Loading...
05-66-015CAP FOR FUTURE CONNECTION SOLAR OR HEAT RECOVERY HOT WATER HEAT TRAP WATER HEA P2 " gP2w&CW CL " HW HO 3 WATE UP 3/4 WOA RWI LD BATH " / 3" " 3�OSANITARY HW &CW 3 PI�EFUDW) PI P3 GRADE ® BLDG. TERMINATED FACE DN. OF STRUCTURE, & TO BE 2" CD LINE TO BEDROOM #1 1 CL /2" HW 3/4" BEDROOM #4 SECOND FLOOR PLUMBING PLAN 1/411 = 1' -0" N CAP FOR FUTURE CONNECTION SOLAR OR HEAT RECOVERY RELIEF VALVE COLD WATER i PBT RELIEF PIPE TO OUTSIDE BLDG. TERMINATE 6" ABOVE GRADE. MINIMUM OF 1' -0" AWAY FROM ANY OUTSIDE WALL FLOOR WATER HEATER PIPING DIAGRAM EWR -2: ELECTRIC WATER HEATER "LOCHINVAR" (OR APPROVED EQUIVALENT) ENERGY SAVER STUBBY MODEL NO. ETA066KK; 4.5 KW, 240/11/60. RECOVERY 26.3 GPH AT 70' RISE. STORAGE 66 GAL. GLASS -LINED TANK, 5 YEAR WARRANTY. ENERGY FACTOR 0.87. TANK SIZE 20" DIAM. x 46" HEIGHT BEDROOM #2 CL D.S. BATH H U 3" 7 FU) P3 PI TO P2 3" SANITAR P _Lc -, � lul IPE DW) (7 � —' _ C.o. ot, *0 BEDROOM #3 ELECT.PANEL w 3 0 SHUT-OFF VALVE C1 m m mim i miiiimimimmi imi GARAGE 1" CW 1" HW w 0 N T.O.S.= +11.2 FT. NG M GARAGE DOOR JAMB -SEE DETAIL GARAGE DOOR r PLUMBING FIXTURE SCHEDULE 5YM130L SYMBOL FIXTURE TYPE SIZE C.W. H.W. DESCRIPTION P I GATE VALVE WATER CLOSET 3" 1/21 - E P2 O LAVATORY 1 -1 / ' 1/2' 1/211 VENT THRU ROOF P3 ® BATH TUB 2" 1/2' 1/2" PROVIDE ANTI -SCALD VALVE P4 ® KITCHEN SINK 1-1121, 112' 1/2" w/ GARBAGE DISPOSAL P5 ® (Nri G CD DI5HWA5HER _ DISCHARGE INTO GARBAGE DISPOSAL UNIT. P6 $�'m C D C 3 �' '0C ° WASHING MACHI. 2" 1/2' 1/211 BEDROOM PLUMBING LEGEND SANITARY SEWER LINE CTG &— CLEANOUT TO GRADE ----------- - - - - -- COLD WATER (C.W.) LINE - - HOT WATER (H.W.) LINE PT PRESS. � TEMP. RELIEF LINE GATE VALVE CHECK VALVE UNION E HOSE BIBS VB VACUUM BREAKER VIV VALVE IN VERTICAL VTR VENT THRU ROOF AFF ABOVE FINISHED FLOOR LEVEL —® FCO FLOOR CLEAN OUT PLUMBING NOTES GENERAL PROVIDE ( FURNISH AND INSTALL) ALL NECESSARY MATERIALS AND LABOR FOR A COMPLETELY OPERATIONAL PLUMBING SYSTEM AS SHOWN ON THE DRAWINGS AND HEREIN SPECIFIED. INSTALL IN ACCORDANCE WITH THE SOUTH FLORIDA BUILDING CODE AND LOCAL ORDINANCES. SCOPE OF WORK: PROVIDE THE FOLLOWING COMPLETE SYSTEMS: A. SANITARY COLLECTION. B. DOMESTIC HOT AND COLD WATER. PAY FOR ALL FEES, INSPECTIONS AND CONNECTION CHARGES REQUIRED. VERIFY AT JOB 51TE ALL SPACE CONDITIONS, DIMENSIONS WITH PIPE, FIXTURES, AND EQUIPMENT SIZES PRIOR TO FABRICATION OR INSTALLATION CORDINATE REQUIREMENTS TO AVOID INTERFERENCE WITH OTHER TRADES. SUBMIT SHOP DRAWINGS FOR ARCHITECT / ENGINEER APPROVAL BEFORE PROCEEDING WITH THE PURCHASE OR INSTALLATION OF EQUIPMENT AND MATERIALS. GUARANTEE ALL WORK FREE OF DEFECTS IN MATERIALS AND WORKMANSHIP FOR A PERIOD OF ONE YEAR FROM DATE OF ACCEPTANCE. MATERIALS PROVIDE SHUT -OFF VALVES FOR EACH FIXTURE AND AIR CHAMBERS WHERE SHOWN AND WHERE REQUIRED FOR PROPER PERFORMANCE OF THE SYSTEM. PROVIDE DIELECTRIC FITTINGS TO CONNECT PIPING TO EQUIPMENT OF DISSIMILAR METALS. USE CLAMPS AND FASTENERS OF SIMILAR METALS OR ISOLATE THEM FROM PIPING AND SLABS TO PREVENT CORROSION. PIPING DOMESTIC HOT AND COLD WATER: COPPER TUBING TYPE "K" OR "L" WITH SOLDER JOINTS. WOG BRONZE VALVES 125 P.5.1. MIN. PROVIDE PRE - MOLDED FIBER GLA55 INSULATION FOR HOT WATER LINES. SANITARY WASTE AND VENT: CAST IRON PIPING UNDER SLABS, CAST IRON NO -HUB OR COPPER D.W.V. ABOVE P.V.C. DRAIN PIPE AND FITTINGS MAY BE USED WHEN ALLOWED BY THE LOCAL JURISDICTION. J'•'a •• • (D O (D b � � y O cz CD � c+ O O L J N cfl c� ... � �I 1 cz � O ~ � v � � r � O cz cz MO cz N cz cz • 2 "vTR HB I - 11/21/03 I!I I I II I I I IIII VIII I I I I III I III ill I I I I I! I III I II III P4 T7P _ '� Z N (Nri G CD I l I I MASTER $�'m C D C 3 �' '0C ° TERRACE BEDROOM ° a 9 � gi / j �m P $n OO � u � m W / KITCHEN 00= o 1/2" CW 1/2" HW 2"(2 FU) CA N N _ DINING I P2 FAMILY 3o SANITARY PIPE (DW) PI o " IF F. PANTRY 3" 3/4" HW 3/4" HW 3 4" CW WALK -IN Z �' m WATER - - CL UPT _ _- 3/4" CW 3/4" HW CLOSET - STORAGE co ( p I 3/4" CW COLD _ ` ` z m WATER UP - m 3/4" CW 3"(11 FU) 3 "(25 FU) 3" 9 FU) \ \ O -TI C7 3 "(21 FU) 3 "(12 FU) 3 "(1 FU) '1 3 4" H 3,� 3"(12 FU) v = D C.O. PIPE (IT) PI4EFU O.S.= +12.0 FT. NGVD D m D Eg 3 1 LIVING MB rn _9 Z 1 r n z n 1 UTILITY AHU m BATH o N P6 2 "VTR I P3 ENTRY P2 2 2" I 1 111 ® "(46 ® III I I DEN T' N 4 FU) 3/4" CW 1 /2 H 2 VTR III ill 1 3 " 8 FU 1 EXTERIOR 6" ABV. 4 "(46 FU) P2 GRADE ® BLDG. TO SEWER TERMINATED FACE ON. OF STRUCTURE, & TO BE 2" LINE TO i P8 pi P7 ED OU , DRAWN BY: n72 " +m J. M. - JM K.C. DATE: II 03 -07 -2004 SHEET 2 "VTR FIRST FLOOR PLUMBING PLAN \ — 1 1/411 = 1' -011