Res No 174-14-14268RESOLUTION NO.:174-14-14268 A Resolution authorizing the City Manager to negotiate and enter into a contract with the Corradino Group fora total expenditure not to exceed $26,609.48 for Twin Lakes Traffic Calming Design WHEREAS,pursuant to Florida Statute287.055forCCNA,TheCorradinoGroupwasone of thefirmsselectedto provide professional engineering services;and WHEREAS,theCity negotiated hourly rateswiththefirmand entered intoa professional service agreement with The Corradino Group to perform engineering services fortheCity;and WHEREAS,the Mayor and City Commission wishto provide traffic calming tothearea known as Twin Lakes, bounded by,and WHEREAS,the total expenditure isnotto exceed $26,609.48;and WHEREAS,the Mayor andCity Commission desireto authorize theCity Manager to negotiate and enter intoa contractwithThe Corradino Group fortheTwinLakesTraffic Calming Designforatotal amount notto exceed $26,609.48 NOW,THEREFORE,BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF SOUTH MIAMI,FLORIDA THAT: Section 1:TheCity Manager is authorized tonegotiatethetermsand conditions andto execute a contract with TheCorradinoGroupfortheTwinLakesTrafficCalmingDesignforanamountnottoexceed$26,609.48.Acopyofthe proposal is attached. Section 2:The expenditure shallbechargedtothe People's Transportation Planaccountnumber124-1730-541- 6490whichhasabalance of $712,942.09,beforethisrequestwasmade. Section3:Ifanysectionclause,sentence,orphrase of thisresolutionisforanyreasonheldinvalidor unconstitutional byacourtofcompetentjurisdiction,theholdingshallnotaffectthevalidityoftheremainingportionsofthis resolution. Section 4.Thisresolutionshalltakeeffectimmediatelyuponadoption. PASSED AND ADOPTED this 2nd dayof September,2014. ATTEST:APPROVED: ^YOR COMMISSION VOTE:5-0 TION MayorStoddard Yea ViceMayorHarris yea Commissioner Welsh yea Commissioner Liebman Yea Commissioner Edmond yea South'*Miami THE CITY OF PLEASANT LIVING CITY OF SOUTH MIAMI OFFICE OF THE CITY MANAGER INTER-OFFICE MEMORANDUM To:The Honorable Mayor &Members of theCity Commission From:Steven Alexander,City Manager Date:September 2,2014 Agenda Item No.:k Subject:A resolution authorizing theCity Manager to negotiate and enter intoa contract withthe Corradino Groupforatotal expenditure not to exceed $26,609.48 for Twin Lakes Traffic Calming Design. Background:A traffic study was performed toassessthe magnitude of cut-through traffic in the neighborhood depicted as Twin Lakes,bounded by SW 62nd Avenue and SW 67th Avenue between SW 48th Street andSW 64th Street,andalsothe neighborhood depicted as Bird Estates,between SW 61st Avenue and 64th Avenueand between SW 40th StreetandSW 44th Street.Forlocation of neighborhoods see Exhibit 1 "South Miami Traffic Calming Neighborhood" map. Based onthe results of thestudy,traffic calming measures suchas speed tables and a traffic circle are recommended. In accordance with pursuant to Florida Statute 287.055 for CCNA,The CorradinoGroupwasone of thefirmsselectedtoprovideprofessional engineering services.TheCity negotiated hourly rates with thefirmand entered intoaprofessionalserviceagreementwithTheCorradinoGrouptoperform engineering services fortheCity. Below isa table demonstrating theTraffic&Transportation Firmsunderthe CCNA. ^|ip|iii^Bl^|||Sp;pl ^i^^^^^il^litl:^^^^Sllli JiliMliBllilllW Ty Lin International Mango/ManorLaneTrafficCalming Design in process The Corradino Group Bird Estate &Twin Lakes Traffic Calming Design proposal submitted Marlin Engineering Pinecrest/Snapper Creek Traffic Calming Pending design proposal CH Perez Consulting Cocoplum Traffic Calming Study phase URS Crosswalk Pending SoutmMiami THE CITY OF PLEASANT LIVING CITY OF SOUTH MIAMI OFFICE OF THE CITY MANAGER INTER-OFFICE MEMORANDUM The Corradino Group submitted a proposal intheamount $26,609.48 to perform theTwinLakesTrafficDesign. Amount:Amount not to exceed $26,609.48 Account:The expenditure shallbe charged tothe People's Transportation Planaccount number124-1730-541-6490whichhasabalance of $712,942.09,beforethis request was made. Attachments:Resolution Proposal Exhibit 1 THE CORRADINO GROUP O Z q CONSULTANT WORKORDERPROPOSAL <£Twin Lakes Neighborhood Traffic Calming £Date:August 24,2014 O Dear Mr.Ayala: The Corradino Group,Inc.proposes to provide the services identified below for the project entitled "Twin Lakes Neighborhood Traffic Calming",pursuant toits Professional Service Agreement with the City of South MiamiforCivil Engineering services for Roadway Projects,dated June 28,2013 . I.GENERAL The general objective for the Consultant isto provide all project management and professional engineering services required for the design and preparation ofa complete set of construction contract plans foratraffic calming devices (Roundabout and Speed Tables),at the following locations: •S.W.63rd Avenue and S.W.42nd Terrace -Roundabout •S.W.44th Street fromS.W.64th Avenue toS.W.62nd Avenue -1 Speed Hump •S.W.63rd CourtfromS.W.58th Street toS.W.62nd Terrace -2 Speed Humps •S.W.65th Avenue fromS.W.64th Street toS.W.61st Terrace -1 Speed Humps Elements ofworkshallinclude roadway analysis,topographic survey,signingand pavement markings,and drainage and geotechnical activities as required.All existing features,i.e.sidewalks, driveways,etc.,requiring repair or replacement,shall also be addressed accordingly. All plans and design documents are tobe prepared with Standard English values in accordance with all applicable engineering manuals and guidelines. II.SCOPE OF WORK Project Activity 4:Roadway Analysis Task No.4.4 Horizontal/Vertical Master Design Files Includes allefforts required for establishing the master design filesfor the horizontalandvertical geometry,existing drainage features,utilities(includingconflict location identification and adjustment),etc.Alsoincludesallworkto create elements showing the alignmentforthehorizontal geometry in the plan sheets andalleffortsrequiredtoplacelabelsandrequired information inthe master design file.In addition,throughthe use of AUTOTURN,thevehiclepathforallroundabouts will beincluded as requested,to ensure maneuverability. Task No.4.11 Cost Estimate Includes all work required to prepare a construction cost estimate for each submittal. Task No.4.14 Field Reviews Includestraveltimefor field visitsinordertoobtainthe necessary data fordesign. 4055NW97th AVENUE •MIAMI,FL33178 TEL 305.594.0735 «800.887.5551 FAX 305.594.0755 WWW.CORRAPINO.COM August 24,2014 Page2 WORK ORDER PROPOSAL Task No.4.16 Quality Assurance/Quality Control Includesimplementationof QA/QC plan.Alsoincludesinternal peer reviewand/or constructability reviews,responses to comments andanyresolution meetings ifrequired,and assembly ofplansfor submittals for reviews. Task No.4.18 Supervision Includes alleffort required to supervise all technical design analysis and plans production. Task No.4.19 Coordination Includes all efforts to coordinate withall disciplines of the project team,including sub-consultants,to produce afinal set of construction documents. Project Activity 5:Roadway Plans Task No.5.1 Key Sheet Includes efforts for producing the Key Sheet. Task No.5.5 Typical Section Sheets Includes all efforts for development and production of the Typical Section Sheets. Task No.5.6 General Notes /Pay Item Notes Includes all efforts for development and production of the general notes and pay item notes as required. Task No.5.7 Summary of Quantities CADD production work necessary to complete sheets,does not include the effort required to perform quantity take offs. Task No.5.15 Plan Sheet Includes production work necessary to develop sheets and all required labeling not included in the Master Design file. Task No.5.21 Miscellaneous Detail Sheet Includes efforts for developing miscellaneous roadway construction details as required. Task No.5.31 Traffic Control Detail Sheets Includes efforts for developing Traffic Control Detours Sheets Task No.5.41 Quality Assurance/Quality Control Includes implementation of QA/QC plan.Also includes internal peer review and/or constructability reviews,responses to comments andany resolution meetings if required,and assembly of plans for submittals for reviews. Task No.5.42 Supervision Includes all efforts required to supervise and coordinate plans production and sub-consultant coordination. Project Activity 6:Drainage Task No.6.0 Drainage Analysis/Design Includesallwork required for the design ofanisolatedstormdrain system composed ofinlets and/or manholes witha closed French drainsystem.Analysis will be based ona 5-year returnperiodusing the rational method and a minimum time of concentration of 10 minutes. CIP Form 116 Revised 7/30/10 August 24,2014 Page3 WORK ORDER PROPOSAL Project Activity 7:Utilities Task No.7.2 Identify Existing UAOs Includes identification of all utilities ateach intersection by reviewing existing plans,checking with SunshineStateOne Call,City of Miami,andany potential existing SUE reports. Task No.7.3 Make Utility Contacts Includessendinglettersandplanstoeach utility companyfor coordination. Task No.7.10 Review Utility Markups,Work Schedules,Provide Relocation Documents Includesreviewof utility markedupplansandwork schedules as theyarereceived. Task No.7.11Utility Coordination /Follow-up Includes coordination and follow-up toensure the resolution ofall known utility conflicts and/or attainmentof utility clearanceor "No conflict"letters from each utility company.Ifthereisa conflict thatitcan'tbe resolved,a UWS shallbeprepared,coordinated andobtainedbytheEOR with the corresponding utility agency. Project Activity 8:Permitting Task No.8.5 Complete and Submit all Required Permit Applications Includes the following permits and approvals: •Miami-DadeCountyPublicWorks Traffic Division approval •DERM/DRER Project Activity 19:Signing &Pavement Marking Analysis Task No.19.3 Reference and Master Design File Includes alleffortsrequiredfor establishing thesigningandmarking master design filetoinclude reference filesoftopo,r/w,roadway,etc.Also includes design and layoutof signs,lanelines,gores, pavement markings,rpm's,and all efforts required for drafting. Task No.19.7 Quantities Includes allworkrequiredto determine the quantities for each plan sheet. Task No.19.9 Cost Estimate Includes all work required to prepare a construction cost estimate for each submittal. Task No.19.14 Quality Assurance/Quality Control Includes implementation of QA/QC plan.Also includes internal peer review and/or constructability reviews,verify comments are addressed,assembly of plans for submittals,etc. Task No.19.16 Supervision Includes effort to supervise all technical design analysis. Project Activity 20:Signing &Pavement Marking Plans Task No.20.3 Tabulation of Quantities Includes time to place pay item numbers,descriptions,quantities and totals on tabulation sheet(s). Task No.20.6 Plan Sheet Includes all efforts required to create the signing and pavement marking sheets. CIP Form 116 Revised 7/30/10 August 24,2014 WORK ORDER PROPOSAL Page 4 Task No.20.14 Quality Assurance/Quality Control Includes QCreview,verify comments are addressed,resolution meetings and documentation, assembly of plans for phase submittals,etc. Task No.20.15 Supervision Includes allefforts required to supervise and coordinate plans production and sub-consultant coordination. Additional Services Task No.3.7 Post Design (Hourly rate as required) Includes shop drawing reviews,responding to RFPs,plan revisions(not involving errors or omissions),and limited construction assistance. Reimbursable Expenses Project Activity 27:Survey See attached Scope Project Activity 30:Geotechnical See attached Scope III.SUB-CONSULTANTS The below listed Sub-Consultants will assist in the performance of the Work. Sub-Consultant Name Specialty or Expertise PSI,Inc.Geotechnical Exploration Longitude Surveyors,LLC Surveying IV.SCHEDULE OF WORK -TIME OF PERFORMANCE Consultant shall submit the Deliverables and perform the Work as depicted in the tables below (Additional pages may be added as needed) I SCHEDULE OF DELIVERABLES Task,Sub-task, or Activity ID#Major Task,Sub-Task,Activity,or Deliverable Duration (specify weeks or calendar days) Delivery Date* (cumulative weeks,or calendar days) 1 Phase I Submittal -60%Plans 8 weeks**NTP+8 weeks 2 Phase 2 Submittal -90%Plans 4 weeks ***NTP+12weeks 3 Final Submittal -100%Contract Plans 4 weeks ***NTP+16weeks RE1 Topographic Survey 2 weeks NTP+2 weeks RE2 Geotechnical Report 2 weeks NTP+2 weeks *Anupdatedschedule,indicating actualdeliverydates,based ontheabove durations,will beprovidedtotheCityupon receipt of theNTP and will be submitted inMicrosoft Project Schedule software. "Includes timeforcoordinationwith Miami-Dade CountyPublicWorksDepartmentfor concept approval. ***lncludes timeforreviewbytheCityaswellasreviewbythe Miami-Dade CountyPublicWorksDepartmentAlso includes timeforobtainingall necessary permits. CIP Form 116 Revised 7/30/10 August 24,2014 WORK ORDER PROPOSAL Page 5 V.COMPENSATION Consultantshall perform the Work detailedinthisProposalforaTotalfeeof twenty-six housand-six hundred and nine dollars and fouty-eight cents ($26,609.48).The City shallnotbe liable foranyfee, cost,expense or reimbursable expense orother compensation beyondthis amount.Saidfee includesanallowancefor Reimbursable Expenses requiredin connection with the Work,whichshall notexceed$4,955.00.SaidReimbursableExpensesshallbeusedin accordance with theAgreement Provisions andshallconformtothelimitationsofFlorida Statutes §112.061. SUMMARY OF COMPENSATION* Task,Sub- task,or Activity ID if Major Task Name and/or Activity Description Fee Amount Fee Basis 1 Phase I Submittal (60%Plans)$9,127.06 Lump Sum 2 Phase II Submittal (90%Plans)$4,563.53 Lump Sum 3 Final Submittal (100%Plans)$1,521.18 Lump Sum AS1 Allowance for Drainage Design (As needed)$2,336.88 Lump sum AS2 Allowance for Post Design $2,105.84 Lump sum» Subtotal -Professional Fees $19,654.48 Lump Sum RE1 Topographic Survey $2,800.00 Lump Sum RE2 Geotechnical $2,155.00 Lump Sum AS3 Allowance for Additional Services (Upon City's PM approval) $2,000.00 Limiting Amount,not to exceed TOTAL $26,609.48 *Note:Compensation should match theTask,Activities,and/or Deliverables identified. VI.ADDITIONAL SERVICES The City may establish an allowance for additional services requested by the City and for unforeseen circumstances,which shall be utilized at the sole discretion of the City. VII.DATA PROVIDED BY CITY The following information or documents are to be provided by the City,if available: •Right-of-Way Maps •As-built Information VIII.PROJECT MANAGER CONSULTANTS Project Manager for this Work Order assignment will be Carlos Alcantara,P.E. Submitted by:6 d CAA Carlos Alcantara,P.E. The Corradino Group,Inc. Reviewed and approval in concept Recommended by: CIP Form 116 Ricardo Ayala,P.E. Cityof South Miami Capital Improvements Project Manager Revised 7/30/10 ESTIMATE OF WORK EFFORT AND COST -PRIME CONSULTANT Nameof Project: County: FPN: FAP No.: Twin Lake Neighborhood Traffic Calming Project Miami-Dade Staff Classification Total Staff Hours From Project Manager Sr.Project Engineer Project Engineer Engineering Intern 3.ProjectGeneralTasks 4.RoadwayAnalysis 5.RoadwayPlans 6.DrainageAnalysis 7.Utilities 8.Environmental Permits 9.Structures -Misc.Tasks.Dwgs.Non-Tech. 10.Structures-BDR 11.Structures -Temporary Bridge 12.Structures-ShortSpanConcrete 13.Structures-MediumSpanConcrete 14.Structures •Structural Steel 15.Structures•SegmentalConcrete 16.Structures-MovableSpan 17.Structures-RetainingWalls 16.Structures •Miscellaneous 19.Signing&Marking Analysis 20.Signing&MarkingPlans 21.SignalizationAnalysis 22.SignalizationPlans 23.LightingAnalysis 24.LightingPlans 25.LandscapeArchitectureAnalysis 26.Landscape ArchitecturePlans 27.Survey(Field&OfficeSupport) 28.Photogrammetry 29.Mapping 30.Geotechnical 31.ArchitectureDevelopment 32.Noise Wall Analysis Total Staff Hours Total Staff Cost StaflHourEstimote Fee Sheet -Prune Summary • 21 22 SS.192.64 I $0.00 Survey FieldDaysby Subconsultant 4-PersonCrew: Notes: 1.ThissheettobeusedbyPrimeConsultanttocalculatetheGrandTotalfee. 2.Manually enterfee from eachsubconsultant.Unused subconsultant rows maybe hidden. SALARY RELATED COSTS: SUBTOTAL ESTIMATED FEE: REIMBURSABLE EXPENSES Subconsultant:Longitude Subconsultant:PSI,Inc. SUBTOTAL ESTIMATED FEE: ConsultantName:TheCorradinoGroup,Inc. Consultant No.: Date:8/19/2014 Estimator:Carlos E.Verson SH By Activity 18 14 20 23 Cost By Activity S3.S24 S3.354 $2,337 $1,740 51.087 $2,561 $2,946 $17,546.64 Check =$17,546.64 ADDITIONAL SERVICES Drainage(LimitingAmount,NottoExceed) Adrliona!Services PostDesign Services (12%ofDesignFee)(HourlyRate,NottoExceed) GRAND TOTAL ESTIMATED FEE; Average Rate Per Task $130.51 $129.02 $129.83 $124.28 $120.73 $128.03 $128.10 $17,548.64 $2,800.00 $2,155.00 $22,503.64 $2,000.00 $2,105.84 $26,609.48 8/19/2014 1:11 PM Project Activity 4:Roadway Analysis Estimator:CEV Task No. 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 4.9 4.10 4.11 4.12 Task Typical Section Package Pavement Design Package Access Management Horizontal /Vertical Master DesignFiles Cross Section Design Files Traffic Control Analysis Master TCP Design Files DesignVariationsandExceptions Design Report Computation Book&Quantities Cost Estimate Technical Special Provisions 4.13 Other Roadway Analysis Units LS LS LS LS LS LS LS LS LS LS LS LS LS No of Units Roadway Analysis Technical Subtotal 4.14 Field Reviews LS 4.15 Technical Meetings LS 4.16 Quality Assurance/Quality Control LS 4.17 Independent Peer Review LS 4.18 Supervision LS % Roadway Analysis Nontechnical Subtotal StaffHourEstimate 4.Roadway Analysis Hours/ Unit 15 5% 0% 3% Total Hours 15 Twin Lake Neighborhood Traffic Calming Project Comments 15 hoursper Roundabout 3 hours per each submittal x2 submittals 21 2peoplex2hoursx1reviewperRoundabout Page 2of12 8/19/2014 Project Activity 4:Roadway Analysis Task No.Task Units No of Units Hours/ Unit Total Hours Comments 4.19 Coordination LS %2%1 4.Roadway Analysis Total 28 .'.....,-. StaffHourEstimate 4.Roadway Analysis Page 3of12 8/19/2014 Estimator:CEV Task No. 5.1 5.2 5.3 5.4 5.5 5.6 5.7 5.8 5.9 5.10 5.11 5.12 5.13 5.14 5.15 5.16 5.17 5.18 5.19 5.20 5.21 5.22 Task Key Sheet SummaryofPay Items-including QuantityInput Drainage Map Interchange Drainage Map Typical Section Sheets General Notes/Pay Item notes Summary of Quantities Box Culvert Data Sheet BridgeHydraulics Recommendation Sheets Summary of Drainage Structures OptionalPipe/CulvertMaterial Project Layout Plan/Profile Sheet Profile Sheet Plan Sheet Special Profile Back of Sidewalk Profile Sheet Interchange Layout Sheet RampTerminalDetails(PlanView) Intersection LayoutDetails Miscellaneous Detail Sheets Drainage Structure Sheet (per Structure) StaffHourEstimate 5.Roadway Plans Scale Project Activity 5:Roadway Plans Units Sheet Sheet Sheet Sheet Sheet Sheet Sheet Sheet Sheet Sheet Sheet Sheet Sheet Sheet Sheet Sheet Sheet Sheet Sheet Sheet Sheet EA No.of Units Hours / Unit 1.4 Page 4of12 No.of Sheets Total Hours Twin Lake Neighborhood Traffic Calming Project Comments 3 hours per Roundabout +1 hour perspeed hump 8/19/2014 Proiect Activity 5:Roadway Plans Task No.Task Scale Units No.of Units Hours / Unit No.of Sheets Total Hours Comments 5.23 Miscellaneous Drainage Detail Sheets Sheet 0 0 0 0 5.24 Lateral Ditch Plan/Profile Sheet 0 0 0 0 5.25 Lateral Ditch Cross Sections EA 0 0 0 0 5.26 Retention/Detention Ponds Detail Sheet Sheet 0 0 0 0 5.27 Retention Pond Cross Sections EA 0 0 0 0 5.28 Cross-section Pattern Sheet Sheet 0 0 0 0 5.29 RoadwaySoilSurvey Sheet Sheet 0 0 0 0 5.30 Cross Sections EA 0 0 0 0 5.31 Traffic Control Plan Sheets Sheet 0 0 0 0 5.32 Traffic Control Cross Section Sheets EA 0 0 0 0 5.33 Traffic Control Detail Sheets Sheet 2 2 2 2 5.34 Utility Adjustment Sheets Sheet 0 0 0 0 5.35 SelectiveClearingandGrubbing Sheet 0 0 0 0 5.36 Erosion Control Plan Sheet 0 0 0 0 5.37 SWPPP Sheet 2 1 2 2 5.38 Project ControlNetwork Sheet Sheet 0 0 0 0 5.39 Interim Standards LS 0 0 0 0 5.40 Utility Verification Sheet(SUEData)Sheet 0 0 0 0 Roadway Plans Technical Subtotal 14 22 5.41 Quality Assurance/Quality Control LS %5%1 5.42 Supervision LS %3%1 :5.Roadway Plans Total -.-:.14 '...-:'•p24j):'i StaffHourEstimate 5.Roadway Plans Page 5of12 8/19/2014 Estimator:FAL Task No. 6.1 6.2 6.3 6.4 6.5 6.6 6.7 6.8 6.9 6.10 6.11 6.12 6.13 6.14 6.15 6.16 6.17 Task Determine Base Clearance Water Elevation PondSitingAnalysis and Report Design of Cross Drains Designof Roadway Ditches DesignofOutfalls DesignofStormwaterManagement Facility (Offsite Pond) DesignofStormwaterManagement Facility (Roadside DitchasLinearPondor Infield Pond) DesignofFloodPlain Compensation Area Design ofStormDrains Optional Culvert Material French Drain Systems Drainage Wells Drainage Design Documentation Report BridgeHydraulic Report Temporary Drainage Analysis Cost Estimate Technical Special Provisions StaffHourEstimate 6.Drainage Analysis-1 Proiect Activity 6:Drainage Analysis Units Per Location Per Basin EA Per Ditch Mile EA EA Per System Per Encroachment EA LS Per 1000 Feet of French Drain EA LS EA LS LS LS No of Unite 6 of 12 Hours/ Unit Total; Hours B-30628,Bird Avenue Road Improvements Comments 8/19/2014 Proiect Activity 6:Drainage Analysis Task No.Task Units No of Units Hours/ Unit Total Hours Comments 6.18 OtherDrainageAnalysis LS 1 0 0 Drainage Analysis Technical Subtotal 16 6.19 Field Reviews LS 1 0 0 6.20 TechnicalMeetings LS 1 2 2 1 people x2 hours per meeting 6.21 Quality Assurance/QualityControl LS %0%0 6.22 Independent Peer Review LS %0%0 6.23 Supervision LS %0%0 Drainage Analysis Nontechnical Subtotal 2 6.24 Coordination LS %0%0 6.Drainage Analysis Total 18 StaffHourEstimate 6.Drainage Analysis-1 7 of 12 8/19/2014 Estimator:CEV Task No. 7.1 7.2 7.3 7.4 7.5 7.6 7.7 7.8 7.9 7.10 7.11 7.12 7.13 7.14 7.15 7.16 7.17 TASK Kickoff Meeting IdentifyExistingUAOs Make Utility Contacts Exception Coordination Preliminary Utility Meeting Individual/Field Meetings Collect and Review Plans and Data fromUAO(s) Subordination of Easements Coordination Utility Design Meeting Review Utility Markups,Work Schedules, Processing of Schedules and Agreements Utility Coordination /Followup Utility ConstructabilityReview Additional Utility Services Processing Utility WorkbyHighway Contractor (UWHC) Contract Plans toUAO(s) Certification/Close-out Other Utilities StaffHourEstimate 7.Utilities Proiect Activity 7:Utilities Units LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS No of Units Hours/ Unit 7.Utilities Total Page 8of12 Total Hours 14 Twin Lake Neighborhood Traffic Calming Project Comments 1 hour x6 Utilities 6 Utilities x1hourper Utility 8/19/2014 StaffHourEstimate 8.Environmental Permits Proiect Activity 8:Environmental Permits Estimator:CEV Form Revited 6/6/05 TwinLakeNeighborhoodTrafficCalmingProject 0 Task No.••::••task ••'-•'["••••^v;.:'^:I Units'No.of Units f ;Hdurs/ Units .Total Hours •v :;•••;.:.^'^:;:.-/C^ 8.1 PreliminaryProject Research LS 0 0 8.2 Complete Permit Involvement Form LS 0 0 8.3 Establish Wetland Jurisdictional Lines LS 0 0 8.4 Agency Verificationof Wetland Data LS 0 0 8.5 Complete AndSubmitAllRequiredPermit Applications LS 8 8 DERM/DRER(4hr)andMiami-DadeTrafficDivisionApproval (2hrx 2submittal) 8.6 PrepareDredgeand FillSketches LS 0 0 8.7 Prepare USCG Permit Sketches LS 0 0 8.8 Prepare Easement Sketches LS 0 0 8.9 Prepare R/W Occupancy Sketches LS 0 0 8.10 PrepareCoastalConstruction Control Line(CCCL) Permit Sketches LS 0 0 8.11 PrepareTreePermitInformation LS 0 0 8.12 Mitigation Coordination andMeetings LS 0 0 8.13 MitigationDesign LS c 0 8.14 Environmental Clearances LS 0 0 8.15 Other Environmental LS 0 0 Environmental Permits Technical Subtotal 8 8.16 TechnicalMeetings LS 1 0 0 8.17 QualityAssurance/QualityControl LS %0%0 8.18 Supervision LS %0%0 Environmental Permits Nontechnical SubTotal 0 8.19 |Coordination |LS |%|0%0 8.Environmental Permits Total ':".* Technical Meetings WMD ACOE USCG USFWS FFWCC FOOT Other meetings Subtotal technical meetings ProgressMeetings Phase Review Meetings ITotal Meetings EA 0 0 0 EA 0 0 0 EA Q 0 0 EA 0 0 0 EA 0 0 0 EA 0 c 0 EA 0 0 0 0 EA 0 0 0 EA 0 0 0 Carries to 8.18 Note:Project Manager attendance at progress,phaseand field reviewmeetingsare manually enteredonGeneralTask3 Page 9 of 12 Projectma Proiect Activity 19:Signing and Pavement Marking Analysis Twin Lake Neighborhood Traffic Calming ProjectEstimator:CEV Form Revised 6/6/05 Task No. Task Units No.of Units Hours/; Units Total?; Hours '";•"';''--*'-'''.'"/-^Comments';.'.'',''•' 19.1 TrafficData Analysis LS 1 0 0 19.2 No Passing Zone Study LS 1 0 0 19.3 Reference and Master Design File LS 1 7 7 3hoursper Roundabout +1 hours perspeed hump 19.4 Multi PostSign Support Calculations EA 0 0 0 19.5 SignPanelDesignAnalysis EA 0 0 0 19.6 Sign Lighting/Electrical Calculations EA 0 0 0 19.7 Quantities LS 3 2 6 2 hour x3 submittals 19.8 Computation Book LS 1 0 0 19.9 Cost Estimate LS 3 2 6 2 hour x3 submittals 19.10 Technical Special Provisions LS 1 0 0 19.11 Other Signing and Pavement Marking LS 1 0 0 Signing &Pavement Marking Analysis Technical Subtotal 19 19.12 Field Reviews LS 1 0 0 19.13 Technical Meetings LS 1 0 0 19.14 Quality Assurance/Quality Control LS %5%1 19.15 Independent Peer Review LS %0%0 19.16 Supervision LS %3%1 Signing &Pavement Marking Analysis Nontechnical Subtotal 2 19.17 Coordination LS %2%0 StaffHourEstimate 19.Signing&Marking Analysis Page 10of12 8/19/2014 Proiect Activity 19:Signing and Pavement Marking Analysis Task No.Task Units No.of Units Hours/ Units Total Hours -".^.:'-Comments', 19.Signing&Pavement Marking Analysis Total 21 StaffHourEstimate 19.Signing&Marking Analysis Page 11of12 8/19/2014 Proiect Activity 20:Signing and Pavement Marking Plans Estimator:CEV Twin Lake Neighborhood Traffic Calming Project Task No. Task Scale Units No of Units Hours/ Unit No.of. Sheets Total. Hours Comments 20.1 Key Sheet Sheet 1 0 0 20.2 SummaryofPay Items-including CES Input LS 1 0 0 20.3 Tabulation of Quantities Sheet 5 1 5 1hour per sheet 20.4 General Notes /Pay Item Notes Sheet 0 0 0 20.5 Project Layout Sheet 00 0 20.6 Plan Sheet Sheet 5 3 15 3 hours per sheet 20.7 TypicalDetails EA 0 0 0 20.8 GuideSignWork Sheet (s)EA 0 0 0 20.9 Traffic Monitoring Site EA 0 0 0 20.10 Cross Sections EA 0 0 0 20.11 Special Service PointDetail EA 00 0 20.12 Special Details LS 1 0 0 20.13 Interim Standards LS 1 0 0 Signing &Pavement MarkingPlans Technical Subtotal 0 20 20.14 Quality Assurance/Quality Control LS %5%1 20.15 Supervision LS %3%1 20.Signing &Pavement Marking Plans Total 0 •V.;22"»-~*'.'..'•' StaffHourEstimate 20.Signing&MarkingPlans Page 12of12 8/19/2014 #*&<£*#COST BREAKDOWN S.W.63RD AVENUE AND S.W.42ND TERRACE CITYOF SOUTH MIAMI,FLORIDA PSI PROPOSAL NO.0397-131532 18-Aug-14 ITEM#DESCRIPTION UNIT #OF UNITS UNIT RATE TOTAL I.Field Exploration 1 Mobilization of Truck-Mounted Drill Rig Per Job 1.0 $350.00 $350.00 2 Percolation Tests Open Hole Method (Min.6"Dia.)Per Test 1.0 $450.00 $450.003 4 Asphalt Cores Each 2.0 $100.00 $200.00 5 ClosingHoles with Grout/Approved Method(s)toSafeproof Site.[SafeprooftobeAccomplishedBefore Laboratory Leaves the Site(s).] Per Lineal Foot 15.0 $10.00 $150.00 II.Geotechnical Engineering Services 1 Senior Engineer Per Hour 1.0 $120.00 $120.00 2 Project Engineer Per Hour 6.0 $90.00 $540.00 3 Senior Engineering Technician Per Hour 5.0 $45.00 $225.00 4 CADD/Computer Technician Per Hour 2.0 $60.00 $120.00 TOTAL PROJECT FEE PER CIRCLE $2,155.00 LONGITUDE SURVEYORS,tLC Monday,August 18,2014 Carlos E.Verson,P.E.ProjectManager THE CORRADINO GROUP 4055 NW 97th Avenue,2nd floor Miami,FL 33178 VIA EMAIL:cverson@corradino.com TWIN LAKES.DOCX In reference to:Surveying services for the intersection ofSW 42 Terrace and SW 63 Avenue South Miami,FL DearMr.Verson, In response to your request regarding afee estimate for surveying and mapping services forthe above referenced project.LONGITUDE SURVEYORS,LLC (LS)is pleased to submit thefollowing proposal for your consideration. A.Scope of Services: LONGITUDE will perform a full Topographic Survey including the following information; A Digital TerrainModel (DTM)willbeprepared. Right-of-Way and property lines for the project area and adjacent properties will beshown graphically. A graphical baseline will be created and included. Location ofall overhead utilities,sidewalks,curb and gutters,paved roads,fences,signs,manholes,catch basins,valves/valve boxes andanyother aboveground improvements within the project area,withelevations, invertandgrate elevations forallprojectareastormandsanitarymanholes andcatch basins. Elevations will be taken at edge of pavement,center of pavement,right-of-way limits and approximately 5feet beyond wherever possible.In addition,cross section elevations willbe taken at 25-foot intervals. LS will collect shotstodelineatethe driveways beyond the right-of-way whenever possible. All elevations will bereferencedtothe National Geodetic Vertical Datum of1929 (NGVD29). Control pointswill besetoutsidetheproject limits,in locations wheretheycanbeusedbythecontractor during construction. All controlpointswill have Northing and Easting coordinates referenced tothe Florida State Plane Coordinate System,basedonthe North American Datum of1983/90and elevations referenced tothe National Geodetic Vertical Datum of1929(NGVD29). B.Survey Limits: City ofSouth Miami intersectionofSW63 Avenue andSW42Terrace approximately 250feetineachdirectionoftheintersection. C Deliverables: LS will deliversignedandsealedoriginalsoftheresultingMapofSurveyandanelectroniccopyoftheresultingcadfile. D.Schedule: LS have estimated eight business days to complete thistask. It fee: The total professional feeto complete thistaskshallbealumpsum of $2.800.00 I understand and agree bysigningbelow"I APPROVE AND ACCEPT"thisproposalasalegalbinding contract. By:Date: (Authorized Signature) Title: (Typedor printed name) I thankyoufor the opportunity to submit thisproposal.Welookforwardtoutilizingourbestprofessionaleffortsonyourbehalfonthisvery important project. Respectfully Yours, Eduardo M.Suarez,PSM/President/1 LONGITUDE SURVEYORS 8290 NW64th Street •Miami,FL 33166»ph:305.463.0912 •fax:305.513.5680 -www.longitudesurveyors.com • LB7335 South Miami Traffic Calming Neighborhoods Prepared January 2013 Twin Lakes Study:RFP Cocoplum Construction:Complete Mango Terrace Study:Complete Design:RFP Study:Complete Design:RFP Pinecrest Villas Construction:Complete Study:RFP CRA City Road &&®County Road a a m State Road Exhibit 1 AGREEMENT FOR PROFESSIONAL SERVICES THIS AGREEMENT,entered into thisO&T day of s^effiiJ^r 20j V.by the CITY OF SOUTH MIAMI through itsCityManager,bothofwhomshall hereinafter be referred toas the "CITY"where applicable;and The Corradino Group withanofficeand principal placeof business located at 4055 NW 97th Ave#200,Doral,FL 33178 (hereinafter called the "CONTRACTOR"). WITNESSETH: WHEREAS,the CITY isin need of all project management and professional engineering services required for the design and preparation ofa complete set of construction contract plans fora traffic calming devices (Roundabout and Speed Tables),at the following locations: •1 Roundabout at S.W.63rt Avenue and S.W.42ftd Terrace: •1 Speed Hump at S.W.44th Street fromS.W.64th Avenue to S.W.62nd Avenue •2 Speed Humps at S.W.63rd Court from S.W.58th Street to S.W.62«*Terrace •1 Speed Hump at S.W.65th Avenue from S.W.64th Street to S.W.61 *Terrace The elements of work shall include roadway analysis,topographic survey,signing and pavement markings,and drainage and geotechnical activities as required.All existing features,i.e. sidewalks,driveways,etc.,requiring repair or replacement,shall also be addressed accordingly; and WHEREAS,the CITY desires to retain the CONTRACTOR to provide the required good and/or services based on the CONTRACTOR'S representations that itisqualifiedandcapableof providingsaid goods and/or services ina professional and timely manner andin accordance with the CITY's goals and requirements;and WHEREAS,the CONTRACTOR has agreed toprovide the services identified inits August 24,2014 proposal for the project entitled "TwinLakesTrafficCalming",pursuant to its ProfessionalService Agreement with the City ofSouthMiamifor Civil Engineeringservicesfor Roadway Projects,dated June 28,2013.Acopyof the Proposal and the Professional Service Agreement is attached. NOW,THEREFORE,in consideration of the mutual covenants and agreements herein contained,the parties agree as follows: 1)Therecitals set forthabovearetrueandcorrect representations of the parties and they are hereby made a part ofthis agreement by reference. 2)ENGAGEMENT OF CONTRACTOR:Basedon the representations of the CONTRACTOR as set forth above andas set out in the following "checked"documents (checkthe boxprecedingthe document toindicatethatsuch document ispartofthiscontract): •CONTRACTOR'S response to the City's written solicitation;or *y CONTRACTOR'S proposal orquote. Thomas F.Pepe 2014 7/1/14 Page-1-of 4 The CITY hereby retains the CONTRACTOR toprovide the goods and/or services set forthinsaid proposal,quoteorresponseto solicitation,whichever is applicable,as modified bythe Contract Documents (hereinafter referred toas the Work"). 3)Contract Documents:The Contract Documents shall include this Contract and the following "checked doCUments"(check the box preceding the document to indicate that such document is part of this contract) d General Conditions to Contract n Supplementary Conditions ^"other documents"referring tothiscontractand signed bytheparties, n the solicitation documents ("hereinafter referred to as"Bid Documents" including any request forbid,proposal or similar request) ^Scope ofServices •Contractor's response to the City'sBid Documents ^Contractor's proposal or quote aCity's Insurance Requirements d City's Indemnification Requirements d Payment Bond a Performance Bond aswell as any attachments or exhibits that are made a part of any of the "checked documents". This Contract and,ifa "checked document",the General Conditions to Contract,Supplementary Conditions,the Solicitation,Scope of Services and ''other documents",shall take precedent over the proposal.The "checked documents"are attached hereto and made a part hereof by reference. 4)Date of Commencement:The Contractor shall commence the performance under thisContractona date tobespecifiedinaNoticetoProceed,orPurchaseOrder("Work Commencement Date"),and shall complete the performance hereunder within !^° daysor the length of time set forthin the ContractDocuments,whichever is the shorter period of time.Time is of the essence. 5)PrimaryContacts:ThepersoninchargeofadministeringthisAgreementonbehalf of the CITY is the CityManagerorsuch other personas the City Managermay designate in writing.The primary contact person for the CONTRACTOR shall be ULrlfiS &<UkJnl&Jt^fPE^ 6)ScopeofServices:Thegoods and/or servicestobeprovidedareas set forthin the "checked documents". 7)Compensation:TheContractor'scompensationfor the performance ofthis contract (hereinafter referredtoastheContract Price)shallbeas set forthinContractor'sresponseto Thomas F.Pepe 2014 7/1/14 Page-2-of 4 the City's written solicitation,if any,or,if none,then as setout in Contractor's proposal or quote,whicheverisapplicable,andas modified bytheContractDocuments. 8)Hours of Work:In theeventthatthiscontract requires the performance of services, it is presumed thatthe expenses of performing Work after regular working hours,and on Sunday and legal holidays is included in the Contract Price.However,nothing contained herein shall authorize workondaysandduringhours that are otherwise prohibited byordinance unless specifically authorized orinstructedinwritingby the City. 9)Time Provisions:ThetermofthisAgreementshallcommenceonthe Work Commencement Date and shall continue for fio **><»v:>untilit expires frtf ^C >T X^X, unless earlier terminated according to anyof the terms of this Agreement.Notwithstanding the foregoing,this Agreement maybe extended byan additional 3£>period if the extension isin writing and signed by the City Manager.An extension of the term of this Contract isat the CITY's sole and absolute discretion. 10)Termination:This contract maybe terminated without cause by the Citywith30 days of advanced written notice.This provision supersedes and takes precedence over any contrary provisions for termination contained in the Contract Documents. 11)Applicable Law and Venue:Floridalaw shall apply to the interpretation and enforcement of this contract.Venue for all proceedings shall be in Miami-Dade County,Florida. 12)Insurance,Indemnification &Bonding:CONTRACTOR shall comply with the insurance,indemnification and bonding requirements set forth in the Contract Documents. Any provision in any contract document that provides for indemnification by the Cityis subject to the City's right to sovereign immunity and the protection provided byFlorida Statutes, including Section 768.28.Furthermore,nothing contained in any contract documents shall waive or limit such immunity or protection. 13)Liquidated Damages:In the event that the Contractor shallfailto complete the Work within the time limit set forth in the Contract Documents,or the extended time limit agreed upon,in accordance with the procedure asmore particularly set forthin the Contract Documents,liquidated damages shall be paid attherateof$(M/V dollars perday until the Work is completed. 14)JuryTrial Waiver:The parties waive their righttojurytrial. 15)Entire Agreement,Modification,and Non-waiver:The Contract Documents constitute the entire agreement ofthepartiesand supersedes anyprior agreements,writtenor oral.TheContractDocumentsmaynotbe modified or amended exceptinwriting,signedby bothpartieshereto.TheContract Documents,ingeneral,andthisparagraph,in particular,shall not bemodifiedor amended byanyactsoromissionsof the parties.Nofailuretoexerciseand nodelayinexercisinganyright,power orprivilegeshall operate asawaiver.Nowaiverofthe Page-3-of4 Thomas F.Pepe 2014 7/1/14 Contract Documents,in whole or part,including the provisions ofthis paragraph,may be implied by any act or omission. 16)Public Records:CONTRACTOR and all of its subcontractors are required to comply withthe public recordslaw (s.119.0701)while providing goods and/or Services onbehalfofthe CITY andthe CONTRACTOR,under such conditions,shall incorporate this paragraph in all ofits subcontracts forthis Project. IN WITNESS WHEREOF,the parties,have executed this Contract on or prior to the date firstabove written with full knowledgeofits content andsignificanceandintendingtobe legally bound by the terms hereof. The Corradino Group ATTEST] lenendez,CMC //faria M.Menendez CityClerk Read and ApDro^ed^to Fori] Legalityja^d-^lfeCution 1 Thomas F.Pepe 2014 7/1/14 Page-4-of 4 \lexander City Manager