Loading...
Res. No. 063-04-11842RESOLUTION NO.63-04-11842 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF SOUTH MIAMI. FLORIDA.AUTHORIZING THE CITY MANAGER TO EXECUTE A CONTRACT WITH TJ PAVEMENT CORP.FOR THE INSTALLATION OF NEW GUARD-RAILS ALONG THE CANAL BANKS ON MANOR LANE FOR AN AMOUNT OF $5,800.00,TO BE CHARGED TO PUBLIC WORKS DEPARTMENT STORM WATER TRUST FUND ACCOUNT NUMBER 111-1730-541-3450;PROVIDING FOR AN EFFECTIVE DATE. WHEREAS,the Mayor andCity Commission wishto replace guardrails along Manor Lanecanal banks and; and; WHEREAS,TJ Pavement Corp.istheonly contractor interested in performing thissmall project WHEREAS,the Mayor andCity Commission authorize theCity Manager to execute a construction contract withTJ Pavement Corp.asthesole source contractor forthe replacement of 140linealfeet of guardrail at the canal on Manor Lane. NOW THEREFORE.BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF SOUTH MIAMI.FLORIDA: Section 1:That theCity Manager is authorized to execute a construction contract for $5,800.00 withTJPavement.Corp.fortheconstruction of 140 linealfeet of guardrailalongthecanalat Manor Lane; Section2:Thattheamount of $5,800.00willbechargedtoPublicWorksDepartmentStorm Water Trust Fund Account Numbers 111-1730-541 -3450. Section3:Thatthisresolutionshallbecomeeffectiveimmediatelyuponadoption. PASSEDAND ADOPTED this 6th day of April APPROVED: [aria Menendez,City Clerk READ AND APPROVED AS TO FORM: /£?<&?//- CITY ATTORNEY ,2004. ATTEST ^~2^ Commission Vote:5-0 Mayor Russell:Yea Vice Mayor Palmer:Yea Commissioner Birts-Cooper:Yea Commissioner Wiscombe:Yea Commissioner Sherar:Yea CITY OF SOUTH MIAMI Excellence,Integrity,Inclusion TO:Honorable Mayor,ViceMayor &CityCommission FROM:Maria V.Davis City Manager DATE:April 6,2004 ITEM No.. RE:Authorizing the City Manager to execute an agreement with TJ Pavement Corp. for construction of guard-rails along canal at Manor Lane. South Miami All-America City 2001 RESOLUTION A RESOLUTION OFTHE MAYOR AND CITY COMMISSION OFTHE CITY OF SOUTH MIAMI, FLORIDA,AUTHORIZING THE CITY MANAGER TO EXECUTE A CONTRACT WITH TJ PAVEMENT CORP.FOR THE INSTALLATION OF NEW GUARD-RAIL ALONG THE CANAL BANKS ON MANOR LANE FOR AN AMOUNT OF $5,800.00,TOBE CHARGED TO PUBLIC WORKS DEPARTMENT STORM WATER TRUST FUND ACCOUNT NUMBER 111-1730-541- 3450;PROVIDING FORAN EFFECTIVE DATE BACKGROUND &ANALYSIS Inour continued efforts to provide maintenance and safety within our rights-of-way and along our canal system,it has been determined that the guardrails along the canal system at Manor Lane need tobe replaced.In conforming to our construction process on small projects,we requested proposals from several contractors.TJ Pavement Corp.was the only company willing to perform the small project.TJ Pavement Corp.is,in part,willing to perform the work because they are currently engaged on a project in the City close to the site,which means they would not incuradditionalcostsfor mobilization.Othercompaniesarenotinterestedbecausetheprojectis too small,complex and not cost effective,especially with the added mobilization cost. Asa result,we recommend executing an agreement with TJ Pavement Corp.asasole source contractor for the project.The current balance for the referenced account is $16,265.00. RECOMMENDATION Itis recommended thattheCity Commission approve the resolution. Attachments: •ProposedResolution •Contractor's Proposal MVD/wab FPTtM :T T PQUFMPNT ITIPP FQ*KIP :-*£?K??I7I1 flil q Mar-7^PFK7I4 FRrdfiPM P^ TJPavement Corp. ENAIMFPRIMft CONTRACTOR. M*HM OVV4U&!.,%>'lb.33& MIAMI,PL 33165 Ph (305)220-1220 Fax (305)220-1019 PROPOSAL SUBMITTED TO:CITY OF SOUTH MIAMI PROJECT: NAME:Mr.Greg Penv NAME;' jggggk S^SyE^1"^ADDRESS:manor Iamp2Sf^ATE:Miami nasis?orrT/STAifcT^fiimi fl vn^—2™*(MS)6^-7354 DATE:3/102004FAX:^(305)668-7208 ^ The f ollowino construction: ♦140 LF constructionofguardrail rOTAU:$5,800,00 The work and performed bythe go may result in a lien being placed on the premises described above,in case the owner orcontractor defaultifs In any paymentunder this contract Owner hereby agrees to accept fun responsibility for all fences,sidewalks,all underground pipes,wires,septic tanks,drain lines,wells,etc unless stated above. Owner is liable in fuH amount of contract intheevent owner cancels afterwork has started. The coshall not be responsible for damage or delays do tostrikes,foes,accidents,or the others cause beyond lis control,not for inherent defectsInthepremisesonwhichworktobedone. In the event ofany default ofthis contract by owner-owner agrees to pay all cost and reasonable attorneys'fees incurred by TJ Pavement Corp as aresult of said default AD materials are guaranteed to be as specified.All work to be completed In aworkman like manner according to standard practfces.Any alteration or deviation from above specifications Involving extra costwin be executed only upon written orders and wiB become an extra chargeoverand above the estimate. This proposal subject to acceptance within _180_days and is void thereafter attheoption oftheunder signed. Workshallbegin within 10daysofthiscontractbeingsignedby all partieshereand return totheco. WE HEREBY PROPOSE TO FURNISH LABOR AND MATERIALS COMPLETE IN ACCORDANCE VAfTTH THE ABOVE SreCMFr^TlONS FOR THE SUM OF:FIVE THOUSAND EIGHT HUNDRED DOLLARS WITH PAYMENT TOBEMADE AS FOLLOWS:_J>AY ftEQUISmON Authorized Signature:^ ^ACCEPTANCE OF CONTRACT The above prices,specifications and conditions are hereby accepted.You aretodothe work as specified payment wilt be made as outlinedabove. Accepted by.;Signature;