Res. No. 117-09-12926RESOLUTION NO.:
117 -09 -12926
A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF
SOUTH MIAMI, FLORIDA REQUESTING FOR MIAMI -DADE COUNTY TO PROVIDE
INFRASTRUCTURE IMPROVEMENTS AT THE INTERSECTION OF SW 56TH
STREET AND SW 62ND AVENUE; PROVIDING FOR AN EFFECTIVE DATE.
WHEREAS, the Mayor and City Commission wishes to provide infrastructure improvements to
the intersection of SW 56th Street and SW 62n6 Avenue, and
WHEREAS, the Mayor and City Commission agree to the proposed intersection improvements as
per the attached Exhibit "A" plan provided by Miami -Dade County, and
WHEREAS, the proposed improvements to the intersection of SW 56th Street and SW 62nd
Avenue consist of drainage, curb and gutter, milling and resurfacing of the intersection, widening of the
north leg to accommodate the exclusive right turn lane, pedestrian ramps /landings, regrading of existing
swale at the intersection and signing and pavement markings per the attached Exhibit "A" plan.
NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE
CITY OF SOUTH MIAMI, FLORIDA THAT:
Section 1: The City of South Miami formally requests for Miami -Dade County to provide
improvements to the intersection SW 56th street and SW 62nd Avenue as per the attached Exhibit "A"
plan.
Section 2: That Miami -Dade County performs the proposed infrastructure improvements for
the intersection of SW 56th Street and SW 62nd Avenue per Exhibit "A" plan.
Section 3: That Miami -Dade County shall consider the following as additional request for
future consideration as part of the proposed intersection improvements:
• Construction of sidewalks in the immediate area of the intersection to facilitate pedestrian
crossing.
• Improvements to traffic light signalization
Section 4. The attached documentation is made a part of the resolution.
Section 5. This resolution shall be effective immediately upon being approved.
PASSED AND ADOPTED this 28th day of July , 2009.
APPROVED READ AND • FORM:
CITY • R'
APPROVED:
MAYOR I
COMMISSION VOTE: 4 -0
Mayor Feliu: Absent
Vice Mayor Beasley: Yea
Commissioner Palmer: Yea
Commissioner Newman: Yea
Commissioner Sellars: Yea
South Miami
AA-AmeticaCRV
CITY OF SOUTH MIAMI 11111.1
OFFICE OF THE CITY MANAGER
INTER- OFFICE MEMORANDUM 2001
To: The Honorable Mayor Feliu and Members of the City Commission
Via: W. Ajibola Balogu"'nn,, City Manager
From: Jose Olivo, P.E. (`�" ° 0
Public Works & Engineering Department
Date: July 28, 2009 Agenda Item No.:
Subject: Miami -Dade County to Perform Infrastructure Improvements at the Intersection of
SW 56`h Street and SW 62nd Avenue.
Resolution: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF
SOUTH MIAMI, FLORIDA REQUESTING FOR MIAMI -DADE COUNTY TO
PROVIDE INFRASTRUCTURE IMPROVEMENTS AT THE INTERSECTION
OF SW 56TH STREET AND SW 62ND AVENUE; PROVIDING FOR AN
EFFECTIVE DATE.
Background: in response to the City's request for needed drainage and roadway
improvements at the above referenced intersection, the Miami -Dade
County Public Works Department (MDC) provided the City with a
preliminary design plan showing roadway and drainage improvements for
review and approval (see attached Exhibit "A" plan). The preliminary
design plan was then presented to our City Commission on November 25,
2008 for review and approval. Thereafter; on December 22, 2008, review
comments from former Commission member were provided to MDC,
which MDC responded to via email on January 27, 2009 (see attached
email). At this time, in order to move forward with the proposed
improvements, MDC is requesting for project approval from the City
based on the attached Exhibit A' and MDC responses to review
comments from former Commission member. In addition, MDC has
indicated this to be a time sensitive matter, due to the potential risk of
budget cuts in the programmed expenditures for these improvements.
Please note that these improvements will be performed by MDC at no
expense to the City within MDC public right -of -way. MDC has also been
informed on the City's request to include traffic light signalization
improvements at the intersection.
Reason /Need: The improvements to the intersection consist of drainage, curb and gutter,
milling and resurfacing of the intersection, widening of the north leg to
accommodate the exclusive right turn lane, pedestrian rampsllandings,
regrading of existing swale at the intersection and signing and pavement
markings.
Cost: N/A
Funding Source: Miami -Dade County to fund proposed intersection improvements.
Backup Documentation:
❑ Proposed Resolution
❑ Exhibit "A ": Preliminary Engineering Plan
❑ Letter from MDC in response to traffic concerns raised by resident.
❑ Review comments and responses via email.
Page 2 of 2
Pagel of 3
Olivo, Jose
From: Memari, Ali (PWD) [memari @miamidade.gov]
Sent: Tuesday, January 27, 2009 3:11 PM
To: Olivo, Jose
Cc: Heredia, Javier (PWD); Ona, Leandro (PWD); Aira, Frank (PWD)
Subject: RE: Intersection Improvements of SW 56 Street and SW 62 Avenue
Good afternoon Jose,
Please see below, our response (in red) to the City's review comments of the preliminary design plan.
Thankyou
- - - -- Original Message---- -
From: Olivo, Jose [ mailto :jolivo @cityofsouthmiami.net]
Sent: Monday, January 26, 2009 11:49 AM
To: Memari, Ali (PWD); Heredia, Javier (PWD)
Cc: Balogun, Ajibola
Subject: FW: Intersection Improvements of SW 56 Street and SW 62 Avenue
Good morning Ali /Javier,
I kindly ask that you please let me know if you have any update or response on the status of the design
plans as per our commissioner's comments. Thank you.
From: Olivo, Jose
Sent: Monday, December 22, 2008 9:16 AM
To: 'memari @miamidade.gov'
Cc: 'javierh @miamidade.gov'; Balogun, Ajibola
Subject: FW: Intersection Improvements of SW 56 Street and SW 62 Avenue
Mr. Memari,
Your proposed preliminary design was presented to our City Commission. Attached are review
comments provided by City Commissioner J. Beckman on 12/11/08
Miller / 62nd Ave intersection reconstruction comments to Miami -Dade County Public Works.
Traffic Division and Commissioner Carlos Jimenez
1. The area south of Miller Road is within the borders of the City.
2. The curbing and drainage are essential features.
3. Currently there are no sidewalks on the north side of Miller road. The new design does
not appear to allow room of a future sidewalk at the northeast corner. It is suggested that
sidewalks be included in the design so they can be constructed now or at a future date. It
is also suggested that construction of sidewalks now in the immediate area of the
intersection should be done to facilitate pedestrian crossing. Since there are no existing
sidewalks on the north side of the intersection, we provided a concrete landing at northeast and
northwest corners for the future connection. The landing on the northeast corner is for connection
to future sidewalk on the north side of Miller Dr. only, and due to insufficient right -of -way at this
corner, it can not be connected to future sidewalk on the east of SW 62 Ave. When future
sidewalk on the east side of SW 62 Ave becomes feasible, then right -of way on the northeast
2/4/2009
Page 2 of 3
corner needs to be acquired.
4. The turn lanes on the north leg should not extend into the driveway area of the resident.
The left -turn lane's extension on the north leg is the same as the existing condition.
On behalf of City Mgr. and City Comm., I am available to meet with you onsite to discuss these
comments. Please let me know when you can meet. Thank you.
From: Olive, Jose
Sent: Wednesday, November 26, 2008 9:05 AM
To: ' Memari, Ali (PWD)'
Cc: Heredia, Javier (PWD)
Subject: RE: Intersection Improvements of SW 56 Street and SW 62 Avenue
Mr. Memari,
The City has no plans on funding this project. Thank you
From: Memari, Ali (PWD) [mailto:memari @miamidade.gov]
Sent: Wednesday, November 26, 2008 8:59 AM
To: Olive, Jose
Cc: Heredia, Javier (PWD)
Subject: RE: Intersection Improvements of SW 56 Street and SW 62 Avenue
Mr. Olive,
After reviewing the subject intersection improvements, would you please let us know if the City has any
plans toward funding this project.
Thankyou
- - - -- Original Message---- -
From: Olive, Jose [ maiito :jolivo @cityofsouthmiami.net]
Sent: Tuesday, November 25, 2008 9:41 AM
To: Memari, Ali (PWD)
Subject: RE: Intersection Improvements of SW 56 Street and SW 62 Avenue
Mr. Memari,
Staff will forward a recommendation to the City Manager and City Commission on the proposed
intersection improvements. I will let you know if there are any comments. Staff is also aware that
this design supersedes the proposed traffic circle which proved to be inadequate as per MDC's
finding in their traffic study. Thank you.
From: Memari, Ali (PWD) [mailto:memari @miamidade.gov]
Sent: Wednesday, November 19, 2008 4:33 PM
To. Olive, Jose
Cc. Ona, Leandro (PWD); Heredia, Javier (PWD); Aira, Frank (PWD)
Subject: Intersection Improvements of SW 56 Street and SW 62 Avenue
Mr. Olivo,
Attached please find the revised preliminary plan of the subject intersection for your approval.
The construction cost of the improvements is roughly estimated $112,000, which includes the
following:
2/4/2009
Page 3 of 3
• Construction of curb & gutter at all four corners of the intersection
• Milling & resurfacing of the intersection
• Widening of the north leg to accommodate the exclusive right turn lane (see attached
letter, respond to a citizen request)
• Construction of drainage inlet at 3 corners (NW corner does have drainage inlet)
• Re- grading of existing swale at four corners
• Signing & pavement markings installation
Thank you
Ali Memari
Project Manager
Public Works Department
Highway Division
Plans Review & Design
305 - 375 -3015 Office
305 - 679 -7738 Fax
E -mail: memariO.miamidade.gov
2/4/2009
A
Gr�11t�1'11' to
ADA Coordination
Agenda Coordination
Animal Services
Art in Public Places
Audit and Management Services
Aviation
Building
Building Code Compliance
Business Development
Capihal Improvements
Citizens' Indepemdenftransponation Trust
Commission on Ethics and Public Trutt
Communications
Community Action Agency
Community & Economic Development
Community Relations
Consumer Services .
Corrections & Rehabilitation
Cultural Affairs
Elections
Emergenty Management
Employee Relations
Fmpo vennent Trust
Enterprise Techrro(ogy Services
Environmemal Resources Management
fair Employment Pmciices
Finance
Fire Rescue
General Services Administration
Govemment Information Center
Harmic Preservation
Homeless Trust
Housing Agency
Housing Finance Authority
Human Services
Independent Reelms, Panel
imemaUOnsl Trade Consortium
juvenile Services
Medical Examiner
MetmeMiami Action Plan
Metropolitan Planning Organization
Park and Recreation
Planning and Zoning
Police
Procurement Management
Property Aprosbal
Public library System
Public works
Safe Neig,bodhood Parks
Seaport
Solid Waste Management
Strategic Business Management
Team Metro
Transit
Task Farce on Urban Economic Revitalization
Vizcaya Museum And Gardens
Water & sonser
Public Works
Traffic Engineering Division
111 NW 1 st Street • Suite 1510
Miami, Florida 33128 -1970
T 305- 375 -2030 F 305- 372 -6064
miamidade.gov
March 19, 2008
Mr. Oscar Valdes
5500 SW 62 Avenue
Miami, FL 33155
Re: Request for a Traffic Study to Improve and Protect the Northwest Comer of the
Intersection of SW 62 Avenue and SW 56 Street
Dear Mr. Valdes:
In response to your referenced request, please be advised that Public Works
Department (PWD) staff conducted a traffic study to evaluate traffic conditions and
physical characteristics at this intersection.
As a result of the traffic study, an exclusive right turn lane has been proposed to be
built at the north leg of the intersection of SW 62 Avenue and SW 56 Street. This
additional exclusive right turn lane will improve the capacity and consequently the level
of service of this intersection. As part of this improvement project, utilities affected by
the proposed intersection geometric configuration change will be relocated according
with highway design standards established by the Florida Department of
Transportation. PWD will initiate the design and once plans are completed, this
improvement will be scheduled for construction as funds and contracts become
available.
Should you have any questions or require additional information, please contact Ms.
Doraida Rodriguez, Area Traffic Engineer, at (305) 375-2839.
Sincerely,
Ayman., Section Head
Citizen Support Section, Traffic Engineering Division
cc; Muhammad M. Hasan, P.E., Chief, Traffic Engineering Division
David Hays, P.E., Traffic Engineering Division
Vishnu Rajkumar, Section Head, Design Section, Traffic Engineering Division
Doraida Rodriguez, E.I., Area Engineer, Traffic Engineering Division
ZACitiren SapporADRM07t88205 L,dgc
�P,
i
p�nr
OMEN
IRA XIA € N€ �� €
A 19
It
Nwxa�
k�
a s
r
s x
s
F1
0
,x P
� e
1�F.
I
I p �
t
Y
s x
s
F1
0
,x P
� e
1�F.