5TO:
FROM:
DATE:
City of South Miami
PUBLIC WORKS & ENGINEERING DEPARTMENT
4795 SW 75th Avenue
Miami, FL 33155
Tel. (305) 663-6350 Fax (305) 668-7208
Steven Alexander, City Manager
Kelly Barket, Chief Superintendent of Public Works
December 11, 2013
South Miami
bed
ifiir
2001
5
Resolution: A Resolution authorizing the City Manager to approve a change order for the
excavation of a water main extension under the Murray Park Pool Project
contract with Recreational Design & Construction, for an amount not to exceed
$11,998.27, to be charged to General Obligation Bond Construction account
number 114-4010-541-3450.
Background: During the excavation for installation of the new water main for Murray Park
pool, a utility conflict was discovered. An existing slab trench does not allow
for the required separation for utilities. This unforeseen condition will be
addressed by the change order, so that the new water main extension for
the pool, may be safely and properly connected to the existing water main.
Expense: Change order amount not to exceed $11,998.27
Account: The expenditure shall be charged to the General Obligation Bond 114-4010-
541-3450, which has a balance of $749,937.00.
Attachments: Change Order Request
Recreational Design & Construction Resolution
Recreational Design & Construction Purchase Order
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
RESOLUTION NO.: _____ _
A Resolution authorizing the City Manager to approve a change order for the excavation of
a water main extension under the Murray Park Pool Project contract with Recreational
Design & Construction, for an amount not to exceed $11,998.27, to be charged to General
Obligation Bond Construction account number 114-4010-541-3450.
WHEREAS, pursuant to unforeseen circumstances, a change order is required to continue with the
construction of a new water main connection for the Murray Park Pool; and
WHEREAS, the Mayor and City Commission wishes to provide a change order in the amount of
$11,998.27, and
WHEREAS, the Mayor and City Commission desire to authorize the City Manager to approve a change
order for Recreational Design & Construction for the Murray Park Pool Project for a total amount not to exceed
$11,998.27.
NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF
SOUTH MIAMI, FLORIDA THAT:
Section 1: The City Manager is authorized to approve a change order with Recreational Design &
Construction for the Murray Park Pool Project, for an amount not to exceed $11,998.27.
Section 2: The expenditure shall be charged to the General Obligation Bond for infrastructure
projects account number 114-4010-541-3450, which has a balance of $749,937.00 before this request
was made.
Section 3: If any section clause, sentence, or phrase of this resolution is for any reason held invalid or
unconstitutional by a court of competent jurisdiction, the holding shall not affect the validity of the remaining
portions of this resolution.
Section 3. This resolution shall take effect immediately upon adoption.
PASSED AND ADOPTED this ___ day of ______ , 2013.
ATTEST:
CITY CLERK
READ AND APPROVED AS TO FORM
LANGUAGE, LEGALITY AND EXECUTION
THEREOF
CITY ATTORNEY
APPROVED:
MAYOR
COMMISSION VOTE:
Mayor Stoddard
Vice Mayor Liebman
Commissioner Newman
Commissioner Harris
Commissioner Welsh
I~[I RECREATIONAL DESIGN &
Prime Contract Change Order
~ CONSTRUCTION, INC.
Murray Park Aquatic Center
5800 SW 66ST
South Miami, Florida 33143
Date: 12/4/2013
To Contractor:
Recreational Desi~n & Construction, Inc.
3990 North Powerline Road
Fort Lauderdale. FL 33309
The Contract is hereby revised by the following Items:
PCO Description
Project #:
Architect's Project No: NA
Contract Date: 3/26/2013
Contract Number:
Change Order Number: 007
There was an unforeseen condition found during the excavation of the
water main extension on SW 68 Sf. An existing slab cover trench was
found close to the existing WM. This did not allow the min. 3' separation
between utilities. See attached sketch. Approximately 15' of slab cover
trench needs to be abandoned so that the new water main extension
can be can connected to the existing water main.
Contractor's Overhead & Profit 15% as per Contract
Notes:
This change order is based on plans that not yet been approved by the
appropriate authorities. Should any changes occur once a permit issue,
RDC reserves its rights to evaluate the changes.
This change order does not include police presence
Total Change Order Amount
The oriqinal Contract Value was ............................................................................................................... .
Sum of chan~es by prior Prime Contract Chanqe Orders ..................................................................... .
The Contract Value prior to this Prime Contract Chanqe Order was .................................................. .
The Contract Value will be chanqed by this Prime Contract Chanqe Order in the amount of... .... .
The new Contract Value including this Prime Contract Change Order will
be ......................................................................................................... .
The Contract duration will be changed
by .................................................................................................................................... .
The revised Substantial Completion date as of this Prime Contract Chanqe Order is ....................... .
CONTRACTOR
Recreational Desi9n & Construction, Inc.
3990 North Po eJline RoadFort Lauderdale. FL 33309
OWNER
City of South Miami
6130 Sunset Dr
South Miami FI 33143-5093
Bv
SI(;NATIIRF
Date
Amount
$10,433.28
$1.564.99
$11,998.27
$1,422.000
$241.747
$1,663.747
$11.998
$1,675,745
o
8/19/2014
25 Years Experience
ljr~m:;ed & Insured
. ~
NOlINCLUDED:
I'ERMn FEES
1'1\ V !vlENT OR PERFORMANCE BOND
TESTS
INCLUDE'S: l.AIJOR,MATERIAI. <.I.: BOUlPMl?NT
Tel: (305) 378-5593
Fax: (305) 378-5596
starpaving @aol.com
[>.4 YJHENT TERMS: 25% [)EPOSlT PRIOR TO COMiHENCEjHEN1: RAI-ANCl£ DUE IN FULL
DOE UPONC01HPLETJON. NOPAYWHENPA!DCLAUSE
I'IUCE VALID FOR 30 DA VS .IF NOT SP.ECIF.lED IT IS NOT INCLUDED IN THIS PROPOSAL AND
WILL lNCVRR AN ADDITIONAL CHAnCE.STAR PAVING RESERVES THE RIGHT TO INCRL\SE
TIU: COST OF MA TERfALS AS IT IS INCREASIW BY THE SUI'C'LlER THROUGHOl!T THE
J)l;RATION OF THIS PROJECT.
TOTA.L BIDAA10UNT: $10,433.28
The work and material pcrforllll'd by the Company lIIay result in II lien being pluced on the premises den,ribct!
above, in CIlSC (he owner or Contractor defaults ill ally payment under this contract.
Owner hereby agrees to llcccpi full responsibility for Illl fences. sidewalk, all underground pipes, wires, sl~ptk
fllnks, drainiillcs, wl'II, etc. unless stntcd ahove. Owner is linble in fulll/mount of contract ill the cveoi owner
cancels after work has st:lrtCtl. The Company siHlllnot be responsible for dlluUlge or dclay duc to stril(cs. fires.
IIcddcnts, or other clluse beyond its rontrol, not for illlle/'ent defects ill Ihe premises in which (0 be donc. In the
evcllt of lin)' default of Ihis contract by the owner, owner ngrees to pay \111 c.ost lind reasonable attorney's rees
incurred by Star Paving, Corp. as II result of said ddault. All III a tcl"illl is guaranteed to be as specificl\. All \\'(Irk
to be ~olllplctcd in II workmanlike manne,' according to stundard practices. AllY alteration or deviation from
above specifications involving extra cost will be executed upon w!"itten orders llml will become llnd extra dWl'gc
over and above the estimate. This proposlII subject to acceptance within 30 days is v.>id there:tfter at the option
of the undersigned
Al'THORIZED SICNf\TURE: ________________ _
IMTf:
ACCEPTANCE OF I'ROPOSAL The above price, specification and conditions are hereby accepkd. You lIrc
authorized to do the work as spedticd. Payment will be llIade as job progress.
l.IC£NShD &: INSVRliD
25 Years Experience
Licensed & Insured
I)RO.JECT:
MURRAY PARK
67tH SW 58PL
SOUTH MIAMI, FL
15190 SW 136 St, #4' Miami, FL 33196
DATE: [)ECEMBER 03, 2013
PROPOSAL d( CONTRACT
CHANGE ORDER #3
Tol: (305) 378-5593
Fax: (305) 3785596
starpavinf) @aol.com
WE ARE PLEASED TO PROVIDE ALL LABOlt MATERIAL AND EQUIPMENT TO PERfORM
THE FOLLOWING SCOPE OF WORK ON:
Change
Order; Aba ndon 15' of french drain
Scope of
Work
Cut Asphalt and disposal
Saw cut, demo and dispose concrete slab
Dig and dispose of trench ballast rock
Fill trench with rip rap bags (15' long x 3' wide x 10' high)
Back fill with suitable material
8" Umerock base
1.5 Asphalt restoration
Material
._!?5lsc;r.!ption Qt UP __________ Total
Rip Rap bag 504.00 6.25 3,150.00
Umerock 3.60 17.50 63.00
3,213.00
Equipment
____ ~escripti9!l_ .. _" Qt UP Hr Days Tot91._._
BackHoe 1.00 1600 8 4.00 512.00
Plate
320.00 Cumpactor 1.00 10.00 8 4.00
Utility Truck 1.00 15.00 8 4.00 480.00
Loader 35.00 8 4.00 1.120.00
Pump 5.00 8
labor
~~ription Ot UP
Operator 1.00 25.65
Pipe layer 1.00 13.25
Labor 2.00 12.50
Superint 1.00 25.00
Miscelaneous
Descrietion Ot UP
Traffic Control
Surveyour
hauling 2.00 110.00
Debris
disposal 1.00 450.00
Aspl1altTn 1.00 165.00
Time
8
8
8
8
Time
4.00
.-.... _-----_._.-
4.00
4.00
4.00
4.00
subtotal
10%
OH&P
160.00
2,592.00
Total
820.80
424.00
800.00
800.00
2,844.80
Total
--.~--
Included
Included
220.00
450.00
165.00
835.00
9,484.80
948.48
10,433.28
ASELlNE &
ROADWAY
.. '
u'
6.8
EXIST. DRAiNAGE MH
RIM EL: + 11.17'
E &-Wo' COVERED TRENCH
BOTT: +3.17'
I STREET
EXIST. DRAINAGE INLET
RIM a: +10.93'
N lIN: +7.48' (lS U IRON)
BOTT: +6.38'
r"n "J 1;.IV
PROP. (3) li'X2" MRP. STOP
PER w.S' 2.16 r
STA 3+ 10.2, O/S ?-6' L
STA 3+ 12.2, O/S 1..6' L
STA 3+142. 0/5 f6' l
EXIST. DRAINAGE INLET
RIM a: + 10.88' j
S INV; +7.08' (15 j IRON)
BOTT: +6.05'
PROP. (2) 12"-45' HORIl.
BENDS (ROTATEO AS R£()'o)
STA 3+68.5, O/S 7.6' L
STA 3+84.1, 0/58.0' R
PROp. AIR Rfl£AS£ VALlf' PER WS 1.60
ST.4 3+86.6, O/S 8.0' R
s';;;(;{ 511 N~ Lo~+-i(jJ
o~ A8~<DoW
"'5lb~ Covee T12Gu ~,
rz.. 1.3
[X/ST. 6"1£:!' w.v TO 8£ cur &-' '1
PLUXEO P,' /.I-OWAS!) FORCES
AT OWNER's £XP£NS[
PROP. 646" TAPPINC StEM &-I
6" TAPPlNB VALl-f PER GS 1.7 [
STA 3+89.1, 0/5 12.8' L
PROP. si'2" l-fRTlCAL OFFSET !
STA 3+89.1, 0/5 7.6' L
! Ill!!?::; ": ·.~;}J-:L W' \ , -.•.•.. ' _.Y1"'l""~'U
FlUSHING ASSY. AND CONNECT
TO EXIST. 12" D.lP. WM
STA 3+97.3. O/S 8.0' R
PROP. 12"x6~ TEE &-6" Go V.
STA 3+89.1, O/S 8.0' R
_____ EXIST.
EXIST.
EXiST.
(E-l1
EXIST.
RIM [;
E INV:
W INV:
~;l
City of South Miami
PUBLIC WORKS & ENGINEERING DEPARTMENT
4795 SW 75 th Avenue
Miami, FL 33155
Tel. (305) 663-6350 Fax (305) 668-7208
TO: Steven Alexander, City Manager
FROM: Jorge L. Vera, Capital Improvement Project Manager
DATE: October 1, 2013
South Miami
bOd
iiffP
2001
Resolution: A Resolution amending the Recreational Design and Construction contract for the Murray
Park Community Pool to include the contemplated offsite design and installation of the
water and sewer facilities on SW 68 Street for an amount not to exceed $241,747, to be
paid for by General Obligation Bond (GOB) funds, which will increase the total contract
amount to $1,663,747.
Background: Under Resolution 62-13-138880 the City approved and entered into a contract with
Recreational Design Construction, Inc. (ROC) for the design and construction of a
community pool at Murray Park. The total contract cost for the design and construction of
the pool was in the amount of $1,422,000. The funding for this project was secured by
several grants consisting of CDBG grant in the amount of $1,201,361 for construction of
the pool, SNP grant in the amount of $220,050 for construction and design of the pool and
CRA funds in the amount of $100,000 for the design of the pool for a grand total of
$1,521 ,411.
At the time the contract was approved the cost for the additional scope of work for offsite
design and construction services on SW 68 th street was unknown. Under Exhibit B of the
contract, the City included an alternate clause to address the additional offsite design and
construction costs once they were determined. Due to the time restrain of the grants and
in order to reduce cost and expedite the project, it was essential and in the City's best
interest to use a single contractor for the entire project. A single contractor would provide
uninterrupted coordination between the offsite design construction work and the pool
design and construction scope of work.
As required by the alternate clause in the contract, ROC submitted quotes for the offsite
design and installation of water and sewer lines on SW 68 Street. The design costs
include surveying, testing and building permit plans are $38,724, and the construction
cost is $203,023. The total cost associated with the scope of work for the offsite design
and construction of the water and sewer lines is for an amount not to exceed $241,747.
The cost for offsite services are funded from the General Obligation Bond (GOB), a
different source than the design and construction of the pool funds.
Since it is in the City's best interest to use a single contractor for the entire project, the
City is amending the original contract amount for the design and construction of the pool.
The contract amount is being amended to reflect the alternate cost for the offsite design
and construction of the water and sewer lines on SW 68 th street, which will increase the
total contract amount to $1,663,747.
/0
Expense: Additional offsite scope of work amount $241,747
Total contract amount not to exceed $1,663,747.
Account: The expenditure for the offsite scope of work shall be charged to the General Obligation
Bond account number 114-4010-541-3100 for design which has a balance of
$71,337.80 and 114-4110-541-3450 for construction which has a balance of
748,828.60.
Attachments: Proposed Resolution
Contract change order
Exhibit B of RDC contract
GOB account balance
~:: ,:',
',', :,:'
":" "
. ::.
," .
. PrirneCohtracfChOr@e .
. M'!'J:~y. PSj(k,(\q(Jqfl,~ Cel)ter
5i3iN'SW 66<$r' "
. :S.~\A~Mi6;M(fWt1dq ~3jA3'
' .•... : ..• ,.!;r ... , .. ~.·.·.:9 .. :.~.:· ...•. , .... ~,.*.·.oe ... ··.,:.'I ..•. ~.:.·.~.~M."i.~ .. n.~,:I.Q·f.I ... j .. f.r.:'ill.J,'~.' .. ,p.·:'.;.'.;.p,~.:".:·"r· •. '.~,:.:.~·.O,.'.L .• ~,' .• ,r.,.: .•. :D,.,:,]: .• :I·.··.".,3,.,~:;.' .• :! .• , •. $ .•.. r·p:i.·I.·~II·.'.n .• ·.n:: .• :~.:,·::'.,.,.~ ..• :&.·, .. h .. "".·.·.· ..•.. ;"'.~.c.· .. : .• ·.',~.a .•. ,O"·9.:.A;·.h ...... S •. ·.f .. ·.tv. o.·.tJ.O'.·., .... :h,l.,.n.,. Ci .... ,.'. . . ·'·.:~~:~~#~t~~{:(~~r~~i~~jt3 . .. ~. :~ :~~ :,~':C ~I~~~:, ~;'g~~~i~~w~~wJ;:lf~~~t,t~~~~ .
:.; t~~ ·eo'n'r.~~jJ~:h~r~b~r~'(i$~dJ~~the'fot!o,f(J~~J~em~:'···· . , .
POO
........ t· .... .. ,.
·::ilt~il~'~~J~B~~~r~~
',:, '
;G~rief¢rCon'd!fion$';1 t'rlonfh .
·Qpntrg91b:r'~oy~th~k(j~:.Ptofit 'i$:%p~:p~.r d::>HttdGl .' .. ' "', ' : .. '. . .. ' . " ",. ..
'~Qtes; • .: ......•.•.. '., .... . •• : ..., " ...... .
. ·Thi$·'¢h¢irige'org~(is;p'ps~q:o(\pl0n$thaln6fyerl:3;eeriapprQy'~Q I.;>y:the •.
. .• k.~~r~~~:~:~=B!~et~~~BlJ~~n&~h~h~~Jz.:~0r·Arice·o·p~imlt.i~Sye;
1)liS ¢hqil~e ~f(ler~9.e~ 66t.iliql4QEi ~9Ik;~~.res(a[\9~
··tptqICh~nti'e.'o.id~t:Amount
~~~~~~'!i~r?~~~;i%1i,~~~~~'~~i;2~~JE:::':~:::::;;:~Ii:;::~:;:::::r:········
The.' Cof.\k06f.VaJ0~Wiltb.¢. 6nbn~ed oY.:t1)is;Pfime.C6htrodChorii:ie·;Oti;:ler In th.e. olno.liritQL.. . T~e~(\~,W:¢:Qhf!'94fVQI4.e;lh~it,!~Jnritthi~f:>rlM~C6rif(6.q~P.t1grtq,~t)'(~¢.(wlll'be""." ..•• ,;~~ .. , •..•.•• ,;.;"".,.;.·
Tf')e Cohtrd;eldufoiiqn will;be¢netriged ..' .
1)ONTRAcrOR,
li.ecreationalQi3sign & Conslructiol:'ljlnc.
3~90'N6rthPow$rIlM Rbqdnp6rt Lm/dMdOfe. Pi 333M
By JQseoh C. Cerrone. III
~I~NATIIRF
D~te,' r",,"
. '.
GWN£:R
Giiy'ofSouth Midmt·
6i30Sllt'lSe'f Dc ". '"
.SoIJth.Midrni FI R~l4$-~09."· ..
BV
~1r.;NATlI"'·'"
:It';;
·ai19/iol4
~.
March 26, 2013
City of South Miami
City Manager
4795 S.W. 75th Avenue
South Miami, FL 33135
Attn: Steven J. Alexander
Re: Murray Park Community Pool RFP No. SM-PW2010-10
Dear Mr. Alexander,
Exhibit 8 -Scope of Work
Recreational Design & Construction, Inc. (ROC) is pleased to submit this Revised Scope of
Work includin~ pricing for the construction of the Murray Park Community Pool facility located at
5800 S.W. 66t Street in South Miami, Florida.
Our scope of work and pricing is in accordance with the attached site plan and elevation renderings
and the City of South Miami's design criteria to meet the grant funding as per December 21st
meeting. The time frame to design and construct the above noted project is 365 calendar days from
contract signing that includes an allowance of one month for permitting.
The pricing for the complete scope of work and services is as follows:
Design Fees and Services
• ROC shall provide all necessary civil, landscape, irrigation, aquatic, architectural, structural,
mechanical, plumbing and electrical plans necessary to permit and construct the proposed
project within the boundaries of the property as outlined with red dashes on the site plan
(hereinafter referred to as "Boundaries of the work"). Specifications will be noted on plans.
ROC will not be required to prepare a specification book. However, ROC shall provide as-built
drawings.
• Design and permitting per applicable FBC2010 and Miami Dade County Code in effect.
• ROC shall be responsible for obtaining the permits from the City of South Miami Building
Department and other applicable permits as required for the work within the Boundaries of
the Work.
• Permitting fees will be paid for or reimbursed by the Owner.
• Design, Permitting and construction outside the Boundaries of the work are not included.
• ROC agrees to Design, Permitting and Construction pur~uant to the Alternate Work shall
describe below in this Exhibit B which is work that is outside the Boundaries of the work.
However, the Alternate work shall be performed under a separate contract and shall be billed
separate from Design-Build contract. The contract price for the Alternate work shall be
negotiated separately.
General Conditions
• The general condition costs include all project management, supervision, mobilization,
temporary site' water, temporary electric utilities, temporary trailer/storage facilities,
temporary toilets, temporary fencing/gates and dumpsters.
• ROC shall provide construction stakeout as necessary to complete the proposed project.
Bond and Insurances
• Provide a Design/ Build payment and performance bond once the permits are in place.
Murray Park Community Pool RFP No. SM-PW201 0-1 0 -Page 1 of 6
,,,
Survey & Construction Testing
• Original sUlvey provided by owner, construction testing fees are included, construction
survey layouts and final as-built drawings by RDC.
Site Preparation
• A temporary silt fence will be installed around the area being developed to prevent soil
erosion & airborne dust generation.
• Clearing and prepping with-in the limits of work, to prepare the areas for construction, shall be
performed as part of this scope of work.
• Debris resulting from the clearing and grubbing shall be disposed of at an off-site location in
accordance with applicable codes & statutes.
Site Work
• ADA compliant 5'-0" wide concrete sidewalks will be constructed to connect the existing
community center walkway (north of the basketball courts) & the community center parking
lot to the aquatic center entrance.
• A bicycle rack will be provided.
Site Electric
• The electric power shall be connected to a new FPL service.
Site Drainage
• The areas with-in the limits of construction shall be graded/shaped as required to create
dry/wet retention areas for storm water drainage quantity control and provide proper pad
elevations for the proposed building & pool deck.
Site Utilities
• The building sanitary sewer systems & filter discharge piping will be connected to the existing
on site sanitary sewer system.
• The building potable water system, collector tank auto-fill line & pool deck hose bibs shall be
connected to the existing water main along SW 58th Place
• A backflow preventer (if required) will be installed on the potable water service to the pool
facilities.
Landscapellrrigation
• Landscaping will be based on providing minimum city and county code, low maintenance
native plant species requiring minimal irrigation.
• The design shall include the removal, relocation & replanting of the existing native vegetation
within the limits of construction (as required).
• Any existing invasive plant materials within the limits of construction will be removed.
• The site irrigation system shall be fed from the. existing potable water service.
• The irrigation system will be constructed with bubblers & low spray heads to maximize
control.
Concession/Ticket Room/Control Building/Pool Equipment/Life Guard Building
• An approximately 1350 square foot single story structure will be designed and constructed to
include a men's toilet room, a women's toilet room, a lifeguard/ticket office, a concession
area, a family changing room, a pool equipment room and an electric room.
• The structure shall be constructed with 8" reinforced concrete masonry units, 4" reinforced
concrete slabs on grade and prefabricated metal bar joist systems with 2" metal decks.
• A built up roofing system consisting of a single ply membrane, protection board and vapor
barrier over 2" LWT concrete shall be installed over the metal decking.
• The roofing system will meet with Miami-Dade product approval.
Murray Park Community Pool RFP No. SM-PW201 0-1 0 -Page 2 of 6
<.
• The building exterior will be provided with a painted 5/8" smooth stucco finish.
• Aluminum intake louvers with insect screens shall be installed in the exterior walls to provide
ventilation into the restrooms, lifeguard/ticket office, concession area, electric room & the
pool storage room. The louvers shall meet Miami-Dade product approval.
• Hollow metal exterior doors/frames shall be constructed of galvanized exterior grade
material. The doors shall meet Miami-Dade product approval.
• Door hardware provided shall be vandal proof "Classroom" type functions.
• Glass window systems will be constructed of high impact resistant tinted glass with anodized
aluminum framing. The windows shall meet with Miami-Dade product approval.
• Manually operated roll-up windows with ADA compliant exterior ledges will be provided in the
ticket office & concession area. The roll-up windows shall meet with Miami-Dade product
approval.
• The toilet room interior and chase walls shall be constructed of reinforced concrete masonry
units.
• The men's toilet room, women's toilet room and family changing room walls shall be finished
with a skim coat, two (2) coats of epoxy paint.
• The lifeguard/ticket office and concession area walls shall be finished with a skim coat & two
(2) coats of paint.
• The interior block walls of the pool equipment room and electric room shall be finished with
block filler paint.
• The lifeguard/ticket office and concession area shall have VCT finished floors with 6" vinyl
cove bases.
• The men's toilet room, women's toilet room and family changing room shall be provided with
a standard color ceramic tile floor with a tile base.
• The pool equipment room and electrical room shall have a troweled/sealed concrete floor
finish. .
• The lifeguard/ticket office and concession area shall be provided with a 2'x4' moisture
resistant acoustic ceiling tile system.
• The men's toilet room, women's toilet room and family changing room will be constructed with
a painted gypsum board ceiling finish.
• The pool equipment room and electric room shall have an exposed painted ceiling.
• ADA compliant and standard height changing benches will be provided in the men and
women's toilet rooms.
• Millwork shall be constructed of plastiC laminate over exterior grade plywood with water
resistant adhesives.
• The concession area will be provided with a fabricated counter at the transaction window.
Sneeze guards will be provided as required by health codes.
• Fire extinguishers shall be provided to meet the NFPA and Florida Building Code
requirements.
• ADA signage shall be provided as required by the Florida Building Code.
• The floor mounted toilet & urinal partitions will be constructed of %" thick high-density
polyethylene plastiC with natural anodized aluminum hardware and head-rail bracing.
• Toilet accessories to be Stainless Steel as manufactured by Bobrick (or equal) and shall
comply with the latest ADA regulations.
• A diaper changing station shall be provided in each toilet room & family changing room.
• ADA showers will be provided in the men's and women's toilet rooms with seats, curtains,
curtain rods & robe hooks.
• The men's restroom facility shall consist of two (2) floor-mounted water closets, two (2)
wall-hung urinals (w/carriers), three (3) wall-hung lavatories (w/carriers), one (1) ADA
shower, one (1) wall hydrant and two (2) floor drains.
• The women's restroom facility shall consist of five (5) floor-mounted water closets, three (3)
wall-hung lavatories (with carriers), one (1) ADA shower, one (1) wall hydrant and two (2)
floor drains.
Murray Park Community Poof RFP No. SM-PW201 0-1 0 -Page 3 of 6
• The family changing room shall consist of one (1) ADA floor-mounted water closet, one (1)
ADA wall-hung lavatory (with carrier), one (1) hose bib & one (1) floor drain.
• A mop basin, mop hanger & hose/hose bracket will be provided in the pool equipment room.
• A natural gas domestic hot water heater (80-gallon) will be installed in the pool equipment
room.
• Domestic hot water piping shall be provided to the mop basin, showers and lavatories.
• A uBi-Level" ADA compliant stainless steel electric water' cooler shall be installed on the
exterior of the building at the pool deck area.
• Recessed wall hydrants (with lockable boxes) shall be installed in the exterior wall of the
buildings.
• The restrooms, changing room, lifeguard/ticket office, concession area & electric room will be
provided with mechanical ventilation.
• The pool equipment room will be provided with cross ventilation.
• Recessed fluorescent light fixtures will be installed in the lifeguard/ticket office and
concession area.
• Surface mounted fluorescent light fixtures will be installed in the restrooms and changing
stations.
• Linear fluorescent gasket light fixtures will be installed in the pool equipment room.
• Linear fluorescent light fixtures with wire guards will be installed in the electric room.
• Installing battery backup in some of the fluorescent light fixtures will provide interior
emergency lighting.
• Future phone/data outlets will be provided in the administration/ticket office, lifeguard office
and concession area.
• Power outlets shall be provided in sufficient quantities for equipment & uses planned in the
support building.
Pool Deck
• The pool deck will be constructed of reinforced concrete.
• Pool is not designed for night time use. Deck lighting is including for security only and not to
meet Florida Department of Health requirements for nighttime use.
• A deck drainage system shall be designed and incorporated into the storm water
management system.
• Quick connect hose bibs & electrical outlets will be provided along the perimeter of the pool
deck spaced at 100'-0" intervals.
Recreational Pool (Approximately 3,500 SF)
• The recreational pool shall be designed as a concrete pool with a slip resistant quartz
aggregate finish.
• The recreational pool shall be designed in accordance with DOH requirements with a bather
load of 120 persons
• The recreational pool will have a minimum depth of 0'-0" pitching to a maximum depth of.:!:
6'-0".
• Underwater lighting will be installed.
• Pool ladders will be provided for accessing the pool.
• Pool piping systems shall be installed in PVC (Sch. 40).
• Pool filtration & chemical controller/feed systems will be installed.
• Pool pumps will be provided with variable frequency drive motors to conserve energy.
• A natural gas pool heating system will be provided.
• A collector tank with an auto-fill valve will be installed.
• Pool depth markers will be installed along the perimeter of the pool.
• One (1) ADA compliant lift will be provided.
• A portable vacuum shall be provided.
• One (1) Portable lifeguard chair will be provided for use along the perimeter of the
Murray Park Community Pool RFP No. SM-PW201 0-1 0 -Page 4 of 6
•.
Community pool.
• Pool safety equipment and DOH required signage would be furnished/installed.
Splash Deck (Approximately 1,100 SF Wet Deck Area);
• The splash pad area shall be designed to include interactive water play features with a
minimum 4'-0" wide concrete splash free zone around the perimeter.
• The splash pad area will be constructed of a 6" thick reinforced concrete slab with a slip
resistant colored concrete surface.
• The splash pad will be designed and constructed to recycle the filtered pool water & minimize
storm water run-off.
• Play features shall include pop jets, silly serpent, bell spray jet, palm tree 1 dumping coconuts,
shower tower and rain drop and manufactured by Rain Drop Products or equal.
• The water play feature will be constructed with stainless steel bases & have direct spray
features, ground water sprays & touch activated features.
• The filtration will be "dual loop" & include sand filtration with a UV disinfection system.
Items by Owner
• Owner to pay for and provide all soil boring and geotechnical soil reports.
• Owner to pay for and provide all current topographical,boundary and elevation surveys.
• Owner to pay for the natural gas line extensions to the project location -pool equipment pad
from the existing gas line location. (Florida City Gas may extend this line at no charge -to be
determined) .
• Any improvements to the eXisting facilities around the proposed development.
• All Department of Environmental Resource Management (DERM) fees to be paid by the City
of South Miami. .
• All Miami-Dade Water & Sewer Department (WASD) fees to be paid by the City of South
Miami.
• All Florida Department of Environmental Protection Water & Wastewater Permit fees to be
paid by the City of South Miami.
• All Florida Department of Environmental Protection (FDEP) NPDES Construction Activities
Permit fees to be paid by the City of South Miami.
• All Building Construction Permit fees to be paid by the City of South Miami.
• FPL impact and primary electrical and new transformer service fees to be paid by the City of
South Miami.
Exclusions
• Site de-mucking, mass grading and removal of unsuitable soils.
• Any improvements to the existing facilities around the proposed development.
Any improvements or upgrading of the existing off-site utilities servicing the proposed
development. These may include but are not limited to gas lines, sewer fines, water lines,
and drainage utilities. However, this exclusion does not apply to the Alternate work
agreement sent forth below.
• Pool deck furnishings.
• Pool is not designed for night time use. Deck lighting is including for security only and not to
meet Florida Department of Health requirements for nighttime use.
The total price for the above scope of work and services: $1,422,000.00
One Million four Hundred Twenty Two Thousand and 00/100 Dollars.
Murray Park Community Pool RFP No. SM-PW2010-10 -Page 5 of 6
Alternate: .
To connect new project to the existing water and sanitary sewer systems assuming that the
receiving sanitary sewer pump station (M-DWASD Pump Station #177) is no longer under
conditional moratorium, and that M-OWASDhas finished all of the proposed upgrading to the
subject pump station. ROC shall provide the city with a design proposal including the cost
breakdown of the design and permitting of the Alternate work immediately. Once the permit has
been issued ROC shall enter into a separate contracUChange order to construct the Alternate
work for a reasonable price, to be negotiated in accordance with the contract.
Cost to connect to existing sanitary sewer system, to be negotiated.
If you have any questions, please feel free to contact me at (954) 566~3885.
We look forward to working with you and having this project completed in a timely manner.
Sincerely,
Recreational Design & Construction, Inc.
Joseph C. Cerrone, III
President
O:\BIOSIBI08 20101Bid 939-10 Murray Paf1( Community PoolIOWNER CONTRACT OOCUMENTS\(2013-03-20) REV EXHIBIT BIMurray Paf1( REVISED-Exhibit.B 3.20.13.rtf
cc; Steven P. Kulick: Purchasing Manager
Steven Alexander: ALEXANDER GLOBAL COMMUNICATIONS
Murray Park Community Pool RFP No. SM-PW201 0-1 0 -Page 6 of 6
N,~ ~(l(li~s, :r.&r.$1!"~.p,:>~". ~;"f~l.::ti=, 0: ~!e:::~r:;.""c revi~fo."!1 cf ,jI1'W ]:'Cr~iohs :]/th~~ Qfl'JWi"9::
in ... ·;,01::: Q> in p-l1lt m.~ be T1'Z:>.dc wf~~;d f1,c e;(_o<::.\~ ",,;ttell p<:n .. ;~1i<:H"> of Z:'M,~, j..,c.
~; ~~~i;:~;:~ ~;~~o~"~1.~~<1~ the pmp~t:, ~f ?);<;!.".)\'l;:!J f(lr:.
Women's Restroom I Changing
Men's Restroom I Changing
Family I Changing
Ticketing Office
Concessions
Pool Equipment
Electrical
Concrete Pool Deck
Ent:y Area
Recreational Pool
Picnic Area
ADA Bi-Level Drinking Fountains
Landscaping
Signage
Stabilized Walkway
Concrete Sidewalk
Splash Deck area
Pool Equipment Yard
311 d.
264 s.f.
49 s.f.
215 s.f.
115 s.f.
148 sJ.
40sJ
+/-6,200 s.f.
3,500 s.f.
1,11051
Additional restrooms fixt(Jres have been included
in the design to meet the Department of Health
requirements for the future construction of a Splash
Deck
Z Y 5 C 0 V I CHI r~ ~~;~e::l[ONAL
ARC HIT E C T 5 ~ CONSTRUCTION, INC.
RESOLUTION NO. §)-lJ-IJJl80
A Resolution authorizing the City Manager to execute a design build contract
with Recreational Design & Construction, Inc. for the design and construction of
the proposed Murray Park Community Pool.
WHEREAS, the City has secured a CDSG grant in the amount of $1,207,374.00 for construction
and a SNP grant of $220,050.00 for construction but of which 17% may be used for design. The SNP
grant will expire as of March 31, 2013 and the CDBG grant expired on December 31, 2012; however,
pursuant to an agreement between Miami-Dade County and the City, Miami-Dade County has agreed
to extend the grants for a period of six months to June 30, 2013; and,
WHEREAS, the City received two proposals in response to an RFP from design build companies
for the design and construction of the pool; and,
WHEREAS, the City previously selected OJ Pompeo Construction Corporation for their design
concept however during negotiations, the contractor withdrew from the project; and,
WHEREAS, the City, pursuant to Florida Statute 287.55, (5) Competitive Negotiation, section (b),
the City began negotiations with the second most qualified firm, Recreational Design & Construction,
Inc.; and,
WHEREAS, Recreational Design & Construction, Inc. proposed a contract price of $1,422,000,
which includes $137,400 for design and pre-construction costs; and,
NOW THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF
SOUTH MIAMI, FLORIDA:
Section 1. The City Manger is hereby directed and authorized to negotiate and execute a design
build contract with Recreational Design & Construction, Inc., for the design and construction of the
proposed Murray Park Community Pool that is substantially similar to the contract that is attached. The
approval of this resolution is with the understanding that the operation and maintenance costs to the
City and the CRA shall not exceed $50,000, to be adjusted annually by the Consumer Price Index, and
that the pool shall not be open for more than ten (10) weeks, unless non-ad valorem funding can be
found.
Section 2. The funding for the Murray Park Community Pool Project is detailed below:
Total r Current I
Source Fundin~ Construction i Design Expended Balance . -._---... ---------"-----_ .
CDBG $1,207,374 ?1,207,374 0 $6,013 $1,201,361
SNP $220,050 $182,642 $37,409 $0 $220,050
SMCRA $100,000 a $100,000 $0 $100,000
$1,527,424 $1,390,016 $131,409 $6,013 i $1,521,411 ,
P8ge 1 01'2
Res. No. 62-13-13880
Section 3. Severability: If any section, clause, sentence, or phrase of this resolution is for any
reason held invalid or unconstitutional by a court of competent jurisdiction, this holding shall not affect
the validity of the remaining portions of this resolution.
Section 3. Effective Date: This resolution shall take effect immediately upon enactment.
PASSED AND APPROVED this 19th day of March, 2013.
ATIEST:
CFrY CLERK
Page 2 of2
APPROVED:
COMMISSION VOTE:
Mayor Stoddard:
Vice Mayor Liebman:
Commissioner Harris:
Commissioner Newman:
Commissioner Welsh:
4-1
Yea
Yea
Yea
Nay
Yea
To:
From:
Date:
SUbject:
Background:
CITY OF SOUTH MIAMI
OFFICE OF THE CITY MANAGER
INTER-OFFICE MEMORANDUM
The Honorable Mayor & Members of the City Commission
Steven Alexander, City Manager
March 5. 20 I 3
South Miami
b:tr:d
i'flir
2001
A Resolution authorizing the City Manager to execute a design
build contract with Recreational Design & Construction, Inc. for
the design and construction of the proposed Murray Park
Community Pool.
The City received two proposals in response to our Design Build RFP No. SM-
PW 20 I 0-1 0, which closed September 17. 20 I O. On April 17, 2012. the
Commission approved the selection of Di Pompeo Construction Corporation and
authorized the City Manager to negotiate a design build contract for the Murray
Park Community Pool. However. during December 2012, Di Pompeo withdrew
from the project.
Pursuant to Florida Statute 287.55. (9) Competitive Negotiation, section (5) (b),
the City began negotiations with the second most qualified firm. Recreational
Design & Construction. Inc.
Recreational Design & Construction (ROC) submitted a one pool concept that
includes a 3,SOOsf recreational pool with lap and teaching areas and a 1,IOOsf
splash deck. Design concept drawings and design elements are included with this
package. Estimated project cost is $1,422.000 which includes $137,400 for design
and pre-construction services. Below is a summary of the available grant funding
and expenses to date:
Source
CDSG
SNP
SMCRA
F~~~f~-~.-._ co~struction r~·.~~J~~-T~~pended·f ~~j;~:~1
$1,207,374 $1!207,~741 __ 0 ;_~~6,013l-···I£i~.!'.~!.J
$220,050 $182,642 i $37,409! SO i S220,050 1
$io6~6oo !_·o 1 $100,000 i-soT $100,000 I $l,~27~~~~J ... $11390Io16t$i37,4091$6IQ!~J ...... $1,521,411 I
Time is of the essence as it is unlikely Miami-Dade County will extend the grants
beyond the June 30, 2013 six month extension without substantial progress
completed and verified. In accordance with the most recent grant extension from
Miami-Dade County, the City must accomplish the following milestones:
Attachments:
• The construction plans must be completed and approved and the pool
must be under contract by April. 2013; and
.. A Notice to Proceed must be issued and the pool must be under
construction by June 30. 2013.
Therefore it is recommended, Recreational Design & Construction Inc·s. pool
design be approved and accepted without any major changes or revisions. It is
estimated detailed design drawings will take a minimum of 30 days to complete.
Changes or modifications to the design will extend that timeframe. Once design
drawings are completed. permitting and construction to securing a TCO is
expected to take approximately one (I) year from a Notice to Proceed.
Lastly. please find attached a Murray Park Community Pool Estimated Cost
Breakdown which provides details relating to funding and the additional expenses
required to design and construct the community pool.
Note: Contingency is not included within the Design Build Contract and
no General Fund or Special Revenue Fund dollars have been allocated
in FY 2013 to cover any Community Pool Design or Construction
overages. It is critical to understand, the City will be exhausting all
CDBG and CRA funds with the expense of the ROC Design Build
Contract and the additional expenses required not included within the
Design Build Contract. The water and sewer improvements which will
be occurring on the City's right-of-way (ROW) will be funded using the
City's General Obligation Bond (GOB) allocation. Any unforeseen
additional expenses will be required to be funded by the City's General
Fund or possibly funds from one of the City's Special Revenue funds or
CRA.
Resolution
Murray Park Community Pool Estimated Cost Breakdown
Miami-Dade County Grant Extension Letter. dated February 28, 2013
AlA Design Build Contract, including Exhibit M "Design Elements"
Pool Design Concepts and Drawings
Funding Balance
MURRAY PARK COMMUNITY POOL
ESTIMATED COST BREAKDOWN
Description
RDC Design Build Contract Amount
$1,521,411
Expense Amount
1,422,000
Estimated Expenses Funded by the CDBG &: CRA That Are NOT Included in the
Design Build Contract of $1 ,422,000
Current topography, boundary and elevation surveys
Gas line extension by Florida Gas
General Improvements Surrounding the Facility
DERM & Fire Department Permit Fees
FPL Connection Fee
Florida Department of Health Permit Fee
Site Furnishings
Office Supplies
Concession Stand Equipment
Additional Signage
Miami-Dade County Water & Sewer Impact Fees
Total Cost NOT Included in the Design Build Contract
Net Balance of COBG Be eRA Funds Be Expenses
Funds Available From GOB
WASD Permit Fee
Connection of the Existing Sanitary Sewer Lines on ROW
ROW Water Be Sewer Expenses (funded By GOB)
Total Estimated Project Cost
8,000
5,000
10,000
1,500
2,000
2,000
13,011
1,000
10,000
5,000
41,900
99.411
o
4,500
135,600
_~~~~C'~h" ___ ~ ___ ~'>4"'.
140,100
1,661,511
* Contingency is not included within the DeSign Build Contract and no General Fund or
Special Revenue Fund dollars have been allocated in FY 2013 to cover any Community Pool
Design or Construction overages.