPLICE SISHE PULE
SAR SIZE
LENCsTH (INCHES)
#4
24"
UP TO 6' -0" 8X16 1 12X16
SON
#6
"a
I6 X 12
2 - #5
#8
CLN
#0I
64■
GAST IN PLACE LINTEL SGHMDULM
CLEAR SPAN
REINI=ORCINC;
UP TO 5' -0" 8X12/ 12X1?
2 # 5 T * B, # 3 0 4" O.G.
UP TO 6' -0" 8X16 1 12X16
2 # 6 T 4 B, # 5 60 O.G.
EA. HAY
NF-116
METHODS & SAFETY:
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL METHODS, PROCEDURES AND
SEQUENCES OF CONSTRUCTION. CONSTRUCTION SITE SAFETY, INCLUDING ALL
ADEQUATE TEMPORARY BRACING AND SHORING, IS THE SOLE RESPONSIBILITY OF
THE CONTRACTOR.
CONSTRUCTION LOADS:
THE STRUCTURES INVOLVED HAVE BEEN DESIGNED ACCORDING TO THE LIVE AND
DEAD LOADS AS LISTED UNDER THE DESIGN CRITERIA SECTION ABOVE AND ACCORDING
TO THE REQUIREMENTS OF THE FLORIDA BUILDING CODE. THESE LOADS MAY
NOT TAKE INTO ACCOUNT LOADS WHICH MAY BE IMPOSED DURING CONSTRUCTION.
IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO EMPLOY THE NECESSARY
PROFESSIONAL SERVICES TO DETERMINE THE NECESSARY METHODS AND SUPPORTS
REGARDING FORMING AND CONSTRUCTION LOADS.
SAFE GUARDS:
RAILING , PICKETS ,HAND RAILS, STAIR RAILING AND OTHER SIMILAR SAFEGUARDS
MUST BE DESIGNED AS PER FLORIDA BUILDING CODE 2001 EDITIONS SECTION
1608.2 & NFPA 101 REQUIREMENTS
PROVIDE SHOP DRAWINGS SIGNED AND SEALED WITH CALCULATIONS TO ARCHITECT
AND ENGINEER FOR APPROVAL.
6 TO TB (AFTER PROTECTNCs IT WITH
4 2- RTW24- 1-ULLY NAILED To TRUSS t
APCON SCREWS INTO CONCRETE TB
' 4 2' O.CJ
2 X 8 BETWEEN TRUSSES TO TB WITH
216' HILTI PNS (CAT. • ON12P8). THEN
:H TRUSS W/ 4 -16d NAILS (TOE NAILS)
TRUSS ANCHORAC r= REPAIR 1DETA I L
344 ■ 1' - 0' USE THIS DETAIL IF TRUSS IS MISSING THEIR ANCHORAGE _
NOTE ADDED
r-OUNr;)A71ON 5CHr=MULE
MARK
slzE
REINFORCINS
���
A NT•
TRANSV
EA. HAY
NF-116
I6 X 12
2 - #5
2 - #5
2
4 1IX4 "X 1/4" Sa
WI= -8
8 x8
I - #5
4 - #5
#5 @ 12" GG
#5 DDOeP" DOWELS Fi2� v HOLES
q
#5 IN O ROUT
F I L.Lr=D CELL
GOLU�4I N 5GHr;�ULE
MARK
SIZE
REIWORCINS
REMARKS
vERTIGAL
TIES
BOTr
8 11X 12"
4 - #5
#5 0 12" GG
2 - #5
2
4 1IX4 "X 1/4" Sa
TOP U PL 12 "X12 "X4 "XI /4" W/ 4 5/6" THRU BOLTS
SOT. PL 12 "XI2 "X3/8" W/ 4 518" AN. BOLTS
5
8 "X 12"
4 - #5
#5 @ 12" GG
#5 DDOeP" DOWELS Fi2� v HOLES
q
#5 IN O ROUT
F I L.Lr=D CELL
BEAly 5GHE�ULE
MARK
SIZE
REINFORCING
REMARKS
HT
NVHTA 18
MID
BOTr
STIRRU1x
TB
8 X 12
2 - #5
NOA 01 -0110.06
2 - #5
#5 ® 120
FIRST 48" T
B -1
S X 22
2 - #5
747#
2 -# 6
#5 ®8 "G
TIE53-I ", x I"
CA
Q5
IrV I &_ 1. LoIrvc_-7. /-%" IJ= I ANILS
HANGER SCHEDULE
PRODUCT
GODE/MF6.
# OF NAILS
UPLIFT
REMARKS
HT
NVHTA 18
FULLY NAILED
2133 #
NU
6- I Od
NOA 01 -0110.06
NU WE
FULLY
FULLY NAILED
NOA 01- 0110.06
747#
TAPCOM SCREWS
STED RAFTER
TIE53-I ", x I"
MIN.
�( y1
r -•
i ,-
0
0
ZZ
941
g
r
a
SHEET
N
to
t" .
0 r
r
> .
`d o >
r C7 �
ri
tTf . X
- 0 r
yz n
C >
Z
x0
701
;a tti
M Vf
O d
o tl
"rn z
r n
z
n
�- 5'