Loading...
05-141-002A Q4 , 11 m ARCHITECT: DAVID S. TRAUTMAN 5885 5W 13rd ST 114 MIAMI, FLORIDA 33143 305 -661-0819 PH 305-6613-5162 FX ROXrorooAOL.COM E -MAIL WWW.TRAUTMAN - ARCH I TEC,T5.COM STRUCTURAL ENGINER: IGNACIO J. CALVO P.E. 1800 SW 27TH AVE- #401 MIAMI, FLORIDA 33145 305 - &48 -9008 PH 305 -648 -9128 FX MEP ENGINEER: GUERRERO /GONZALEZ 4300 SW -i3 AVE 101A MIAMI, FLORIDA 33169 305 -262 -3944 PH 305 -262 -8211 FX - 1. WORK PERFORMED SHALL COMPLY WITH THE FOLLOWING: A. THESE GENERAL NOTES (UNLESS OTHERWISE NOTED IN PLANS OR SPECIFICATIONS). B. FLORIDA BUILDING CODE. LATEST EDITION. C. ALL APPLICABLE LOCAL AND STATE CODES, ORDINANCES AND REGULATIONS. D. NATIONAL ELECTRIC CODE, OSHA B NATIONAL BOARD OF FIRE UNDERWRITERS. 2. ON SITE VERIFICATION OF ALL DIMENSIONS AND CONDITIONS SHALL BE THE RESPONSIBITILITY OF THE GENERAL CONTRACTOR AND ALL NOTED DIMENSIONS TAKE PRECEDENCE OVER SCALED DIMENSIONS. 3. THE GENERAL NOTES AND TYPICAL DETAILS APPLY THOUGHTOUT THE JOB UNLESS OTHERWI.5E NOTED OR SHOWN. 4. ALL CONDITIONS AND ALL APPLICABLE REQUIREMENTS OF THE CONTRACT BETWEEN THE CONTRACTOR AND OWNER SHALL GOVERN ALL SECTIONS OF THE SPECIFICATIONS. 5. ALL WORK THAT IS EITHER IMPLIED OR REASONABLY INFERABLE FROM THE CONTRACT DOCUMENTS, DRAWINGS AND SPECIFICATIONS, SHALL BE THE RESPONBILITY OF THE CONTRACTOR. ALL DRAWINGS AND SPECS ARE DIRECTED TO THE ATTENTION OF THE CONTRACTOR AND THE INCLUSION OF ANY WORK BY MENTION, NOTE OR DETAIL, ITEMIZATION OR IMPLICATIONS HOWEVER BRIEF, MEANS THE CONTRACTOR SHALL PROVIDE AND INSTALL SAME. ALL WORK PERFORMED TO BE PART OF A COMPLETED PACKAGE WITHIN THE DEFINITIONS OF NORMAL INDUSTRY STANDARDS. 6. THE ARCHITECT /ENGINEER SHALL NOT BE RESPONSIBLE FOR, NOR HAVE S CONTROL OR CHARGE OF THE CONSTRUCTION MEANS, METHOD S , E QU E NCES OR FOR THE SAFETY PRECAUTIONS AND PROGRAMS. -1. NOTICE: SEPARATE PERMITS REQUIRED FOR FIRE PROTECTION, PLUMBING, ELECTRICAL AND MECHANICAL WORK. AIR CONDITIONING AND VENTILATION PERMIT TO BE THE RESPONSIBILITY OF THE MECHANICAL CONTRACTOR AND HIS SUB- CONTRACTORS. 8. THE CONTRACTOR SHALL COORIDINATE THE WORK OF ALL TRADES: STRUCTURAL, PLUMBING, FIRE PROTECTION, ELECTRICAL 4 AIR CONDITIONING AT THE TIME THE WORK IS PERFORMED ON THIS STRUCTURE. NO ADDITIONAL PAYMENTS SHALL BE MADE FOR THE CONTRACTOR'S FAILURE TO CORRECT CONFLICTING FIELD CONDITIONS AFTER THE WORK HAS BEGUN. S. ALL PERMITS, INSPECTIONS, APPROVALS, ETC. SHALL BE APPLIED FOR AND PAID FOR CAS PART OF BID PRICE) BY THE CONTRACTOR IN ALL FIELDS OF THE WORKS, AND HE SHALL BE RESPONSIBLE FOR THE COORDINATE OF INSPECTION AND APPROVAL OF THE WORK. PRIME 10. SUBMIT A COPY OF THE CONTRACT DOCUMENTS ISSUED FOR PERMIT BY THE BUILDING DEPARTMENT, TO THE ARCHITECT TO ALLOW HIM /HER TO INCORPORATE ANY BUILDING DEPARTMENT MODIFICATIONS INTO THE PLANS PRIOR TO THE START OF CONSTRUCTION. 11. ALL WORD, COMPLETED OR OTHERWISE, SHALL BE PROPERLY PROTECTED AT ALL TIMES. CONTRACTOR SHALL FOLLOW ALL ACCEPTED METHODS OF SAFETY PRACTICE AND PROVIDE ALL FENCES, BARRICADES, ETC. AS MAY BE NEEDED TO PROTECT LIFE AND PROPERTY AND AS MAY BE REQUIRED BY AUTHORITIES HAVING JURISDICTION OVER THIS WORK. HE SHALL REPAIR AT HIS OWN COST ANY DAMAGES TO THE PERMISES OR ADJACENT WORK CAUSED BY HIS OPERATION. 12. PATCH AND REPAIR ALL FINISHES DAMAGED DURING THE COURSE OF THIS WORK. FILL AROUND NEW PIPING AND CONDUITS WITH CONCRETE, SEAL ALL HOLES AND GAPS, NEW FINISHES AT CUT AND PATCHED AREAS SHALL MATCH EXISTING ADJACENT FINISHES WITH NO NOTICEABLE 13. BEFORE COMMENCING WITH THE WORK, THE CONTRACTOR SHALL FILE WITH THE OWNER CURRENT INSURANCE CERTIFICATIONS IN THE AMOUNTS REQUESTED BY THE OWNER FOR WORKMAN COMPENSATION, COMPREHENSIVE GENERAL LIABILITY, BODILY INJURY AND PROPERTY DAMAGE. IT IS THE INTENTION OF THE PARTIES THAT THE CONTRACTOR SHALL INDEMNIFY THE OWNER AND ARCHITECT FOR ANY AND ALL COSTS, CLAIMS, SUITES, AND JUDGEMENTS FOR PROPERTY DAMAGE AND PERSONAL INJURY, ARISING OUT OF THE WORK OF THE CONTRACTOR. 14, DISCREPANCIES. THE GENERAL CONTRACTOR SHALL FAMILIARIZE HIMSELF WITH THE PROJECT THOROUGHLY INSPECT THE SITE, THE DRAWINGS AND SPECS, SO AS TO THOROUGHLY UNDERSTAND THE WORK. ANY AND ALL DISCREPANCIES AND OMISSIONS SHALL BE REPORTED TO THE ARCHITECT PRIOR TO COM- MENCEMENT OF ANY WORK. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO INSURE THAT DISCREPANCIES AND OMISSIONS ARE REPORTED AND CLARIFICATION OBTAINED FROM THE ARCHITECT PRIOR TO WORK BEING DONE. ANY WORK THAT PROCEEDS OTHERWISE SHALL BE, IF INCORRECTLY PERFORMED, REPLACED OR REPAIRED WITH THE COST OF THE SAME BEING BORNE BY THE CONTRACTOR. ALL DIMENSIONS SHALL BE FIELD VERIFIED BY THE G.C. FOR COORDINATION PRIOR TO WORK BEING DONE 15, OMISSIONS: IN THE EVENT THAT CERTAIN FEATURES OF THE CONSTRUCTION ARE NOT FULLY SHOWN ON THE DRAWINGS, THEN THEIR CONSTRUCTION SHALL BE OF THE SAME CHARACTER AS FOR SIMILAR CONDITIONS THAT ARE SHOWN OR NOTED. IS. ALL MATERIALS USED SHALL BE NEW AND DELIVERED TO THE JOB IN ORIGINAL SEALED CONTAINERS BEARING ORIGINAL MANUFACTURERS LABELS. 19. ALL COLORS SHALL BE AS SELECTED BY THE OWNER /ARCHITECT 20. THE GENERAL CONTRACTOR SHALL LEAVE ALL CHASES, HOLES, OR OPENING TRUE AND OF PROPER SIZE IN HIS OWN WORK OR CUT SAME IN EXISTING WORK AS MAY BE NECESSARY FOR PROPER INSTALLATION OF HIS OWN OR OTHER CONTRACTORS WORK, CONSULTING WITH OTHER CONTRACTOR'S CONCERNED REGARDING PROPER LOCATION AND SIZE OF SAME. IN CASE OF HIS FAILURE TO LEAVE OR CUT SAME IN THE PROPER PLACE, HE SHALL CUT THEM AFTERWARDS AT HIS OWN EXPENSE. NO EXCESSIVE CUTTING WILL BE PERMITTED NOR SHALL ANY STRUCTURAL MEMBERS BE CUT WITHOUT THE CONSENT OF THE ARCHITECT. CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR THE COORDINATION OF ALL WORK OF TRADES PLUS THE COORDINATION, REPAIR AND PREPARATION FOR THE WORK OF ANY OTHER TRADES THAT WILL BE SUBSEQUENTLY LET UNDER SEPARATE CONTRACT BY THE OWNER. 21. ALL CONTRACTORS WORK SHALL BE PERFORMED IN A FIRST CLASS WORKMAN -LIKE MANNER, MATCHING AND ALIGNING ALL SURFACES WHERE APPLICABLE TO AFFORD A FINISHED, NEAT APPEARANCE. CONTRACTOR SHALL CLEAN ALL SURFACES FREE OF ALL DIRT AND REFUSE CAUSED BY DEBRIS FROM ALL INSTALLATION TECHIQUES OF THE TRADE. ALL ADJACENT SURFACES TO THEIR WORK SHALL BE LEFT AS THEY APPEAR PRIOR TO THE COMMENCEMENT OF THE CONTRACTORS WORK TO BE DONE. CONTRACTOR SHALL PROPERLY PROTECT ALL ADJACENT SURFACES DURING THE COURSE OF HIS INSTALLATIONS. ALL GLASS AND HARDWARE SHALL BE THOROUGHLY CLEANED IN A MANNER ACCEPTABLE TO THE OWNER. 22. THE CONTRACTOR SHALL GUARANTEE IN WRITING IN FORM AS ACCEPTABLE TO THE OWNER ALL LABOR AND MATERIALS INSTALLED BY HIM FORA PERIOD OF NOT LESS THAN (I) ONE YEAR AFTER DATE OF ACCEPTANCE OF WORK BY THE OWNER EXCEPT AS MODIFIED HEREIN OR ON OTHER DRAWINGS. SHOULD DEFECTS OCCUR, ALL WORK SHALL BE REPLACED OR PROPERLY REPAIRED AT NO ADDITIONAL COST TO THE OWNER. 23. ALL REQUIRED TESTS SHALL BE PERFORMED AT THE EXPENSE OF THE CONTRACTOR AND BY AN APPROVED TESTING LABORATORY. TEST RESULTS SHALL BE SUBMITTED TO THE ARCHITECT. 24. ALL WORK AND /OR MATERIAL SHALL BE INSTALLED IN STRICT ACCORDANCE WITH MANUFACTURERS OR INDUSTRIES RECOMMENDATIONS OF SPECIFICATIONS. 25, SHOP DRAWINGS AND SAMPLES FOR ITEMS DESIGNATED BY THE ARCHITECT ARCHITECTURAL A -0 PROJECT DATA 4 GENERAL NOTES. A -1 SITE PLAN/ ROOF PLAN AND NOTES A -2 FIRST FLOOR PLAN A -3 SECOND FLOOR PLAN A -4 ELEVATIONS A -5 ELEVATIONS A -& SECTIONS A -1 SECTIONS /WALL SECT. A -S SECTIONS A -9 WINDOW /DOOR DETAILS A -10 WINDOW /DOOR SCHEDULES. A -11 FINISH SCHEDULE/MISC DETAILS STRUCTURAL S -1 NOTES 5-2 FIRST FLOOR AND FOUNDATION 5-3 SECOND FLOOR FRAMING 5-4 ROOF FRAMING 5-5 DETAILS S -6 DETAILS MECHANICAL M -1 FIRST FLOOR A/C PLAN j M -2 SECOND FLOOR A/C PLAN ELECTRICAL E -1 FIRST FLOOR ELECTRICAL PLAN E -2 SECOND FLOOR ELECTRICAL PLAN E -3 NOTES /DETAILS PLUMBING I 6P -1 SITE PLAN P -1 FIRST LEVEL PLUMBING PLAN P -2 SECOND LEVEL PLUMBING PLAN MP -1 MECHANICAL /PLUMBING NOTES /DETAILS 0 21. NO CLAIMS FOR EXTRAS OR CHARGE ORDERS WIL� BE GIVEN CONSIDERA- TION UNLESS THEY ARE IN WRITING AND SIGNED 5T THE ARCHITECT, THE CONTRACTOR AND THE OWNER. 26, THE GENERAL CONDITIONS OF THE CONTRACT FOh THE CONSTRUCTION OF BUILDINGS" OF THE AMERICAN INSTITUTE OF ARCHITECTS, DOCUMENT A -201, LATEST ADDITION, ARE HEREBY MADE PART OF CONTRACT DOCU- MENTS. THESE GENERAL NOTES, SPECIFICATIONS AND CONTRACT BETWEEN THE OWNER AND CONTRACTOR SHALL TAKE PREC -PDENCE OVER THE "GENERAL CONDITIONS" IN THE EVENT OF A CONFLICT. 2S. GENERAL CONTRACTOR TO SECURE ALL POINTS OF ENTRY DURING CONSTRUCTION AND IS TO COORDINATE WITH THE OWNER MEANS CAF INGRESS AND EGRESS OF CONSTRUCTION WORKERS, MATERIALS, SUPPLIER, EQUIPMENT, TRASH, ETC. 30. SCHEDULE OF VALUES: CONTRACTOR SHALL SUBMIT A DETAILED COST BREAKDOWN "SCHEDULE OF VALUES" IN THE OF AIA G102 PRIOR TO THE FIRST PAYMENT. THIS SCHEDULE OF VALUES SHALL CLOSELY FOLLOW THE STANDARD CSI FORMAT, AND SHALL BREAKDOWN UNITS OF WORK IN SUFFICjENT DETAIL TO ALLOW ARCHITECT TO EVALUATE THE VALUE OF WORK COMPLETED. THE BREAKDOWN SHALL BE A TRUE REFLECTION OF THE COST OF T4�E WORK AND SHALL NOT BE "FRONT -END" LOADED. THE SCHEDULE OF VALUES SHALL BE SUBJECT TO THE ARCHITECTS APPROVAL. RETAINAGE SHALL BE 5% AND SHALL BE HELD UNTIL SUBSTANTIAL COMPLETION OF WORK. CONSTRUCTION SCHEDULE: PRIOR TO THE FIRST PAYMENT THE CONTRACTOR (SHALL PROVIDE A SCHEDULE OF THE CONSTRUCTION WORK, INDICATING CRITICA_ PATH ITN(S, DATES OF SUBMITTAL, AND DATES OF PROJECT MEETINGS. "' SCHEDULE SHALL INDICATE EACH INDIVIDUAL SUBCONTRACTOR AND COMPONENT OF WORK. CONTRACTOR SHALL ALLOW TEN (10) WORKING DAYS FOR ARCHITECTS REVIEW OF ALL SUBMITTALS. SCHEDULE SHALL BE SUBJECT TO ARCHITECTS APPROVAL. SCHEDULE SHALL BE UPDATED ON A MONTHLY BASIS AS A PREREQUISITE TO PAYMENTS. 30. THE SITE SHALL BE TREATED FOR TERMITES PER FBC 104.2.5 �A hJ� dog k y� DAVID TT AUTMAN A R C H I T "E C T 6431 SW 62 TERRACE MIAMI. FLORIDA 33143 305 - 667 -0619 TEL 305 -667 -0215 FAX REVISIONS 90 Lu 4 I. ul _ La q 0 SEAL "At. A4v .• AO D /PRUJ /3040 20JUL02 �A