Loading...
Res. No. 020-04-11799RESOLUTION NO.20-04-11799 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF SOUTH MIAMI, FLORIDA,AUTHORIZING THE CITY MANAGER TO EXECUTE A CHANGE ORDER FOR ADDITIONAL DRAINAGE IMPROVEMENTS PURSUANT TO SECTION 10.03 OF THE PROTURF,INC.AGREEMENT FOR THE DANTE FASCELL PARK TENNIS COURT IMPROVEMENTS WHICH CHANGE ORDER WILL RESULT IN CONSTRUCTION COSTS IN THE AMOUNT OF $9,981.52 TO BE CHARGED TO SOUTH FLORIDA WATER MANAGEMENT DISTRICT GRANT ACCOUNT NUMBER 001-0000-132-2060;PROVIDING FOR AN EFFECTIVE DATE. WHEREAS,the Mayor and City Commissionwishes to provide drainage improvements to the tennis courts at the Dante Fascell Park and; WHEREAS,the construction activitieswill consist of anew drainage system along the southernboundary of thetenniscourtstoenhancepercolation,and; WHEREAS,the Mayor and City Commission entered into a contract with Proturf,Inc.on ll/IS/OBand WHEREAS,the Mayor andCity Commission authorizing thecity manager to execute a changeorderforadditionaldrainage improvements pursuanttosection10.03 of theProturf,Inc. agreementfortheDanteFascellParktenniscourtimprovementswhichchangeorderwillresultin constructioncostsintheamount of $9,981.52tobechargedtoSouth Florida watermanagement district grant account number 001-0000-132-2060 NOW THEREFORE,BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF SOUTH MIAMI,FLORIDA: Section1:Thecitywishestoinstallanew exfiltration drainagesystemalongthe southernmostboundary of thetenniscourtsaspart of theDanteFascellTennisCourtandParkingLot ImprovementsprojectcurrentlyunderconstructionbyProturf,Inc.Pursuanttosection10.3 of the Proturf,Inc.agreement,thecitymanagerisauthorizedtoexecutetheworkchangeorderwhichis attached as exhibit 1. Section2:TheengineeringconsultantreviewedtheproposalsubmittedbyProturf,Inc.and confirmedthattheunitpricesforthis additional workwereconsistentwithworkpreviouslyperformed in the City. Section3:Theprojectwillbe funded throughtheSouthFloridaWater Management District Grant account number 001-0000-132-2060. Section4:ThattheMayorandCityCommissionauthorizetheCityManagertoexecutean additionaldrainageimprovementagreementwithProturf,Inc.forthetenniscourtsintheamount of $9,981.52. PASSED AND ADOPTED this 3rd day of February ,2004. Page 2 of Res.No.20-04-11799 APPROVED: faria Menendez,City Clerk READ AND APPROVED AS TO FORM: J:\My Documcnts\rcsolutions\Resolution Dante -Proturf.doc ATTEST: Horace G.Feliu,Mayor Commission Vote:M Mayor Feliu: Vice Mayor Russell: Commissioner Bethel: Commissioner Wiscombe: Commissioner McCrea: 3-2 Yea Nay- Yea Yea Nay CITY OF SOUTH MIAMI Excellence,Integrity,Inclusion South Miami fa?i!fcfi All-America City 2001 TO:Honorable Mayor,Vice Mayor &City Commission DATE:February 3,2004 FROM:Maria V.Davis City Manager tf _**ITEM No._ RE:Authorizing the City Manager to Execute an Additional Drainage Improvement Agreement with Proturf,Inc.for the Dante Fascell Park Tennis Courts. RESOLUTION A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF SOUTH MIAMI, FLORIDA,AUTHORIZING THE CITY MANAGER TO EXECUTE A CHANGE ORDER FOR ADDITIONAL DRAINAGE IMPROVEMENTS PURSUANT TO SECTION 10.03 OF THE PROTURF,INC.AGREEMENT FOR THE DANTE FASCELL PARK TENNIS COURT IMPROVEMENTS WHICH CHANGE ORDER WILL RESULT IN CONSTRUCTION COSTS IN THE AMOUNT OF $9,981.52 TO BE CHARGED TO SOUTH FLORIDA WATER MANAGEMENT DISTRICT GRANT ACCOUNT NUMBER 001-0000-132-2060;PROVIDING FOR AN EFFECTIVE DATE. BACKGROUND &ANALYSIS Proturf,Inc.is currently renovating thetenniscourtsatthe Dante Fascell Park,under the contract executed bytheCity of South MiamionOctober3,2003.The original design provided for standardtennis court gradingand construction throughout thefacility.However,during construction an unforeseencondition arose asthe southernmost boundary of the courts,which receiveslittleorno direct sunlight because of the adjacent landscaping,has been retaining moisture for extended periods. Torectifythisproblem,adesignwasrecentlycreatedbyourengineeringconsultantstoprovidea small exfiltration drainage system along therear boundary of the courts.This system consists of asmall gravel-filled trench withapipethatwouldhelp convey the stormwater runoff tothe newlyinstalledcatchbasins just outsidetheperimeter of thecourts.Thissolutionwillexpedite theremoval of moisture fromthecourtsandthereforeensurethe proper maintenance of theclay surface. PublicWorks staff requested andreceivedaproposalfromProturf,Inc.to accomplish thiswork. Theproposalfor $9,981.52 wasthoroughlycheckedand compared withpricesforsimilarwork Page2 of2 Comm.Mtg.Agenda February 3,2004 being performed intheCity.ThisamountwillbefundedthroughtheSouth Florida Water Management District Grant Account Number 001-0000-132-2060.The account balance before theproposed$9,981.52is$64,733.33. RECOMMENDATION Itis recommended thattheCity Commission approvethefundingforthework. Attachments: •Proposed Resolution •Contractor's proposal MVD/WAB 01/14/2004 WED 16:23 FAX 305 774 6277 C3TS ARCHITECS-ACCTG —Jan.14-2004-3:47PM- Proturf,Inc. 7344 SW 48th Street,Suite 301 Miami,FL33155 Phono:305.665,9351 Fox:305.665.5478 TITLE:Drainage@ Tennis Courts PROJECT:Dante l'ascell Park TO:Attn:Ramon CastdJa C3TS Hninccrs Architects Planners 901 Ponce dc Leon Blvd.,Suite 900 305.445.3366 Coral Gables,FL 33134 Phone:305.445.2900 RE:To: DESCRIPTION OF PROFOSAl. From: ®003/004 •Nq.1829—P.2- CHANGE UK1IEK REQUEST No.00001 DATE:1/14/2004 JOB:2003-10 Dante Fascell Park CONTRACT NO:1 Number: In accordance with job sice visiton 1/9/03 and several meetings with the consulting engineer we are proposing to provide 6"drainage with pearock gravel along theback side of the north and somh tennis conns for approximately 185 If oneach side. Unit Price .TaxRateTaxAmountNet AmouiilItem 00001 00002 Description .Stock* Attached Cost Break Down for Work to tipCompleted Overtuifl Qu*ntfrF1J» 1.000 Is 1.000 10% 00003 Profit 1.000 10% 09004 Bond Cost I.O00 1% APPROVAL: By: Date:_ RxpoBtinn *> Andres Correa i8.1G8.U <MK>%$0.00 $8,168.13 S8KI3 0.00%$0.00 $816.13 $898.43 0.00%so.on SftttUj $98.33 000%SO.00 $98.83 Unit Cost:$9,981.52 Unit Tax:S0.00 Lump Sum:$0.00 Lump Tax:S0.00 Total:$9,981.52 By Date: Ramon Caslelta