Res. No. 073-07-12458RESOLUTION NO.: 73-07-12458 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF SOUTH MIAMI, FLORIDA, AUTHORIZING THE CITY MANAGER TO ISSUE A WORK ORDER TO AA ENGINEERING SERVICES, INC. FOR BROAD CANAL DEBRIS REMOVAL AND SHORELINE STABILIZATION IN AN AMOUNT OF $30,000.00 TO BE CHARGED TO GRANT ACCOUNT NUMBERS 106-1713-536-3450 AND 106 -1727- 536 -6550; PROVIDING FOR AN EFFECTIVE DATE WHEREAS, the Mayor and City commission' wishes to continue the Broad Canal shoreline stabilization project, and WHEREAS, the Mayor and City Commission authorize the City Manager to issue work order to AA Engineering Services, Inc. for the unforeseen additional scope of work for the Broad Canal Shoreline Stabilization project in an amount up to $30,000.00. , NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION • THE CITY OF SOUTH MIAMI, FLORIDA THAT: Section 1: That the Mayor and City Commission authorize the City Manager to issue work order to AA Engineering Services, Inc. for the unforeseen additional scope of work for the Broad Canal Shoreline Stabilization project in an amount up to $30,000.00. Section 2: That the additional project's construction cost shall be charged to grant account numbers 106-1713-536-3450 and 106-1727-536-6550 with account balances of $339,767 and $626,000, respectively. Section 3. The attached agreement is made a part of the resolution. PASSED AND ADOPTED this -1± day of 21 Z,2 ez,--J, 2007. ATTEST: `CITY CLERK READ AND APPROVED AS TO FORM: COMMISSION VOTE: 5-0 Mayor Feliu: Yea Vice Mayor Wiscombe: Yea Commissioner Palmer: Yea r- ATTP`RNEY Commissioner Birts: Yea Commissioner Beckman: Yea Include File Name and Path CITY OF SOUTH MIAMI N OFFICE OF THE CITY MANAGER G INTER-OFFICE MEMORANDUM 2001 To: The Honorable Mayor Feliu and Members of the City Commission Via: Yvonne S. McKinley, City Manager From: W. Ajibola Balogun, REM, CFEA, Director Public Works & Engineering Department Date: May 1, 2007 Agenda Item No.:m Subject: Construction Contract with AA Engineering Services, Inc. for the stabilization of Broad Canal shoreline and debris removal. Resolution: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF SOUTH MIAMI, FLORIDA, AUTHORIZING THE CITY MANAGER TO ISSUE A WORK ORDER TO AA ENGINEERING SERVICES, INC. FOR BROAD CANAL DEBRIS REMOVAL AND SHORELINE STABILIZATION IN AN AMOUNT OF $30,000.00 TO BE CHARGED TO GRANT ACCOUNT NUMBERS 106-1713 - 536 =3450- AND 106-1727-536-6550; PROVIDING FOR AN EFFECTIVE DATE Request: Authorizing the City Manager to work order to AA Engineering Services, Inc. for the stabilization of Broad Canal shoreline and debris removal in an amount of $30,000.00. Reason/Need: While performing repairs to the Broad Canal shorelines as a result of damages sustained during Hurricane Wilma, we have encountered approximately 3 feet thick layer of silt and muck that heeds to be dredged. In addition, we plan to clean lots of floating debris on the water, which includes, palm fronds; organic peat matter, coconuts, trash and other debris (see attached pictures). The contractor has submitted the attached $13,852 proposal for the additional work. An inspector from the project's funding agency visited the, jobsite and agreed to fund the additional project scope of work (see attached e-mail dated Friday, April 20, 2007) from the contractor. In addition to the proposal amount, we recommend approval of $16,148 contingency for future unforeseen circumstances during the project. Cost: $30,000.00 Funding Source: U.S. Department of Agriculture, Natural Resource Conservation Service Grant Account No. 106-1713-536-3450 will fund 50% of the total cost and 50% will be funded by Florida Department of Environmental Protection Grant Account No.: 106-,1727-536-6550 with account balances of $339,767 and $626,000, respectively. Backup Documentation: ❑ Proposed Resolution ❑ Proposal from AA Engineering Services, Inc. ❑ E-mail from NRCS Representative and pictures of the debris in the canal. April 12, 2007 Mr. Greg Netto P.E., City of South Miami 6130 Sunset Drive South Miami, F133143 Project: Broad Canal Shoreline Stabilization # CI07 -0216 Ref: Debris removal - line items Mr. Netto Line Item nricinLy • Removal of floating coconuts, tennis balls, palm fronds and other debris $1,700.00 • Dredging and stock pilling of silt approximately 160 c , $30.29x160 =. 3,029.00 • Installation an additional 100' -0 "of turbidity barrier $15x100 1,500.00 • Preparing a staging and drying area for sediment 925.00 • Disposal of silt. and debris in sealed trucks $18x 160 2,880.00 • Restoration of area used to stock pile silt and debris 1,500.00 • Include a post dredge survey of this area (1 cross section) 500.00 • Profit and overhead 1,818.00 Total price for work as stated $13,852.00 We appreciate the opportunity in allowing our company to quote you on this project, if you need any further information feel free to contact us at your earliest convenience. 370 w. CAMINO GARDENS BLVD SUITE 104 BOCA RATON, FL 33432 BOCA RATON 561.417.0675 STUART 772.220.7882 FAX 561.620.2619 0 u Pik 4 Ai tA I A41 4ZM v*', Ri- ............. . . . . . . . I !4n 4.7 aj arc' 4, g .y _h �, ry lb