05-66-015CAP FOR FUTURE
CONNECTION SOLAR
OR HEAT RECOVERY
HOT WATER
HEAT TRAP
WATER HEA
P2
"
gP2w&CW CL
" HW HO 3 WATE UP 3/4 WOA RWI
LD
BATH "
/ 3"
" 3�OSANITARY
HW &CW 3 PI�EFUDW)
PI
P3
GRADE ® BLDG.
TERMINATED FACE DN.
OF STRUCTURE, & TO
BE 2" CD LINE TO
BEDROOM #1
1
CL
/2" HW 3/4"
BEDROOM #4
SECOND FLOOR PLUMBING PLAN
1/411 = 1' -0"
N
CAP FOR FUTURE
CONNECTION SOLAR
OR HEAT RECOVERY
RELIEF VALVE
COLD WATER
i
PBT RELIEF PIPE TO
OUTSIDE BLDG. TERMINATE
6" ABOVE GRADE. MINIMUM
OF 1' -0" AWAY FROM ANY
OUTSIDE WALL
FLOOR
WATER HEATER PIPING DIAGRAM
EWR -2: ELECTRIC WATER HEATER "LOCHINVAR" (OR APPROVED EQUIVALENT)
ENERGY SAVER STUBBY MODEL NO. ETA066KK; 4.5 KW, 240/11/60.
RECOVERY 26.3 GPH AT 70' RISE. STORAGE 66 GAL. GLASS -LINED TANK, 5
YEAR WARRANTY. ENERGY FACTOR 0.87. TANK SIZE 20" DIAM. x 46" HEIGHT
BEDROOM #2
CL
D.S. BATH
H U 3" 7 FU) P3
PI
TO P2
3" SANITAR
P
_Lc -, � lul
IPE DW)
(7 � —' _ C.o.
ot,
*0
BEDROOM #3
ELECT.PANEL
w
3
0
SHUT-OFF VALVE C1 m
m
mim i miiiimimimmi imi
GARAGE
1" CW
1" HW
w
0
N T.O.S.= +11.2 FT. NG
M
GARAGE DOOR JAMB -SEE DETAIL
GARAGE DOOR r
PLUMBING FIXTURE SCHEDULE
5YM130L
SYMBOL
FIXTURE TYPE
SIZE
C.W.
H.W.
DESCRIPTION
P I
GATE VALVE
WATER CLOSET
3"
1/21
-
E
P2
O
LAVATORY
1 -1 /
' 1/2'
1/211
VENT THRU ROOF
P3
®
BATH TUB
2"
1/2'
1/2"
PROVIDE ANTI -SCALD VALVE
P4
®
KITCHEN SINK
1-1121,
112'
1/2"
w/ GARBAGE DISPOSAL
P5
®
(Nri G
CD
DI5HWA5HER
_
DISCHARGE INTO GARBAGE
DISPOSAL UNIT.
P6
$�'m C D C
3 �' '0C °
WASHING MACHI.
2"
1/2'
1/211
BEDROOM
PLUMBING LEGEND
SANITARY SEWER LINE
CTG &—
CLEANOUT TO GRADE
----------- - - - - --
COLD WATER (C.W.) LINE
- -
HOT WATER (H.W.) LINE
PT
PRESS. � TEMP. RELIEF LINE
GATE VALVE
CHECK VALVE
UNION
E
HOSE BIBS
VB
VACUUM BREAKER
VIV
VALVE IN VERTICAL
VTR
VENT THRU ROOF
AFF
ABOVE FINISHED FLOOR LEVEL
—® FCO
FLOOR CLEAN OUT
PLUMBING NOTES
GENERAL
PROVIDE ( FURNISH AND INSTALL) ALL NECESSARY
MATERIALS AND LABOR FOR A COMPLETELY OPERATIONAL
PLUMBING SYSTEM AS SHOWN ON THE DRAWINGS AND
HEREIN SPECIFIED. INSTALL IN ACCORDANCE WITH THE
SOUTH FLORIDA BUILDING CODE AND LOCAL ORDINANCES.
SCOPE OF WORK:
PROVIDE THE FOLLOWING COMPLETE SYSTEMS:
A. SANITARY COLLECTION.
B. DOMESTIC HOT AND COLD WATER.
PAY FOR ALL FEES, INSPECTIONS AND CONNECTION
CHARGES REQUIRED.
VERIFY AT JOB 51TE ALL SPACE CONDITIONS, DIMENSIONS
WITH PIPE, FIXTURES, AND EQUIPMENT SIZES PRIOR TO
FABRICATION OR INSTALLATION CORDINATE REQUIREMENTS
TO AVOID INTERFERENCE WITH OTHER TRADES.
SUBMIT SHOP DRAWINGS FOR ARCHITECT / ENGINEER
APPROVAL BEFORE PROCEEDING WITH THE PURCHASE OR
INSTALLATION OF EQUIPMENT AND MATERIALS.
GUARANTEE ALL WORK FREE OF DEFECTS IN MATERIALS
AND WORKMANSHIP FOR A PERIOD OF ONE YEAR FROM
DATE OF ACCEPTANCE.
MATERIALS
PROVIDE SHUT -OFF VALVES FOR EACH FIXTURE AND AIR
CHAMBERS WHERE SHOWN AND WHERE REQUIRED FOR
PROPER PERFORMANCE OF THE SYSTEM.
PROVIDE DIELECTRIC FITTINGS TO CONNECT PIPING TO
EQUIPMENT OF DISSIMILAR METALS. USE CLAMPS AND
FASTENERS OF SIMILAR METALS OR ISOLATE THEM FROM
PIPING AND SLABS TO PREVENT CORROSION.
PIPING
DOMESTIC HOT AND COLD WATER: COPPER TUBING TYPE
"K" OR "L" WITH SOLDER JOINTS. WOG BRONZE VALVES
125 P.5.1. MIN. PROVIDE PRE - MOLDED FIBER GLA55
INSULATION FOR HOT WATER LINES.
SANITARY WASTE AND VENT: CAST IRON PIPING UNDER
SLABS, CAST IRON NO -HUB OR COPPER D.W.V. ABOVE
P.V.C. DRAIN PIPE AND FITTINGS MAY BE USED WHEN
ALLOWED BY THE LOCAL JURISDICTION.
J'•'a •• •
(D O
(D
b
� � y
O
cz
CD �
c+
O O
L J
N
cfl c�
... � �I 1
cz
� O ~
� v �
� r �
O
cz cz MO
cz N
cz
cz •
2 "vTR
HB
I
-
11/21/03
I!I I I II I I I IIII VIII I I I I III I III ill I I I I I! I III I II III
P4
T7P
_
'� Z
N
(Nri G
CD
I l I I
MASTER
$�'m C D C
3 �' '0C °
TERRACE
BEDROOM
° a
9 � gi
/
j
�m P $n
OO
�
u
� m W
/ KITCHEN
00=
o
1/2" CW
1/2" HW 2"(2 FU)
CA
N
N _
DINING
I
P2
FAMILY 3o SANITARY
PIPE (DW)
PI
o
"
IF F. PANTRY
3" 3/4" HW
3/4" HW 3 4" CW
WALK -IN
Z
�'
m
WATER
- -
CL
UPT
_ _-
3/4" CW 3/4" HW
CLOSET
-
STORAGE
co (
p
I 3/4" CW
COLD
_
` `
z
m
WATER UP
- m
3/4" CW 3"(11 FU) 3 "(25
FU) 3" 9 FU)
\ \
O -TI
C7
3 "(21 FU) 3 "(12 FU)
3 "(1 FU)
'1 3 4" H 3,�
3"(12 FU)
v =
D
C.O. PIPE (IT)
PI4EFU
O.S.= +12.0 FT. NGVD
D m
D Eg
3
1
LIVING
MB
rn _9 Z
1 r n
z
n
1 UTILITY AHU
m
BATH
o
N
P6
2 "VTR
I
P3
ENTRY
P2 2
2"
I 1 111
® "(46 ® III
I I
DEN
T'
N
4 FU)
3/4" CW
1 /2 H 2 VTR
III ill
1
3 " 8 FU 1
EXTERIOR 6" ABV.
4 "(46 FU)
P2
GRADE ® BLDG.
TO SEWER
TERMINATED FACE ON.
OF STRUCTURE, & TO
BE 2" LINE TO
i P8 pi
P7
ED
OU
,
DRAWN BY:
n72
"
+m
J. M. -
JM K.C.
DATE:
II
03 -07 -2004
SHEET
2 "VTR
FIRST FLOOR PLUMBING
PLAN
\ — 1
1/411 = 1' -011