Loading...
Res. No. 006-05-11985RESOLUTION NO.06-05-11985 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF SOUTHMIAMI,FLORIDA,AUTHORIZINGTHE CITY MANAGER TOISSUEA SERVICE WORK ORDER TO MILIAN SWAIN &ASSOCIATES,INC (MSA)FOR PROFESSIONAL ENGINEERING SERVICES FOR SURVEYING &TESTING, DESIGN,BIDANDCONSTRUCTIONPHASESERVICESFORTHEMANOR LANE TRAFFIC CALMING AND DRAINAGE IMPROVEMENTS IN AN AMOUNT OF $68,971,TOBECHARGEDTO PEOPLES TRANSPORTATION TAX ACCOUNT NUMBER 124-1730-541-3450;PROVIDING FOR EFFECTIVE DATE WHEREAS,the Mayor and Commission of the City of South Miami,wish to provide traffic calming and drainage improvements in the vicinity of and along Manor Lane;and. WHEREAS,the Mayor and Commission,wish tousethe professional services of MSA.to provide survey &testing services,final design,bid and construction phase services for the Manor Lane TrafficCalming&DrainageImprovements;and WHEREAS,theboundariesofthe improvement areaaredefinedas:ManorLanefromaboutSW 63rd Avenue tothe intersection of SW 66,h Avenue and SW 79th Street,and SW 63rd Avenue from SW 72nd Street to Manor Lane (note that SW 63rd Avenue turns into Manor Lane at 7530 SW 63rd Avenue); and WHEREAS,theseprofessionalserviceswillbefundedthroughthePeoplesTransportationTax Fund. NOW,THEREFORE.BEIT RESOLVED BYTHECITY COMMISSION OF THE CITY OF SOUTH MIAMI,FLORIDA,that: Section 1:TheCityManagerisauthorizedtoexecuteaWorkOrderwithMilian,Swain& Associates,Inc.in connection withthe survey &testing,design,bid&construction phase services for Manor Lane Traffic Calming &Drainage Improvements project,inan amount of $68,971.00 from account number 124-1730-541-3450 with an account balance of $356,848.22. Section 2:The attached proposal ismadepart of this resolution. Section 3:This resolution shall become effective immediately upon adoption. PASSED AND ADOPTED this (S.daY of JM"d>~)2005. APPROVED: cCJTh •(Tv^^fi (aria Menendez,City Clerk READ AND APPROVED AS TO FORM: ATTEST: Commission Vote: Mayor Russell: Vice Mayor Palmer: Commissioner Wiscombe: Commissioner Birts-Cooper: Commissioner Sherar: 4-0 out of room Yea Yea Yea Yea South Miami fcxftxi CITY OF SOUTH MIAMI Wfffl Inter-office Memorandum TO:Honorable Mayor,Vice Mayor DATE:January 18,2005 &City Commission FROM:Maria V.Davis j/^f/,s[^AGENDA ITEM No./ >City IV 2001 City Manager fiA*y\M^\S RE:Authorizing the City Manager to execute a professional services agree ment with MSA for Manor Lane Traffic Calming &Drainage Improvements RESOLUTION: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF SOUTHMIAMI,FLORIDA,AUTHORIZINGTHE CITY MANAGER TOISSUEA SERVICE WORK ORDER TO MILIAN SWAIN &ASSOCIATES,INC (MSA)FOR PROFESSIONAL ENGINEERING SERVICES FOR SURVEYING &TESTING, DESIGN,BIDANDCONSTRUCTIONPHASESERVICESFORTHEMANOR LANE TRAFFIC CALMING AND DRAINAGE IMPROVEMENTS,IN AN AMOUNT OF $68,971 TOBECHARGEDTO PEOPLE'S TRANSPORTATION TAX ACCOUNT NUMBER 124-1730-541-3450;PROVIDING FOR AN EFFECTIVE DATE BACKGROUND &ANALYSIS: As one ofour selected professional general engineering consultants,Milian Swain &Associates, Inc.(MSA)will provide survey &testing services,design bid and construction phase professional services for Manor Lane Traffic Calming and Drainage Improvements.The professional services will be provided for the project area defined as:Manor Lane from about SW 63rd Avenue tothe intersection of SW 66th Avenue and SW 79th Street and SW 63rd Avenue from SW 72nd Street to Manor Lane (note that SW 63rd Avenue turns into Manor Lane at 7530 SW 63rd Avenue). The proposed traffic calming is the implementation of some ofthe recommendations of the approved Manor Lane Traffic Intrusion Study prepared in February 2001.After the study,Miami Dade County Public Works Department,Traffic Engineering Division reviewed the report and expressed noobjectiontothefollowtwo traffic calming devices: 1.A landscaped traffic diverter with texture concrete at the Manor Lane &SW 78th Terrace intersection. 2.A traffic calming device at the intersection of SW 74th Street &SW 63rd Avenue By implementing these calming devices,we intend to eliminate the excessive traffic intrusion to theManorLane neighborhood and prevent continued degradation ofqualityoflifeandsafety. Inadditiontothetrafficcalmingelement,weareproposingimprovementstothedrainagesystem alongtheproposedprojectcorridor.Ourrecordsindicatethatsome of theexistingdrainage Page 2 of 2 Comm.Mtg.Agenda Jan.18,2005 structures within the estimated 3,500 lineal feet project corridor are old and sub-standard.As part of this professional service,5 percolation tests will be performed by a geotechnical engineer to assist in the design of adequate drainage systems needed along the corridor.The proposed improvements will include the design for required catch basins,exfiltration trenches,piping, pavement restoration,landscaping and pavement marking.This professional service will be funded through the People's Transportation Tax Fund account number 124-1730-541-3450,with an account balance of $356,848.22,before thisrequest. RECOMMENDATION: Itis recommended thattheCity Commission approve the resolution. ATTACHMENTS: a Proposed Resolution a MSA's Work Order for Professional Services •MSA's Summary of ProfessionalFeeworksheet aProjectLocationMap-Exhibit "A" aLetterfrom Miami-Dade County Public Works Department datedMay29,2001 - Exhibit "B" MSA Milian,Swain &Associates,Inc. Civil&Environmental Engineers 2025S.W.32ndAvenue,Miami,Florida 33145 tel (305)441-0123 fax (305)441-0688 File:Proposal January 7,2005 Revision #1:January 11,2005 City of South Miami PUBLIC WORKS DEPARTMENT 4795SW 75th Avenue, Miami,Florida 33155 Attention:Mr.Ajibola Balogun,REM Director Reference:PROPOSAL -Manor Lane Traffic Calming &Drainage Improvements Cityof South Miami,Miami-Dade County,Florida Dear Ajibola: We are pleased to submit for your consideration our proposal for professional engineering services regarding the above referenced project.Enclosed you will find details ofour participation in this project. We will commence with our assignment after your final review and acceptance ofthis proposal and upon receipt ofawrittenNoticeto Proceed from your office.We wouldbe happy to meet withyou and discuss the terms ofthis proposal to ensure that itproperly reflects the work effort you desire. Ifyou have any questions or require additional information,please contact me atyour earliest convenience. Sincerely, MILJANrSWKIN &ASJSOCJ ITMenacI Manager-/CiviL&Municipal Engineering copy:Arsenio Milian,P.E. File INC. City of South Miami PUBLIC WORKS DEPARTMENT "Manor Lane Traffic Calming &Drainage Improvement City of South Miami,Miami-Dade County,Florida SCOPE OF SERVICES January 7,2005 Revision #1:January 11,2005 PROJECT DESCRIPTION Theproject consists ofthe preparation ofconstruction documents fortheconstructionof traffic calmingandroadwayand drainage improvementstoManorLanefromtheintersectionwithSW 79th Streettothesouth right of way ofSW 72nd Street(Sunset Drive).Seeattached Exhibit Afor reference.Milian,Swain &Associates,Inc.(Consultant)proposes the following Scope of Services: PHASE 01:SURVEY a.The Consultant will retain the services of a professional land surveyor registered in the State ofFloridatoperformaspecific purpose survey of the ManorLaneroadrightof way,within the limits depictedinattached Exhibit A(±3,500 If.). b.The Surveyor will locate all utility castings,existing driveways (identifyif asphalt, concrete,etc.),mailboxes,trees (providetrunk diameter),medians,curbs,signs andall other significant above ground features for the entire width and lengthofthe affected road right of way. c.The Surveyor will providerim/grate,invert elevations,pipe diameters and pipedirection atall accessible drainage structures and sanitary sewer manholes.Provide cross- sectional spot elevations @ 100'intervals and athigh and low points within the affected roadway,including sidewalk (frontandback),swale (top and bottom),edge of pavement and centerline/baseline.All existing elevations shallbe based on NGVD datum. d.The Surveyor will prepare planviewof survey to contain ALL survey information gathered in the field and baseline of survey stationing proceeding from South toNorth and West to East,as applicable for the project. e.Survey will be prepared by the Surveyor inAutoCAD format using size "D"(24"x36") sheets and the City's standard sheet titleblock format. f.The Surveyor will provide two(2)signed and sealed hardcopies and two(2)electronic copies to the Consultant.Consultant will provide One (1)hardcopy and one (1) electronic copy to the City. PHASE 02:DRAINAGE TESTING a.The Consultant will retain the services ofa geotechnical engineer registered in the State of Florida to perform FIVE(5)percolation tests within the Manor Lane roadway corridor based on Test Location Map prepared and provided by the Consultant. MOTY OFSOUTH MMMltMANOR LANE TRAFFIC CAUCNO IMMtOVIMEMTZWlNAUCOrE Of SERVICES I 110I.OOC JS b.Percolation Test Procedures shall be in accordance with the South Florida Water Management District Usual Open Hole Test (Constant Head)procedures.Tests shall be fifteen (15)feet deep as measured from existing grade. c.Actual field location of tests shall be offset if needed to clear existing obstructions or utilities,ifany.Utility clearance will beobtainedbytheGeotechnicalEngineer prior to performance of the tests. d.TheGeotechnicalEngineer will prepareaPercolationTestReporttoinclude field test resultsand calculated soil hydraulic conductivity (K-Value)for each test. e.TheTestingLab performing the tests will fill allholes,cuts,orotherexcavationsmade during the tests to avoid the possibility ofaccidentsordamagetoanypedestrianor vehicular traffic. f.Two (2)signedand sealed sets ofthetestreportshallbesubmittedbytheGeotechnical Engineertothe Consultant.Consultant will submitOne(1)signedand sealed copyof the test report to the City. PHASE 03:DESIGN AND PERMITTING a.Attend initial coordination (Kickoff)meeting with the City. b.The Consultant will obtain aDesignTicketfrom Sunshine State One CallofFlorida,Inc. and request as built information from utility companies listed as havingpotential utilities within theproject area.In addition,theConsultant will request pertinentunderground records from the City's department ofPublicWorks. c.Based onreviewof the topographic survey,drainage tests and record drawings of existing drainage system(s)within theprojectcorridor,the consultant will identify area(s)within theroadrightofwaythatcouldbeimprovedbytheinstallationofanew drainage system;including replacementofexisting slab-covered trenches with new exfiltration trenches per DERM current standards.Prepare design drawings and drainage calculationsforthe installation of exfiltration trench(Frenchdrain)systems at the selected locations and asphalt pavement overlay throughout the roadway corridor. d.Prepare Paving,Grading,Drainage,Traffic Signage &Pavement Markingsand Landscaping plans forthe construction oftrafficcalming improvements in accordance with the following recommendations described in the Manor Lane TrafficIntrusionStudy performed by Civil Works Inc.,dated February,2001: Alternate #6; •Realign the intersection of SW 78th Terrace,Manor Lane andSW 65th Place to reduce the pavement widthand establish a landscape diverter alongManorLane, including reconstruction ofexisting pavement using stamped concrete orbrick pavers. Alternate #10: •Construct a landscaped traffic island (circle)atthe intersection ofSW 63rt Avenue andSW 74th Street,including reconstruction of existing pavementatthe intersection using stamped concrete orbrick pavers. W3TY OFSOUTH KlAUIWANOft LANETRAFFIC CAUONO lUrROVEMEKTJWfraALSCOtt Of SERVICES I II M.DOC d.Prepare Outline Technical Specifications for the proposed improvements and preliminary Opinion ofProbable Construction Costs. e.Submit two (2)copies ofthe 50%Design package tothe City for review and approval. f.Prepare presentation material and attend one (1)public meeting with area residents to present the proposed roadway,drainage and traffic calming improvements.The meeting will be attended bythe consultant's Project Manager andLandscape Architect. g.Prepare 100%construction documents incorporating City's 50%review comments,to include all proposed roadway,drainage and traffic calming improvements.The proposed design will address utility crossings and pavement restoration within the affected roadway segments,pertinent detailsfor exfiltration trenches,drainage structures,pavement restoration,asphalt pavement overlay,landscaping plan and planting details,supporting drainage calculations and Updated Opinion of Probable Construction Costs. h.Edit sampleofMaster Front-End and Bid Forms provided bythe City asneededto reflect specific conditions ofthe project.Prepare completetechnical specifications for the proposed improvements following the format established by the Construction Specifications Institute (CSI). i.Submit two(2)copiesofthe 100%packagetothe City for review andapproval. j.Prepare Final construction drawings,specifications and drainage calculations reflecting 100%review comments received fromtheCityto include Final Opinion of Probable Construction Costs and Final Project Manual. k.The Consultant will assist theCityinobtainingapprovalsfromthe following agencies: •Cityof South Miami PublicWorksDepartment. •Miami Dade DERM -Water Control Section. •Miami Dade Public Works Department. I.Identify allprocessingandpermitfees required bytheregulatory agencies andrequest fees fromthe City.All applicablePermitfeesaretobepaiddirectlybythe City. m.Prepareandsubmitthe application packagesandprocessingfeesasrequiredfor review and approval. n.TheEngineer will retrievethepermitpackage(s),revisetheplansif needed anddeliver approved drawings to the City. o.The consultant will submit the Final design package to the City containing the following: •Two(2)sets ofthe drainage calculationsandOpinionof Construction Costs. •One(1)electronic copyofthe final drawings,ProjectManualandOpinionof Probable Construction Costs. •TwentyFour(24)sets ofthe FINAL drawings and Project Manualfor bidding purposes. •Permit drawings approved by the regulatory agencies. KWTY or SOUTHMlAHnM ANOR LANETRAFFICCALMIKO IMr*OVEMENnXJ)HNALSCOrE orSERVICES I 1105.DOC PHASE 04:BIDDING &CONSTRUCTION PHASE TheConsultant will provide assistance during the bidding andconstruction phases oftheproject as follows: a.AttendPre-BidMeetingwiththeCityand prospective bidders. b.Respondtobidder's RFI's andissueaddendaand clarification ofthe construction documents,if needed. c.Tabulate and evaluate bids received,check references of responsible lowest bidder and make Consultant's recommendation to the City. d.Attend pre-constructionmeeting with the City and selected contractor. e.Review shop drawings of the proposed improvements. f.Performperiodicconstructionobservationsonaweekly basis (based on a 16 week construction period)limited to32sitevisits@2.0hrspervisit=64hoursmax.)to observe the general status andprogressofthework.Writeanddistributeconstruction observationreport after each site visit. NOTE:Construction Observations by the Consultant are limitedto observing the work and materials that are to become partofa completed project in conformance withthe approvedconstructiondocuments.The implementation and monitoring of construction safetyprogramsisthe responsibility oftheContractorandisnotpartoftheConsultant's Scope of Services.TheConsultant will notbeheld responsible forContractor's construction means,methods,techniques,sequences or procedures,or for safety precautions and safety programs connected withthework. g.Review Contractor's monthly paymentrequest(s)andmakerecommendationsastothe requested payment based onConsultant's opinion oftheactual status andprogressof the work. h.Review request for Change Orderssubmittedbythe Contractor andsubmittothe City, the Consultant's opinion and recommendation(s)on said Change Order request(s). i.Perform a Substantial Completion Construction observation of the proposed improvements,to ensure thattheworkcompleted meets theminimumrequirementsfor substantial completion in accordance with the Contract Documents,including preparation ofa Punch Listofany defects and discrepancies in the work. j.PerformaFinal Construction Observationto ensure satisfactory completionofallitems in the Punch List. k.Recommend execution ofa Certificate ofFinal Acceptance and final payment to the Contractor upon satisfactory completion ofall items in the Punch List and receipt ofall necessary close-out documentation from the Contractor. I.Obtain record drawings (as-built)from the Contractor in hard and electronic formats and submit to the City. fcdTY Or SOUTH MIAMVMANOR LANETRAFFIC CALMINO IMFROVEMENTSy3)FlNALSCOPE OFSERVICES1 11OS.DOC COMPENSATION Compensation shall be based on a Fixed Fee Basis.The total fixed fee for this project including sub-consultantservicesis $68,970.00.A breakdown ofthework effort required to perform the taskscontainedinthisproposalis included in attached Exhibits B. The Consultant will submit monthly invoices forservicesrenderedandcosts incurred in accordance withtheinvoicesubmittalformat contained in current Professional Services Agreement between the City ofSouth Miami (City)and Milian,Swain &Associates,Inc. (Consultant). -END- KCm Or SOUTH M1AMRMANOX LANETOAFnCCAU«NOIMFROVEMENTSXJ)nNAUCOrEOrSERVICES I II0J.DOC fyhweir A - City of South Miami:Manor Lane Traffic Calming Feet EXHIBIT B Milian,Swain &Associates,Inc. 2025 SW 32nd Avenue Miami,Florida 33145 (305)441-0123 (305)441-0688 SUMMARY -ENGINEERING FEE CITY OF SOUTH MIAMI PUBLIC WORKS DEPARTMENT MANOR LANE TRAFFIC CALMING AND DRAINAGE IMPROVEMENTS P.T.P Project No.:003 ACTIVITY Principal Engineer Project Manager Senior Engineer Engineer CADD Technician Construction Manager Construction Inspector Clerical Hours MSA Fee For Activity $145.00 $110.00 $95.00 $85.00 $65.00 $95.00 $72.00 $50.00 PHASE 01:SURVEY 0.00 2.00 0.00 4.00 0.00 0.00 0.00 0.00 6 $560.00 PHASE 02:DRAINAGE TESTING 0.00 1.00 0.00 2.00 0.00 0.00 0.00 0.00 3 $280.00 PHASE 03:DESIGN &PERMITTING 6.00 51.00 16.00 208.00 134.00 0.00 0.00 9.50 424.5 $34,865.00 PHASE 04:BIDDING &CONSTRUCTION 2.00 21.00 8.00 37.00 8.00 26.00 73.00 13.50 188.5 $15,426.00 TOTAL MANHOURS 8 75 24 251 142 26 73 23 622 $51 131 00 TOTAL MSA SALARY COSTS $1,160.00 $8,250.00 $2,280.00 $21,335.00 $9,230.00 $2,470.00 $5,256.00 $1,150.00 TOTAL CONTRACT FEE COMPUTATION REVISIONS Subconsultant Services: $7,200.00 Total MSA Activity Salary Costs TOTAL Subconsultant Services TOTAL(Fixed Fee Services) Estimated Direct Costs (Printing,etc.) GRAND TOTAL $51,131.00 $17,140.00 1/11/2005 -.nl..-„ PHASE 01:SURVEY 1.RevisedperCity Copfm /A/if (RoyalPoint Surveyors) PHASE02:Drainage Testing $1,975.00 (H.R.Engineering.Inc.) PHASE03:Landscape Architecture $6,875.00 (Curtis&Rogers) PHASE04:Landscape Architecture $1,090.00 (Curtis&Rogers) TOTAL (Subconsultants):$17,140.00 $68,271.00 $700.00 :$fi8;97:i:60::: (^Comments: Prepared By:Julio M.Menache Date:01/07/05 12/21/2004 TUE 17:06 FAX 3053726064 MIAMI-DADE COUNTY.FLORIDA MIAMI-DADE m;&m— TRAFFIC ENGINEERING DIV @002 STEPHEN P.CLARK CENTER May 29,2001 PUBLIC WORKS DEPARTMENT SUITE 1610 111N.W.1st STREET MIAMI,FLORIDA 33126-1970 (305)375-2960 Mr.SubrataBasu Assistant City Manager City of South Miami 6130 Sunset Drive South Miami,FL33143 Re:TrafficCalming Vicinity of ManorLane. Dear Mr.Basu: Pursuant to your letter and the traffic study report on the subject matter,we would liketo offer thefollowinginformation: Proposal1: Proposal 2,3A: Proposal3B: Proposal 4,6,10: Proposal 5: Proposal 7: Proposal8: Proposal9: Already implemented. This work will be accomplished by our Signals and Signs Division inapproximatelythreeweeks. The Department is withholding its determination concerning the chokers.Please re-evaluate after the implementation of3A. Staffhasno objection to these proposals. Staff has no objection to the installation of textured pavement However,inour opinion mid-block,median treatment wouldbe more appropriate and effective,rather than the textured pavement <* Staff has no objection to the concept.However,in our opinion a mid-block location would be more appropriate to calm the traffic. The other alternative would be to extend the median through the curve in order to control speeding and the accident probability. A 4-Way Stop control existsat SW 64Courtand SW 74 Street Sunset Drive is under the jurisdiction of the Florida Department of Transportation(FDOT).Therefore,this request has been forwarded to the State. Equal Opportunity/Handicap Employer/Sarvfces 12/21/2004 TUE 17:07 FAX 3053726064 TRAFFIC ENGINEERING DIV IS 003 Letter to Subrata Basu Page2 of2 Please note that,volume in relation to the liability standards,is not reflected in the report Results of speed studies,other than statements that speeding has been observed,are also not provided as part of the document It is important to address these parameters in order to justify the closure pf Manor Lane.Therefore,the Department is withholding its detennination at the time,until the required documentation is satisfactorily submitted. It suggested that as part of the plan,the traffic calming devices proposed in the report and approved by the Department be implemented prior to considering a full closure.Once the traffic pattern is set,traffic conditions along Manor Lane should be re-evaluated to determine if the closure of Manor Lane or achoker along SW 78 Terrace east of SW 67 Avenue are still required. O^TMim^***Srtte*mf0nnaii0n>please ^not hesitate to contact my °&>e at Sincerely, Muhammed M.Hasan,P.E.,Chief Traffic Engineering Division cc:Rory Santana,PJ2.,District Traffic Operations Engineer FJD.O.T.,w/attachment. &ate»<,n0S42&M.<loc Manor Lane Traffic Intrusion Study RECOMMENDATIONS Topreservethequality oflife,safetyandthephysicalenvironment oftheresidential neighborhood, thefollowinginternaland external recommendations arebeingmadeto reduce the traffic intrusion, speeding,andexcessivetrafficvolumes on Manor Lane. ♦Alternate 1 -Installan additional NoLeftTurnsign(R3-2)atSW 68th Avenue and SW 80th Streetto reinforce theturn restriction.This second turn restriction sign needs to be installed on the far left side of the intersection in accordance with the Manual on Uniform Traffic Control Devices. ♦Alternate 2 -Realigntheintersection of SW 79th Street,ManorLane,andSW66* Avenue.Also install a7 to 9 AM No Left Turn restriction on eastbound SW 79th Street. ♦Alternate 3A -Establish 7to9AMNo Right Turn restrictions alongSW 67th Avenue at SW 78thTerrace and SW 77thTerrace.Also construct an entrance feature ateachintersectiontohelp identify theneighborhood. OR ♦Alternate 3B -Construct apartialdiverter atSW 78th Terraceto eliminate eastbound accessintothe neighborhood and establish a morning (7to9AM)NoRightTurn restriction at SW 77*Terrace. Civil Works,inc.3195 Ponce de Leon Blvd.,Suite 200 Coral Gables,Florida 33134 Consulting Engineers Page 12 CWI Project No.20126.00 DATE: 1/05/01 Cfef Mfar*s,fcre. 100'=Jl!.»»f.-<-;'-:m -^^i I PATE: 1/05/01 RLR CWI KQ; 20126.00 Q rr 3 CM M/brioi /nc. QgmS&BgXM&dBBt EB 07523 3195Po»diLsaiBh4S=i£3200 CadQUm,tL 33134 I SW 80 ST 2 ME 1/05/01 BLR m NP; 20126.00 ---n C&j Works,he. W""IM 9 OoaolBBgikvmn EB 0752S ¥$zP I 3193Rw9a»IiKBESfi!,&±32C0 OnlQgfeB,EL 33134 100' _!NSTALL ENTRANCE fFEATURE i SW 77 TERR R3-1 INSTALL ENTRANCE FEATURE SW 78 ALT 3A 31 1/05/01 cwi Ha 2012B.0O TW1SNI Cftfl M^orK:^/he. EB 07329 319!BaMdilmBMl EdaMO ChaJOMMLlL 33134 INSTALL R3-1 TRAFFIC BNTRUSiOte Manor LaneTraffic Intrusion Study ♦Alternate 4-Reconstruct (widen)SW 80th Street to provide two eastbound lanes from west ofSW 67th Avenueto US-1 andonelane west boundwith turn lanesinall directions atthe intersection of SW 67th Avenue and SW 80th Street.Thiswill provideadditionalstoragecapacityfortheeastboundtonorthboundleftturnat US-1. ♦Alternate 5-Install two speed humps or provide a pavement texture change on Manor Lane,one south of SW 64th Court and the other north of SW 64th Court. These speed humps or pavement changes will help control the speed of vehicles around thisjogin Manor Lane.Newtype *F"curbandgutteris recommended tobe installed at this same location to address a pavement drop-off/drainage problem at this location.In addition,curb andgutteratthis location will help create some side friction to reduce the speed through this roadway jog. ♦Alternate 6 -Realign the intersection of SW 78th Terrace,Manor Lane,and SW 65th Place to reduce the pavement width and to establish a landscaped diverter along ManorLane.Additionally,thepavementshouldbereconstructedwithinthisarea with stamped concrete or brick to provide a textured surface to help control speeding. ♦Alternate 7-Construct a landscaped median island atthe north endof Manor Lane whereitturnsandbecomesSW 63"1 Avenue.Thiswillslowtrafficaroundthiscurve and create additional resistance to traffic intrusion. ♦Alternate 8-Reorientate the stop signs atthe intersection of SW 64th Court and SW 74th Street.This change in stop signs will work in conjunction with Alternate 9 to reducetheeveningtrafficintrusionvolume. ♦Alternate 9 -Establish No Left Turn restrictions (from 4 to 6 PM)along the westbound Sunset Drive at the intersections of SW 63rd Avenue,SW 63rd Place,and SW 64th Court to reduce thePM Peak Period traffic intrusion to Manor Lane. Civil Works,Inc.3195 Ponce de Leon Blvd.,Suite 200 Coral Gabies,Florida 33134 Consulting Engineers Page 17 CWI Project No.20126.00 1/09/01 RLR OM WO! 2012&00 yj ♦V SW 80 ST A <o> V ^1VVUVVV\3 «3C3CaB=»=a=*=*: ...WIDEN SW 80 STREET rW j FOR2EASTBOUND-1 LANES. CM Works,Inc. OifiTHii^ITmlnm EB 03328 319SPtnDodiI«mBMLOils209 CsriGdi&tEL 33134 TRAFFIC SNTSVUSIQN STUDY ALT 4 I PAIR 1/08/01 RLR SSLSSh 2012&00 CM Works,Inc. OiffTffiij Tftigfn m>EB 07528 ObdGdflML 33134 ,100' EXIST.CLOSURE INSTALL TYPE CURB AND GUTTER INSTALL SPEED HUMPS OR TEXTURED PAVEMENT. TRAFFSC.INTRUSION STUDY MS 1/05/01 RLR JGSLKOj 20126.00 .-.--.--..-..7n CM &b/fe foe. j O-niHli-aFisiTBju EBOTSa :"-i ill 31SSPmBdsLaaHn!,feS3200 GtEiKHfc,PL 33134 F51 4 100', MIWMIlTiHi.l1!,' DATE: 1/05/01 RLR CM WO! 2012A.00 INSTALL LANDSCAPE TRAFFIC ISLAND Cm Works,ha EBONS 3193 RmosdiLniBWt Sato200 OgnlffiWB,1L 33134 ^JSL^ REMOVE EXISTING PARKING (3 SPACE CONSTRUCT PARKING LANE PROTECTION EXIST.PARKING (TO REMAIN) INTRUSION STUDY ALT 7 NOIS 1SIX33A0IAI3y L-ia w V, \ ,0t t s Vi! v;ii—... '/ OlddVUl !i-^ g // rr: •^d) v_>;• ik o. V, R1—1 REMOVEEXIST. SIGN OO'SZIOZ 10/S0/i 3M • DAT& 1/05/01 RLR m NQ; 20125.00 CM Works,ha naaaflfl••j tlhimim eb otszb 3ttSBraceds Lce:32rf,Crta 2i3 Got!Gsfcfcs,EL 33134 u INSTALL R3-2 L-SW63 PL 63 AVE R1-? TRAFFIC INTRUSION STUDY 100' ManorLaneTraffic Intrusion Study Alternate 10-Construct a small traffic island at the intersection of SW 63rd Avenue and SW 74th Street.The traffic circle will replace the existing stop control and turn restriction atthis intersection.Additionally,the pavement should be reconstructed within this area with stamped concrete or brick to provide a textured surface to help control speeding. Alternate 11 -Stripe the centerline of Manor Lane asa "No Passing Zone"from SW 80th Street/SW 66th Avenue atthe south endto Sunset Drive atthe north end.This will help reduce the apparent pavement width,thus increasing the "side friction"of the roadway.In addition,the No Passing Zone will help reduce the speed along the roadwayby delaying thefesterpace vehicles.(This alternate isnot included asan exhibit.) CivilWorks,Inc. Consulting Engineers 3195 Ponce de Leon Blvd.,Suite200 Page24 Coral Gables,Florida 33134 CWI Project No.20126.00 DATE: 1/05/01 CM Works,foe tas INSTALL LANDSCAPE TRAFFIC CIRCLE TEXTURED CONCRETE TRAFFIC BNTRUS90N